Post on 14-Jul-2015
Developing the Hydrogeologic Conceptual Model
EnviroInsite Training Workshop
March 2013
Conceptual Model
Hydrogeologic Conceptual Model
• Boring Logs
• Strip Logs
• Create Section
CH
CH
CH
CH
LM0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
5
10
15
20
Dep
th (
fee
t)
SCIBH-101
CH
CH/CL
CH
LMCH
CL
LM 0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
5
10
15
Dep
th (
fee
t)
SCIBH-102
CH
LM
CL/CH
CL
CL/CH
CHLM 0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
5
10
15
20
Dep
th (
fee
t)
SCIBH-103
CH/CL
LM 0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
5
10
15
Dep
th (
fee
t)
SCIBH-104
CH/CL
LM 0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
5
10
15
20
Dep
th (
fee
t)
SCIBH-105
CH/CL
LM 0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
5
10
15
Dep
th (
fee
t)SCIBH-106
CH/CL
LM 0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
5
10
15
20
Dep
th (
fee
t)
SCIBH-107
CH/CL
0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
5
10
15
20
Dep
th (
fee
t)
SCIBH-108
CH/CL
LM 0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
5
10
15
Dep
th (
fee
t)
SCIBH-109
CH/CL
CL
LM 0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
5
10
15
Dep
th (
fee
t)
SCIBH-110
CH/CL
LM 0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
5
10Dep
th (
fee
t)
SCIBH-111
CH/CL0
4
Sample
1e+00
1e+04
PID Screening (ppm)0
Dep
th (
fee
t)
SCIBH-112
topsoilsand
silty sand
sand
clayey siltsand
clayey silt
sand
gravel
silty sandsand
clayey siltgravel
clayey siltclay and sand
clayey siltsandy silt
bedrock
810.00
800.00
790.00
780.00
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
670.00
660.00
650.00
640.00
630.00
620.00
610.00
600.00
BR-4
silty clayclay and sand
clayey siltsilty sand
silt
siltsand
till
sand
till
gravel
clayey silt
sandsiltsandsilt
bedrock
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
670.00
660.00
650.00
640.00
630.00
BR-5
topsoilsand
sand and gravelsand
silt
till
silty sandsand
gravelsandsiltsandsiltsand and gravelsiltsand and gravel
till
sand
till
bedrock
800.00
790.00
780.00
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
670.00
660.00
650.00
640.00
630.00
620.00
610.00
BR-6
silty clayclayey sand
sandy clayclayey siltsilty sand
siltsandsiltsand
till
sandsiltsandsiltsand
till
gravelsandsand
till
sandsilt
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
670.00
660.00
650.00
640.00
MW-45
topsoilsilty sandclayey siltsandclayey siltsilty sandgravelsandsilty sand
silt
sandsiltgravelsiltsandy siltsandsiltclayey silt
siltclayey siltsilty sand
silt
gravelclayey siltsandy silt
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
MW-46
silty claysand
silty sandsand
silty sand
silt
silty claysiltysilty clay
siltsilty clay
silt
silty claysilt
silty sandsiltsandy silt
siltsilty sand
gravelsilty sandclayey silt
800.00
790.00
780.00
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
MW-47
silty claysandsilty claysand
gravelsand
silt
silty clay
silt
silty sandclayey siltsilty sandsandy siltsilty sandsandsandy siltgraveltill
silttillsiltgravel
till
800.00
790.00
780.00
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
MW-48
topsoil
sand
silty claygravelsilty claysandclayey silttilltilltill
silt
sand
gravel
sand
tillgravel
till
810.00
800.00
790.00
780.00
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
670.00
660.00
650.00
640.00
630.00
MW-49
silty claysilty sandsandsand
clayey silt
sand
silt
clayey silt
sand
silty sand
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
670.00
660.00
650.00
MW-4-99
unknown
clay
silt
clay
siltclay sand and gravelclay
silt
claysilty clayclay and sandsiltclay sand and gravelsiltclay and sandclaysilty clay
sand and gravelclay and sand
silt
clay
clay sand and gravelbedrock
780.00
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
670.00
660.00
650.00
640.00
630.00
MW-50
topsoilsandy siltsilty claysiltsandy claysandy siltunknown
silty sandsilty sand and gravelsandy siltsilty sand and gravelsilty sand
clayey silt
clay
sandsilt
silty sandsandsiltsand and gravelsilty sandsiltclay
sand and gravelunknownsand and gravel
clay and sandunknown
sand and gravelclaysilt
clay sand and gravelsandclaysand
bedrock
