FLATBED UNLOADING PROCESSSOLMAX MATERIALS CAN BE DELIVERED VIA FLATBED TRUCKS. THIS DOCUMENT PROPOSES GUIDELINES FOR UNLOADING TO PREVENT STAFF INJURIES AND DAMAGES TO THE MATERIALS TO BE INSTALLED.
- Find a secure area to unload the material.- Start at the top of the pyramid to unload.
* Loading con�iguration can vary accordong to product and truck type.
1. SECURING THE PERIMETER
- Forklift- Front-end loader- Backhoe- Excavator
- Refer to Solmax's Sling Procedures document for selection of proper unloading equipment;
- All rigging and shackles should be inspected, be in good working order, and carry a valid test certi�icate.
2. CHOOSING THE RIGHT EQUIPMENT
SOLMAX.COM CANADA - MALAYSIA - CHILE - USA - CHINA - SOUTH AFRICA - FRANCE - INDIA
Rev
02.1
6
- Move the roll to the desired location.
4. LINER
3. STARTING TO UNLOAD
SOLMAX.COM CANADA - MALAYSIA - CHILE - USA - CHINA - SOUTH AFRICA - FRANCE - INDIA
- Grab the loose sling attached to the roll from the top and attach to equipment;
- Make sure the slings are securely tied to the equipment you are using; - Lift slowly until the roll is high enough to move away from �latbed trailer.
5. PILING THE ROLLSPE SMOOTH: 4 rolls high (max)PE TEXTURED: 3 rolls high (max)