Post on 14-Sep-2015
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
EJC 417 Technical SpecificationT06417-1 1/12
General Arrangement
9.8 ft.(3.0 m)
154
(391
2)86
(218
4)56
(142
2)8
(203
)
11 (279
)
6(1
52)
90(2
286)
88 235)
Note: All vertical dim Dimensions ar are in millimet Optional ROPSRevision Date: 2006-2-08
Web: http://www.sandvik.com
2
006
San
dvik
Min
ing
and
Con
stru
ctio
n C
anad
a In
c.Sa
ndvi
k M
inin
g an
d C
onst
ruct
ion
rese
rves
the
right
to
chan
ge th
is s
peci
ficat
ion
with
out n
otic
e
(2
ensions are for an empty unit.e in inches, dimensions in brackets res. canopy shown.
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
Technical SpecificationT06417-1 2/12EJC 417
Standard Unit Specifications
General Information Power Train
Systems
Steering HyFull hydraulic double acting sa gear pump an
Main DimensionsTotal length 7010 mm 276 inTotal width 2235 mm 88 inOver all height 2286 mm 90 inHeight of dump box 2184 mm 86 inDump height 3912 mm 154 in
Operating WeightsTotal 15014 kg 33100 lb.front axle 9609 kg 21184 lb.rear axle 5405 kg 11916 lb.
Loaded WeightsTotal 30436 kg 67100 lb.front axle 10653 kg 23436 lb.rear axle 19806 kg 43664 lb.
CapacitiesPayload 15.4 tonnes 17 tonsBox volume 8.4 m 11.0 yd
Dump Box Motion TimesDischarging time 14 sec.Dumping angle 75 sec.
Driving Speeds Forward and Reverse (Loaded)1st gear 4.7 km/h 2.9 m.p.h.2nd gear 9.8 km/h 6.1 m.p.h.3rd gear 16.9 km/h 10.5 m.p.h.4th gear 29.1 km/h 18.1 m.p.h.
FrameRear and front frame Welded steel box constructionMaterial G40.21 - 50wt Cat. #3Central hinge full plate, clevis type with
spherical bearingsDump box Welded steel box constructionMaterial G40.21 - 50wt Cat. #3
EngineDiesel engine Detroit Diesel Series 40EOutput 156 kW (210 Hp) @ 2 200 rpmTorque 705 Nm (520 lbf-ft) @ 1 500 rpmNumber of cylinders In line, 6Displacement 7.64 l 466 inCooling system Liquid cooledCombustion principle Turbo charged, after cooled,
direct injected, 4 cycleAir filtration Dry typeElectric system 24 VExhaust system Catalytic purifier with silencerFuel tank capacity 148 l 39 US gal.
TransverterDana SOH 13.7 LMHR 32421
4 speed forward and reverse, single stage converter, 2.13:1 stall torque ratio.
AxlesFront Dana SOH 16D2149, standard differential,
oscillating 8Rear Dana SOH 16D2149, standard differential,
fixed
TiresTire size 14:00 R24Air pressure, fAir pressure, rRevision Date: 2006-2-08
Web: http://www.sandvik.com
2
006
San
dvik
Min
ing
and
Con
stru
ctio
n C
anad
a In
c.Sa
ndvi
k M
inin
g an
d C
onst
ruct
ion
rese
rves
the
right
to
chan
ge th
is s
peci
ficat
ion
with
out n
otic
e
draulicspower steering, centre articulated with ateering cylinder. Open centre system withd pilot operated stick steer control.
ront 552 kPa 5.52 bar 80 psiear 552 kPa 5.52 bar 80 psi
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
EJC 417 Technical SpecificationT06417-1 3/12
Dump Box HydraulicsFull hydraulic open-centre system with one gear pump.Electric push button dump box control located on the steerstick.
Standard BrakesService brakes are spring applied/hydraulically released,liquid cooled (LCB) multi-disc brakes on all wheels withtwo separate circuits for the front and rear axles. Servicebrakes also function as an emergency brake, when theemergency brake system is engaged.
Other Standard Equipment Electric shift Central hydraulic pressure test points Central manual lubrication system SAE hose fittings
ManualsAll manuals are delivered on CD-ROM in web basedformat with Adobe PDF output for printing.
