Elektrizace železnic Praha a.s.

Supplier of OCL and electrotechnological units for railways and urban mass transportation

EFRTC General meeting, 3.10.2010, Florence Ing. Michal Satori, +420 724 924 187

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

- Headquarter in Prague- 694 employees (2009)- Gross sale 103 720 000 EUR (2009)-Subsidiaries - Slovak Republic, Hungary, Monte Negro

Annual report 2009

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

History of the company

In 1954 – estabilished company called „Elektrizace železnic Praha“ (translated „Railways Electrification Prague“)

At the beginning OCL for speeds up to 120 km/h were developed for 3 kV DC and 25 kV AC traction systems

Since 1954 our company electrificated all of the main lines in Czechoslovakia and urban mass transportation lines

In 1992 the company was privatized and transformed into joint-stock company

In the 90‘s we have developed OCL for speeds up to 200 km/h for 3 kV DC and 25 kV AC traction systems

In 2007 the innovated OCL types for speeds up to 260 km/h were certified according to TSI

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

After privatization we started to supply too: Traction substations 750 V DC, 1500 V DC, 3 kV DC (including

substation 110kV, 22 kV AC) and 25 kV AC (including sub. 110 kV) Electrical coach pre-heating system Electrical heating of switches Service and maintenance Projects (electrotechnological units)

Our company offers not only OCL and electrotechnological units construction but also owns a powerful production base.

Production base consists of 2 production centres (1 for steel structures, 1 for OCL accesories and switchgears)

The construction works are implemented by 4 centres (2 for railway OCL, 1 for electrotechnological units, 1 for urban mass transportation).

Production centre Vlkov, Czech Republic:

-engineering and manufacturing of steel lattice masts, tubular masts and cross-beams of all types - production of lighting towers- cutting, machining and working of materials- steel structure anti-corrosion protection

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

Production centre Česká Třebová, Czech Republic:

-production of OCL accesorries (motor drives, cantilevers, clamps, fittings, breakdown fuses)-production of air insulated LV and HV switchgears (24/110 V DC, 230/400 V AC, 750 V DC, 1500 V DC, 3 kV DC, 25 kV AC and others)- acredited mechanical and electrical laboratory

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

Our newest product - Container rectifier substation 22 kV AC/3 kV DC

OCL construction centres-Excavation and foundation works for OCL structures-montage and demontage of standard and special masts and cross-beams -montage and demontage of cantilevers, conductors, feeders, tensioning equipment, optical cables

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

Technological units construction centre-Installing substations 110 kV AC, 22 kV AC, 750 V DC, 1500 V DC, 3 kV DC, 25 kV AC equipment-Programming of PLC and protections-Set in operation

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

OCL construction in the Czech Republic (more than 6 500 km electrified lines)

Corridors in Czech republic

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

3 kV DC, OCL 200 km/hReconstruction, 1. corridor(Bubeneč – Kralupy, CZ)

3 kV DC, OCL 200 km/hReconstruction, 2. corridor(Červenka – Zábřeh, CZ)

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

3 kV DC, OCL 200 km/h„New connection“ of theRailway stations in Prague,1. corridor

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

25 kV AC, OCL 200 km/hReconstruction, III. corridor(Planá – Cheb, CZ)

25 kV AC, OCL 200 km/hReconstruction, III. corridor(Stříbro – Planá, CZ)

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

OCL construction non corridor lines and abroad

Electrification Nikšič – Podgorica,OCL 120 km/h (25 kV AC), Monte Negro

Reconstruction Rybník – Lipno, Inclined OCL 80 km/h, CZ

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

The newest construction – Test center Velim (Czech Republic)

New OCL up to 250 km/h,25kV AC (3kV DC, 15 kV 16,3Hz)

Rectifier substation reconstruction(part 750 V DC, 1,5 kV DC 3 kV DC)

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

Urban mass transportation OCL construction

TRAM line Hlupočepy – Barrandov,Prague

TRAM line Ohrada – Palmovka, Prague

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

Production and installation of electrotechnological units in the Czech Republic

9 Rectifier substations 3 kV DC (including sub.110 kV, 22 kV AC) 5 Switching substations 3 kV DC 8 Transformer substations 25 kV AC (including sub. 110 kV AC) 5 Switching substations 25 kV AC 30 Electrical heating of switches 1 Reconstruction of remote-control center

Production and installation of electrotechnological units abroad

1 Transformer substation 25 kV AC, Podgorica, Monte Negro 1 Switching substation 25 kV AC, Danilovgrad. Monte Negro 25 Switchgears 750 V DC for France - cooperation with Cegelec 12 Rectifier units for Rotterdam - cooperation with Cegelec 17 Switchgears 750 V DC for Morocco – coop. with Cegelec

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

Transformer substation 25 kV ACKadaň, CZ

Rectifier substation 3 kV DCŠumperk, CZ

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

Transformer substation 25 kV ACPodgorica, Monte Negro

Rectifier substation 750 V DCLeslys, France

Service centre (part of Construction centres)-OCL service-Technological units service-Periodical maintenance of OCL-Periodical maintenance of technological units

ELEKTRIZACE ŽELEZNIC PRAHA A.S.

Elektrizace železnic Praha a.s.

Thank you for your attention