GEORGIA PRIMARY HEALTH CARE DEVELOPMENT PROJECT
UPDATED PROCUREMENT PLANAs of October, 2004
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
1 PHC Rehabilitation (180 sites) + PHC Lab Refurbishment (5 laboratories)
1.1 PHC Rehab. D&S Local TA TA CQ 14 1 $425 $60
Jan. 2005
1. Feb. 20052. Feb. 20053. Mar.20054. Mar. 2005
Apr.2005
1.2PHC Rehabilitation (180 sites) + PHC Lab Refurbishment (5 laboratories)
CW NCB 15 $8,041 Apr. 2005
1. Apr.20052. May 20053. May20054. Jun 2005
Oct. 2005
1.3PHC Medical Equipment (180 sites) + PHC Lab Equipment (5 laboratories)
G ICB 2 (yr.2 and 3) $2,759 Mar.
2005
1. Apr 20052. Mar 20053. May 20054. May 2005
Oct.2005
1.4PHC Office Equipment (180
sites) +Lab Office Equipment (5 sites)
G ICB 2 (yr.1 and 3) $427 Mar.
2005
1. Apr 20052. Mar 20053. May 20054. May 2005
Oct.2005
1.5 PHC Office Furniture (180 sites) + PHC Lab Office Furniture (5sites) G ICB 5 $1,129 Mar.
2005
1. Apr 20052. Mar 20053. May 20054. May 2005
Oct.2005
1.6 PHC Medical Furniture G NCB 2 $433 Mar. 2005
1. Apr 20052. Mar 20053. May 20054. May 2005
Oct.2005
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
1.7 PHC IT Equipment G IS 2 $56 Mar. 2005
1. Apr 20052. Mar 20053. May 20054. May 2005
Oct.2005
1.8 PHC Vehicles G ICB 1 $194 Pending design of the referral system
1.10Combine with #1.11
Master Plan for laboratories Foreign TA TA $53
Pending to the PHC Master Plan
1.11 Master Plan for laboratories Local TA TA $13
1.12 Development of equipment lists Local TA TA IC 1 $2
1.113PHC Lab. Design and Supervision Local TA TA CQ 1 $17
1.14 PHC Radio Communication feasibility study Local TA TA IC 1 $2
1.15 PHC Radio Communication Equipment G ICB 1 $311 Pending design of the
referral system
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
1.16Combined w# 1.16 – 1.17
PHC Master Plan Foreign TA TA QCBS $ 700
?In progress. 11.16 PHC Master Plan Local TA TA
1.17 Rapid Mini-Master Plan Local TA TA IC 1
1.18combine # 1.19 – 1.20
PHC Staff Training Program Foreign TA TA $215
Oct. 2004
1. Nov. 20042. Dec.20043. Dec.20044. Jan. 2005
1.19 PHC Staff Training Program Local TA TA $22
1.20 PHC Staff Training Program Training Courses TA $644
1.21 Legal Framework for PHC /GP/FM Foreign TA TA 1 $53
1.22 Legal Framework for PHC /GP/FM Local TA TA 1 $44
1.23 Legal Framework - Conferences, Staff training and workshops TR 3 $82
1 Regional Master Plans for Imreti and Adjara regions to be delivered in January.
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
1.24 Legal Framework - Study Tours, TR
10 $32
1.25 Legal Framework - Specialized Local TA
TA SS 1 $10
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
2. Kutaisi Perinatal Center Rehab & Equipment
2.1Technical Assessment of Perinatal Referral Pilot in Eastern Georgia
Foreign TATA IC 1 $27 Completed
2.2 Kutaisi Rehab. D&S Local TA TA CQ 1 $23 Oct. 2004
1. Nov. 20042. Dec. 20053. Jan. 20054. Feb. 2005
2.3 Kutaisi Hospital Perinatal Rehab CW NCB 1 $367 Feb. 2005
1. Feb 20052. Mar.20053. Mar 20054. Apr 2005
Oct.2005
2.4 Kutaisi Referral Pilot Medical Equipment G ICB 1 $115 Mar.
2005
1. Apr 20052. Mar 20053. May 20054. May 2005
Oct.2005
2.5 Kutaisi Referral Pilot Medical Furniture G NCB 1 $86 Mar.
2005
1. Apr 20052. Mar 20053. May 20054. May 2005
