World Bank Shanghai Urban Environment APL II I III
District Financing Vehicle - Subproject
Minfeng Raw Water Conveyors Project
Environmental Management Plan
Project Implementing Agency:
Shanghai Chengtou Raw Water Co., Ltd.
Loan Management Company:
Shanghai Chengtou Environment Asset Management Co. Ltd.
Shanghai Aca ental Sciences
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Shunghni District Financing Vehicle (DFV)
Minfcng Raw Water Conveyors Project-Environmental Management Plan
Minfeng Raw Water Conveyors Project
Environmental Management Plan
Project Name: Minfeng Raw Water Conveyors Project
Project Implementing Agency: Shanghai Chengtou Raw Water
Co., Ltd.
Loan Management Company: Shanghai Chengtou Environment
Asset Management Co. Ltd.
EMP Institute:Shanghai Academy of
Legal Person:
Project Manager: Lu Shiqiang
Examined by: Shao Yiping
Verified by: Jiao Jizhen
Prepared by: Ai Lili
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Table of Contents
1 The Background and the Purpose of EMP ................................................ 1
2 Minfeng Raw Water Conveyors Project .................................................... 2
2.1 Project Description ........................................................................................ 2
2.1.1 Project Name ............................................................................................ 2
2.1.2 The Proposed Project Location ................................................................. 3
2.1.3 Project Owners or Implementation Agency ............................................. 3
2.1.4 Project Scale ............................................................................................. 3
2.1.5 Major Project Components ....................................................................... 4
2.1.6 Environmentally Sensitive Targets ........................................................... 4
2.1.7 Cost Estimate and Implementation Plan ................................................... 9
2.2 Objective of EMP .......................................................................................... 9
2.3 Laws, Regulations, Policies and Regulatory Frameworks .......................... 10
2.3.1 Environmental Laws and Regulations .................................................... 10
2.3.2 EIA Technical Guidelines and Criteria .................................................. 11
2.3.3 Pollution Discharging Standard .............................................................. 11
2.3.4 WB Safeguard Policies ........................................................................... 13
2.3.5 World Bank Group Environmental Health and Safety Guidelines ......... 14
2.3.6 Project Related Documents .................................................................... 15
2.4 Summary of Environmental Impacts and Environmental Protection Measures .............................................................................................................. 16
2.4.1 Environmental Impacts and Mitigation Measures during Construction . 16
2.4.2 Environmental Impacts and Mitigation Measures during Operation ..... 19
2.5 Emergency Management ............................................................................. 20
2.5.1 Organization and Duties ......................................................................... 20
2.5.2 Emergency Response .............................................................................. 20
2.6 Environmental Monitoring Plan .................................................................. 22
2.6.1 Purpose of Monitoring ............................................................................ 22
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
2.6.2 Environmental Monitoring Organizations .............................................. 22
2.6.3 Environmental Monitoring Plan ............................................................. 23
2.6.4 Completion Acceptance .......................................................................... 25
2.7 Environmental Management Organization ................................................. 26
2.7.1 Environmental Management Organization and Responsibilities ............. 27
2.7.2 Environmental Protection Organization during Construction ................ 28
2.7.3 Management of Contractor ..................................................................... 31
2.7.4 Environmental Protection Organization during Operation ..................... 32
2.8 Environmental Management-Related Plans ................................................ 33
2.8.1 Training .................................................................................................. 33
2.8.2 Public Participation Plan ........................................................................ 34
2.8.3 Information Communication .................................................................. 35
2.9 The Budget of Environmental Protection .................................................... 37
3 Jinze Reservoir Project of Upper Huangpu Raw Water Intake system 38
3.1 Project Description ...................................................................................... 38
3.1.1 Project Name .......................................................................................... 38
3.1.2 The Proposed Project Location ............................................................... 39
3.1.3 Project Owners or Implementation Agency ........................................... 39
3.1.4 Project Scale ........................................................................................... 39
3.1.5 Major Project Components ..................................................................... 40
3.1.6 Cost Estimate and Implementation Plan ................................................. 40
3.2 Summary of Environmental Impacts and Environmental Protection Measures .............................................................................................................. 41
3.2.1 Environmental Impacts and Mitigation Measures during Construction . 41
3.2.2 Environmental Impacts and Mitigation Measures during Operation ..... 43
3.3 Environmental Monitoring Plan .................................................................. 45
3.4 Environmental Management Organization ................................................. 47
3.4.1 Environmental Management Organization and Responsibilities ............. 47 ii
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
3.4.2 Environmental Protection Organization during Construction ................ 48
3.4.3 Environmental Protection Organization during Operation ..................... 50
3.5 The Budget of Environmental Protection .................................................... 51
4 Pipe Routing Project of Upper Huangpu Raw Water Intake System... 52
4.1 Project Description ...................................................................................... 52
4.1.1 Project Name .......................................................................................... 52
4.1.2 The Proposed Project Location ............................................................... 52
4.1.3 Project Owners or Implementation Agency ........................................... 52
4.1.4 Project Scale ........................................................................................... 52
4.1.5 Major Project Components ..................................................................... 52
4.1.6 Cost Estimate and Implementation Plan ................................................. 53
4.2 Summary of Environmental Impacts and Environmental Protection Measures .............................................................................................................. 53
4.2.1 Environmental Impacts and Mitigation Measures during Construction . 53
4.2.2 Environmental Impacts and Mitigation Measures during Operation ..... 56
4.3 Environmental Monitoring Plan .................................................................. 58
4.4 Environmental Management Organization ................................................. 60
4.4.1 Environmental Management Organization and Responsibilities ............. 60
4.4.2 Environmental Protection Organization during Construction ................ 61
4.4.3 Environmental Protection Organization during Operation ..................... 63
4.5 The Budget of Environmental Protection .................................................... 64
iii
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Abbreviations
CRWC Shanghai Chengtou Raw Water Company
DFV Shanghai District Financing Vehicle
EIA Environmental Impact Assessment
EMP Environmental Management Plan
FSR Feasibility Study Report
SAES Shanghai Academy of Environmental Sciences
SEPB Shanghai Environmental Protection Bureau
EPB Environmental Protection Bureau
ESI Environmental Supervision Institute
UHRRWC Shanghai Upper Huangpu River Raw Water Co. Ltd.
WIPS Water Intake Pumping Station
WTP Water Treatment Plant
1
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
1 The Background and the Purpose of EMP
Regulation on the protection of drinking water source in Shanghai was promulgated in
2010, according to its requirement, protection scope of water source area, including
the upper Huangpu River, should be delineated. Given this, there are six sets of water
intakes which should be included into the Grade I protection zone. According to the
requirements of first-grade protection zone, any project which is irrelevant to
water-supply facilities and water protection should be terminated or disclosed.
However, relocation is hard for some enterprises. For instance, according to the
geographic location, demolition cannot be realized for both several enterprises on the
north bank and Shanghai Shipyard on the southern bank. Under such circumstances,
since it is so hard for Minhang and Fengxian water intakes to implement the
first-grade protection, concrete measures must be taken to tackle this big problem.
Regarding raw water planning of upper reaches of Huangpu River approved in October,
2013, Shanghai Municipal Government insists that the raw water sources of the upper
reaches of the Huangpu River provides water to Qingpu, Songjiang, Jinshan, Fengxian
and some portions of Minhang with water supply capacity of 5,000,000 m3/d, serving a
population of about 9,500,000 people. In order to improve the security of raw water in
five districts of the upper reaches of Huangpu River, that is, Qingpu, Songjiang,
Fengxian and some portion of Minhang, five existing water intakes will be incorporated
into Jinze of Taipu river and Songpu water-intake, forming the layout of pipe routing
project of upper Huangpu Intake system which features one line, two spots and three
stations and realizing two-way water diversion in both positive and opposite direction
in a bid to safeguard water supply. At the same time, Jinze area, northern bank of Taipu
River, will utilize existing lake to build a new reservoir in order to strengthen the
centralized protection and stabilization of the water quality of the water source.
Consideration of the current water situation, two engineering will be implemented in
advance, that is, one-way Pipe Routing Project of Upper Huangpu Intake system and a
small ecological regulating reservoir. 1
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Minfeng Raw Water Conveyors Project is a part of the raw water project of upper
Huangpu River water source. The raw water supply is changed from Songpu Bridge
into Jinze reservoir for centralized water supply. The range of project influence
includes Pipe Routing Project of Upper Huangpu Raw Water Intake system and Jinze
Reservoir Project of Upper Huangpu Raw Water Intake system.
In accordance with the Law of Environmental Impact Assessment of People’s
Republic of China and Regulations on the Administration of Construction Project
Environmental Protection, environmental impact assessment is required for new,
upgrade and expansion projects that have environmental impacts, and an
environmental impact assessment report or form should be prepared to describe local
environmental quality condition of the project location and environmental impacts
associated with project construction and operation. In accordance with Notice of
Strengthening EIA Management of Construction Project Financed by International
Financing Organization issued by the Ministry of Environmental Protection (MEP)
and based on nature of this Project, Pipe Routing Project of Upper Huangpu Raw
Water Intake system and Jinze Reservoir Project of Upper Huangpu Raw Water
Intake system are combined with the EMP for Minfeng Raw Water Conveyors Project.
EMP report shall be prepared by Shanghai Academy of Environmental Sciences
separately (SAES).
2 Minfeng Raw Water Conveyors Project
2.1 Project Description
2.1.1 Project Name
Minfeng Raw Water Conveyors Project
2
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
2.1.2 The Proposed Project Location
The proposed Minhang and Fengxian Conveyor Project is located inSongjiang
District, Minhang District and Fengxian District of Shanghai.
The project is located in Upper Huangpu River Water Source protection area.
Minhang water regulating tank and Fengxian water regulating tank are all located in
the Grade II water source conservation area, Minhang branch line(1.0km) and
Fengxian branch line(1.467km) are located in the Grade
I water source conservation area, while the rest branch lines locate in the Grade
II water source conservation area.
2.1.3 Project Owners or Implementation Agency
Implementation agency of this Project is Shanghai Chengtou Raw Water Co., Ltd
(CRWC).
2.1.4 Project Scale
(1) The raw water conveyance capacity of this project is 1.95 million m3/d. Raw
water will be conveyed from the existing Songpu Pumping Station via two
routes to Minhang Water Intake Pumping Station (WIPS) and Fengxian WIPS
respectively. The conveyance capacity of the Minhang conveyor is 1.1 million
m3/d and the conveyance capacity of the Fengxian conveyor is 0.85 million
m3/d. Minhang and Fengxian WIPSs will serve as emergency standby water
supplies after the project is completed.
(2) Minhang pressure regulating tank covers an area of 7447m2 with a flat area of
3000 m2, and the volume is 11300m3. The top elevation and bottom elevation
of the tank are 4.7m and -0.4m separately.
(3) Fengxian pressure regulating tank covers an area of 5789.87m2, the volume is
10200m3. The top elevation and bottom elevation of the tank are 5.1m and
0.3m separately. 3
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
2.1.5 Major Project Components
(1) The water pipelines from Songpu PS to Minghang water department with the
length of 2.3km using a single pipe of DN2600. The new water pipelines from
Minfeng Diversion Chamber to Songpu PS and from Minfeng Diversion
Chamber to Fengxian Water Division with the length of 9.906km using a
single pipe of DN3000.
