EN ER GY A UD I T R E POR T
O F
HY D R O E LE C T R I C PR O J EC T S
OF
JA M M U & KA SH M I R ST A T E PO W ER
D EV E LO P M EN T C O R PO R A T I ON
L I M I T ED
Submitted by:
JAMMU & KASHMIR POWER DEVELOPMENT CORPORATION LTD. November-2013
Energy Audit Report of HEPs
Table of Contents
Sr. No.
Description Page No.
1 Executive Summary: Scope of work 1
2 Audit activity – Methodology & Approach 1
3 Team for conducting of Audit 2
4 Details of Hydro Electric Projects for which energy audit was undertaken
3
5 Summary Recommendations 5
6 HEP wise Observation:
A Jhelum River Basin 1. Lower Jhelum 9 2. Upper Sindh – I 10 3. Ganderbal 11 4. Upper Sindh – II 13 5. Karnah 14 6. Pahalgam 15 B Chenab Basin 7. Chenani – I 16
8. Chenani – II 17
9. Chenani – III 18
10. Baderwah 19
11. Baglihar 20
C Ravi Basin
12. Sewa – III 21
D Indus Basin
13. Iqbal Bridge 23
14. Hunder 24
15. Sumoor 25
16. Bazgo 26
17. Igo-Mercellong 27
18. Marpachoo 28
19. Haftal 29
20. Stakna 30
21. Sanjak 31
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 1 of 31
Executive Summary:
Scope of work:
The Hon’ble J&K SERC vide their order dated 16.07.2011 issued directives for carrying out energy audit of all the HEPs. The Hon’ble Commission also provided the formats for energy audit report. The audit was required to be conducted in compliance with the above directive of the Hon’ble Commission.
Audit activity – Methodology & Approach
i. Formats/checklist was prepared and circulated to all the HEPs detailing information/details required for checking and analysis.
ii. All the HEPs were visited at prefixed date and various aspects of the HEPs impacting the energy efficiency including condition of various machinery & equipment was discussed.
iii. All the registers detailing energy generated, auxiliary consumption, breakdowns etc were verified.
iv. Test check of the out puts with regard to the energy generated, auxiliary consumption.
v. The shortcomings as observed vis-a vis operating standards were discussed and reasons/explanations were noted.
vi. Detailed information in the required formats were tabulated after verification from the registers and comments of the project in-charge was incorporated.
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 2 of 31
Team for conducting of audit and analysis/compilation of data and report
Energy audit was conducted by the following executives:
Sl. No.
Executive/Consultants Responsibility
1. CA. Arvind Tewari – Commercial consultant – Energy Sector
Co-ordination, Collection & compilation of details/data
2. Shri Byomkesh Mallick – Asst. Commercial consultant – Energy Sector
Collection & compilation of details/data
3. Shri Pranab Das – Asst. Commercial consultant – Energy Sector
Collection & compilation of details/data
4. Er..M.D. Shantamurthy – Retd. Executive Engineer, Electricity Department, Andaman & Nicobar Administration
Supervision, analysis of data/information & framing of report
5. Er. Shyamal Kr. Basu – Energy & Power consultant Supervision, analysis of data/information & framing of report
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 3 of 31
Details of Hydro Electric Projects for which energy audit was undertaken is provided below:
Sl. No.
Name of Power House Unit Capacity of each unit
(MW)
Installed Capacity
(MW)
Year of Commissioning
A. Jhelum River Basin
1 Lower Jhelum
Unit I 35.00
105.00
Feb, 1978
Unit II 35.00 Jan, 1979
Unit III 35.00 Nov, 1979
2 Upper Sindh – I Unit I 11.30
22.60 Dec, 1973
Unit II 11.30 July, 1974
3 Ganderbal
Unit I 3.00
15.00
Feb, 1955
Unit II 3.00 Feb, 1955
Unit III 4.50 1961
Unit IV 4.50 1961
4 Upper Sindh – II
Unit I 35.00
105.00
June, 2000
Unit II 35.00 Sept, 2001
Unit III 35.00 June, 2002
5 Karnah Unit I 1.00
2.00 1991
Unit II 1.00 1997
6 Pahalgam
Unit I 1.50
4.50
June, 2005
Unit II 1.50 June, 2005
Unit III 1.50 July, 2013
B Chenab Basin
7 Chenani – I
Unit I 4.66
23.30
1971
Unit II 4.66 1971
Unit III 4.66 1971
Unit IV 4.66 1975
Unit V 4.66 1975
8 Chenani – II Unit I 1.00
2.00 1996
Unit II 1.00 1996
9 Chenani – III
Unit I 2.50
7.50
2003
Unit II 2.50 2003
Unit III 2.50 2003
10 Baderwah
Unit I 0.50
1.50
May, 2005
Unit II 0.50 May, 2005
Unit III 0.50 September, 2012
11
Baglihar
Unit I 150
450 01/04/ 2009 Unit II 150
Unit III 150
C. Ravi Basin
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 4 of 31
Sl. No.
