William B. Wade132.1%
William A. Diggs100.8%
J. P. Ryon92.5%
Eva Turner139.9%
Dr. Samuel Mudd118.3%
Dr. Gustavus Brown130.7%
Daniel of St. Thomas Jenifer156.8%
C. Paul Barnhart121.2%
Arthur Middleton108.7%
03
Water Damage
Earthquake Damage
ADA IssuesLeaking Issues
Prototype School
PPoor DaylightUndersized
Essential Spaces
Mudd Elementary School was originally constructed in 1967, and received an addition in
1995. Interior finishes are in fair condition, and ceilings show signs of leaking. Earthquake
damage is evident in some bearing walls. Some inboard classrooms have no access to
natural light. The building layout is efficient, but wayfinding is confusing. The school
lacks sufficient administrative and storage space. Essential spaces are undersized,
and there is a general lack of specialty programs housed within the school. Exterior
cladding is in fair condition, and shows some cracking and water damage. Exterior
glazing does not provide sufficient thermal insulation. Toilet rooms lack accessible
fixtures. Mechanical systems require upgrades, a back-flow preventer is needed, and
HVAC systems especially are functioning poorly. Electrical systems require significant
upgrades. The site provides ample acreage, and vehicle circulation is efficient.
Dr. Samuel MuddElementary School
Building Facts
Poor Thermal Performance
Lack of Specialty
Classrooms
105
Current Building Score
MaintenancePriority
Prescribed Work Cost Analysis
Recommendations
N/A
2.59
Major Renovation, Addition OR Replacement.
It is recommended that Mudd Elementary receive a
major systemic renovation and addition to increase
capacity. A feasibility study will demonstrate whether a
major renovation/addition or a 768-seat replacement on
site is most appropriate.
ARCH
MEP
SITE
SURVEY 1.00
3.60
2.67
2.65
4 Maintenance
SurveyCategories 2.59
This School Project Determination
BuildingScore
Description Qty. Unit County Share State Share Cost/Unit TOTAL
ARCH
Major Renovation 45,746 sf $1,607,972 $2,737,898 $95 $4,345,870
Roof Replacement 45,746 sf $118,482 $201,740 $7 $320,222
Exterior Walls 45,746 sf $91,492 $- $2 $91,492
Addition 14,000 sf $1,010,100 $1,719,900 $195 $2,730,000
MEP
Full Systemic Renovation 45,746 sf $1,100,191 $1,873,299 $65 $2,973,490
Security & Fire Alarm System Upgrade 45,746 sf $72,782 $123,926 $4 $196,707.80
Lighting System Upgrade 45,746 sf $135,408 $230,560 $8 $365,968
SITE
Drainage 1 ls $200,000 $- $200,000 $200,000
Stormwater Management/Water Quality 1 ls $129,500 $220,500 $350,000 $350,000
Parking Lot 3,000 sy $216,000 $- $72 $216,000
Subtotals $4,681,927 $7,107,822 $11,789,750
Total Including Soft Costs $9,575,558 $7,107,822 $16,683,380
Current
404
604
OptimumSRC 768
Proposed
Cost of New Construction (est.) $21,600,000