Features Budget TimePeople Features Budget Time (constant) People.

Post on 17-Dec-2015

216 views 1 download

Tags:

Transcript of Features Budget TimePeople Features Budget Time (constant) People.

Product owner

Scrum Master Developers Testers

Managers

As a user role I want to goal so I can reason

Product owner

BacklogBacklog

Highest priority Lowest priority

Product owner

BacklogBacklog

1 8 10 2 5 10 10 5

Highest priority Lowest priority

Developers

BacklogBacklog

Sprint 1 Sprint 2 Sprint 3 Sprint 4 Sprint 5

Release ARelease A Release BRelease B

1 8 10 2 5 10 10 5

Product owner

Developers

Capacity 10 15 108 20

Highest priority Lowest priority

Task Duration

Task 1 1d

Task 2 1d

Task 3 3d

Task Duration

Analyze 2d

Design 0.5d

Test 1d

Integration 3d

Sprint 1 (Goal)

Developers

Sprint 1

Task Duration

Jan 1 Jan 2 Jan 1

Analyze 1d 0d

Design 1d 0d

Test 3d 2d 0d

Integration 2d 0d

Task Duration Jan4 Jan 5 Jan6

Analyze 2d 1d 0d

Design 0.5d 0.5d 0.5d 0d

Test 1d 0d

Integration 3d 2d 1d 0d

Developers

Anyone

Developed stories demoFeedback

What was goodWhat was wrongWhat can be better

Vote for the best ideas

Managers are responsible for ideas implementation

DevelopersManagement

Dusan Kocurekhttp://www.scrumdesk.com

2008