Name of Power House Unit Capacity of each unit
(MW)
Installed Capacity
(MW)
Year of Commissioning
12 Sewa – III
Unit I 3.00
9.00
June, 2002
Unit II 3.00 Oct, 2002
Unit III 3.00 June, 2003
D. Indus Basin
13 Iqbal Bridge
Unit I 1.25
3.75
Nov, 1995
Unit II 1.25 1996
Unit III 1.25 1996
14 Hunder Unit I 0.20
0.40 1995
Unit II 0.20 1995
15
Sumoor Unit I 0.05
0.10 1993
Unit II 0.05 1993
16 Bazgo Unit I 0.15
0.30 1994
Unit II 0.15 1994
17 Igo-Mercellong Unit I 1.50
3.00 1/6/2005
Unit II 1.50 19/08/2005
18 Marpachoo
Unit I 0.25
0.75
2006
Unit II 0.25 2006
Unit III 0.25 2006
19 Haftal Unit I 0.50
1.00 2006-2007
Unit II 0.50 2006-2007
20 Stakna Unit I 2.00
4.00 1987
Unit II 2.00 1987
21 Sanjak
Unit I 0.42
1.26
Commissioned but not declared
commercially operational
Unit II 0.42
Unit III 0.42
Total capacity in MW 761.96
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 5 of 31
Summary observation & recommendations
Achievement of efficiency in energy management requires that proper data with regard to energy and other parameters is maintained. It is essential to record the metered data, maintain database of all the information associated with the energy accounting and audit meters and verify the correctness of metered data. Further, each power house should prepare quarterly, half-yearly and yearly energy account for its system for taking appropriate action for efficient operation and system development.
The energy data is essentially required for proper monitoring and supervision and which can be subjected to checks /further analysis to find out the areas/reasons of energy loss and steps to be taken for minimizing the same.
The energy data recorded should be reliable and therefore it is essential that minimum acceptable metering standards which will affect proper metering of the system parameters for the purpose of accounting, commercial billing and settlement of electrical energy and will also provide information which will help to optimize the system planning.
The above objective can only be achieved if there is standard operating manual with respect to the metering/data recording system. The manual should provide for type, standards, ownership, location, accuracy class, installation, operation, testing and maintenance, access, sealing, safety, meter reading and recording, meter failure or discrepancies, anti-tampering features, quality assurance, calibration and periodical testing of meters, additional meters and adoption of new technologies in respect of following meters for correct accounting, billing and audit of electricity:
(i) Interface meter
(ii) Energy Accounting and audit meter
All interface meters and energy accounting and audit meters should be of static type and should comply with the relevant standards of Bureau of Indian Standards (BIS). If BIS Standards are not available for a particular equipment or material, the relevant British Standards (BS), International Electro-technical Commission (IEC) Standards, or any other equivalent Standard shall be followed and should further confirm to the standards on ‘Installation and Operation of Meters’ as specified in Electricity Grid code issued by CEA/SERC.
It was observed that no such manual/standards are in place as a result required meters/data recording system are not in place in certain cases hence accurate and reliable data required for analyzing/control are not available. Further, the meters were not displaying all the parameters required for proper monitoring/analysis of energy data. It is suggested that steps should be taken to ensure that meters essentially display following parameters:
Interface meters:
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 6 of 31
(i) Unique identification number of the meter (ii) Date
Time Cumulative Wh register reading Average frequency of the previous 15-minute block Net Wh transmittal in the previous 15-minute block, with+/-sign Average percentage voltage Reactive power with +/- sign
Voltage-high VArh register reading Voltage-low VArh register reading.
Energy & accounting meters:
(1) The energy accounting and audit meters should be suitable for measurement, recording and display of cumulative active energy with date and time.