Optional Equipment Specifications
Turning RadiusInner 3175 mm 125 inOuter 5893 mm 232 inTurning angle 44
Main ComponentsHydraulic pump Gear pumpControl valve Pilot operatedSteering cylinder EJC 127 mm bore X 51 mm rod
(5.0" X 2.0")
Pressure SettingsMain relief 13.8 MPa 138 bar 2000 psiPort relief valves 13.8 MPa 138 bar 2000 psi
Main ComponentsDump cylinder 2 stage telescopic 184/152 mm
(7.25/6.0)Hydraulic pump Gear pumpControl valve Pilot operated
Pressure SettingsMain relief 13.8 MPa 138 bar 2000 psiPort reliefs 13.8 MPa 138 bar 2000 psiHyd. oil tank capacity 125 l 33 US gal.
Main ComponentsPressure accumulators Piston type with charging valveBrake pedal valve Modulated
Electrical EquipmentAlternator 24V 60 A, minBatteries 2 x 12 V, 950 CCAStarter 24 V, Heavy DutyDriving lights 4pcs front, 2pcs rear
DistributionManual Type Customer Market AreaSpare parts manuals 3 Copies 1 CopyOperators manual 3 Copies 1 CopyService manual 3 Copies 1 Copy
Available Alternative EquipmentAuto lube system Lincoln modular
Alternative Dump Box OptionsVolume Width Side Height6.9 m 9.0 yd 2134 mm 84 1905 mm 758.2 m 10.7 yd 2540 mm 100 1981 mm 78
Available Add-On OptionsDump box Split dump box rework
Abrasion resistant box linersOperators compartment
SAE ROPS canopyEnclosed operators cab with A/C
Fire suppressisystems
Hand held fireextinguishersEmergency stesystemRevision Date: 2006-2-08
Web: http://www.sandvik.com
2
006
San
dvik
Min
ing
and
Con
stru
ctio
n C
anad
a In
c.Sa
ndvi
k M
inin
g an
d C
onst
ruct
ion
rese
rves
the
right
to
chan
ge th
is s
peci
ficat
ion
with
out n
otic
e
(solid mounts)on Manual - Ansul 6 nozzles, 1 tanks
Automatic (Checkfire II) - Ansul 6 nozzles, 1 tanks
4.5 kg 10 lb.9.1 kg 20 lb.
ering SAE J-1511, electric
Additional InformationT06417-1 4/12
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
EJC 417
Tractive Effort Curve (Metric Units)
0
20
40
60
80
100
120
140
160
180
200
220
0 2 4 6 8 10 12 14 16 18
F
(
k
N
)
0 2 4 6 8 0 2 4 6 8
Rolling resistance (%)
G
r
a
d
e
(
%
)
510
152025
5
10
15
20
25
ENGINE:TRANSVERTER:
Payload:14.00 R2416D2149AXLES:
TIRES:15 422 kg
CLARK LMHR 32421
EJC 417Detroit Diesel Series 40E
EMPTY LOADED
30
30Revision Date: 2006-2-08
Web: http://www.sandvik.com
2
0
0
6
S
a
n
d
v
i
k
M
i
n
i
n
g
a
n
d
C
o
n
s
t
r
u
c
t
i
o
n
C
a
n
a
d
a
I
n
c
.
S
a
n
d
v
i
k
M
i
n
i
n
g
a
n
d
C
o
n
s
t
r
u
c
t
i
o
n
r
e
s
e
r
v
e
s
t
h
e
r
i
g
h
t
t
o
c
h
a
n
g
e
t
h
i
s
s
p
e
c
i
f
i
c
a
t
i
o
n
w
i
t
h
o
u
t
n
o
t
i
c
e
20 22 24 26 28 30 32 34 36 38 40 42 44 46
Speed (km/h)
Additional InformationT06417-1 5/12
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
EJC 417
Tractive Effort Curve (US Units)
0
5
10
15
20
25
30
35
40
45
50
0 1 2 3 4 5 6 7 8 9 10 11
T
r
a
c
t
i
v
e
E
f
f
o
r
t
(
K
l
b
f
EMPTY
0 2 4 6 8
LOADED
0 2 4 6 8
Rolling resistance (%)
G
r
a
d
e
(
%
)
510152025
5
10
15
20
25
ENGINE:TRANSVERTER:
Payload:14.00 R2416D2149AXLES:
TIRES:34 000 lbs
Detroit Diesel Series 40ECLARK LMHR 32421
EJC 417
30
30Revision Date: 2006-2-08
Web: http://www.sandvik.com
2
0
0
6
S
a
n
d
v
i
k
M
i
n
i
n
g
a
n
d
C
o
n
s
t
r
u
c
t
i
o
n
C
a
n
a
d
a
I
n
c
.
