FEMA-1505-DR San Simeon Earthquake Santa Barbara County Dave Rickard.

Post on 13-Jan-2016

214 views 0 download

Tags:

Transcript of FEMA-1505-DR San Simeon Earthquake Santa Barbara County Dave Rickard.

FEMA-1505-DRFEMA-1505-DRSan Simeon EarthquakeSan Simeon Earthquake

Santa Barbara CountySanta Barbara County

Dave Rickard Dave Rickard

Inspection Team Inspection Team

Building “C” Superior Court Building “C” Superior Court

Building “C” Superior CourtBuilding “C” Superior Court

Typical Concrete Sidewalk DamageTypical Concrete Sidewalk Damage

Building “B” ExampleBuilding “B” Example

Cracking

Cracking

Cracking

Building “G” Main CourthouseBuilding “G” Main Courthouse

CrackingCracking

Cracking

Building “G” South Wall Building “G” South Wall

Concrete Damage

Cracking

Building “G” Basement Floor Building “G” Basement Floor

1/8” Crack

Crack

Crack

Building “G” Basement Floor Building “G” Basement Floor Cracking ExampleCracking Example

1/8” open cracking 15 LF in File Room

Building “G” Jail Holding SpotBuilding “G” Jail Holding Spot

Sceam Cracking

Building “G” Basement Cont’ Building “G” Basement Cont’ ExampleExample

Wall Cracking

Entire Length of

Wall

Building “G” Jail Area Typical Building “G” Jail Area Typical Cracking – Patch and Paint Cracking – Patch and Paint

Crack

Planter in front of Courthouse Planter in front of Courthouse

Quake punched out concrete and broke paint

Laguna Sanitation Wastewater Laguna Sanitation Wastewater Treatment Plant Treatment Plant

Repairs to fiberglass baffles

Repairs to primary digester and feed piping

County Insurance – Self InsuredCounty Insurance – Self Insured

The County's deductible for Earthquake The County's deductible for Earthquake [EQ] coverage is 5% of the total values [EQ] coverage is 5% of the total values per "Unit" per occurrence subject to a per "Unit" per occurrence subject to a $500,000 minimum.  A "Unit" is defined $500,000 minimum.  A "Unit" is defined as a separate building, contents within a as a separate building, contents within a separate building, property in the open separate building, property in the open (yard), or time element coverage at a (yard), or time element coverage at a separate building.separate building.

List of Projects & Dollar AmountList of Projects & Dollar Amount

Laguna Sanitation Wastewater Treatment Plant $50,000Laguna Sanitation Wastewater Treatment Plant $50,000 Public Defender Build. Interior Bathrooms and Exterior Public Defender Build. Interior Bathrooms and Exterior

Cracking $30,000Cracking $30,000 Court House “Facility G” Exterior and Interior $125,000Court House “Facility G” Exterior and Interior $125,000 Building “B” 312 Cook St Exterior Cracking = $5,000Building “B” 312 Cook St Exterior Cracking = $5,000 Sidewalks and Planter repairs – $5,000Sidewalks and Planter repairs – $5,000 Juvenile Hall (SB) = $20,000Juvenile Hall (SB) = $20,000 HMGP Grant Request = Retrofit All Courthouses to HMGP Grant Request = Retrofit All Courthouses to

Required Codes and Standards = $4,000,000Required Codes and Standards = $4,000,000 Total Requested – Public Assistance = $235,000Total Requested – Public Assistance = $235,000

– Hazard Mitigation Proposal = $4,000,000Hazard Mitigation Proposal = $4,000,000

Any QuestionsAny Questions

“Here’s Your $4 Million”

Santa Barbara

“Burp”