(2) The energy Accounting and audit meters may also have the facility to measure, record and display one or more of the following parameters depending upon the energy accounting and audit requirement. All parameters excluding instantaneous electrical parameters shall also be stored in memory. (a) Apparent power
(b) Phase wise kilowatt at peak KVA
(c) Phase wise KVA(reactive) at peak KVA
(d) Phase wise voltage at peak KVA
(e) Power down time
(f) Average power factor
(g) Line currents
(h) Phase voltages
(i) Date and time
(j) Tamper events
(3) The energy accounting and audit meter should have data storage capacity for at least 35 days in a non-volatile memory.
Energy accounting and audit meters should have facility to download the parameters through meter reading instruments as well as remote transmission of data over communication network.
Location of meters: It was observed that in many cases meters were not installed at proper location hence making recording of data difficult.
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 7 of 31
It is essential that Interface meters and energy accounting and auditing meters are installed at proper location so as to facilitate to account for the energy generated, transmitted and consumed in various segments of power system and the energy loss. The location of the meters should be as under:
Sl. No.
Type of meter Location
1 Main meter On all outgoing feeders
2 Check meter On all outgoing feeders
3 Standby meter (i) High Voltage (HV) side of Generator Transformers (iii) High Voltage (HV) side of all Station Auxiliary Transformers
4 Energy accounting and audit meters
(i) At the stator terminal of the generator;
(ii) On HV and LV sides of the station and the unit auxiliary transformers.
(iii) On feeders to various auxiliaries
It was also observed that there is no system of comparison of readings of main meter and check meter in most of the power houses. It was also observed that there are no laid down procedures to be followed in case of meter failure/discrepancies
It is essential that a system of regular recording & comparison of energy data from main meter & check meter is introduced as this would ensure correctness of data and identification of any malfunctioning of any meter. Further, there should be laid down procedures to be followed in case of meter failure/discrepancies. Accordingly it is suggested that:
In case of Interface meters:
(a) Whenever difference between the readings of the Main meter and the Check meter
for any month is more than 0.5%, the following steps should be taken:
(i) Checking of CT and VT connections; (ii) Testing of accuracy of interface meter at site with reference standard meter of
accuracy class higher than the meter under test.
If the difference exists even after such checking or testing, then the defective meter shall be replaced with a correct meter.
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 8 of 31
(b) In case of conspicuous failures like burning of meter and erratic display of metered parameters and when the error found in testing of meter is beyond the permissible limit of error provided in the relevant standard, the meter should be immediately replaced with a correct meter.
In case of Energy accounting and audit meters:
Energy accounting and audit meters should be rectified or replaced by the generating company utility/licensee immediately after notice of any of the following abnormalities:
(a) The errors in the meter readings are outside the limits prescribed for the specified Accuracy Class;
(b) Meter readings are not in accordance with the normal pattern of the load demand;
(c) Meter tampering, or erratic display or damage.
Testing & recalibration of meters: It was observed that there is no system of periodical testing and recalibration of meters. In certain cases meters have not been tested since installation. A system of periodical testing of meters is required to be introduced otherwise readings of the meters may not be reliable and lead wrong conclusions. It is suggested that all interface meters should be tested at least once in five years. These meters should also be tested whenever the energy and other quantities recorded by the meter are abnormal or inconsistent with electrically adjacent meters. Whenever there is unreasonable difference between the quantity recorded by interface meter and the corresponding value monitored at the billing center via communication network, the communication system and terminal equipment shall be tested and rectified. The meters may be tested using NABL accredited mobile laboratory or at any accredited laboratory and recalibrated if required at manufacturer’s works.
In-case of energy accounting and audit meters Energy accounting and audit meters should be tested at site at least once in five years or whenever the accuracy is suspected or whenever the readings are inconsistent with the readings of other meters, e.g., check meters, standby meters. The testing must be carried out without removing the CTs and VTs connection. Testing may be carried out through NABL accredited mobile laboratory using secondary injection kit, measuring unit and phantom loading or at any accredited test laboratory and recalibrated if required at manufacturer’s works
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 9 of 31
HEP wise Observation:
A. Jhelum River Basin
1. Lower Jhelum HEP
The LJHP is in Jhelum river basin and was established/commissioned in the year 1978. The installed capacity of the project is 105 MW. It has three units of 35 MW each. There has been no capacity addition to the project since commissioning.
