Facilities Services

Located at 491 Cecelia Road

across the Street from the old

Burnside School.

Introduction

Facilities Services is Responsible for;

Repair and Maintenance of all School District 61

• Buildings

• Grounds

• Equipment and Vehicles

• Custodial Services

• Facility Rentals

• Cartage and Mail Delivery

Minor Capital Summer Projects

• Campus View - Seismic and OSC Portable Move

– Move OSC Portable

– Extended Staff Parking Lot

– Paved play area at back of school

– Paved current pathway to Classroom Portables and OSC Unit

– Built Exterior Ramp

– Continue Seismic Upgrade Work

• Work at Richmond School for Braefoot Move

– Tec Package installations

– Office Installation, Classroom Upgrades

– Lighting Upgrades, Grounds Upgrades

Minor Capital Summer Projects Completed or

In Progress by SD Employees

• 16 New Classroom Conversions

– Tec Packages

– 2 Portables Converted to classrooms

– Computer labs converted to classrooms

– Music carts and shelving built

– Moving walls to provide larger classrooms

– Cubbies or metal lockers installed

– Staff rooms moved to accommodate classrooms

• Security Alarm Upgrades – various schools

• Telephone and PA upgrades – various schools

• Sportsfield Upgrading

– Northridge, Oak Bay

Minor Capital Summer Projects Completed or

In Progress by SD Employees

• Victor

– Renovations for Strong Start (bathroom and kitchen

installations)

– Hazmat remediation underway

– Renovate four classrooms for current student use

– Move students to Richmond and prepare rooms

• Roofing

– Victor, Hillcrest, Frank Hobbs and Cloverdale Portables

• Esquimalt Theatre – lights and painting

• Lambrick Park - Kitchen replacement

• Lighting Upgrades – various schools

• Quadra –irrigation, fencing and sod

• Quadra Warehouse – Renovations for Itinerant Staff

• HVAC, Painting, Flooring, Plumbing, Grounds Cleaned Up

Minor Capital Summer Projects Completed or

In Progress by SD Employees

• Vic West

– Playground re-surfacing

• Shop Upgrades

– Monterey and Spectrum

• Lansdowne

– Gym Floor Replacement

• Lambrick Park

– Gym Floor resurfacing

• Mt. Doug

– Phase 2 Window Replacement

– Unit Ventilator Replacement – 5 classrooms

• Tillicum

– Fire Alarm Upgrade

Minor Capital Summer Projects

Completed by Contractors

• Eagle View

– Inclusive Playground

• South Park

– Annex Slate Roof Replacement

– Annex Skylight Replacement

– Bike Shelter Roof Replacement

• Richmond

– Boiler Upgrade

– Unit Ventilator Installations

• Roof Replacements

– Macaulay, View Royal, Richmond

Minor Capital Summer Projects

Completed by Contractors

• Unit 1 at Frank Hobbs Complete

– $4.6M in Ministry Funding

– Site Prep Completed for Doncaster

– Builds to begin for Doncaster and Tillicum in November

Minor Capital Child Care Studios – Built by SD Employees

Braefoot

Vic High/S.J Willis

Cedar Hill

Shoreline

Seismic

SCHOOL DISTRICT 61 - SEISMIC PROGRAM

School Status

PLANNING - 7 Schools

Arbutus SPIR complete

Reynolds SPIR complete

Shoreline/Craigflower PDR underway

Lambrick Park SPIR complete

Cedar Hill PDR complete

Northridge SPRFS complete

Bank Street SPRFS complete

SCHOOL DISTRICT 61 - SEISMIC PROGRAM

School Status

Completion

Date

CONSTRUCTION –

4 Schools

Campus View Construction Underway 2020

Braefoot Construction Underway 2020

SJ Willis Renovations Construction Underway 2020

Vic High Design Underway 2022

COMPLETED –

16 Schools

South Park Completed 2004

Margaret Jenkins Completed 2008

Mount Doug Completed 2008

Monterey Completed 2009

Willows Completed 2010

James Bay Completed 2010

Central Completed 2011

Vic High Ph 1 Completed 2011

McKenzie Completed 2012

Lansdowne Completed 2013

Vic West Completed 2014

George Jay Completed 2015

Tillicum Completed 2015

Cloverdale Completed 2016

Quadra Completed 2016

Burnside Complete 2019