Environmental and Social Management Plan (ESMP)

These are the Abbreviated ESMP for Rehabilitation Works in lieu to the SPPL under the

GOI regulations for the first-year implementation subprojects.

19.1 DI Pamukkulu

Environmental and Social Management Plan

Mitigation and Monitoring Plan

Checklist for Construction and Rehabilitation Activities

PART 1: INSTITUTIONAL & ADMINISTRATIVE

Country Indonesia

Project title Strategic Irrigation Modernization And Urgent Rehabilitation Project (SIMURP)

Scope of project and activity

• Land preparation for the syphon, about 1500 m2. The land will be acquired through direct negotiation with 2 land owners.

• Mobilization of equipment, material, and labor. The small-scale of construction works will not create labor influx.

• Demolition of existing damage structure;

• Irrigation drainage rehabilitation.

• Sediment removal;

• Installation of the irrigation gate.

Institutional arrangements

(Name and contacts)

WB (Project Team Leader)

Jun

Matsumoto

Project Management

Dirrectorate of Irrigation and Low Land

Local Counterpart and/or Recipient

N/A

Implementation arrangements

(Name and contacts)

Safeguard Supervision

Virza S.

Sasmitawidjaja

Ninin K. Dewi

Local Counterpart Supervision

Dirrectorate of Irrigation and Low Land

Local Inspectorate Supervision

N/A

Contractor

N/A

SITE DESCRIPTION

Name of site DI Pamukkulu

Describe site location

DI Pamukkulu located on Takalar District, South Sulawesi Province. Pamukkulu irrigation scheme is under BBWS Pompengan Jeneberang.

Attachement 1: Site Map [✓]Y [ ] N

Who owns the land?

Government The land to be purchased for syphon construction owned by community

Geographic description

The site are located mostly in the village area. However some area are passing the urban area.

LEGISLATION

Identify national & local legislation & permits that apply to project activity

• Law No. 32 Year 2009 on Environmental Protection and Management • Government Regulation (PP) No. 27 Year 2012 on The Environmental Permit

• Ministry of Environment Regulation (Permen LH) No. 05 Year 2012 on Type of Activities Required EIA

• Ministry of Environment Regulation (Permen LH) No. 13 Year 2010 on Environmental Management Efforts and Environmental Monitoring Effort (EMME) and Statement Letter of Assurance for Implementation of Environmental management and Monitoring (SPPL)

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

2

• Ministry of Public Work Regulation No. 10/PRT/M/2008 on Type of Business Plan and/or Activities under Public Works that Required Environmental Management Efforts and Environmental Monitoring Efforts (EMME) document.

PUBLIC CONSULTATION Identify when / where the public consultation process took place

07 November 2017 at Hotel Grand Kalampa Takalar, South Sulawesi Province

INSTITUTIONAL CAPACITY BUILDING Will there be any capacity building?

[ ✓ ] N or [ ]Y if Yes, Attachment 2 includes the capacity building program

3

4

5

6

7

8

19.2 DI Jurang Batu

Environmental and Social Management Plan

Mitigation and Monitoring Plan

Checklist for Construction and Rehabilitation Activities

PART 1: INSTITUTIONAL & ADMINISTRATIVE

Country Indonesia

Project title Strategic Irrigation Modernization And Urgent Rehabilitation Project (SIMURP)

Scope of project and activity

• Mobilization of equipment, material and labor. The small-scale of construction works will not create labor influx.

• Demolition of existing damage structure;

• Irrigation drainage rehabilitation.

• Sediment removal;

• Installation of the irrigation gate.

Institutional arrangements

(Name and contacts)

WB (Project Team

Leader)

Jun Matsumoto

Project Management

Dirrectorate of Irrigation and Low Land

Local Counterpart and/or Recipient

N/A

Implementation arrangements

(Name and contacts)

Safeguard Supervision

Virza S.

Sasmitawidjaja

Ninin K. Dewi

Local Counterpart Supervision

Dirrectorate of Irrigation and Low Land

Local Inspectorate Supervision

N/A

Contractor

N/A

SITE DESCRIPTION

Name of site DI Jurang Batu

Describe site location

DI Jurang Batu located in Central Lombok District, West Nusa Tenggara Province. Jurang Batu irrigation scheme is under B/BWS Nusa Tenggara I

Attachement 1: Site Map [✓]Y [ ] N

Who owns the land?

Government

Geographic description

The site are located mostly in the village area. However some area are passing the urban area.