The LJHP has a head of 61.78 meters and design energy is 609.43 MUs. Total requirement of water for the rated generation is 7700 cusecs.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Tri-vector (class 0.2s for active & 0.5s for reactive)
2 Location of metering points on generators
Control room
3 Specification and type of interface meters installed on outgoing feeders
Tri-vector (class 0.2s for active & 0.5s for reactive)
4 Stand by/check meters installed Not installed
5 Periodical testing and calibration of meters
Not done
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with analysis is provided in the attached Annexure –A, B & C of Appendix-1 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 10 of 31
2. Upper Sindh-1 HEP
The USHP-I is in Jhelum river basin and was established/commissioned in the year 1973. The installed capacity of the project is 22.60 MW. It has two units of 11.30 MW each. There has been no capacity addition to the project since commissioning.
The USHP-I has a head of 150.90 meters and design energy is 106.62 MUs. Total requirement of water for the rated generation is 425 cusec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
CTR 900/5; PTR 11KV /110 volt A C Meter.
3 phase, 3 wire for unbalanced load,
Rotating disk type
5 Revs/KWH; 50Hz
2 Location of metering points on generators
Mounted on Panels
3 Specification and type of interface meters installed on outgoing feeders
a) CTR 25/5; PTR 11KV /110 volt A C Meter.
5 phase, 3 wire for unbalanced load,
1.8 Revs/KWH; 50Hz
b) CTR 30/5; PTR 11KV /110 volt A C Meter.
3 phase, 3 wire for unbalanced load,
1.5 Revs/KWH; 50Hz
4 Stand by/check meters installed
Not installed
5 Periodical testing and calibration of meters
Nil
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-2 to this report.
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 11 of 31
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
3. Ganderbal HEP
The Ganderbal HEP is in Jhelum river basin and was established/commissioned in the year 1955. The installed capacity of the project is 15.00 MW. It has two units of 3.00 MW each and two units of 4.50 MW each. There has been no capacity addition to the project since commissioning.
The Ganderbal HP has a head of 137 meters and design energy is 90.15 MUs. Total requirement of water for the rated generation is 475 cusec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Unit I/II
MAKE: Metropolitan Vickers
TYPE: NE Polyphase walt-hr meter
2x350 Amp, 6600 V across phases
3 wire, 50Hz, 110V
Unit III/IV
3 phase, 3 wire 50Hz, 1800 Revs per KW-hr
Type: HN3 3x110V, 2x5 Amp
Energy Meters are defunct
2 Location of metering points on generators
Meters installed on generator panels of the four units
3 Specification and type of interface meters installed on outgoing feeders
Line 1 (to Habak grid)
1.Voltmeter, 0-40KV, Analog
2.Ammeter, 0-80A, Analog
Line 2 (to Ganderbal R/Stn)
1.Ammeter, 0-200A, Analog
4 Stand by/check meters installed Not installed
5 Periodical testing and calibration of meters
Nil
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 12 of 31
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-3 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 13 of 31
4. Upper Sindh - II HEP
The USHP-II is in Jhelum river basin and was established/commissioned in the year 2000. The installed capacity of the project is 105.00 MW. It has three units of 35.00 MW each. There has been no capacity addition to the project since commissioning.
The USHP-II has a head of 231.66 meters and design energy is 447.37 MUs. Total requirement of water for the rated generation is 475 cusec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Make: Secure Meters Ltd. GEC-0129, GEC-012, GEC-01027
2 Location of metering points on generators Relay and Control Panel
3 Specification and type of interface meters installed on outgoing feeders
None
4 Stand by/check meters installed Not installed
5 Periodical testing and calibration of meters
Done in 2011-12
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-4 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 14 of 31
5. Karnah HEP
The Karnah HEP is in Jhelum river basin and was established/commissioned in the year 1991. The installed capacity of the project is 2.00 MW. It has two units of 1.00 MW each. There has been no capacity addition to the project since commissioning.
The Karnah HP has a head of 36 meters and design energy is 11.36 MUs. Total requirement of water for the rated generation is 250 cusec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Not Installed
2 Location of metering points on generators
Not Installed
3 Specification and type of interface meters installed on outgoing feeders
Digital
4 Stand by/check meters installed Not installed
5 Periodical testing and calibration of meters
Not done
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-5 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 15 of 31
6. Pahalgam HEP
The Pahalgam HEP is in Jhelum river basin and was established/commissioned in the year 2005. The installed capacity of the project is 4.50 MW. It has three units of 1.50 MW each.