S
a
n
d
v
i
k
M
i
n
i
n
g
a
n
d
C
o
n
s
t
r
u
c
t
i
o
n
r
e
s
e
r
v
e
s
t
h
e
r
i
g
h
t
t
o
c
h
a
n
g
e
t
h
i
s
s
p
e
c
i
f
i
c
a
t
i
o
n
w
i
t
h
o
u
t
n
o
t
i
c
e
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Speed (mph)
Additional InformationT06417-1 6/12
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
EJC 417
Productivity Curve (Metric Units)
EJC 417 PRODUCTIVITY
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
0 500 1000 1500 2000 2500 3000 3500 4000 4500
ONE WAY DISTANCE IN METRES
T
O
N
N
E
S
P
E
R
H
O
U
R
0% 10
Basic data for calculations:Payload tonnesOverall Speed limit km/hFixed Cycle time min
Fixed cycle time includes the time for filling, dumping, turning and accelerating
Slope/Grade (%) Hor./0 1:10/10 1:7/15 1:5/20Loaded speed (km/h) Empty speed (km/h)
15.420
3.75
204.46
208.82020
20Revision Date: 2006-2-08
Web: http://www.sandvik.com
2
0
0
6
S
a
n
d
v
i
k
M
i
n
i
n
g
a
n
d
C
o
n
s
t
r
u
c
t
i
o
n
C
a
n
a
d
a
I
n
c
.
S
a
n
d
v
i
k
M
i
n
i
n
g
a
n
d
C
o
n
s
t
r
u
c
t
i
o
n
r
e
s
e
r
v
e
s
t
h
e
r
i
g
h
t
t
o
c
h
a
n
g
e
t
h
i
s
s
p
e
c
i
f
i
c
a
t
i
o
n
w
i
t
h
o
u
t
n
o
t
i
c
e
% 15% 20%
Additional InformationT06417-1 7/12
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
EJC 417
Productivity Curve (US Units)
EJC 417 PRODUCTIVITY CURVE
0
20
40
60
80
100
120
140
160
0 2000 4000 6000 8000 10000 12000 14000
ONE WAY DISTANCE IN FEET
T
O
N
S
P
E
R
H
O
U
R
0% 10
Basic data for calculations:Payload short tonsOverall Speed limit mphFixed Cycle time 4.0 min
Fixed cycle time includes the time for filling, dumping, turning and accelerating
Slope/Grade (%) Hor./0 1:10/10 1:7/15 1:5/20Loaded speed (mph) Empty speed (mph)
1712.4
12.42.73.7
12.45.512.412.4
12.4Revision Date: 2006-2-08
Web: http://www.sandvik.com
2
0
0
6
S
a
n
d
v
i
k
M
i
n
i
n
g
a
n
d
C
o
n
s
t
r
u
c
t
i
o
n
C
a
n
a
d
a
I
n
c
.
S
a
n
d
v
i
k
M
i
n
i
n
g
a
n
d
C
o
n
s
t
r
u
c
t
i
o
n
r
e
s
e
r
v
e
s
t
h
e
r
i
g
h
t
t
o
c
h
a
n
g
e
t
h
i
s
s
p
e
c
i
f
i
c
a
t
i
o
n
w
i
t
h
o
u
t
n
o
t
i
c
e
% 15% 20%
Additional InformationT06417-1 8/12
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
EJC 417
End Loading with EJC 145
11 cu.yd. Dump box2
1
8
6
m
m
(
8
6
i
n
)
3
4
7
1
m
m
(
1
3
7
i
n
)Revision Date: 2006-2-08
Web: http://www.sandvik.com
2
0
0
6
S
a
n
d
v
i
k
M
i
n
i
n
g
a
n
d
C
o
n
s
t
r
u
c
t
i
o
n
C
a
n
a
d
a
I
n
c
.
