Post on 06-Mar-2016
description
BRISBANE GIRLS GRAMMAR SCHOOL-Simple Facade-Complex Moire Effects
ST. ANDREWS BEACH HOUSE
-Copper-Frame+Panel-Structure-Connection
time Machinearchitecture design studio: air final projectCATERINA RUSSILDI, miao xue, xiaoyan wang, wenye zhu
patter
nfo
rm
presidents
BASIC
FRAM
E
SERIES
ROT
ATIO
N
MOVE
loft
MIRR
OR
TRIM
ADDITION
ART
ZOO
environment
event
cultureRAIL 7%
SEA 5%
ROAD 88%
FREIGHT TRANSPORTATION FREIGHT FLOWS
GEELONG TO MELB2026889 TONNES
MELB TO GEELONG1879023 TONNES
VEHICLE TYPE
LIGHT63720
HEAVY7854
EMPLOYMENT LOCATION
OTHER
OUTSIDE WYNDHAM
INSIDE WYNDHAM
Wyndham is in need of a display that will reflect this as well as their ideal of change, progress and prosperity. Our propos-al successfully envelops all these concepts of movement in space and time in a provocative playfulness where light and form combine to illustrate the city’s intention. By creating a tunnel, a fantastic change of perspective will be brought out. As the cars enter the city, the tunnel works as a vortex that will create the illusion of fast-paced change and the patterns created by the perforated surfaces and light will further ac-centuate the city’s view of the future. Our proposal creates and reflects this investment in tomorrow’s city, enhancing the surrounding environment and turning a regular freeway into an eye-catching monument, a symbol of the city and its pro-gressive identity. The ‘Time Machine’ will indeed become a part of Wyndham, conveying its desire of moving forward in time and becoming a new and pioneering entity.
DESIGN NARRATIVES & concept
PRINCES FREEWAY
SITE PLAN 1:500
FIRST LAYER AND STRUCTURE
PANEL DETAIL
OUTSIDE LAYER AND STRUCTURE
PANEL DETAILFO
UNDA
TION
JO
INT
FRAM
E-PA
NEL
JOIN
TPA
NEL
JOIN
T
WEST ELEVATION 1:200
EAST ELEVATION 1:200
SOUTH ELEVATION 1:200
NORTH ELEVATION 1:200
SECTION 1:200
NIGHTT VIEWS
Panels:Measurements: 2.5x2.5x.1 mMaterial: copperInstallation: they will be held together by a clasp sys-tem set up on the frames where nails perforate the panel and will be hung from horizontal frames.Panels will be cut to adapt to tunnel structure
Frames:Material: stainless steelInstallation: each individual frame will be con-nected to the others by a long horizontal frame on top, from which panels will be able to hang as well.Frames will be anchored to the ground by means of a foundation held on a concrete footing.
EAST ELEVATION 1:200
WEST ELEVATION 1:200 SECTION 1:500
SOUTH ELEVATION 1:500
NORTH ELEVATION 1:500