E. M. Hanna; 7/31/03 DXI Management Consulting 3 Importance of the Individual Project Plan

Transcript of E. M. Hanna; 7/31/03 DXI Management Consulting 1 Resource Leveling.

E. M. Hanna; 7/31/03DXI Management Consulting

1

ResourceLeveling

E. M. Hanna; 7/31/03DXI Management Consulting

2

Agenda Importance of the Individual Project Plan Importance of Resolving Resource

Over-Allocations in All Project Plans Identifying Resource Over-Allocations Manual (On-demand) Leveling of Projects Manual (On-demand) Leveling of Resources Leveling Resources Across a Portfolio of

Projects

E. M. Hanna; 7/31/03DXI Management Consulting

3

Importance of the Individual Project Plan

E. M. Hanna; 7/31/03DXI Management Consulting

4

The Building Blocks of EPM The individual Project Plan is the building

block from which the Enterprise Project Management environment is constructed.

The discipline of building sound Project Plans is critical to the success of EPM.

Resolving resource over-allocations is a critical part of the discipline of building sound Project Plans.

E. M. Hanna; 7/31/03DXI Management Consulting

5

Basic Process for Creating a Project Plan

ProjectSetup

EnterTask

Details

EnterDurationsAgainstTasks

Outline thePlan

Link Tasks(CreateDepend-encies)

Check andadjust

DefineResource

Pool

AssignResources to

Tasks

ResolveResource

Over-Allocations

Baseline thePlan

Publish thePlan

to the Server

Manage;Track

Progress

E. M. Hanna; 7/31/03DXI Management Consulting

6

Importance of Resolving Resource

Over-Allocationsin all Project Plans

E. M. Hanna; 7/31/03DXI Management Consulting

7

Over-Allocation of Resources Over-Allocation of Resources exists when—

Work [Scheduled] > Available Hours* Usually caused by scheduling multiple

assignments for a resource during a single time period (Note: EPM significantly intensifies this problem)

Project considers the Resource Calendar—but not other assignments—when scheduling new assignments*Available hours = Working Hours in Time Period X Resource Units

E. M. Hanna; 7/31/03DXI Management Consulting

8

Impact of Over-Allocated Resources If over-allocated resources exist in a schedule,

the entire project schedule is untrustworthy and not suitable for use in managing the project.

If individual project plans are untrustworthy, all portfolio analysis becomes untrustworthy

E. M. Hanna; 7/31/03DXI Management Consulting

9

E. M. Hanna; 7/31/03DXI Management Consulting

10

E. M. Hanna; 7/31/03DXI Management Consulting

11

Identifying Resource Over-Allocations

E. M. Hanna; 7/31/03DXI Management Consulting

12

E. M. Hanna; 7/31/03DXI Management Consulting

13

E. M. Hanna; 7/31/03DXI Management Consulting

14

E. M. Hanna; 7/31/03DXI Management Consulting

15

E. M. Hanna; 7/31/03DXI Management Consulting

16

Approaches to Leveling Project does the leveling

Automatic leveling Manual (on demand) leveling

Entire project Selected resources

Project Manager does the leveling

Risk

E. M. Hanna; 7/31/03DXI Management Consulting

17

Methods of Resolving Resource Over-Allocations Delay a task Split a task Reduce a task’s

duration Change the resources

assigned to the task Assign more resources

to the task

Replace an over-allocated resource with and under-allocated resource

Remove an over-allocated resource from a task

Add overtime

ProjectUses OnlyThese Two

E. M. Hanna; 7/31/03DXI Management Consulting

18

Manual (On-Demand) Leveling of an Entire Project

E. M. Hanna; 7/31/03DXI Management Consulting

19

E. M. Hanna; 7/31/03DXI Management Consulting

20

E. M. Hanna; 7/31/03DXI Management Consulting

21

Manual (On-Demand) Leveling of a Single Resource

E. M. Hanna; 7/31/03DXI Management Consulting

22

E. M. Hanna; 7/31/03DXI Management Consulting

23

E. M. Hanna; 7/31/03DXI Management Consulting

24

Leveling Resources Across aPortfolio of Projects

E. M. Hanna; 7/31/03DXI Management Consulting

25

E. M. Hanna; 7/31/03DXI Management Consulting

26

E. M. Hanna; 7/31/03DXI Management Consulting

27

E. M. Hanna; 7/31/03DXI Management Consulting

28

E. M. Hanna; 7/31/03DXI Management Consulting

29

E. M. Hanna; 7/31/03DXI Management Consulting

30

E. M. Hanna; 7/31/03DXI Management Consulting

31

E. M. Hanna; 7/31/03DXI Management Consulting

32

E. M. Hanna; 7/31/03DXI Management Consulting

33

Recommendations About Leveling Resource over-allocations must be addressed A “Project Audit” should be conducted on

project plans that are being published to the server. The audit should include a check for over-allocated resources.

Recommend—especially to naïve clients—that Project’s Automatic Leveling and Manual (On Demand) Leveling features not be used.

E. M. Hanna; 7/31/03DXI Management Consulting

34