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
670.00
660.00
650.00
640.00
630.00
MW-51
silty sandunknown
silty sandsand and gravel
silty sand
silty clay
silty claysand
silty clay
sand and gravelsilty clay
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
670.00
MW-52
topsoilsilty clayunknown
sandunknown
sandunknownsand
gravelsand
silty clay
till
unknownsandgravel
sandsilty gravelsand and gravel
sandtilltill
sand and gravelclay
bedrock
810.00
800.00
790.00
780.00
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
670.00
660.00
650.00
640.00
630.00
620.00
SB-BR-04
claysandsand
sand and gravel
silt
sandsand and gravel
silt
silty sandsandy clay and siltsilty claysilt
sandy siltsilty sandsiltsilt
silty sandsilt
sand and gravelsandsand and gravel
silt
clay and sandclaysilt
clay and sandsilty claybedrock
800.00
790.00
780.00
770.00
760.00
750.00
740.00
730.00
720.00
710.00
700.00
690.00
680.00
670.00
660.00
650.00
640.00
630.00
SB-BR-06
550
600
650
700
750
800
850
900
Ele
va
tio
n (
fee
t)
A A'BR-1
BR-1
RA
BR-2
BR-3
GM
X-1
GM
X-1
0
GM
X-1
1GM
X-1
2
GM
X-1
3
GM
X-1
4
GM
X-1
5
GM
X-1
6
GM
X-1
6R
GM
X-2
GM
X-3
GM
X-4
GM
X-7
GM
X-8
GM
X-9
HP-1
0C HP-1
1-5
HP-3
C
HP-4
-4HP-5
C
HP-6
-3
HP-7
C
HP-8
C
HP-9
C
MW
-1
MW
-10
MW
-11
MW
-12
MW
-14
MW
-26
MW
-27
MW
-28
MW
-33
MW
-34
MW
-35
MW
-36
MW
-37
MW
-38
MW
-3D
MW
-42
MW
-43
MW
-44
MW
-4D
MW
-5D
MW
-8D
MW
-9D
WW
-3
WW
-4
WW
-8
topsoil
peat
gravel
sand and gravel
sand
silty sand
sandy silt
silt
silty/sandy clay
clayey silt with sand
silty clay
sandy clay
clayey silt
clay
till
bedrock
unknown
clay and sand
clayey silt/silty clay
silty sand and gravel
Within 100 feet of sectionBorings
BR-1
BR-1
RA
BR-2
BR-3
EW-1 EW
-2
GM
-1
GM
X-1
GM
X-10
GM
X-11
GM
X-12
GM
X-13
GM
X-14
GM
X-15
GM
X-16
GM
X-16R
GM
X-2GM
X-3
GM
X-4
GM
X-7GM
X-8GM
X-9
HP-1
0-1
HP-1
0-2
HP-1
0-3
HP-1
0-4
HP-1
0-5
HP-1
0-6
HP-1
0A
HP-1
0B
HP-1
0C
HP-1
1-1
HP-1
1-2
HP-1
1-3
HP-1
1-4
HP-1
1-5
HP-3
-1
HP-3
-2
HP-3
B
HP-3
C
HP-4
-1
HP-4
-2
HP-4
-3
HP-4
-4
HP-5
-1HP-5
-2
HP-5
-3HP-5
AHP-5
BHP-5
C
HP-6
-1
HP-6
-2
HP-6
-3
HP-7
-1HP-7
-2HP-7
-3
HP-7
AHP-7
BHP-7
C
HP-8
-1
HP-8
-2
HP-8
-3
HP-8
-4HP-8
AHP-8
BHP-8
C
HP-9
-1HP-9
-2
HP-9
-3
HP-9
-4
HP-9
A
HP-9
B
HP-9
CM
D-M
W-1
2
MD-M
W-1
3
MD-M
W-1
4
MM-1
MM-2M
M-3
MM-4M
W-1
MW
-10
MW
-11
MW
-12M
W-1
3
MW
-14
MW
-15
MW
-16
MW
-26
MW
-27
MW
-28
MW
-3
MW
-33
MW
-34
MW
-35
MW
-36
MW
-37
MW
-38
MW
-3D
MW
-4
MW
-42
MW
-43
MW
-44
MW
-4D
MW
-5
MW
-5DM
W-7
MW
-8
MW
-8D
MW
-9
MW
-9D
R-1
R-2
R-3
WW
-3
WW
-4
WW
-8
Casing
Screen
Within 100 feet of sectionWells
0 2000 4000 feet
817.1 817.0
817.0
796.5
802.5
817.4
795.4
785.8
760.7
766.8
766.8
760.6
762.7
762.3
799.0801.9
801.8
792.5
785.7
792.5
793.3
793.6
793.6
830.7
826.6
826.5
798.3
798.0
799.1
773.2
773.3
760.8
791.7
793.7
793.6
811.3
819.6826.8
824.5819.5
829.3
805.8
814.4
812.2
818.0
794.3
794.7
790.3
819.7
815.8
820.7
820.3
817.2
816.5820.0
816.7
814.9
815.9
815.9
817.1817.1
Within 100 feet of section
water level (feet)
Developing Conceptual Model
Hydrogeologic Conceptual Model
• Boring Logs
• Strip Logs
• Create Section
• 3d Geologic Model
EnviroInsite Terminology
Term Definition
Developing Conceptual
Model
Boring Data Detailed soil / rock description as would come from geologist in logging a boring.
Stratigraphy Hydrogeologist’s conceptualization of large-scale stratigraphic units.
What can you do with Boring data?
Developing Conceptual Model
Post Elev. Contour Elev. 3d Logs
Logs on Profile
Boring Logs
What can you do with Stratigraphy?
Developing Conceptual Model
Post Elev. Contour Elev. 3d Geologic Model
3d Fence Diagram
3d Logs 2d Geologic Modeling / Logs
Strip Logs
• Integrate multiple sources of data
• Downhole charts use data from Point Values table
EnviroInsite Training
Point Values table
EnviroInsite Training
Field Type
Well Text
Constituent Text
Depth Numeric
Value Numeric
Text Value Text
Developing HydrogeologicConceptual Model
Hands-on Exercise
EQuIS Source
EI Data EQuIS Table.Field
Developing Conceptual
Model
Boring Data dt_lithology.material_namedt_lithology.start_depth / end_depthdt_coordinate.elev / elev_unit
Stratigraphy dt_lithology.geo_unit_code_1
dt_lithology.start_depth / end_depth
dt_coordinate.elev / elev_unit