Oct.2005
2.6 Kutaisi Referral Pilot Office Equipment G IS 2 $58 Mar.
2005
1. Apr 20052. Mar 20053. May 20054. May 2005
Oct.2005
2.7 Kutaisi Referral Pilot Office Furniture G
NS 2 $61
Mar. 2005
1. Apr 20052. Mar 20053. May 20054. May 2005
Oct.2005
2.8Training of Kutaisi Perinatal Center Staff TR Othe
r 2 $31 TBD 2
2.9 Training of PHC Teams TR Other 3 $49
2 Design of the Perinatal Referral system from PHC all way to the Perinatal Center is missing Before staff training the FTA for the curriculum development has to be procured ( not included in the original procurement plan)
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
3.0 Rehabilitation of the RFMTC
3.1 RFMTC - Arch. Design and Supervision TA CQ 1
$45 Oct. 2004
1. Nov.20042. Dec.20043. Jan.20054. Jan 2005
Feb 2005
3.2 FM Training Centre Rehabilitation (5 centres)
CW NCB 2 $738 Feb.2005
1. Mar 20052. Mar 20053. Apr 20054. Apr 2005
Aug.2005
3.3RFMTC Office Equipment
G ICB 1 $171 Feb.2005
1. Mar 20052. Mar 20053. Apr 20054. Apr 2005
Aug.2005
3.4RFMTC Medical and Laboratory Equipment G IS 2 Feb.2005
1. Mar 20052. Mar 20053. Apr 20054. Apr 2005
Aug.2005
3.5RFMTC Training Equipment
G IS 2 Feb.2005
1. Mar 20052. Mar 20053. Apr 20054. Apr 2005
Aug.2005
3.6RFMTC Office Furniture (Phases 1 and 2) G NS 2 Feb.2005
1. Mar 20052. Mar 20053. Apr 20054. Apr 2005
Aug.2005
3.7 RFMTC Training Materials GIS
NS DC
1 Several TBD Several TBD
Aug 2005
3.8 RFMTC Office & IT Equipment G IS 3 $ 102 Dec. 2004
1. Dec 20042. Nov 20043. Dec 20044. Dec 2004
Aug.2005
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
4. Family Medicine Faculty
4.1 Arch design and supervison TA CD 1 $ 45 Oct. 2004
1. Nov,20042. Dec.20043. Dec.20044. Jan.
2005
Feb. 2005
4.2FM Faculty Refurbishment C
WNCB 1 $58
3 Feb.2005
1. Feb. 20052. Mar 20053. Apr 20054. Apr 2005
June.2005
4.3
FMF Office and IT Equipment G IS 3 Oct.2004
1. Nov. 2004
2. Dec. 2004
3. Jan. 20054. Jan. 2005
June.2005
4.4FMF Office Furniture
G NS 1 Oct.2004
1. Nov. 2004
2. Dec. 2004
3. Jan. 20054. Jan. 2005
June.2005
4.5FMF Medical Furniture
G NS 2 Oct.2004
1. Nov. 2004
2. Dec. 2004
3. Jan. 20054. Jan. 2005
June.2005
4.6FMF Medical Equipment
G IS 3 Oct.2004
1. Nov. 2004
2. Dec. 2004
3. Jan. 20054. Jan. 2005
June.2005
4.7FMF Training Equipment G IS 1 Oct.2004
1. Nov. 2004
2. Dec. 2004
3. Jan. 20054. Jan. 2005
June.2005
4.8 FMF Training Materials GIS
NSDC
1 Several
TBD Several TBD
$40$30$16
Oct.2004
1. Nov. 2004
2. Dec. 2004
3. Jan. 20054. Jan. 2005
June.2005
4.9combine # 4.10
FMF business plan Foreign TA TA CQ 1 $ 80 Nov.
2004
1. Nov.20042. Dec.20043. Dec.20044. Jan 2005
Feb 2005
4.10 FMF Business Plan Local TA TA
$12 Nov. 2004
5. Nov.20046. Dec.20047. Dec.20048. Jan 2005
Feb 2005
4.11FMF Planning
/Curriculum study tours and workshops
TR $58
TBDSubject to DFID/OPM involvement
4.12 FM Residency Program Curriculum Foreign TA TA $15
9
4.13 FM Residency Program Curriculum Local TA TA $10
4.14 Health Mgt. Residency Program Foreign TA TA $80
4.15 Health Mgt. Residency Program Local TA TA $15
4.16combin
Education Reform Policy
TA IC $ 26 5. Oct 20046. Nov. Feb
e# 4.17
Recommendations Foreign Ta 2004 2005 In Progress
4.17
Education Reform Policy Recommendations Local TA
TA IC $ 47. Oct 20048. Nov.
