Drawing - Duplex Alternating Brine Pump Skid · DRAWING NO. SCALE FILE ID. SHEET REV. OF DUPLEX...

Post on 12-May-2020

5 views 0 download

Transcript of Drawing - Duplex Alternating Brine Pump Skid · DRAWING NO. SCALE FILE ID. SHEET REV. OF DUPLEX...

5-287

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

A A

B B

C C

D D

DATE

FRAC.

DRN.

APP'D.

`DEC.

`

DRAWING NO.

SCALE

FILE ID.

SHEET

REV.

OF

DUPLEX ALTERNATING BRINE PUMP SKIDGENERAL ARRANGEMENT

11MSPL

ARK

7/31/2014

REVISIONSNO. BY REMARKS

INCORPORATEDDATE

CONSTRUCTION NOTES

Note: Typical design for most brine pump applications. Consult factory for special requirements.

:

1. THE SATURATED PUMP SYSTEM WILL BE SKID MOUNTED, PRE-PIPED AND WIRED PER THE FOLLOWING.

2. THE LOW CARBON STEEL SKID TO BE POWER TOOL CLEANED TO SSPC-SP-3 AMD PRIMED WITH DUPONT10-2970. A 3-5 MIL FINISH COAT OF DUPONT CORLAR 2.1 SAFETY BLUE TO BE APPLIED OVER THE PRIME COAT.

3. BRINE PUMPS PROVIDED PER THE FOLLOWING:- QTY REQUIRED: TWO (2) - 2 X 100%- PUMP TYPE: MAGNETIC DRIVE CENTRIFUGAL- PUMP MATERIAL: POLYPROPYLENE- PERFORMANCE: 25 GPM AT 70' TDH- SUCTION TYPE: FLOODED- MOTOR: 2 HP 460V 60HZ 3PH TEFC

4. ALL OF THE SKID MOUNTED PIPING TO BE SCH 80 PVC WITH SCH 80 PVC FITTINGS. SOME FITTING MAYBETHREADED. ALL PRESSURE GAUGE PIPING TO BE SCH 40 304 STAINLESS STEEL

5. ALL MANUAL ISOLATING VALVES AND CHECK VALVES TO BE PROVIDED PER THE PROJECT P&ID.

6. A 2" PVC BASKET STRAINER TO BE PROVIDED O THE SUCTION SIDE OF THE BRINE PUMP SKID.

7. ALL PUMP MOTORS TO BE PROVIDED WITH NEMA 4X MOTOR CONTROL CENTER. ALL OF THE REQUIREDMOTOR STARTERS TO BE PROVIDED .

8. ALL EXTERIOR HIGH VOLATGE WIRING TO BE CONTAINED IN EMT STEEL CONDUIT. WATER TIGHTFLEXIBLE CONDUIT MAYBE USED ON RUNS 3' OR SHORTER

9. ALL PIPING FASTNERS TO BE STAINLESS STEEL.

10. WEIGHTS:- SHIPPING: 600 LBS- OPERATING: 650 LBS

11. THE COMPLETE PUMP SKID WILL HAVE A FULL HYDRO- TEST BEFORE SHIPPING AT 100 PSIG FOR 2HOURS TO INSURE THE SKID TO BE LEAK FREE BEFORE SHIPPING. IF MINOR LEAKS OCCUR AFTERSTART-UP MARLO WILL NOT CONSIDER THOSE TO BE COVERED UNDER THE NORMAL EQUIPMENTWARRANTY.

12. THE COUNTRY OF ORIGIN FOR ALL ITEMS SUPPLIED BY MARLO OR MARLO SUB-SUPPLIERS WILLBE AT MARLO'S OPTION UNLESS SPECIFICALLY NOTED ON THIS SUBMITTAL DOCUMENT

13. ALL DIMENSIONS ARE PLUS OR MINUS 1".

14. SKID DOES NOT MEET ANY SEISMIC OR WIND LOAD REQUIREMENTS.

15. SKID IS DESIGNED FOR AN INDOOR INSTALLATION.

2" FLANGEDINLET FROM BRINEMAKER, MUST BE AFLOODED SUCTION

INLET ISOLATIONVALVE

55 5/8"

20 7/8"

72"

40"

17 1/2"

40"37 1/8"

2" BASKET STRAINER

1-1/2" FLANGEDTO WATER SOFTENER

OUTLET ISOLATIONVALVE

TWO (2)25 GPM @ 90' TDH 2 HP460V/60Hz/3PHBRINE PUMPS

B

A48 3/8"

1-1/2" 125# FLANGEDTO BRINE MEASURINGTANK

CONTROL SIGNAL120V/60Hz/1pH

TO WATERSOFTENER

CONNECTION SCHEDULEITEM DESCRIPTION LOCATION MAX. FLOW SIZE CONNECTION MATERIAL

A FROM BRINE STORAGE TANK 10' MAX. BRINE PUMP SKID 25 GPM 2" 150# FLANGED SCH 80 PVCB TO WATER SOFTENER BRINE TANK BRINE PUMP SKID 25 GPM 1 1/2" 150# FLANGED SCH 80 PVC