(2) New water regulating pond (including pressure regulating stabilization
facilities) and overflow wells will be built in the water-side (at the pump
station) in Minhang District and Fengxian District.
(3) Necessary reconstruction project of the existing water intake pumping station
(connecting pipe from water regulating tank to the existing water pumping
station suction well) in Minhang Water Division and Fengxian Water
Division.
2.1.6 Environmentally Sensitive Targets
The main environmentally protective factors of the proposed project are atmosphere,
surface water, ground water, sound environment and ecological environment. The main
environmental protection targets’ survey in the evaluation scope is shown in table 2.1-1.
4
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Table2.1-1 summary of environmental protection targets of this project
No. Village belonged to Name Relationship with this project
Households within 200m
around assessment area
Classes of protection target Stage of protection
1
Lianzhuang Village
Zhongfan resident
36m from north side of Songpu raw water plant, the minimum distance from this project is about 48m
16 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period and operation period
2
The 2nd Group resident in Lianzhuang Village
121m from northwest side of Songpu raw water plant, the minimum distance from this project is about 214m
22 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period and operation period
3 Pengdu Village Nanzhangjia resident
26m from east side of Minhang water regulating tank 27
standard of noise environment, Class II standard of air quality
sensitive targets during construction period and operation period
4
Yanjing Village
Beichao resident
Southeast side of the pipe jacking working well JN2A,the minimum distance from construction site is about 185m
15 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
5 Zhoujiabang resident (now Zhoushan)
Southwest side of the pipe jacking receiving well JN2, the minimum distance from construction site is about 151m
5 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
6 Jinjiali resident (now Jinshanwu)
South side of the working well JN3, the minimum distance from construction site is about 16m
12 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
7 Dongqin Village Sunjiadai Northeast side of the working well JN3, the 18 Class I standard of noise sensitive targets during 5
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
resident minimum distance from construction site is about 102m
environment, Class II standard of air quality
construction period
8 Fanjiadai resident
Northwest side of the working well JN4, the minimum distance from construction site is about 153m
11 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
9 Tangjiadai resident
West side of the working well JN4, the minimum distance from construction site is about 168m
4 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
10 Hujiazhai resident
North side of the receiving well JN5, the minimum distance from construction site is about 16m
8 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
11
Xinye Village
Nanbang resident
North side of the working well JN6, the minimum distance from construction site is about 38m
24 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
12 Jinjiazhai resident
Southwest side of the working well JN6, the minimum distance from construction site is about 172m
10 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
13 Sinongtang resident
North side of the receiving well JN7 and working well JN8, the minimum distance from construction site is about 85m
11 Class II standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
14 Majiatang resident
Northeast side of the working well JN8, the minimum distance from construction site is about 113m
30 Class II standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
15 Fengjia resident Southwest side of the working well JN9, the minimum distance from construction site is 16 Class II standard of noise
environment, Class II sensitive targets during construction period
6
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
about 91m standard of air quality
16
Yuli Village
Shijiabang resident
North, southwest, southeast sides of the working well JN10 and south side of the receiving well JN11, the minimum distance from construction site is about 31m
34 Class II standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
17 Yangjiali resident
Southeast side of the receiving well JN11 and west side of the receiving well JN12, the minimum distance from construction site is about 98m
6 Class II standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
18 Wujiazhai resident
Southwest side of the receiving well JN13, the minimum distance from construction site is about 92m
15 Class II standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
19
Puxiu Village
Majiatang resident
East side of the receiving well JN12, the minimum distance from construction site is about 62m
7 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
20 Ruijiali resident Southeast side of the receiving well JN13, the minimum distance from construction site is about 33m
40 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
21 Wangjiatang resident
South and southwest sides of the receiving well JN14, the minimum distance from construction site is about 21m
20 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
22 Yanjing Village Chuantangfang resident
Southwest side of the receiving well JN1A, the minimum distance from construction site is about 146m
15 Class I standard of noise
environment, Class II standard of air quality
sensitive targets during construction period
7
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
23 Local water in protection area of Huangpu River drinking water source
water regulating tank in this project occupies about 13639m2 in the Grade II water source conservation area. Minhang raw water branch line and Fengxian raw water branch line run across about 2.476kmin the Grade I water source conservation area and run across about 9.95kmin the Grade II water source conservation area
—
Class II~III standard of water environmental quality, key protection area of wetland in Shanghai
sensitive targets during construction period
24 Water intake of Songpu raw water plant
about 200m from Southeast side of pipe jacking well JB1 — Class II standard of water
environmental quality
sensitive water environment protection targets during construction period
25 Water intake of Minhang about 227m from Southeast side of Minhang water regulating tank —
Class III standard of water environmental quality
sensitive water environment protection targets during construction period
26 Water intake of Fengxian about 350m from Northeast side of Fengxian water regulating tank —
Class III standard of water environmental quality
sensitive water environment protection targets during construction period
8
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
2.1.7 Cost Estimate and Implementation Plan
The project is planned to start in September 2014, and to be finished in October 2016.
According to “The preliminary design review report”, the total investment is about
CNY 831.2 million.
2.2 Objective of EMP
Aiming at inevitable environmental impacts of this Project, an EMP is prepared to
formulate a set of operable environmental countermeasures with technical feasibility
and financial sustainability, nail down measures of environmental alleviation,
environmental management and institutional arrangement of contractors, construction
supervisions, operators, and environmental administrative agencies during
construction and operation, and eliminate or compensate adverse impact on society
and environment of this Project as much as possible to an acceptable level.
(1) Nail down measures of environmental alleviation for environmental protection
targets. Shanghai EPB, EIA institute and design institute of this Project
conducted a detailed check and verification of environmental protection
targets on site and recommended effective mitigation measures which are
included into engineering design and will be the contract obligations of
contractors and operators.
(2) Guideline of environmental management. The environmental monitoring plan
during construction and operation in this EMP can ensure effective
implementation of mitigation measures. The monitoring plan will be provided
to construction supervision unit, environmental monitoring unit and other
relevant units as an environmental protection document during construction
and operation. Nails down roles and responsibilities of relevant administrative
and functional agencies and the channel and method of communication among
agencies.
9
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
(3) Nail down roles and responsibilities of relevant administrative and functional
agencies. As well as provide the channel and method of communication
among agencies.
(4) Put forward environmental monitoring plans and training programs for the
construction and operation. In order to ensure the effective implementation of
the environmental mitigation measures and early to deal with unforeseen or
unexpected environmental problems, environmental monitoring plans and
training programs for the construction and operation was proposed in this
EMP.
2.3 Laws, Regulations, Policies and Regulatory Frameworks
2.3.1 Environmental Laws and Regulations
(1) Law of Environmental Protection of PRC, December 1989
(2) Law of Environmental Impact Assessment of PRC, October 2002
(3) Law of Water Pollution Prevention and Control of PRC, February, 2008
(4) Law of Air Pollution Prevention and Control of PRC, April 2000
(5) Law of Environmental Noise Pollution Prevention of PRC, October 1996
(6) Law of Solid Waste Environmental Pollution Control of PRC, December 2004
(7) Notice of Strengthening EIA Management of Construction Project Financed
by International Financing Organization, May 2008
(8) Regulation of Environmental Protection of Shanghai, October, 2005
(9) Protection Regulations for Drinking Water Source of Shanghai, December,
2009
(10) Management Methods of Dust Suspension Pollution Control of Shanghai,
May 2004 10
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
(11) Management Regulations on Construction Solid Wastes and Waste Soil
Disposal of Shanghai, amended, January 2011
(12) Notice of Stringent Control of Construction Activities during Night to
Prevent Environmental Noise Pollution, October 2006
(13) Protection Methods for Raw Water Diversion Pipe and Canal of Shanghai,
January 1995
2.3.2 EIA Technical Guidelines and Criteria
HJ/T2.1-2.4 Environmental impact assessment related technical guidelines
2.3.3 Pollution Discharging Standard
(1) Sewage discharge control standards
The World Bank does not set the discharge standards on this industrial field, so Shanghai
Integrated Wastewater Discharge Standard for special waters (DB31/199-2009) is applied
to construction period and operational period. Water standard for vehicle washing and
road sweeping in the Urban Recycling-Miscellaneous Water Quality (GB/T18920-2002)
is applied to reuse of wastewater in construction period. Excess water can be discharged
into river which is not included in Grade I or Grade II water source conservation area
after achieving the special protection waters standard in Shanghai Integrated Wastewater
Discharge Standard (DB31/199-2009).
Table2.3-1Integrated Wastewater Discharge Standard of Shanghai (Unit: mg/L)
Parameter pH SS COD Petroleum
Special Protection Waters Standard
6~8.5 50 60 3
11
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Table 2.3-2Urban Recycling-Miscellaneous Water Quality Standards (Unit: mg/L)
Name Major Parameters Standard values
Urban Water Quality for Recycled Water and Miscellaneous Water(vehicle washing)
pH 6~9
TDS ≤1000 mg/L
BOD5 ≤10 mg/L
NH3-N ≤10 mg/L DO ≥1mg/L
Total Coliform Group 3/L
Urban Water Quality for Recycled Water and Miscellaneous Water
pH 6~9
TDS ≤1500 mg/L
BOD5 ≤15 mg/L
NH3-N ≤10 mg/L
DO ≥1mg/L Total Coliform Group 3/L
(2) Air Emission control standards
Reference to Integrated emission standard of air pollutants (GB16297-1996), construction
dust and exhaust gas should perform the monitoring concentration limits of unorganized
emissions during construction period.
Table 2.3-3Air pollutant emission limits for new pollution source (Unit: mg/m3)
(Concentration limits to unorganized emission monitoring)
Parameter SO2 NOx Particulates
Location
the highest concentration point out of the perimeter
Boundary
the highest concentration point out of the perimeter
Boundary
the highest concentration point out of the perimeter
Boundary
Concentration 0.4 0.12 1.0
12
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
(3) Noise control standards
Construction noise should perform the Emission Standard of Environment Noise for
Boundary of Construction Site (GB12523-2011).
Table 2.3-4Limits to noise level at construction site boundary(Leq)(Unit: dB(A))
Daytime Night
70 55
2.3.4 WB Safeguard Policies
Table2.3-5The applicability analysis about this project and WB Safeguard Policies
Safeguard Policies Applicability Notes
OP/BP 4.01 Environmental assessment
Yes According to the project category, the proposed project is water intake engineering, the impact on water quality, water conservancy, ecosystem will cover the area of pipeline. And such impact will last to the decommissioning phase, so it is listed in category A that is “it is likely to have significant adverse environmental impacts that are sensitive”.
OP/BP 4.04 Natural habitat
Yes The project location are covered by artificial vegetation, farmland and green belt of water source conservation. As there are no natural habitats involved within the project assessment area, not triggered.
OP 4.09 Pest management
No The pipeline will not be involved with agriculture and healthy, not triggered.
