Enhances Collaboration between G&G and Drilling

Post on 21-Mar-2016

65 views 1 download

Tags:

description

Enhances Collaboration between G&G and Drilling. Nigel Deeks / Emmanuelle Regrain Schlumberger. enables Schlumberger Operations. InterACT Full 1.2 and 1.3.1 API - (GetFrom, AddTo, UpdateInStore) - PowerPoint PPT Presentation

Transcript of Enhances Collaboration between G&G and Drilling

Enhances Collaboration between G&G and DrillingNigel Deeks / Emmanuelle RegrainSchlumberger

2

enables Schlumberger Operations

InterACT– Full 1.2 and 1.3.1 API - (GetFrom, AddTo, UpdateInStore)– DataHub – scaleability, agregation and synchronisation– Server to Server transfer (Push and Pull)– WITSML Data Browsing

Operation Support Centers (OSC)– Internal – Support, Collaboration, Remote Control– Commercial – Schlumberger Silver, Gold & Platinum OSCs

Answer Products – Enabled for WITSML via “Real Time DataLink”– Drilling Optimisation – Perform Toolkit– Geosteering – RTGS– Petrophysics – Interactive Petrophysics– Seismic to Simulation - Petrel

3

in Petrel 2007

Seismic to Simulation Software is now open to Drilling

Planning workflow:– Drilling Risks and Events Exchange– Drilling Risk and Events in the Geological Model

Execution workflow– Trajectory in Real Time– Logs and Risks in Real Time

4

WITSML in Petrel 2007: Planning WorkflowDrilling Risks in the Geological Model

5

WITSML in Petrel 2007: Planning WorkflowDrilling Risks in the Geological Model

6

WITSML in Petrel 2007: Execution WorkflowTrajectory, Log, Risks in Real-Time

7

WITSML in Petrel 2007: Execution WorkflowTrajectory, Log, Risks in Real-Time

8

WITSML Enhances Collaboration in Petrel 2007

Seismic to Simulation Software is now open to Drilling

Share the Risks for Easier, Faster Collaborative Planning

Follow the Trajectory and the Logs for Easier, Faster Decision Making in the Execution Phase

.. A First Step in a New Direction