S
a
n
d
v
i
k
M
i
n
i
n
g
a
n
d
C
o
n
s
t
r
u
c
t
i
o
n
r
e
s
e
r
v
e
s
t
h
e
r
i
g
h
t
t
o
c
h
a
n
g
e
t
h
i
s
s
p
e
c
i
f
i
c
a
t
i
o
n
w
i
t
h
o
u
t
n
o
t
i
c
e
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
EJC 417 Additional InformationT06417-1 9/12
Side Loading with EJC 145
2186
mm
(86
in)
3471
mm
(137
in)Revision Date: 2006-2-08
Web: http://www.sandvik.com
2
006
San
dvik
Min
ing
and
Con
stru
ctio
n C
anad
a In
c.Sa
ndvi
k M
inin
g an
d C
onst
ruct
ion
rese
rves
the
right
to
chan
ge th
is s
peci
ficat
ion
with
out n
otic
e
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
Additional InformationT06417-1 10/12EJC 417
End Loading with EJC 116
Side Loading with EJC 116
3988
mm
(157
in)
6.9 m (9.0 yd)
1905
mm
(75
in)
3988
mm
(157
in)
6.9Revision Date: 2006-2-08
Web: http://www.sandvik.com
2
006
San
dvik
Min
ing
and
Con
stru
ctio
n C
anad
a In
c.Sa
ndvi
k M
inin
g an
d C
onst
ruct
ion
rese
rves
the
right
to
chan
ge th
is s
peci
ficat
ion
with
out n
otic
e
m (9.0 yd)
1905
mm
(75
in)
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
EJC 417 Additional InformationT06417-1 11/12
End Loading with EJC 90
Side Loading with EJC 90
3983
mm
(157
in)
6.9 m (9.0 yd)
1905
mm
(75
in)
3983
mm
(157
in)
6.9 m (9.Revision Date: 2006-2-08
Web: http://www.sandvik.com
2
006
San
dvik
Min
ing
and
Con
stru
ctio
n C
anad
a In
c.Sa
ndvi
k M
inin
g an
d C
onst
ruct
ion
rese
rves
the
right
to
chan
ge th
is s
peci
ficat
ion
with
out n
otic
e
0 yd)
1905
mm
(75
in)
Sandvik Mining and Construction Canada Inc.4445 Fairview Street, Burlington Ontario, Canada L7L 2A4Tel.: (905) 632-4940
Additional InformationT06417-1 12/12EJC 417
End Loading with Toro 151
Side Loading with Toro 151
3500
mm
(138
in)
44 6.9 m (9.0 yd)
1905
mm
(75
in)
3500
mm
(13
8 in
)
44 6.9 m (9.0 yd)
05 m
m (
75 in
)Revision Date: 2006-2-08
Web: http://www.sandvik.com
2
006
San
dvik
Min
ing
and
Con
stru
ctio
n C
anad
a In
c.Sa
ndvi
k M
inin
g an
d C
onst
ruct
ion
rese
rves
the
right
to
chan
ge th
is s
peci
ficat
ion
with
out n
otic
e
19
General ArrangementStandard Unit SpecificationsGeneral InformationMain DimensionsOperating WeightsLoaded WeightsCapacitiesDump Box Motion TimesDriving Speeds Forward and Reverse (Loaded)Frame
Power TrainEngineTransverterAxlesTires
SystemsSteering HydraulicsTurning RadiusMain ComponentsPressure SettingsDump Box HydraulicsMain ComponentsPressure SettingsStandard BrakesMain ComponentsElectrical EquipmentOther Standard EquipmentManualsDistribution
Optional Equipment SpecificationsAvailable Alternative EquipmentAlternative Dump Box OptionsAvailable Add-On Options
Tractive Effort Curve (Metric Units)Tractive Effort Curve (US Units)Productivity Curve (Metric Units)Productivity Curve (US Units)End Loading with EJC 145Side Loading with EJC 145End Loading with EJC 116Side Loading with EJC 116End Loading with EJC 90Side Loading with EJC 90End Loading with Toro 151Side Loading with Toro 151