OP 4.37 Dam safety Yes The project will not be involved with dam, but the raw water is supply by Jinze reservoir, and the Jinze reservoir dam is a low dam. The acting head is low and the highest water level of the reservoir is lower or just little higher than ground elevation which is beneficial for the dam safety.
OP4.11 Physical cultural resources
No The project location does not have known physical cultural resources, not triggered.
OP/BP4.36 Forest No There is no forest in the proposed project location, not triggered.
13
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Safeguard Policies Applicability Notes
OP/BP 4.12 Involuntary resettlement
Yes The RAP reports of this project and its associated projects have been prepared.
OD 4.20 Indigenous Peoples
No Not triggered.
OP 7.50 International Waterways
No All the area is in China, not triggered.
OP/BP 7.60 Disputed area
No All the area is in China, not triggered.
World Bank Group EHS Guidelines( EHS General Guidelines ) , sector-specific Water and Sanitation Guidelines
Yes The project is of potable water treatment and distribution systems, and will have effect on the surface water environment during the construction period. The main pollutants are pH、SS and petroleum, so it is triggered.
2.3.5 World Bank Group Environmental Health and Safety Guidelines
The World Bank Group EHS Guidelines(EHS General Guidelines), sector-specific
Water and Sanitation Guidelines contain performance levels and measures that are
generally considered to be achievable in new facilities by existing technology at
reasonable costs. Application of the EHS Guidelines to existing facilities may involve
the establishment of site-specific targets, with an appropriate timetable for achieving
them.
The applicability of the EHS Guidelines should be considered the hazards and risks
established for each project on the basis of the results of an environmental assessment
in which site-specific variables, such as host country context, assimilative capacity of
the environment, and other project factors, are taken into account. The applicability of
specific technical recommendations should be based on the professional opinion of
qualified and experienced persons.
When host country regulations differ from the levels and measures presented in the
EHS Guidelines, sector-specific Water and Sanitation Guidelines, projects are 14
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
expected to achieve whichever is more stringent. If less stringent levels or measures
than those provided in these EHS Guidelines are appropriate, in view of specific
project circumstances, a full and detailed justification for any proposed alternatives is
needed as part of the site-specific environmental assessment. This justification should
demonstrate that the choice for any alternate performance levels is protective of
human health and the environment.
The Environment, Health and Safety Guidelines includes measures relevant to water
quality and water supply, including wastewater discharging management, monitoring,
water saving, recycling, etc. These measures should be incorporated into the project's
EMP.
2.3.6 Project Related Documents
(1) Special Plan for Plan of Minfeng Raw Water Conveyors Project, July
2013.
(2) Proposal &Feasibility Study Report of Minfeng Raw Water Conveyors
Project, prepared by Shanghai Municipal Engineering Design Institute,
August 2013.
(3) Environmental Impact Assessment Report of Minfeng Raw Water
Conveyors Project, Shanghai Investigation, Design and Research Institute,
December 2013.
15
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
2.4 Summary of Environmental Impacts and Environmental Protection Measures
2.4.1 Environmental Impacts and Mitigation Measures during Construction
Table 2.4-1Environmental Impacts and Mitigation Measures during Construction
Impacts Measures Implemented by
Supervised by Monitored by
Construction muddy wastewater
The project is divided into three simultaneous construction tenders, each tender has a construction camp with a set of wastewater collection and treatment system. Two mud pipelines are set for each bid. The muddy water from conduit jacking well construction and the excavation
work well, underground water seepage, equipment washing wastewater are separated by the wastewater treatment system should be treatment to satisfy the standards for vehicle washing and construction operations of Urban Water Quality for Recycled Water and Miscellaneous Water(GB/T18920-2002). Residual water is treated to reach the standards for special protection water area of Integrated Wastewater Discharge Standard of Shanghai (DB31/199-2009) and then could be discharged into river which is not included in the Grade I or Grade II water source conservation area.
CRWC, Construction institute
ESI, EPB, water management department
Monitoring institute
Domestic Sewage
Temporary living area are set in construction site, which must be out of the Grade I or Grade II water source conservation area. After collection and treatment with integrated wastewater treatment facilities (the treatment technique is A2/O), the sewage should be reused for construction site, roads and vehicles washing. Residual water is treated to reach the standards for special protection water area of Integrated Wastewater Discharge Standard of Shanghai (DB31/199-2009) and then could be discharged into river which is not included in the Grade I or Grade II water source conservation area.
CRWC, Construction institute
ESI, EPB, water management department
Monitoring institute
16
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Ground Water
Use the diaphragm walls without dewatering and strengthen monitoring of soil deformation, land subsidence and deformation of surface buildings or structures.
CRWC, Construction institute
ESI, EPB, water management department
Monitoring institute
Air Pollution
Simple barriers should be installed around construction site to separate construction site and surrounding environment so as to reduce adverse impacts of waste gas to surrounding environment. Work area should ensure regular watering and simple cover. Vehicle cleaning facilities should be set on construction site. Transportation vehicles should be cleaned before leave construction site. If cement, lime, sand and other materials that are easy to produce dust in construction site, enclosed fence should be set up and should be taller than piled materials. Transportation vehicles should be closed to prevent spill and leakage along the transportation route.
CRWC, Construction institute
ESI , EPB Monitoring institute
Noise Reasonably schedule works, and prohibit high-noise works at night. For residential area within 200m distance from the construction site, construction time with high intensity noise equipment shall be shortened, especially in weekend and lunch time in summer, in order to reduce the influence to sensitive target.
CRWC, Construction institute
ESI , EPB Monitoring institute
Solid Waste Pollution
Construction waste residue, building wastes, wet soil from pipeline construction and excavation spoil will be treated by greening and urban appearance administration departments of Songjiang, Minhang and Fengxian District. The temporary dump site shall be located outside Grade I water source conservation area and far away (at least 50 meters) from residential areas and river courses. Domestic wastes are regularly removed by the environmental sanitation agency.
CRWC, Construction institute
ESI, EPB, Environmental Sanitation Bureau Sediment Administration
Ecological
The project should reasonably choose the locations of temporary construction sites, temporary construction roads and temporary stockpile areas to minimize
CRWC, Construction
ESI, EPB, Municipal Greeni
17
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Environment
farmland occupation and avoid occupation of basic farmland. If farmland is temporarily occupied, topsoil should be removed and stored in other places. After works are complete, level the ground, remove debris and residuals and return topsoil to site for farmland restoration. If uncultivated land is occupied temporarily, restore land to original condition or rehabilitate vegetation after works are complete. During construction period, activity scope of construction vehicles, machinery and workers should be strictly controlled, and the width of construction operations should be reduced.
institute ng Administration
Transportation
Shorten the construction period where possible without comprising the quality of works. Reasonably arrange the routes and schedules of construction vehicles, set speed limits and prohibit tooting
CRWC, Construction institute
ESI , transportation management department
Health and safety
Construction personnel need receive health check-up before starting to work. Sick personnel shall not be allowed on site before they are cured. Strengthen sanitary and anti-epidemic work on work areas; increase sanitary and ant epidemic awareness and education.
CRWC, Construction institute
Sanitation and ant epidemic department
18
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
2.4.2 Environmental Impacts and Mitigation Measures during Operation
Table 2.4-2Environmental Impacts and Mitigation Measures during Operation
Impacts Measures Implemented by
Supervised by
Maintenance of pipelines and water regulating tank
Strictly implement the Protection Methods for Raw Water Diversion Pipe and Canal of Shanghai and planning advices about pipeline layout and route selection by Shanghai Municipal Planning Bureau during operation, and delineate the scope of protection area of water pipelines. No piling, drilling, digging, soil sampling which do not meet the Protection Methods for Raw Water Diversion Pipe and Canal of Shanghai in scope of protection area of the pipeline. Ensure that there are no septic tanks, sewage treatment structures, leakage wells, rubbish heap and other sources of pollution within 10m around the water regulating tank, and no sewers and pollutants within 2m around the water regulating tank.
CRWC EPB, water management department
Ecological Environment
After the end of the project, construction sites and temporary occupied land should promptly be leveled, trees, grass or crops should be planted, and vegetation should be restored. For the permanently occupied green belt of water source conservation in this project, the construction company should initiatively coordinate with the relevant departments to solve the problem and pay compensation appropriately based on area of permanent occupied land.
CRWC EPB, Municipal greening administration
19
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
2.5 Emergency Management
2.5.1 Organization and Duties
(1) Composition of Emergency Organization
Working group of water pollution emergency is set up by Shanghai Minhang Water Co. and
Shanghai Fengxian Water Co., and is headed by general manager. It is composed of staff
from Minhang EPB, Fengxian EPB, Songjiang EPB, Minhang Water Authority, Fengxian
Water Authority and Songjiang Water Authority.
(2) Duty of Emergency Organization
The main responsibilities of the working group for emergency is preparing contingency plans,
carrying out emergency work for environmental emergencies, responsible for organizing and
leading emergency handling, assessing events and disputes, reporting the situation to their
superiors and making recommendations and measures to their superiors if it is necessary to
start a higher level of contingency plan.
2.5.2 Emergency Response
(1) Emergency Procedures
Once water pollution occurred such as oil spilling, people at the scene (witnesses, units or
individuals) have the responsibility and obligation to call the emergency telephone
immediately. The working group for emergency should instruct relevant department to send
people to the scene shortly after receiving the report. Inspectors should sample and test
quickly and report test results to the working group for emergency within 30min. Water
analysis departments of Shanghai Minhang Water Co. and Shanghai Fengxian Water Co.
should rush to scene of the accident within 60min after receiving information to retest and to
preliminary determine the grade of accident. Once the accident is confirmed, they should
report to the working group for emergency immediately.
(2) Emergency Response
The working group for emergency should activate contingency plans and rush to the scene of
the incident, meanwhile contact with environmental protection, water affairs bureau and other
relevant departments to handle the pollutants in water sources. Meanwhile they should
20
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
organize emergency rescue teams, emergency supplies and equipment. Shanghai Minhang
Water Co., Ltd. and Shanghai Fengxian Water Co., Ltd. should organize enterprise to
implement the emergency response work by the coordination of the working group for
emergency.
(3) Emergency Handling
1) Shanghai Minhang Water Co. and Shanghai Fengxian Water Co. should coordinate
with environmental protection, water affairs bureau and other relevant departments
to dispose oil spilled in water source and water intake.
2) Define the pollution range of oil spilling in water source and the real-time movement
direction of pollutants in water, and to put forward disposal recommendations.
3) If the oil spilling accident was happened within a certain range from the water intake
and contaminated Huangpu River as well as threatened the water intake, Shanghai
Minhang Water Co. and Shanghai Fengxian Water Co. should take precautions,
such as forming protective circle around water intakes by oil booms, or placing oil
absorption felt in sedimentation tanks.
4) If water intake was contaminated by oil spilling accident, Shanghai Minhang Water
Co. and Shanghai Fengxian Water Co. should take precautions immediately, such as
placing oil booms around water intakes, throwing oil absorption felts, or placing oil
booms and oil absorption felt in sedimentation tanks.