The Pahalgam HP has a head of 24.6 meters and design energy is 17.30 MUs. Total requirement of water for the rated generation is 23.10 cumec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Analog type
2 Location of metering points on generators
Control room
3 Specification and type of interface meters installed on outgoing feeders
-
4 Stand by/check meters installed Not installed
5 Periodical testing and calibration of meters
Not done
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix - 6 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 16 of 31
B. Chenab Basin
7. Chenani - I HEP
The Chenani - I HEP is in Chenab basin and was established/commissioned in the year 1971. The installed capacity of the project is 23.30 MW. It has five units of 4.66 MW each. There has been no capacity addition to the project since commissioning.
The Chenani - I HP has a head of 365.76 meters and design energy is 110.02 MUs. Total requirement of water for the rated generation is 6.87 cumecs.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
3 phase 3W3 x 100V, 2x5A, 50Hz, 2000 Rev/Kwh,
Ganz Electric Hungary,
Type HN3
2 Location of metering points on generators -
3 Specification and type of interface meters installed on outgoing feeders
On metering panels
4 Stand by/check meters installed NIL
5 Periodical testing and calibration of meters
NIL
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-7 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 17 of 31
viii. Loss of generation due to grid connectivity
8. Chenani - II HEP
The Chenani - II HEP is in Chenab basin and was established/commissioned in the year 1996. The installed capacity of the project is 2.00 MW. It has two units of 1.00 MW each. There has been no capacity addition to the project since commissioning.
The Chenani - II HP has a head of 30 meters and design energy is 12.00 MUs. Total requirement of water for the rated generation is 7.12 cumecs.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
3 phase 3W3 x 6600/110V, 3x150/5A, 50Hz,
1500 Rev/Kwh,
Make: BHEL Banglore
Type – PM33ND
2 Location of metering points on generators
3 Specification and type of interface meters installed on outgoing feeders
NIL
4 Stand by/check meters installed NIL
5 Periodical testing and calibration of meters
NIL
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-8 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 18 of 31
viii. Loss of generation due to grid connectivity
9. Chenani - III HEP
The Chenani - III HEP is in Chenab basin and was established/commissioned in the year 2003. The installed capacity of the project is 7.50 MW. It has three units of 2.50 MW each. There has been no capacity addition to the project since commissioning.
The Chenani - III HP has a head of 74.7 meters and design energy is 36.71 MUs. Total requirement of water for the rated generation is 11.12 cumecs.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
E3MO55, 3 phase,
4 wire KWH, Kvarh, Kvah, Kva, 110V, 50Hz
2 Location of metering points on generators
3 Specification and type of interface meters installed on outgoing feeders
On metering panels
4 Stand by/check meters installed NIL
5 Periodical testing and calibration of meters
NIL
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-9 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 19 of 31
viii. Loss of generation due to grid connectivity
10. Bhaderwah HEP
The Bhaderwah HEP is in Chenab basin and was established/commissioned in the year 2005. The installed capacity of the project is 1.50 MW. It has three units of 0.50 MW each.
The Bhaderwah HP has a head of 230 meters and design energy is 9.44 MUs. Total requirement of water for the rated generation is 20 cusec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
3 phase, 4 wire, CTI, 5A, PT Voltage 400(veritek)
2 Location of metering points on generators
-
3 Specification and type of interface meters installed on outgoing feeders
3 phase, 4 wire PF-1-1 temp, 27 degree C, 16000 pulse/unit
4 Stand by/check meters installed NIL
5 Periodical testing and calibration of meters
NIL
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-10 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 20 of 31
viii. Loss of generation due to grid connectivity
11. Baglihar HEP- stage I
The Baglihar HEP stage I is in Chenab basin and was established/commissioned in the year 2009. The installed capacity of the project is 450 MW. It has three units of 150 MW each. There has been no capacity addition to the project since commissioning.
