EM2 - infrastructure.planninginspectorate.gov.uk... · EM2 EM3 EM4 M4 JUNCTIONS 3 TO 12 SMART...

Post on 08-Aug-2020

9 views 0 download

Transcript of EM2 - infrastructure.planninginspectorate.gov.uk... · EM2 EM3 EM4 M4 JUNCTIONS 3 TO 12 SMART...

CUTL

INE

CUTL

INE

CONT

INUED

ON S

HEET

01

CUTLINE

CUTLINE

CONTINUED ON SHEET 03

EM2Height 2.5m

EM3Height 2.5m

EM4Height 2.5m

EM1Height 2.5m 5680

0

5690

0

5700

0

5710

0

5720

0

5730

0

5740

0

5750

0

5760

0

5770

0

5780

0

5790

0

5800

0

5810

0

5820

0

5830

0

5840

0

5850

0

5860

0

5870

0

5880

0

5890

0

5900

0

5910

0

5920

0

5930

0

5940

0

5950

0

5960

0

5970

0

5980

0

5990

0

6000

0

6010

06020

06030

06040

06050

06060

06070

06080

0

EM2

EM3

EM4

M4 JUNCTIONS 3 TO 12SMART MOTORWAY

ENHANCEDNOISE MITIGATION DETAILS

SHEET 2 OF 15

Drawing Title

Job Title

0 250 500125Metres

KEY PLAN

SCALE 1:10,000

DRAWING 2Drawing Number

Alliance Document Reference1:10,000

Rev Scale at A3

Appr'dReviewCheckDrawnRevision DetailsRevision DateRev #

This map is reproduced from Ordnance Survey material with permission ofOrdnance Survey on behalf of the Controller of Her Majesty's Stationery Office© Crown Copyright.Unauthorized reproduction infringes Crown Copyright and may lead toprosecution or civil proceedings. Highways Agency 100030649 2014

All lanes will be provided with low noise surface along the completelength of the Scheme for opening.

NOTESNo dimensions are to be scaled from this drawing

J12

J11

J8/9J7

J6J5 J4b J4 J3

J10

READING

WOKINGHAM

BRACKNELL

MAIDENHEAD SLOUGH

WINDSOR

The Cube199 Wharfside StreetBirminghamB1 1RN

SWAMAHBBFirst Draft9/12/150DSWAMAHBBIssued for Review22/12/151RSWAMAHBBSubmitted23/12/152F

3F

Highways England

514451-MUH-00-ZZ-RP-EN-400158

SWAMAHBBRevision15/2/20163F