5) Strengthen the raw water monitoring: to arrange water quality emergency monitoring
staff to test the water-gate quality at water intake every 15min and to conduct a
water quality monitoring at the inlet water regulating tank in water plant every
15min. If inlet water quality cannot meet the water requirements, water in taking
must be stopped immediately.
(4) Information Publishing
In order to ensure that the information can be delivered in time and accurately, the
information of oil spilling accident should be collected and managed by the coordination of
the working group for emergency.
(5) End of Emergency 21
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
After finishing the disposal of oil spilling accident, the working group for emergency will
announce the end of emergency and to turn into normal management.
(6) Post-Disposal
The working group for emergency should sort out and review all emergency records and
documents, summarize and evaluate the cause of the emergency and the main actions taken in
the emergency.
2.6 Environmental Monitoring Plan
2.6.1 Purpose of Monitoring
Environment monitoring consisting of project construction period and operation period aims
to comprehensively understand the dynamic status of pollutions of this project in time,
understand the change of environment quality of project area, coverage of influence and the
environment quality during the operation, report to the administrative department, and
provide scientific foundations to environment management of this Project.
2.6.2 Environmental Monitoring Organizations
This project does not set specific environmental monitoring agency, the monitoring during
construction and operation will be entrusted to the environmental monitoring station of the
city by contractors and operators. The environmental monitoring station should be a
certificated unit of national environmental quality monitoring with complete equipment and
strong technologies. According to the environmental impact forecast results, select those
locations where pollution may be obvious as the monitoring points, track the pollution during
construction period and operation period. The main monitoring items include noise, air
quality, and surface water quality. The monitoring factors will be determined based on
pollution characters. The monitoring methods adopt the relevant methods listed in the
Standard of Environment Monitoring Technology which is issued by the MEP.
22
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
2.6.3 Environmental Monitoring Plan
Table2.6-1 Environmental Monitoring Plan
Monitoring period
Environmental factors
Monitoring Location (numbers) Monitoring items Monitoring frequency
Responsible
Monitoring agency
Construction Period
Ambient air
Set up 1 air monitoring site in each sensitive residential area, such as Zhongfan, Nanzhangjia, Jinjiadai, Hujiazhai, Nanbang, Shijiabang, Ruijiali, Wangjiatang and Chuantangfang front row, 9 in total.
TSP 1term/quarter, 1 time/day, 9 terms in total
CRWC
Environmental monitoring agency
Noise
Set up 1 noise monitoring site in each sensitive residential area near the construction area, such as Zhongfan, Lianzhuang 2nd group, Nanzhangjia, Beichao, Zhoujiabang, Jinjiadai, Sunjiadai, Fanjiadai, Tangjiadai, Hujiazhai, Nanbang, Jinjiazhai, Silongtang, Majiatang, Fengjia, Shijiabang, Yangjiali, Majiatang, Ruijiali, Wujiazhai, Wangjiatang, Chuantangfang, 22 in total.
Leq dB(A)
1term/quarter, 1day/term, 1 time at day and night, 9 terms in total
Wastewater from construction
Set up 1 construction wastewater monitoring site in each construction area, 3 in total.
pH, CODcr, SS, petroleum
1 term/quarter, 2 days/term, 2 times/term, 9 terms in total
Sewage 1 sewage treatment tank in Minhang, 2 sewage treatment tanks in Fengxian.
CODCr 、 BOD5 、
NH3-N、animal and plant oil
1 term/quarter, 2 days/term, 2 times/term
23
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Monitoring period
Environmental factors
Monitoring Location (numbers) Monitoring items Monitoring frequency
Responsible
Monitoring agency
Surface water
Set up 6 surface water monitoring sites and 2 surface water monitoring sections along the project, the 6 surface water monitoring sites are Xihe river, Qingshui port, Nansha port and 3 rivers where construction camp discharge wastewater. The 2 surface water monitoring sections are located in upstream 500m from Songpu Raw water plant in Huangpu River and downstream 500m from Fengxian water regulating tank in Huangpu River.
Temperature, pH, DO, SS, CODMn, BOD5, ammonia nitrogen, total phosphorus, volatile phenol, petroleum, 10in total.
1 term before construction, 1 term/quarter during construction, 10 terms in total, 2 times/term
Operation Surface water
Set up 6 surface water monitoring sites and 2 surface water monitoring sections along the project, the 6 surface water monitoring sites are Xihe river, Qingshui port, Nansha port and 3 rivers where construction camp discharge wastewater. The 2 surface water monitoring sections are located in upstream 500m from Songpu Raw water plant in Huangpu River and downstream 500m from Fengxian water regulating tank in Huangpu River.
Temperature, pH, DO, SS, CODMn, BOD5, ammonia nitrogen, total phosphorus, volatile phenol, petroleum, 10 in total.
1 term during initial operation
CRWC
24
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
2.6.4 Completion Acceptance
Environmental protection acceptance of completed construction projects is an important
environmental protection system for supervising the environmental protection facilities and
construction projects putting into construction or use at the same time, as well as supporting
the implementation of other environmental protection measures. The environmental
acceptance should be carried out simultaneously with the completion and acceptance of the
main project. After completed, according to relevant laws, CRWC should apply to the SEPB
for environmental acceptance. According to "Management Methods on Environmental
Acceptance of Construction Project Completion", the environmental administrative
departments judge whether the project meets the environmental protection requirements
based on the results of environmental acceptance and on-site inspection. Only when the
environmental acceptance is passed, the construction project can be put into operation. The
contents of environmental acceptance of this project are shown in Table 2.6-2.
Table 2.6-2Table of Contents of Environmental Protection Acceptance of This Project
Pollutant Sources/ Project Contents of Acceptance Effect of Measures Responsible
Organization
Construction period
Wastewater
Construction wastewater is treated by coagulation sedimentation treatment, sewage is treated using integrated water purification device, to achieve "Urban Water Quality for Recycled Water and Miscellaneous Water (GB/T18920-2002)”, the remaining water will be discharged after achieving special protection water area of Integrated Wastewater Discharge Standard of Shanghai (DB31/199-2009)", it can’t be discharged into the Grade I or Grade II water source conservation area.
Before disposed, construction wastewater should meet the standards for vehicle washing and construction operations of Urban Water Quality for Recycled Water and Miscellaneous Water (GB/T18920-2002). Before discharging, construction wastewater should meet the standards for special protection water area of Integrated Wastewater Discharge Standard of Shanghai (DB31/199-2009). Construction wastewater is forbidden discharge into rivers which are in the Grade I or Grade II water source conservation area.
CRWC
Noise Reasonable layout of construction site should be set and management should be
Noise of construction area should meet " Limits to Noise Level at Construction Site
CRWC
25
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Pollutant Sources/ Project Contents of Acceptance Effect of Measures Responsible
Organization strengthened. Boundary (GB12523-2011)"
Waste Gas
Simple isolation measures should be set up around construction area; Roads and tires should be periodically cleaned; Closed fence which is taller than piles of cement, lime and sand should be set around the piles which is easy to produce dust.
Construction exhaust unorganized emission should achieve “Limits to unorganized emission in Integrated Air Pollutant Emission Standard” (GB16297-1996).
CRWC
Solid Waste
Excavation spoil and construction waste should be disposal in time. Garbage should be removed by the sanitation department.
No leakage and no emission. CRWC
Ecological Environment
Temporary construction area should be restored to the original land features.
Original land features should be restored. CRWC
Environment Management
The environmental management agencies should be established; the environmental monitoring plan should be implemented; According to the actual situation, supervision organization prepares construction environmental supervision report.
Ensure that the environmental facilities are operated normally, all the protection measures and environmental management are set down during the whole process. After completed, deliver the environmental supervision to investigation organization of environmental acceptance, as an attachment of the completion acceptance report, submit the environmental acceptance report to environmental protection department for review.
CRWC/ Supervision organization
2.7 Environmental Management Organization
The company has set up an organization for environmental protection management, where
general manager responsibility system is adopted; full-time staffs for environmental
protection are employed, who takes charge of the company’s environmental protection and
environmental protection coordination with other organizations and fulfills environmental
management and supervision. The purpose of the project environmental management is to 26
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
implement relevant environmental responsibility according to national, provincial and
municipal environmental laws and regulations as well as the environmental impact report
approved by administrative department of environmental protection, to carry through the
principle of "three simultaneously ", to strengthen environmental management during
construction period and operation period, to implement environmental protection measures,
to reduce the adverse effects on environment during the construction, so as to achieve the
coordinated development between economic and environmental benefits.
2.7.1 Environmental Management Organization and Responsibilities
Table 2.7-1 Environmental Management Organization
Agency nature Institute Agency responsibilities
Supervision agencies
Shanghai EPB
Responsible for approving the Environmental Impact Assessment Report. Final approval of project feasibility in terms of environmental protection. Responsible for coordinating management of environmental protection among different agencies. Based on environmental report and monitoring plan
provided by qualified monitoring institute and implementation institute, to carry out supervision and random inspection on environmental protection during construction and operation to ensure the implementation of environmental protection measures.
Songjiang EPB, Minhang EPB and Fengxian EPB
Daily supervision on environmental management of the project.
Management agencies
Shanghai Chengtou Environment Asset Management Co., Ltd.
Responsible for project planning and design, supervision of environmental protection.
CRWC
To accept the supervision of the environmental protection departments at all levels. The environmental impact mitigation measures mentioned above should be included in the bidding documents submitted by contractor and finally included in the contract as the requirements for contractor. Ensure that the environmental protection facilities should be operated normally; to establish
27
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Agency nature Institute Agency responsibilities
environmental file and report to the PMO and environmental management departments at all levels. To sign entrusting monitoring agreement (contract) with environmental monitoring department and carrying out the implementation of the EMP. To formulate the emergency response plans for sudden accidents and participate in the emergency treatment for sudden accidents. To consign and carry out environmental supervision,
as well as write the Environmental Supervision Plan in the contract. Contractors should be capable of making sure that the EMP be carried out effectively.
Implementing agency
Construction institute
The contractor should implement the environmental measures in the construction period which are written in the bidding documents or design documents. To accept the supervision of CRWC and the EPA on environmental protection.
Consulting services agencies
EIA consulting institute
To accept the commission of CRWC to formulate the EIA report.
Design consulting institute
To accept the commission of CRWC to prepare for feasibility studies and construction design, and ensure that the measures and programs in EMP should be implemented effectively.
ESI To accept the commission of CRWC to supervise and manage the daily construction activities of the project.
External management monitoring institute on EMP
To conduct environmental monitoring on environmental quality every half of year during construction and prepare External Monitoring Report on EMP.
Monitoring agency
Environmental monitoring institute
To accept the commission of CRWC to monitor on environment quality in project area during construction and operation.
2.7.2 Environmental Protection Organization during Construction
The detailed activities of environment management organizations during construction are
listed in Table2.7-2.
28
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Table 2.7-2Environmental Protection Organization during Construction
Agency nature Institute Agency responsibilities
Supervision Agencies
EPB, water management departments, greening department, transportation management departments, sanitation and ant epidemic department at all levels
To supervise the implementation of environmental monitoring and environmental management in the whole process of the project according to law, including approval of EIA report, environmental monitoring and supervision in construction and operational phases.