LEGISLATION

Identify national & local legislation & permits that apply to project activity

• Law No. 32 Year 2009 on Environmental Protection and Management • Government Regulation (PP) No. 27 Year 2012 on The Environmental Permit

• Ministry of Environment Regulation (Permen LH) No. 05 Year 2012 on Type of Activities Required EIA

• Ministry of Environment Regulation (Permen LH) No. 13 Year 2010 on Environmental Management Efforts and Environmental Monitoring Effort (EMME) and Statement Letter of Assurance for Implementation of Environmental management and Monitoring (SPPL)

• Ministry of Public Work Regulation No. 10/PRT/M/2008 on Type of Business Plan and/or Activities under Public Works that Required Environmental Management Efforts and Environmental Monitoring Efforts (EMME) document.

PUBLIC CONSULTATION Identify when / where the public consultation process took place

09 november 2017 at Hotel Dmax, Lombok, West Nusa Tenggara Province

9

INSTITUTIONAL CAPACITY BUILDING Will there be any capacity building?

[✓ ] N or [] Y if Yes, Attachment 2 includes the capacity building program

10

11

12

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

13

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

14

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

15

19.3 DI Talang

Environmental and Social Management Plan

Mitigation and Monitoring Plan

Checklist for Construction and Rehabilitation Activities

PART 1: INSTITUTIONAL & ADMINISTRATIVE

Country Indonesia

Project title Strategic Irrigation Modernization And Urgent Rehabilitation Project (SIMURP)

Scope of project and activity

• Mobilization of equipment, material and labor. The small-scale of construction works will not create labor influx.

• Demolition of existing damage structure;

• Irrigation drainage rehabilitation.

• Sediment removal;

• Installation of the irrigation gate.

Institutional arrangements

(Name and contacts)

WB (Project Team

Leader)

Jun Matsumoto

Project Management

Dirrectorate of Irrigation and Low Land

Local Counterpart and/or Recipient

N/A

Implementation arrangements

(Name and contacts)

Safeguard Supervision

Virza S.

Sasmitawidjaja

Ninin K. Dewi

Local Counterpart Supervision

Dirrectorate of Irrigation and Low Land

Local Inspectorate Supervision

N/A

Contractor

N/A

SITE DESCRIPTION

Name of site DI Talang

Describe site location

DI Talang located in Jember District, East Java Province. Talang irrigation scheme is under B/BWS Brantas.

Attachement 1: Site Map [✓]Y [ ] N

Who owns the land?

Government

Geographic description

The site are located mostly in the village area. However some area are passing the urban area.

LEGISLATION

Identify national & local legislation & permits that apply to project activity

• Law No. 32 Year 2009 on Environmental Protection and Management • Government Regulation (PP) No. 27 Year 2012 on The Environmental Permit

• Ministry of Environment Regulation (Permen LH) No. 05 Year 2012 on Type of Activities Required EIA

• Ministry of Environment Regulation (Permen LH) No. 13 Year 2010 on Environmental Management Efforts and Environmental Monitoring Effort (EMME) and Statement Letter of Assurance for Implementation of Environmental management and Monitoring (SPPL)

• Ministry of Public Work Regulation No. 10/PRT/M/2008 on Type of Business Plan and/or Activities under Public Works that Required Environmental Management Efforts and Environmental Monitoring Efforts (EMME) document.

PUBLIC CONSULTATION Identify when / where the public

09 november 2017 at Gedung PU Bina Marga, Jember, East Java

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

16

consultation process took place INSTITUTIONAL CAPACITY BUILDING Will there be any capacity building?

[ ✓ ] N or [ ]Y if Yes, Attachment 2 includes the capacity building program

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

17

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

18

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

19

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

20

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

21

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

22

19.4 DI Kedung Putri

Environmental and Social Management Plan

Mitigation and Monitoring Plan

Checklist for Construction and Rehabilitation Activities

PART 1: INSTITUTIONAL & ADMINISTRATIVE

Country Indonesia

Project title Strategic Irrigation Modernization And Urgent Rehabilitation Project (SIMURP)

Scope of project and activity

• Mobilization of equipment, material and labor. The small-scale of construction works will not create labor influx.

• Demolition of existing damage structure;

• Irrigation drainage rehabilitation.

• Sediment removal;

• Installation of the irrigation gate.

Institutional arrangements

(Name and contacts)

WB (Project Team

Leader)

Jun Matsumoto

Project Management

Dirrectorate of Irrigation and Low Land

Local Counterpart and/or Recipient

N/A

Implementation arrangements

(Name and contacts)

Safeguard Supervision

Virza S.