The Baglihar HEP has a head of 123 meters and design energy is 2536.07 MUs. Total requirement of water for the rated generation is 430 cumec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
A 2000-V005 GOSSEN METRAWATT
Multi Functional Power meter (Digital)
2 Location of metering points on generators
Machine Hall LCU Panel
3 Specification and type of interface meters installed on outgoing feeders
Special Energy Meter installed on each feeder make : L&T (ER 300P) 3-phase 4-wire, voltage=3x63.5v class=0.25 pulse rate = 50/unit, current = 1A, M.F=1 Ref. Temp =30degree C
4 Stand by/check meters installed Not installed
5 Periodical testing and calibration of meters
NA
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-11 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 21 of 31
C. Ravi Basin
12. Sewa - III HEP
The Sewa - III HEP is in Ravi basin and was established/commissioned in the year 2002. The installed capacity of the project is 9.00 MW. It has three units of 3.00 MW each. There has been no capacity addition to the project since commissioning.
The Sewa - III HEP has a head of 38.00 meters and design energy is 33.06 MUs. Total requirement of water for the rated generation is 30.62 cumec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
A/C watt hour meter Type AV3.36 3 wire, class 1.0, 3x350/5A, 50Hz, Revs/kwh-180/7, S.No. 170326, kwhx7,
Make – Tiruchirapalli Engg.Ltd.
2 Location of metering points on generators
Gen. Meter Panel (Control room)
3 Specification and type of interface meters installed on outgoing feeders
36 static watt meter, model- EM 2010, 3 6 – 3 wire system, volt-110 V, current – 5A,MF-1, pulse rate -2560/kwh, class –I, Freq-50Hz, Make- L&T, Mysore India
4 Stand by/check meters installed NIL
5 Periodical testing and calibration of meters
NIL
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 22 of 31
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-12 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 23 of 31
D. Indus Basin
13. Iqbal Bridge HEP
The Iqbal Bridge HP is in Indus basin and was established/commissioned in the year 1995. The installed capacity of the project is 3.75 MW. It has three units of 1.25 MW each. There has been no capacity addition to the project since commissioning.
The Iqbal Bridge HP has a head of 15 meters and design energy is 21.23 MUs. Total requirement of water for the rated generation is 28.30 cumec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Electro-Mechanical Analog type (0-100000)
2 Location of metering points on generators
3 Specification and type of interface meters installed on outgoing feeders
NIL
4 Stand by/check meters installed NIL
5 Periodical testing and calibration of meters
NIL
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-13 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 24 of 31
14. Hunder HEP
The Hunder HP is in Indus basin and was established/commissioned in the year 1995. The installed capacity of the project is 0.40 MW. It has two units of 0.20 MW each. There has been no capacity addition to the project since commissioning.
The Hunder HP has a head of 30.10 meters and design energy is 1.77 MUs. Total requirement of water for the rated generation is 1.70 cusec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Electro Mechanical Type
2 Location of metering points on generators
LT panel
3 Specification and type of interface meters installed on outgoing feeders
NIL
4 Stand by/check meters installed NIL
5 Periodical testing and calibration of meters
NIL
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-14 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 25 of 31
15. Sumoor HEP
The Sumoor HP is in Indus basin and was established/commissioned in the year 1993. The installed capacity of the project is 0.10 MW. It has two units of 0.05 MW each. There has been no capacity addition to the project since commissioning.
The Sumoor HP has a head of 52.945 meters and design energy is 0.45 MUs. Total requirement of water for the rated generation is 0.311 cumec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Electro Mechanical Type
2 Location of metering points on generators
LT panel
3 Specification and type of interface meters installed on outgoing feeders
NA
4 Stand by/check meters installed NA
5 Periodical testing and calibration of meters
NA
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-15 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 26 of 31
16. Bazgo HEP
The Bazgo HP is in Indus basin and was established/commissioned in the year 1994. The installed capacity of the project is 0.30 MW. It has two units of 0.15 MW each. There has been no capacity addition to the project since commissioning.
The Bazgo HP has a head of 66.00 meters and design energy is 1.09 MUs. Total requirement of water for the rated generation is 22 cusec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Electro Mechanical Type
2 Location of metering points on generators
LT Panel
3 Specification and type of interface meters installed on outgoing feeders
NA
4 Stand by/check meters installed NA
5 Periodical testing and calibration of meters
NA
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-16 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 27 of 31
17. Igo-Mercellong HEP
The Igo-Mercellong HP is in Indus basin and was established/commissioned in the year 2005. The installed capacity of the project is 3.00 MW. It has two units of 1.50 MW each. There has been no capacity addition to the project since commissioning.