Management Agency
Shanghai Chengtou Environment Asset Management Co., Ltd.
To supervise the implementation of EMP
To supervise and coordinate the implementation of domestic and WB environmental management requirements.
To coordinate with other departments to solve major environmental problems.
CRWC
To establish “the environmental management engineering office” and clear the composition and duties of the office. To formulate procedures and systems of environmental
management in construction phase. To incorporate the requirements of environmental protection measures into the bidding documents and construction contract. To develop an annual plan for environmental protection. To audit and arrange funding for annual environmental
management. To arrange annual environmental monitoring and delegation. To organize the implementation of environmental protection measures and arrange for monitoring. To supervise the implementation of environmental protection measures by construction institute. To coordinate environmental work between environmental management institute, environmental monitoring institute and other relevant institute. To deal with environmental pollution accidents and disputes during construction and report to higher authorities. To arrange for the preparation of monthly, quarterly, semi-annual and annual reports of the environmental protection and report to higher authorities.
29
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Agency nature Institute Agency responsibilities
To provide relevant information and technical support for preparation the External Monitoring Report on EMP. To organize environmental protection propaganda, education and training.
Implementing Agency
Contractors
To develop environmental annual work plan. To check the progress, quality, operation and inspection of environmental protection facilities, deal with problems during the implementation process. To accounting of the use of annual funding for environmental protection. To report the implementation of environmental provisions in the contract to construction institute and construction supervision institute regularly. To manage construction workers’ accommodation and occupational health matters. Security measures should be taken during the construction period in order to ensure construction safety, such as information signed on the construction site and setting barrier around the boundary of the construction site; to establish channels of communication with the public to ensure construction safety.
Consulting services agencies
EIA consulting institute
To carry out the onsite investigation for each project and evaluate its environment impacts. To assist in the preparation of EMP contents.
ESI
To review the construction institute and contractors’ environmental qualification, as well as the implementation of environmental protection measures. In charge of the compliance inspection of contracting institute’s environmental work in construction period and setting up reward and punishment system for environmental appraisement. To supervise the influence on the surrounding
environment caused by the construction as well as the implementation of related environmental measures. To supervise the implementation of construction plans
on ecological protection and pollution prevention as well as the fund for above. In order to prevent potential problems and to make sure that the projects will bring long-term, effective environmental and social benefits, a whole process monitoring on the project quality, cost and construction progress should be taken. To carry out inspections and organize the environmental quality monitoring on environmental protection in the construction period; to provide suggestions, coordinate and solve problems in time; to
30
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Agency nature Institute Agency responsibilities
submit supervision report monthly or stage to CRWC and the environmental protection department. To participate in the environmental protection completion acceptance and submit environmental supervision summary report; to evaluate and summarize the implementation of laws and regulations, standards, technical specifications and the environmental protection measures in construction period.
External management monitoring institute on EMP
To conduct environmental monitoring on environmental quality every half of year during construction and prepare External Monitoring Report on EMP.
Monitoring agency
Environmental monitoring institute
To conduct environmental monitoring for the project in construction and operation period according to the Environmental Monitoring Plan; to file the monitor documents and reporting to the PMO.
2.7.3 Management of Contractor
(1) The principle of "three simultaneously " must be carried out in construction.
Construction company should ensure that environmental facilities will be designed,
constructed and operated with the project construction simultaneously. After
completion of the project, a completion acceptance report with environmental content
or the special completion acceptance report should be submitted to the environmental
authorities. The project can only be put into operation after the acceptance by the
environmental check.
(2) According to the national and Shanghai Environmental Protection regulations,
construction company should apply the emissions reporting registration to Shanghai
EPB and can discharge pollutants according to the assigned index after the approval of
the environmental protection department.
(3) Strengthening the statistical work of environmental monitoring data, establishing the
files on pollution sources and material loss of the project, controlling the total amount
of pollutant discharge strictly and ensuring the discharge indicators to meet the design
requirements.
31
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
(4) Strengthening the functions of supervision and management for the operation of
environmental protection facilities, establishing improved technical files for operation,
maintenance and repairing of environmental protection facilities, and strengthening
technical training for the environmental facility operators, to ensure the environmental
protection facilities are operated in normal and pollution discharges should meet the
environmental standards all the time.
(5) Strengthening the monitoring of non-normal operating conditions as well as the
surroundings, and setting up effective measures which could control the expand of
pollution and prevent pollution accidents.
(6) The environmental requirements should be taken into account during setting up the
operation procedures.
(7) Conducting environmental education to improve environmental awareness of directors
and workers in the project construction company.
(8) The environmental protection should be included in the job responsibilities and as an
indicators to reflect the personal evaluation. It should also be brought in production
scheduling to conduct supervision, inspection, recognition, reward or punishment, so as
to complete the environmental protection measures better.
(9) Environmental management should be integrated into overall enterprise management
plan. In order to reach the target of pollution reducing, energy saving, environmental
protection as well as improving environmental and economic benefits of enterprise, the
environmental management system should be improved continuously.
2.7.4 Environmental Protection Organization during Operation
During operation, the environment management functions of Project Environmental
Management Office in construction will be transferred to the project operation and
management institute. The environmental professionals should be employed to carry out
environmental protection work in operation period. The related environmental measures
should be entrusted to qualified company by contract. The main environmental management
responsibilities are as follows:
(1) Manage the execution of environmental protection measures.
32
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
(2) Coordinate with environmental monitoring agency and residents to settle environmental
issues.
(3) Entrust the city/district environmental monitoring stations to carry out regular
monitoring on three discharges and regional environment quality.
(4) Deal with environmental emergencies when environment accident occurs.
(5) Report information of environmental management of the company to Shanghai EPB
and SH PMO.
(6) Record and file up the documents of environmental management of the company.
2.8 Environmental Management-Related Plans
2.8.1 Training
(1) Purposes of Training
In order to have a smooth and effective implementation of the project, it is necessary to
conduct environmental protection knowledge and skill straining to all employees. Contractors
and workers will receive training during the implement process. Before project construction,
all contractors, operators and construction supervision persons are required to take the
trainings of environment, health and safety.
(2) Training Target
Training targets: CRWC and construction workers.
(3) Training Content
1) Environmental laws and regulations, Environmental policies and programs, World
Bank Safeguards policy.
2) The environmental management mode of the World Bank loan project and the
related environmental provision in the loan agreement.
3) EI and EMP (including environmental management procedures).
4) The environmental regulations on this project (especially for the construction
period).
33
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
5) Environmental responsibilities for the environmental manager, environmental
supervision, construction company during construction period and the relationship
among them.
6) The draft of working reports on environmental management, environmental
supervision, monitoring and construction company monthly report.
7) The treatment and reaction capacity for environmental accidents.
(4) Budget for Trainings
Training budget is about CNY20,000. The budget should be included in the cost of project
supervision and environmental supervision.
2.8.2 Public Participation Plan
CRWC should report the feedback related public comments and suggestions to the
construction company. On the basis of listening to the public comments, the construction
company should further implement environmental protection measures, minimize the impact
of construction on the environment, protect the environmental interests of the public, and
meet the reasonable environmental demands by public.
(1) Information Disclosure
To ensure that the residents have a good source of information on the pollutant discharge of
Raw Water Project –Minhang and Fengxian Conveyor Works easily, ensure their equal
participation in environmental protection and improve their awareness of public participation,
environmental action teams will be established at the community level. Trials will be
conducted within 200m around the project construction firstly and then expanded to other
areas gradually. The way of information disclosure can be conduct by posting notices on the
construction nameplate, temporal living site or the surrounding village committee to notify
the construction contents, the period, the proposed effects, communication and etcetera.
(2) Grievance Redress Mechanism
In order to safeguard the environmental quality and interests of local residents, the project
should build a convenient, open and effective Grievance Redress Mechanism. The affected
people can appeal any problems about the environmental management plan at any time.
34
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Project Environmental Management Office should arrange for people especially to take
charge of residents' grievance redress, publish the grievance redress call and accept the public
inquiries and complaints. The grievance redress procedures are as following:
1) The resident reports to the community committee in writing or orally, which should
negotiate with CRWC and give a reply within two weeks.
2) If the resident is dissatisfied with the disposition of Stage 1, he/she may file a written
or oral appeal with the district EPB, which should make a disposition within two
weeks.
3) If the resident is dissatisfied with the disposition of Stage 2, he/she may file a written
or oral appeal with the municipal environmental protection bureau, which should
make a disposition within two weeks.
4) If the resident is still dissatisfied with the disposition of Stage 3, he/she may file an
appeal with a local court in accordance with the Civil Procedure Law of the People’s
Republic of China and be subject to court judgment. Currently, the municipal and
district EPB have director-general mailboxes and environmental appeal hotlines.
2.8.3 Information Communication
Environmental management requires establishing a necessary internal communication
among different departments and positions of the project office, and also requires disclosing
relative information to outsiders (relevant stakeholders and public). The internal
information communication can take many ways like meeting, internal newsletter, etc. A
formal meeting should be held every month. All documents of information communication
should be recorded and kept in archives. External information communication should be held
a half of a year or once every year. The information communication with the cooperation units
should be recorded and kept in archives.
(1) Recording
For the effective operation of environmental management system, organizations of
environmental management shall establish a perfect environmental protection record system
and keep the records in the following aspects:①Requirements of laws and regulations;②
Project approval;③Environmental factors and relevant environmental impacts;④Training
35
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
for management and construction personnel;⑤Inspection, verification and maintenance
construction and management activities;⑥Record on environmental quality monitoring
data;⑦Effectiveness of remediation and prevention measures;⑧Information of relevant
parties;⑨Examination and verification;⑩Evaluation and appraisal.
Besides, the necessary control shall be conducted on the above-mentioned records including
identification, collection, cataloguing, filing, keeping, management, maintenance, inquiring,
storage life, disposition and others of the records.
(2) Reporting Mechanism
Contractors, operators, monitoring units, environmental supervision engineering(ESE)and
project environmental management office should record and report to the relevant
departments about the project process, the implementation of EMP, record of the
environment quality monitoring in time, including the following six parts:
1) ESE of this Project should record the implementation of EMP by month and submit
weekly and monthly report to the project environmental management office in time.
The weekly and monthly report should include implementation of environmental
protection measures, progress of environmental monitoring, monitoring data, and
etc.
2) Contractors and operators should make detailed record on progress of the project and
the implementation of EMP by quarter, report to the project office in time, and copy
the quarterly report to Shanghai EPB.
3) Monitoring units shall submit monitoring report to contractors (operators) and ESE
in time after complete their assignments.
4) The project office shall make a copy of project progress reports to Shanghai EPB.
The project progress reports (monthly, quarterly, and annual) should include the
information of EMP implementation, such as implementation progress and
effectiveness of EMP, especially environmental monitoring results.
5) ESE and the project office shall inform the local environmental protection
administrative department or up level government department if non-compliance of
environmental protection happens if necessary. 36
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
6) External Monitoring Report on EMP report shall be submitted on March 31 and
September 30 of the following year.
