Fairbanks Areawide Industrial Fairbanks Areawide Industrial Reclamation ProjectReclamation Project
ADEC AREAWIDE ADEC AREAWIDE MANAGEMENT GOALSMANAGEMENT GOALS
Janice WiegersJanice WiegersADECADEC
Areawide vs. Site Specific Areawide vs. Site Specific ApproachApproach Sites viewed in
context with others, not individually
Data can be shared, eliminating redundancy
Co-mingling issues more easily resolved
Variability of scale allows new information to emerge
For ADECFor ADEC Map site locationsMap site locations Determine site status (open, closed, Determine site status (open, closed,
how much work is needed)how much work is needed) Identify preliminary data gapsIdentify preliminary data gaps Identify PRPsIdentify PRPs
Possibly involved in data collection, Possibly involved in data collection, investigation, coordination, cleanup investigation, coordination, cleanup if necessaryif necessary
Fairbanks AreawidesFairbanks Areawides
Common ADEC Common ADEC Requirements for All Requirements for All Responsible PartiesResponsible Parties
1)1) Delineate nature and extent (18 AAC Delineate nature and extent (18 AAC 75.335)75.335)
2)2) Evaluate risk to current and future land Evaluate risk to current and future land usersusers
3)3) Protection of current & future land users Protection of current & future land users through ICs through ICs
4)4) Cleanup and management plansCleanup and management plans5)5) Consistent and compatible reporting for Consistent and compatible reporting for
purposes of information disseminationpurposes of information dissemination
Proactive and solution orientedProactive and solution oriented
1) Delineate contamination1) Delineate contamination Identify Identify allall possible sources and COCs possible sources and COCs Identify conditions that could result in Identify conditions that could result in
ongoing releases (buried piping, tanks, ongoing releases (buried piping, tanks, abandoned injection wells, etc.)abandoned injection wells, etc.)
Delineate extent of contaminants in Delineate extent of contaminants in soil soil and and groundwater (on and off-groundwater (on and off-property)property)
Long-term monitoring necessary to Long-term monitoring necessary to
monitor groundwater qualitymonitor groundwater quality
FAIR Coordinated SamplingFAIR Coordinated Sampling
Spring Sampling – 3Spring Sampling – 3rdrd week in April week in April Fall Sampling – 3Fall Sampling – 3rdrd week in week in
SeptemberSeptember Common benchmark for groundwater Common benchmark for groundwater
elevationelevation
ProblemsProblems Shared groundwater data (EDDs)Shared groundwater data (EDDs) Shared reporting (currently handled Shared reporting (currently handled
by DEC)by DEC)
FAIR FAIR CoordinateCoordinated Sampling d Sampling GeneralGeneralResultsResults
Product present on every site
Dissolved Benzene/GRO at highest concentrations at southern end
DRO/RRO throughout area
Off-site delineation not complete
2) Evaluate Risk2) Evaluate Risk FAIR Risk Management Zones – FAIR Risk Management Zones –
Commercial/IndustrialCommercial/Industrial CSM needed for this areaCSM needed for this area
Hydrogeologic characteristicsHydrogeologic characteristics Contaminant location and transport characteristicsContaminant location and transport characteristics Possible Exposure PathwaysPossible Exposure Pathways
Are there risks to human health or the Are there risks to human health or the environment that need to be controlled or environment that need to be controlled or mitigated?mitigated? Wells or dewatering activities?Wells or dewatering activities? Indoor air quality problems?Indoor air quality problems?
Risks should be mitigated through Risks should be mitigated through cleanup or risk managementcleanup or risk management
FAIR Risk Management FAIR Risk Management PlanPlan
Risk Management ZonesRisk Management Zones
3) Cleanup and 3) Cleanup and Management PlanManagement Plan
What are the site-specific requirements?What are the site-specific requirements? Control riskControl risk Remove source/productRemove source/product Reduce the life of the plume and long-term Reduce the life of the plume and long-term
monitoring requirements (flexible)monitoring requirements (flexible) Compatible with the land owner needs?Compatible with the land owner needs? Schedule?Schedule?
Plan should balance cleanup and Plan should balance cleanup and management options with management options with expected site use and cost expected site use and cost
considerationsconsiderations
4) Institutional Controls4) Institutional Controls Necessary Necessary nownow – not later – not later Better long-term management of Better long-term management of
contamination is priority for DECcontamination is priority for DEC IC plan should be coordinated with IC plan should be coordinated with
RailroadRailroad RP will continue to be responsible when RP will continue to be responsible when
utilities or other parties encounter utilities or other parties encounter contaminationcontamination
Compliance review is necessaryCompliance review is necessary
If managed properly, contamination If managed properly, contamination shouldshould NOTNOT prevent property prevent property transactions or reusetransactions or reuse
Construction Projects: Balloon Tracks Minnie Street Connector Illinois Street Widening
5) Information 5) Information ManagementManagement Must be able to articulate useful Must be able to articulate useful
information to the public regarding information to the public regarding contaminated sitescontaminated sites In order to clarify potential liability In order to clarify potential liability
considerationsconsiderations Reduce economic impacts - adjacent Reduce economic impacts - adjacent
and future property and future property use/sale/developmentuse/sale/development
Must know extent of impacts Must know extent of impacts Plume mapsPlume maps Estimated areas of soil contaminationEstimated areas of soil contamination
SummarySummary DelineateDelineate CSM/Risk EvaluationCSM/Risk Evaluation IC PlanIC Plan Cleanup and Management PlanCleanup and Management Plan
Milestones Milestones ADEC send letter requesting CSM and explanationADEC send letter requesting CSM and explanation Need information on downgradient MSLUG wells Need information on downgradient MSLUG wells
(ADEC)(ADEC) Contaminated site map with addresses – provide Contaminated site map with addresses – provide
CIMMS website (ADEC)CIMMS website (ADEC) Workplan (provide schedule or work) – Workplan (provide schedule or work) – May 30May 30
Need entry permit from railroad for drilling or sampling on Need entry permit from railroad for drilling or sampling on railroad partyrailroad party
Need letter of consent from tenantsNeed letter of consent from tenants Off-site delineation (characterization)Off-site delineation (characterization) Preliminary CSM – Characterization reportPreliminary CSM – Characterization report
Wells, surface soil exposure, indoor air issues?Wells, surface soil exposure, indoor air issues? Groundwater sampling (third week April 2005)Groundwater sampling (third week April 2005)
Product sample from Chevron and Railroad Product sample from Chevron and Railroad Look into common lab – Look into common lab – Coordinate sampling protocol (document that this will Coordinate sampling protocol (document that this will
happen in the workplan)happen in the workplan) Share data for interpretation by each partyShare data for interpretation by each party
Janice – ADEC contactJanice – ADEC contact
FAIR – Solvents at North FAIR – Solvents at North End (HIDE) End (HIDE)