The Igo-Mercellong HP has a head of 27 meters and design energy is 15.88 MUs. Total requirement of water for the rated generation is 750 cusec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Type –AV3, 6.6 KV, 3Ph, 3W, 50 Hz, Current = 3x200/A
Voltage = 3X6.6 KV / 110V/3V
2 Location of metering points on generators UCB
3 Specification and type of interface meters installed on outgoing feeders
Type -1 MP/ME4
Current + 50/1A
L.T. Ratio = 100/1A
3 Ph, 3W,50Hz.
4 Stand by/check meters installed Yes
5 Periodical testing and calibration of meters Yes
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-17 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 28 of 31
18. Marpachoo HEP
The Marpachoo HP is in Indus basin and was established/commissioned in the year 2006. The installed capacity of the project is 0.75 MW. It has three units of 0.25 MW each. There has been no capacity addition to the project since commissioning.
The Marpachoo HP has a head of 40 meters and design energy is 3.79 MUs. Total requirement of water for the rated generation is 2.10 cumec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Electro-Mechanical Analog type (0-100000)
2 Location of metering points on generators
Generator Panel
3 Specification and type of interface meters installed on outgoing feeders
NIL
4 Stand by/check meters installed NIL
5 Periodical testing and calibration of meters
NIL
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-18 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 29 of 31
19. Haftal HEP
The Haftal HP is in Indus basin and was established/commissioned in the year 2006. The installed capacity of the project is 1.00 MW. It has two units of 0.50 MW each. There has been no capacity addition to the project since commissioning.
The Haftal HP has a head of 118.36 meters and design energy is 4.88 MUs. Total requirement of water for the rated generation is 2.30 cumec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Electro-Mechanical Analog type (0-100000)
2 Location of metering points on generators
Generator Panel
3 Specification and type of interface meters installed on outgoing feeders
NIL
4 Stand by/check meters installed NIL
5 Periodical testing and calibration of meters
NIL
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-19 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 30 of 31
20. Stakna HEP
The Stakna HP is in Indus basin and was established/commissioned in the year 1987. The installed capacity of the project is 4.00 MW. It has two units of 2.00 MW each. There has been no capacity addition to the project since commissioning.
The Stakna HP has a head of 21.52 meters and design energy is 19.52 MUs. Total requirement of water for the rated generation is 11.9 cumec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
A.C 50Hz. 3Ph. Type –UMDIB 3x6.6 KV/110V, 3x250/1A, Revs/Kwh 125/162
2 Location of metering points on generators
UCB
3 Specification and type of interface meters installed on outgoing feeders
UMD-1B, 3x75/1A, 3x22 KV/110V, 3 Ph, 3W, 1.0 Rev/Kwh, 50Hz. CL-2
4 Stand by/check meters installed Yes
5 Periodical testing and calibration of meters
Yes
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-20 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity
Energy Audit Report of HEPs
J&K State Power Development Corporation Ltd. Page 31 of 31
21. Sanjak HEP
The Sanjak HEP is in Indus basin and was energized in the year 2011. The installed capacity of the project is 1.26 MW. It has three units of 0.42 MW each. There has been no capacity addition to the project since commissioning.
The Sanjak HP has a head of 48.5 meters and design energy is 4.46 MUs. Total requirement of water for the rated generation is 3.2 cumec.
Observation with regard to the HEP is provided in the table below:
Sl. No.
Particulars Details/Remarks
1 Specification and type of meters installed on generator panels
Electronic type Digital Meter
2 Location of metering points on generators
-
3 Specification and type of interface meters installed on outgoing feeders
Electronic Digital
4 Stand by/check meters installed Yes (Transformer Panel)
5 Periodical testing and calibration of meters
NIL
Registers of the HEP for the FY 2010-11, FY 2011-12 & FY 2012-13 was verified and month wise & unit wise details with regard to the energy generation, auxiliary consumption & net energy dispatched was recorded along with reasons for loss of generation if any.
Month wise & unit wise details of the following for the FY 2010-11, FY 2011-12 & FY 2012-13 along with remarks is provided in the attached Annexure –A, B & C of Appendix-21 to this report.
i. Energy generated
ii. Auxiliary consumption
iii. Transformation losses
iv. Net energy dispatched
v. Plant load factor
vi. Average availability of water in river (Cu.meters/sec.)
vii. Loss of generation due to machine outage
viii. Loss of generation due to grid connectivity.