External Monitoring Report on EMP report should include:
1) The implementation of training plan.
2) The process of the project, such as the construction of pumping station, progress of
pipe-jacking, and green land restoration, etc.
3) The implementation of environmental protection measures, environmental
monitoring, and main monitoring results.
4) Record the main content of complain, the solutions and satisfaction degree if there
are complains.
5) The implementation plan of EMP for the next year.
2.9 The Budget of Environmental Protection
The project is a municipal water pipeline project. There are no exhaust gas emissions, waste
water discharging or noise in operation period and will not affect the surrounding
environment. Therefore, the budget of environmental protection is mainly in construction
period. The estimated budget of this project is about CNY6,304,400 which is not included in
the cost for jacking mud treatment system and greening. These costs has been included in the
project investment. The specific contents are listed in table 2.9-1.
Table 2.9-1 The budget of Environmental protection
No. Items Budget (ten
thousand Yuan)
Remarks
I Environmental monitoring 79.63 1 Water environmental monitoring 31.53 2 Noise monitoring 9.9
3 Atmospheric environmental monitoring 38.2
II Interim Environmental measures 213.4 1 Wastewater Treatment 72.3
(1) Sewage and wastewater disposal costs 72.3
(2) Muddy water pumping equipment 70 It has been included in the project 37
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
No. Items Budget (ten
thousand Yuan)
Remarks
costs cost, in which mud pipeline 8km and 6 pumps
2 Sewage treatment 59.4 Integrated wastewater treatment facilities
3 Ambient air quality control 12
Simple barriers, water spraying and covering, enclosed fence and the management of transportation.
4 Noise Control 15 Temporary screening, muffler, acoustic shield, and etc.
5 Solid waste disposal 48.7 The setting up and management of temporary soil storage yard. The barriers, coverings and so on.
6 Population health protection 6
Management and disposal of domestic sewage and garbage. Regular disinfestation for the construction living area.
III Independent environmental costs 280.1
1 Environmental protection management 63.52 Including the costs of
environmental protection management, environmental supervision and training. 2 Environmental supervision 80
3 Research and survey design consulting service 136.58
(1) EIA, EMP drafting and related working costs 119
(2) Environmental survey and design 17.58 By 6% of item I~II Sum of parts I to III 573.13
IV Basic reserve fee 57.31 By 10% of item I~III which is used for unexpected cost.
Total Static total budget 630.44
3 Jinze Reservoir Project of Upper Huangpu Raw Water Intake system
3.1 Project Description
3.1.1 Project Name
Jinze Reservoir Project of Upper Huangpu Raw Water Intake system
38
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
3.1.2 The Proposed Project Location
Jinze Reservoir Project of Upper Huangpu Raw Water Intake system is located in the Jinze
town of Qingpu district and faces the north bank of Taipu River which is about 57km away
from Taipu sluice gate in the west and about 40km away from Songpu Bridge in the east.
3.1.3 Project Owners or Implementation Agency
Implementation agency of this Project is Shanghai Upper Huangpu River Raw Water Co. Ltd
(UHRRWC).
3.1.4 Project Scale
The total reservoir capacity is 9,100,000 m3 with water short-term supply 3,510,000m3/d.
(1)Water Level
The highest water level designed for reservoir is 3.30m. The lowest water level in normal is
1.65m. The average dead water level in reservoir is -2.0m.
(2)The reservoir capacity
Dead capacity: The reservoir dead capacity is 930,000 m3; the emergency standby capacity:
the capacity between the lowest water level and dead water level is 5,250,000 m3. The
regulating capacity: the capacity between the highest water level and lowest water level in
normal is 2,920,000 m3. Total reservoir capacity: the reservoir capacity below the highest
water level in normal amounts to 9100,000 m3.
(3)Water diversion channel and water pumping gate
The scale of water diversion channel is 55m in bottom width and - 2.0m in bottom elevation.
The water pumping gate is located at the southwest end of reservoir which is against the north
bank of Taipu River. The clear width of the gate is 28m. The bottom sill elevation is -2.0m.
(4)Water intake pumping station
The capacity of water intake pumping station is 3,510,000 m3/d.
(5)Surrounding river
39
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
The new surrounding river will be located at Grade I water source conservation area. The
river is about 6.38 kilometers in length and 20 meters in width. One regulator gate will be
newly built on the surrounding river, with width of 6m.
3.1.5 Major Project Components
The major project components include the ecological regulating reservoir, water intake
pumping gate, surrounding river gate, water intake pumping station, water diversion river,
surrounding river, other hydrology and water quality monitoring facilities includes fix
monitoring stations, on-line monitoring, environmental protection, water holding, field area
and greening area. Two existing lakes “Li Jia dang Lake, Wu Jia dang Lake” are utilized as
main body of reservoir basin. The permanent land covering is 270ha in this project. The
existing land use within range of planning is mainly agricultural land and numerous water
areas and lakes. The fish pond land use is quite numerous in agricultural land. After project is
implemented, Jinze reservoir will become an important water supply source for Shanghai.
The raw water sources provides water to Qingpu, Songjiang, Jinshan, Fengxian and some
portions of Minhang, serving a population of about 9,500,000 people.
3.1.6 Cost Estimate and Implementation Plan
The project is planned to start at the end of 2014, and to be finished after 20 months.
According to “The preliminary design review report”,the total investment (including
reservoir and water pumping station) is about CNY 3,680 million.
40
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
3.2 Summary of Environmental Impacts and Environmental Protection Measures
3.2.1 Environmental Impacts and Mitigation Measures during Construction
Table 3.2-1 Environmental Impacts and Mitigation Measures during Construction
Impacts Measures Implemented by
Supervised by
Monitored by
Under groundwater
Equipment washing wastewater are separated by the wastewater treatment system should be treatment to satisfy the standards for vehicle washing and construction operations of Urban Water Quality for Recycled Water and Miscellaneous Water(GB/T18920-2002), it can be reused to restrain dust of construction roads and construction site, or to wash vehicles. Residual water is treated to reach the standards for special protection water area of Integrated Wastewater Discharge Standard of Shanghai (DB31/199-2009) and then could be discharged into river which is not included in the Grade I or Grade II water source conservation area. The oil pollutant, engine room water and ballast water generated by ships are preprocessed by an oil separator, they must be drained onto the bank or above-water mobile receiving facilities and delivered to the qualified units for uniform disposal. Temporary living area are set in construction site, which can be out of the Grade I or Grade II water source conservation area. The domestic sewage is pumped to Jinze WTP for treatment.
UHRRWC, Construction institute
ESI , EPB, water management department
Monitoring institute
Ground Water
Use the diaphragm walls without dewatering and strengthen monitoring of soil deformation, land subsidence and deformation of surface buildings or structures.
UHRRWC, Construction institute
ESI , EPB, water management department
Air Pollution Simple barriers should be installed around construction site to separate construction site and surrounding environment so as to reduce adverse impacts of waste gas to surrounding environment. Work area should ensure regular watering and simple cover.
UHRRWC, Construction institute
ESI , EPB Monitoring institute
41
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Impacts Measures Implemented by
Supervised by
Monitored by
If cement, lime, sand and other materials that are easy to produce dust in construction site, enclosed fence should be set up and should be taller than piled materials. Transportation vehicles should be closed to prevent spill and leakage along the transportation route. Vehicle cleaning facilities should be set on construction site. Transportation vehicles should be cleaned before leave construction site.
Noise Reasonably schedule works, and prohibit high-noise works at night. Rationally arrange construction site, avoid arranging a lot of power machinery facilities at the same place, construction time with high intensity noise equipment shall be shortened, in order to reduce the influence to sensitive target.
UHRRWC, Construction institute
ESI , EPB Monitoring institute
Solid Waste Pollution
It is prohibited to set up any temporary turnover yard inside Grade II water source conservation area. The dreg soil and waste slag in temporary turnover yard shall be cleared and transported on the same day along with excavation. If not, it needs to adopt provisional measures to cover dregs soil surface. It is prohibited to drain any ship rubbish to peripheral river areas. The ship rubbish must be accepted and disposed by the qualified units. Domestic wastes are regularly removed by the environmental sanitation agency.
UHRRWC, Construction institute
ESI , EPB, Environmental Sanitation Bureau Sediment Administration
Ecological Environment
The project should reasonably choose the locations of temporary construction sites, temporary construction roads and temporary stockpile areas to minimize farmland occupation and avoid occupation of basic farmland. If farmland is temporarily occupied, topsoil should be removed and stored in other places. After works are complete, level the ground, remove debris and residuals and return topsoil to site for farmland restoration. If uncultivated land is occupied temporarily, restore land to original condition or rehabilitate vegetation after works are complete.
UHRRWC, Construction institute
ESI , EPB, Municipal Greening Administration
Social Impact Be sure to compensate for permanent land acquisition and temporary land occupation of the project according to correlative laws and regulations, strictly
UHRRWC, Construction
ESI 、
Transportatio
42
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Impacts Measures Implemented by
Supervised by
Monitored by
control floor space. The temporary land occupation should avoid farmland, forest land and other areas as far as possible. Communication with surrounding residents and related departments should be done during construction and precautionary measures should be pre-established. The caution sign plates near specific bodies of water should be set up according to construction schedule to define project construction time and construction area, etc.. Reasonably arrange the routes and schedules of construction vehicles, set speed limits and prohibit tooting
institute n management departments, Planning and Land authority
3.2.2 Environmental Impacts and Mitigation Measures during Operation
Table 3.2-2Environmental Impacts and Mitigation Measures during Operation
Impacts Measures Implemented by
Supervised by
Monitored by
Under groundwater
Construct about 4.4km municipal sewer pipeline to Xicen sewage plant. The sewage should be treatment to satisfy the standards for discharge to municipal sewers, and then could be discharged into municipal sewer pipe network. Delineate Source Water Protection Areas for Jinze reservoir. Intercept the sewage
and drain it into pipeline within1kmof Source Water Protection Areas as soon as possible. Boost the construction of Taipu River clean water corridor and establish the risk early warning system at Source Water Protection Areas.
UHRRWC EPB, water management department
Monitoring institute
Air Pollution
The design, construction and operational guidance for collection, disposal and discharge of oil fume in kitchen should implement the requirements of national Specification for environmental protection of catering trade (HJ554 – 2010), Specification for the environmental protection design of catering trade of engineering construction code in Shanghai (DGJ08 - 110 - 2004) ( J10473 - 2004) as well as
UHRRWC EPB Monitoring institute
43
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Impacts Measures Implemented by
Supervised by
Monitored by
Management method for environmental pollution prevention of catering service industry in Shanghai (No. 10 order of Shanghai municipal people's government on October 15, 2003). The experiment exhaust gas should be sent to building top (above16.5m) by independent exhaust air system. The discharge concentration and speed of non-methane total hydrocarbon must satisfy requirements of integrated emission standard of air pollutants (GB16297-1996).