2004
Feb 2005 In Progress
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
5. CMSI office refurbishment
5.1CMIS Office Rehab. Design &Supervision Local TA
TACQ 1
$5
5.2CMIS Office Refurbishment C
W MW 1 $84 Pending to the
decision Of the HMIS location
5.3CMSI System Software Development G ICB 1
5.4CMSI IT Equipment
G ICB 1
5.5CMSI Office Furniture
G NS 1
5.6SMSI Office Equipment
G IS 2
5.7CMSI Statist. Forms/Materials
G NS Several TBD
5.8Define Information Needs and
Procedures Foreign TA
TA 1 $159
5.9Define Information Needs and
Procedures Local TA
TA 1 $10
5.10 CMIS Staff Training Seminars and Workshops TR Several TBD $42
5.11 CMIS Local Field Trips TR Several TBD $21
5.12 CMIS Study Tours TR 8 $50
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
6. Health Policy Unit Refurbishment
6.1 HPU design and Supervision Local TA TA CQ 1 $4 Completed
6.2 Health Policy Unit Refurbishment CW MW 1 $70 Sep 2004
1. Oct. 20042. Nov.
20043. Nov.
20054. Nov.
2005
Feb 2005
In progress
6.3Health Policy Unit IT Equipment
G IS 1 $ 44 Oct.2004
1. Nov. 2004
2. Nov. 2004
3. Dec. 2005
4. Jan. 2005
Feb 2005
6.4 Health Policy Unit Office Equipment G IS 1 $
39 Oct.2004
1. Nov. 2004
2. Nov. 2004
3. Dec. 2005
4. Jan. 2005
Feb 2005
6.5
Health Policy Unit Office Furniture
G
NS 1 $ 22
Oct.2004
1. Nov. 2004
2. Nov. 2004
3. Dec. 2005
4. Jan. 2005
Feb 2005
6.6
Health Policy Unit Documents and Materials
G
NS DC
Several TBD
$29
Oct.2004
1. Nov. 2004
2. Nov. 2004
3. Dec. 2005
4. Jan. 2005
Feb 2005
6.7HPU Local Staff (4 full time persons for life of project)
including eligible social charges TA IC 4 $54
9
Oct. 2004
1. Nov 20042. Nov 20043. Dec 20044. Jan 2005
June 2007
6.8
Development of Health Policy Unit Foreign TA
( includes estab. of HPU, baseline studies, , surveys and pharmaceutical policy
development)
TA 1
$585
TBD
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
6.9 Development of Health Policy Unit Local TA TA 1 completed
6.10 HPU Staff Training - Workshops TR 12$ 65
Jan 2005 June 2007
6.11 HPU Staff Leadership Training (2 advanced specialist degrees) TR 2
$ 79Feb 2005
6.12 HPU Study Tours TR 12$ 64
Apr 2005 Study tour in Kirgyz Republic
6.13 Survey Teams Training TR 1$ 32
T BD
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
7. HSPIC Rehabilitation
7.1Project Implementation Center Refurbishment C
W MW 2 $112 COMPLETED
7.2 HSPIC Office Equipment G IS $67 COMPLETED
7.3 HSPIC Office Furniture GNS $34
COMPLETED
Des
crip
tion
Type
Proc
. M
etho
d
Prop
osed
N
umbe
r of
Pack
ages
Estim
ated
Tot
al
Cos
t (U
S$00
0)
BD
/RFP
Pr
ep
Bid
/CP
1. I
nvite
2
. Ope
ning
3.
Eva
l &re
com
m
for a
war
d
4. s
igni
ng
Con
trac
t C
ompl
etio
n
Stat
us
3.0 Communication Strategy
3.1combine # 3.2 – 3.8
CIES Communications Strategy Development Foreign TA TA 1 $80 3
3.2 CIES Communications Strategy Development Local TA TA 1 $25
3 Subject to the DFID/OPM IEC activities
3.3 IEC Campaign - Production/distrib. Of campaign materials Local TA TA 1 $170
3.4 IEC Campaign - Rapid Public Opinion Surveys Foreign TA TA 1 $27
3.5 Radio and TV Spots TA Several $355
3.6 Rapid Public Opinion Surveys Local TA + Interviewers TA
2 $133
3.7 IEC Campaign - Workshops and Seminars TR
Several TBD $98
3.8 Rapid Public Opinion Surveys Local TA TA 1$27
Subtotal #3.1 – 3.8
QCBS
1$888