Sasmitawidjaja

Ninin K. Dewi

Local Counterpart Supervision

Dirrectorate of Irrigation and Low Land

Local Inspectorate Supervision

N/A

Contractor

N/A

SITE DESCRIPTION

Name of site DI Kedung Putri

Describe site location

DI Kedung Putri located on Purworejo District, Central Java Province. Kedung Putri Irrigation Scheme is under B/BWS Serayu Opak.

Attachment 1: Site Map [✓]Y [ ] N

Who owns the land?

Government

Geographic description

The site are located mostly in the village area. However some area are passing the urban area.

LEGISLATION

Identify national & local legislation & permits that apply to project activity

• Law No. 32 Year 2009 on Environmental Protection and Management • Government Regulation (PP) No. 27 Year 2012 on The Environmental Permit

• Ministry of Environment Regulation (Permen LH) No. 05 Year 2012 on Type of Activities Required EIA

• Ministry of Environment Regulation (Permen LH) No. 13 Year 2010 on Environmental Management Efforts and Environmental Monitoring Effort (EMME) and Statement Letter of Assurance for Implementation of Environmental management and Monitoring (SPPL)

• Ministry of Public Work Regulation No. 10/PRT/M/2008 on Type of Business Plan and/or Activities under Public Works that Required Environmental Management Efforts and Environmental Monitoring Efforts (EMME) document.

PUBLIC CONSULTATION Identify when / where the public

02 november 2017 at Hotel Sanjaya Inn, Purworejo, Central Java Province

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

23

consultation process took place INSTITUTIONAL CAPACITY BUILDING Will there be any capacity building?

[✓ ] N or [ ] Y if Yes, Attachment 2 includes the capacity building program

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

24

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

25

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

26

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

27

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

28

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

29

19.5 DI JATILUHUR

Environmental and Social Management Plan

Mitigation and Monitoring Plan

Checklist for Construction and Rehabilitation Activities

PART 1: INSTITUTIONAL & ADMINISTRATIVE

Country Indonesia

Project title Strategic Irrigation Modernization And Urgent Rehabilitation Project (SIMURP)

Scope of project and activity

• Mobilization of equipment, material and labor. The small-scale of construction works will not create labor influx.

• Demolition of existing damage structure;

• Irrigation drainage rehabilitation.

• Sediment removal;

• Installation of the irrigation gate.

Institutional arrangements

(Name and contacts)

WB (Project Team

Leader)

Jun Matsumoto

Project Management

Dirrectorate of Irrigation and Low Land

Local Counterpart and/or Recipient

N/A

Implementation arrangements

(Name and contacts)

Safeguard Supervision

Virza S.

Sasmitawidjaja

Ninin K. Dewi

Local Counterpart Supervision

Dirrectorate of Irrigation and Low Land

Local Inspectorate Supervision

N/A

Contractor

N/A

SITE DESCRIPTION

Name of site DI Jatiluhur (SS Macan and SS Pamanukan)

Describe site location

DI Jatiluhur (SS Macan and SS Pamanukan) located in Subang District, West Java Province. Jatiluhur irrigation scheme is under BBWS Citarum

Attachment 1: Site Map [✓]Y [ ] N

Who owns the land?

Government.

Geographic description

The site are located mostly in the village area. However some area are passing the urban area.

LEGISLATION

Identify national & local legislation & permits that apply to project activity

• Law No. 32 Year 2009 on Environmental Protection and Management • Government Regulation (PP) No. 27 Year 2012 on The Environmental Permit

• Ministry of Environment Regulation (Permen LH) No. 05 Year 2012 on Type of Activities Required EIA

• Ministry of Environment Regulation (Permen LH) No. 13 Year 2010 on Environmental Management Efforts and Environmental Monitoring Effort (EMME) and Statement Letter of Assurance for Implementation of Environmental management and Monitoring (SPPL)

• Ministry of Public Work Regulation No. 10/PRT/M/2008 on Type of Business Plan and/or Activities under Public Works that Required Environmental Management Efforts and Environmental Monitoring Efforts (EMME) document.

PUBLIC CONSULTATION

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

30

Identify when / where the public consultation process took place

31 Oktober 2017 at Hotel Lotus, Subang Regency, West Java Province

INSTITUTIONAL CAPACITY BUILDING Will there be any capacity building?

[ ✓ ] N or [ ] Y if Yes, Attachment 2 includes the capacity building program

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

31

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

32

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

33

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

34

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

35

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

36

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

37

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

38

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

39

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

40

Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)

41