Noise Set water pump and other steadying noise equipment indoors, take sound insulation measures, close doors and windows during operation to decrease external escape of noise. The environmental noise emission at peripheral boundary of the project should satisfy Category I standard in Emission standard for industrial enterprises noise at boundary (GB12348 – 2008).
UHRRWC EPB Monitoring institute
Ecological Environment
After the construction, be sure to restore land vegetation immediately. Build waterfront greening belt and bank slope buffer zone between land area and water area. In operating period, put in suitable fishes for foraging phytoplankton and sunken plant chippings, etc., in order to restrain alga growth and water blooming.
UHRRWC EPB, Municipal Greening Administration
Electromagnetic radiation
Indoor substation should be adopted. After building up, substation should be tested and accepted on-site by the environmental protection department. Only after qualified inspection, it can be placed in service formally. Electrical equipment inside substation and building where they are located should
be provided with good earth. The metals of electric circuits should keep good connection to prevent and avoid intermittent electric discharge.
UHRRWC Radiation Station
Monitoring institute
44
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
3.3 Environmental Monitoring Plan Table 3.3-1 Environmental Monitoring Plan
Monitoring period
Environmental factors
Monitoring Location (numbers) Monitoring items Monitoring frequency Responsi
ble Monitoring
agency
Construction Period
Ambient air Set up 1 monitoring site in each construction area, 4 in total.
TSP 1term/quarter, 1
term/7day, 4 times/day, 8 terms in total.
UHRRWC
Environmental
monitoring agency
Noise Set up 1 mobile of noise monitoring site in each construction area, 4 in total.
Leq dB(A) 1 term/quarter, 1day/term, 1 time at day and night, 9
terms in total.
Wastewater from
construction
Set up 4 construction wastewater monitoring sites in wastewater discharge outlet of construction area.
pH, CODCr, SS, petroleum 1 term/quarter, 2
days/term, 2 times/term, 8 terms in total.
Surface water
Set up 1 surface water monitoring site in each section such as Jinze、Babaimu and water intake of Taipu River. Set up 3 verticals in each section, take 2 times in each verticals at high tide and ebb tide.
Temperature, pH, DO, SS, CODMn, BOD5, ammonia nitrogen, total phosphorus, volatile phenol, petroleum, 10 in total.
1 term before construction,
1 term/quarter during construction,
1 term after construction, 10 terms in total, 2
times/term.
Operation Surface water
Set up 1 surface water monitoring site in each section such as Jinze、Babaimu and water intake of Taipu River. Set up 3
Temperature, pH, DO, SS, CODMn, BOD5, ammonia nitrogen, total phosphorus, volatile phenol, petroleum, 10 in total.
1 term during initial operation
UHRRWC
45
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Monitoring period
Environmental factors
Monitoring Location (numbers) Monitoring items Monitoring frequency Responsi
ble Monitoring
agency verticals in each section, take 2 times in each verticals at high tide and ebb tide.
Noise Set up 4 noise monitoring sites around the pump station at boundary.
Leq dB(A) 1 term during initial operation, 1 time at day and night.
Exhaust fumes
Set up 1 air monitoring site on the kitchen chimney in construction area.
Exhaust fumes 1 time during initial operation, 1 time/day, 1 time /day.
Electromagnetic radiation
Set up 1 electromagnetic radiation monitoring site in each area such as 35 kv substation, Gongdu village, Gongtan village, 3 in total.
Power frequency electric field intensity(V/m)、Magnetic induction intensity(nT)、Radio frequency interference、Quasi-peak.
1 term during initial operation
46
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
3.4 Environmental Management Organization
3.4.1 Environmental Management Organization and Responsibilities
Table 3.4-1 Environmental Management Organization
Agency nature Institute Agency responsibilities
Supervision agencies
Shanghai EPB
Responsible for approving the Environmental Impact Assessment Report. Final approval of project feasibility in terms of environmental protection. Responsible for coordinating management of environmental protection among different agencies. Based on environmental report and monitoring plan provided by qualified monitoring institute and implementation institute, to carry out supervision and random inspection on environmental protection during construction and operation to ensure the implementation of environmental protection measures.
Qingpu EPB Daily supervision on environmental management of the project.
Management agencies
UHRRWC
To accept the supervision of the environmental protection departments at all levels. The environmental impact mitigation measures mentioned above should be included in the bidding documents submitted by contractor and finally included in the contract as the requirements for contractor. Ensure that the environmental protection facilities
should be operated normally; to establish environmental file and report to the PMO and environmental management departments at all levels. To sign entrusting monitoring agreement (contract) with environmental monitoring department and carrying out the implementation of the EMP. To formulate the emergency response plans for sudden accidents and participate in the emergency treatment for sudden accidents. To consign and carry out environmental supervision, as well as write the Environmental Supervision Plan in the contract. Contractors should be capable of making sure that the EMP be carried out effectively.
Implementing agency
Construction institute
The contractor should implement the environmental measures in the construction period which are written in the bidding documents or design documents. To accept the supervision of UHRRWC and the EPA on environmental protection.
47
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Agency nature Institute Agency responsibilities
Consulting services agencies
EIA consulting institute
To accept the commission of UHRRWC to formulate the EIA report.
Design consulting institute
To accept the commission of UHRRWC to prepare for feasibility studies and construction design, and ensure that the measures and programs in EMP should be implemented effectively.
ESI To accept the commission of UHRRWC to supervise and manage the daily construction activities of the project.
Monitoring agency
Environmental monitoring institute
To accept the commission of UHRRWC to monitor on environment quality in project area during construction and operation.
3.4.2 Environmental Protection Organization during Construction
The detailed activities of environment management organizations during construction are
listed in Table3.4-2.
Table 3.4-2 Environmental Protection Organization during Construction
Agency nature Institute Agency responsibilities
Supervision Agencies
EPB, water management departments, greening department, transportation management departments, sanitation and ant epidemic departments, planning and land authority, radiation station at all levels
To supervise the implementation of environmental monitoring and environmental management in the whole process of the project according to law, including approval of EIA report, environmental monitoring and supervision in construction and operational phases.
Management Agency
UHRRWC
To establish “the environmental management engineering office” and clear the composition and duties of the office. To formulate procedures and systems of environmental management in construction phase. To incorporate the requirements of environmental protection measures into the bidding documents and construction contract. To develop an annual plan for environmental protection. To audit and arrange funding for annual
48
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Agency nature Institute Agency responsibilities
environmental management. To arrange annual environmental monitoring and delegation. To organize the implementation of environmental protection measures and arrange for monitoring. To supervise the implementation of environmental protection measures by construction institute. To coordinate environmental work between
environmental management institute, environmental monitoring institute and other relevant institute. To deal with environmental pollution accidents and disputes during construction and report to higher authorities. To arrange for the preparation of monthly, quarterly,
semi-annual and annual reports of the environmental protection and report to higher authorities. To organize environmental protection propaganda, education and training.
Implementing Agency
Contractors
To develop environmental annual work plan. To check the progress, quality, operation and inspection of environmental protection facilities, deal with problems during the implementation process. To accounting of the use of annual funding for environmental protection. To report the implementation of environmental provisions in the contract to construction institute and construction supervision institute regularly. To supervise whether stacking, handling,
transportation of construction waste, construction dregs are performed as required. To supervise that construction waste and construction dregs must be disposed according to requirements of Management Regulations on Construction Solid Wastes and Waste Soil Disposal of Shanghai; To supervise whether continuous, unblocked drainage
facility is set at construction site according to requirements of Management Regulations on civilized construction of construction project in Shanghai. The slime water generated by construction should not be discharged without sedimentation. To supervise whether dust suspension is managed
according to requirements of Management Methods of Dust Suspension Pollution Control of Shanghai; To supervise whether noise pollution is controlled for all classes of mechanical equipment according to related laws and regulations. Reasonably schedule
49
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Agency nature Institute Agency responsibilities
works, and prohibit high-noise works at night. To supervise whether domestic sewage and domestic
waste at construction site are disposed properly; To supervise whether construction unit cleans up residual dregs and construction waste timely after completion of project. The construction unit should take charge of supervising, inspecting, ensuring that disposal and transportation rate reaches 100% requirement.
Consulting services agencies
EIA consulting institute
To carry out the onsite investigation for each project and evaluate its environment impacts. To assist in the preparation of EMP contents.
ESI
To develop the environmental supervision plan, determine the contents of environmental supervision. The environmental protection measures in construction period should be implemented item by item in the environmental supervising plan. To supervise the influence on the surrounding environment caused by the construction. To supervise the implementation of related environmental measures and effect. To solve environmental pollution events in construction timely. To inspect the restoration of the land after construction. To take charge of implementing environmental monitoring measures, examine and verify related environment reports, put forward corresponding requirements for project construction and management according to monitoring results for water quality, ambient air, acoustic environment, etc., minimize adverse effect of the project construction on environment.
Monitoring agency
Environmental monitoring institute
To conduct environmental monitoring for the project in construction and operation period according to the Environmental Monitoring Plan; to file the monitor documents and reporting to the PMO.
3.4.3 Environmental Protection Organization during Operation
The construction unit should implement the requirement of the independent third party
supervision on overall construction process according to requirements of industrial competent
department. Whereas there are a lot of environmental protection work should be done in
construction, operating and maintenance period, during operating period of reservoir, the
construction unit must establish a full time environmental management organization directly 50
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
under the leading of construction company manager to fulfill environmental regulations and
policies formulated by state, Tai Lake basin and Shanghai comprehensively, and to protect
water quality of Taipu River effectively.
The main contents of environmental management in operating period areas following:
(1)To develop an annual plan for environmental protection Jinze reservoir and set overall
and staged goals of environmental protection; to determine environmental protection
direction of Jinze reservoir.
(2)To manage the execution of environmental protection measures and cooperate with local
environment protection department to supervise and inspect of the project jointly.
(3)To organize and carry out environmental monitoring for Jinze reservoir and nearby
water ; to conduct study on sudden pollution incident prevention and control technology.
(4)To organize research on ecological rehabilitation study for reservoir, develop the plan of
ecological rehabilitation and entrust the qualified, experienced professional units to carry out
ecological restoration and aquatic life enhancement and releasing. Cooperate with the
environmental protection and greening departments to supervise, inspect and summarize
ecological rehabilitation works, and to achieve the purpose of protecting the reservoir basin
and peripheral ecologic environment.
(5)To manage the domestic sewage and domestic waste.
3.5 The Budget of Environmental Protection Environmental protection investment including environmental monitoring 、 interim
environmental measures、 independent environmental costs and basic reserve fee. The
estimated budget of the environmental protection is about CNY18,292,000. The investment
has been included in the project total investment and the final cost should be subjected to
actual expenditures.
51
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
4 Pipe Routing Project of Upper Huangpu Raw Water Intake System
4.1 Project Description
4.1.1 Project Name
Pipe Routing Project of Upper Huangpu Raw Water Intake System
4.1.2 The Proposed Project Location
The Pipe Routing Project of Upper Huangpu Raw Water Intake system is located in Qingpu
District and Songjiang District. The pipe routing is as follows: North bank of Taipu River
eastward crossing Taipu River—south bank of Taipu River eastward Qingpu diversion
chamber—south bank of Taipu River eastward Maogang, Xietang southeast Songjiang
diversion chamber—Xietang southeast Hengliao River eastward Huangpu River eastward
Jinshan diversion chamber— Huangpu River eastward Minfeng diversion chamber. The total
length is 44 km.
4.1.3 Project Owners or Implementation Agency
Implementation agency of this Project is Shanghai Upper Huangpu River Raw Water Co. Ltd
(UHRRWC).
4.1.4 Project Scale
Water amount supplied is 3.51 million m3/d and for Songjiang midway PS is 2.4million m3/d.
4.1.5 Major Project Components
(1) The new pipelines from Jinze PS to Minfeng Diversion Chamber with the length
of 40.86km using a single pipe of DN4000~DN3600.
(2) The capacity of new Songjiang midway PS is 2.4 million m3/d.
(3) The new Qingpu Diversion Chamber 、 Songjiang Diversion Chamber(in
Songjiang midway PS) 、 Jinshan Diversion Chamber, Minfeng Diversion
Chamber will be built.
52
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
4.1.6 Cost Estimate and Implementation Plan
The project is planned to start in December 2014, and to be finished in August 2016.
According to “The preliminary design review report”,the total investment is about CNY
3,923 million.
4.2 Summary of Environmental Impacts and Environmental Protection
Measures
4.2.1 Environmental Impacts and Mitigation Measures during Construction
53
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Table 4.2-1 Environmental Impacts and Mitigation Measures during Construction
Impacts Measures Implemented by
Supervised by Monitored by
Construction muddy wastewater
The muddy water from conduit jacking well construction and the excavation work well , underground water seepage, equipment washing wastewater are separated by the wastewater treatment system should be treatment to satisfy the standards for vehicle washing and construction operations of Urban Water Quality for Recycled Water and Miscellaneous Water(GB/T18920-2002). Residual water is treated to reach the standards for special protection water area of Integrated Wastewater Discharge Standard of Shanghai (DB31/199-2009) and then could be discharged into river which is not included in the Grade I or Grade II water source conservation area. Special maintenance site or washing site for construction machinery should not be set inside construction area. The oily construction waste water should be disposed via oil removal and sedimentation. The sedimentation sludge and waste oil in the separation tank should be transported externally for disposal.
UHRRWC, Construction institute
ESI, EPB, water management department
Monitoring institute
Domestic Sewage
Temporary living area are set in construction site, which must be out of the Grade I or Grade II water source conservation area. After collection and treatment with integrated wastewater treatment facilities (the treatment technique is A2/O), the sewage should be reused for construction site, roads and vehicles washing. Residual water is treated to reach the standards for special protection water area of Integrated Wastewater Discharge Standard of Shanghai (DB31/199-2009) and then could be discharged into river which is not included in the Grade I or Grade II water source conservation area.
UHRRWC, Construction institute
ESI, EPB, water management department
Monitoring institute
Ground Water
Use the diaphragm walls without dewatering and strengthen monitoring of soil deformation, land subsidence and deformation of surface buildings or structures.
UHRRWC, Construction institute
ESI, EPB, water management department
Monitoring institute
Air Simple barriers should be installed around construction site to separate UHRRWC, ESI , EPB Monitoring
54
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Impacts Measures Implemented by
Supervised by Monitored by
Pollution construction site and surrounding environment so as to reduce adverse impacts of waste gas to surrounding environment. Work area should ensure regular watering and simple cover. Vehicle cleaning facilities should be set on construction site. Transportation vehicles should be cleaned before leave construction site If cement, lime, sand and other materials that are easy to produce dust in construction site, enclosed fence should be set up and should be taller than piled materials.
Construction institute
institute
Noise The site selection for temporary construction area should be far from residential area and other acoustic environment sensitivity objectives. The nighttime construction must be strictly controlled. The serial construction in nighttime must be approved. For residential area within 200m distance from the construction site, construction
time with high intensity noise equipment shall be shortened, especially in weekend and lunch time in summer, in order to reduce the influence to sensitive target.
UHRRWC, Construction institute
ESI , EPB Monitoring institute
Solid Waste Pollution
The waste slag and construction waste generated by construction, sedimentation wet soil generated by pipeline construction and spoil material in excavation should be collected for disposal according to requirements of Provisions of Shanghai Municipality on Handling Construction Wastes and Dregs. Domestic wastes are regularly removed by the environmental sanitation agency. The temporary dump site shall be located outside Grade I water source conservation area and far away (at least 50 meters) from residential areas and river courses.
UHRRWC, Construction institute
ESI, EPB, Environmental Sanitation Bureau Sediment Administration
Ecological Environment
The project should reasonably choose the locations of temporary construction sites, temporary construction roads and temporary stockpile areas to minimize farmland occupation and avoid occupation of basic farmland. If farmland is temporarily occupied, topsoil should be removed and stored in other places. After works are complete, level the ground, remove debris and residuals and return topsoil
UHRRWC, Construction institute
ESI, EPB, Municipal Greening Administration
55
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Impacts Measures Implemented by
Supervised by Monitored by
to site for farmland restoration. If uncultivated land is occupied temporarily, restore land to original condition or rehabilitate vegetation after works are complete.
Transportation
Shorten the construction period where possible without comprising the quality of works. Reasonably arrange the routes and schedules of construction vehicles, set speed limits and prohibit tooting
UHRRWC, Construction institute
ESI , transportation management department
Health and safety
Construction personnel need receive health check-up before starting to work. Sick personnel shall not be allowed on site before they are cured. Strengthen sanitary and anti-epidemic work on work areas; increase sanitary and ant epidemic awareness and education.
UHRRWC, Construction institute
Sanitation and ant epidemic department
4.2.2 Environmental Impacts and Mitigation Measures during Operation
Table 4.2-2Environmental Impacts and Mitigation Measures during Operation
Impacts Measures Implemented by
Supervised by
Monitored by
Underground Water
Songjiang mid-way pumping station belongs to the service scope of Songjiang Western Sewage Plant. The domestic sewage generated by managerial staff in operating period should be drained into Songzheng highway sewer pipe network directly through a DN300 sewer pipeline about 1km long.
UHRRWC EPB, water management department
Air Pollution The design, construction and operational guidance for collection, disposal and discharge of oil fume in kitchen should implement the requirements of national Specification for environmental protection of catering trade (HJ554 – 2010), Specification for the environmental protection design of catering trade of engineering construction code in Shanghai (DGJ08 - 110 - 2004) ( J10473 - 2004) as well as Management method for environmental pollution
UHRRWC EPB Monitoring institute
56
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
prevention of catering service industry in Shanghai (No. 10 order of Shanghai municipal people's government on October 15, 2003).
Noise Set water pump and other steadying noise equipment indoors, take sound insulation measures, close doors and windows during operation to decrease external escape of noise. The environmental noise emission at peripheral boundary of the project should satisfy Category I standard in Emission standard for industrial enterprises noise at boundary (GB12348 – 2008).
UHRRWC EPB Monitoring institute
Maintenance of pipelines and water regulating tank
Strictly implement the Protection Methods for Raw Water Diversion Pipe and Canal of Shanghai and planning advices about pipeline layout and route selection by Shanghai Municipal Planning Bureau during operation, and delineate the scope of protection area of water pipelines. No piling, drilling, digging, soil sampling which do not meet the Protection Methods for Raw Water Diversion Pipe and Canal of Shanghai in scope of protection area of the pipeline. Ensure that there are no septic tanks, sewage treatment structures, leakage wells, rubbish heap and other sources of pollution within 10m around the water regulating tank, and no sewers and pollutants within 2m around the water regulating tank.
UHRRWC EPB, water management department
Ecological Environment
After the end of the project, construction sites and temporary occupied land should promptly be leveled, trees, grass or crops should be planted, vegetation should be restored. For the permanently occupied green belt of water source conservation in this project, the construction company should initiatively coordinate with the relevant departments to solve the problem and pay compensation appropriately based on area of permanent occupied land.
UHRRWC EPB, Municipal greening administration
57
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
4.3 Environmental Monitoring Plan Table 4.3-1 Environmental Monitoring Plan
Monitoring period
Environmental factors Monitoring Location (numbers) Monitoring
items Monitoring frequency Responsible Monitoring
agency
Construction Period
Ambient air
Set up 1 air monitoring site in each sensitive residential area, such as Zhongfan, Nanzhangjia, Jinjiali, Hujiazhai, Nanbang, Shijiabang, Ruijiali and Wangjiatang front row, 8 in total.
TSP
1term/quarter, 7days/1term, 1
time/day, 7 terms in total.
Project owner
Monitoring institute
Noise
Set up 1 noise monitoring site in each sensitive residential area, such as Gaojiagang, Yeku village, Liantang geracomium, Maoxin village, Yangsijing, Xinyao village, Yaojia village, Xiaxu, Hangnijing, Beiyexu, Zhangjiaku, Sanjia village, Gujiadai, Shihejing, Zhuangxingbang, Yujia village, Tangkou, Shenjiadai, Dongxiejing, Beixing, Gujiajiao, Sunjiabang and Chuantangfang front row, 23 in total.
Leq dB(A)
1 term/quarter, 1day/term, 1 time at
day and night, 8 terms in total.
Wastewater from
construction
Set up 1 wastewater monitoring site in wastewater discharge outlet of construction area.
pH, CODCr, SS,
petroleum
1 term/quarter, 2 days/term, 2
times/term, 15 terms in total.
Sewage Set up 1 monitoring site in each outlet of sewage treatment facilities.
CODCr、
BOD5、
NH3-N、animal and
1 term/quarter, 2 days/term, 2
times/term, 15 terms in total.
58
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Monitoring period
Environmental factors Monitoring Location (numbers) Monitoring
items Monitoring frequency Responsible Monitoring
agency plant oil
Operation
Noise Set up 1 noise monitoring site in each section from Songjiang midway PS to factory boundary, 4 in total.
Leq dB(A) 1 term during initial operation, 1 time at day and night. UHRRWC
Monitoring institute
Exhaust fumes Set up 1 air monitoring site on the kitchen chimney in Songjiang midway PS.
Exhaust fumes
1 time during initial operation, 1 time/day, 1 time at day.
59
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
4.4 Environmental Management Organization
4.4.1 Environmental Management Organization and Responsibilities
Table 4.4-1 Environmental Management Organization
Agency nature Institute Agency responsibilities
Supervision agencies
Shanghai EPB
Responsible for approving the Environmental Impact Assessment Report. Final approval of project feasibility in terms of environmental protection. Responsible for coordinating management of environmental protection among different agencies. Based on environmental report and monitoring plan provided by qualified monitoring institute and implementation institute, to carry out supervision and random inspection on environmental protection during construction and operation to ensure the implementation of environmental protection measures.
Songjiang EPB, Qingpu EPB
Daily supervision on environmental management of the project.
Management agencies UHRRWC
To accept the supervision of the environmental protection departments at all levels. The environmental impact mitigation measures mentioned above should be included in the bidding documents submitted by contractor and finally included in the contract as the requirements for contractor. Ensure that the environmental protection facilities should be operated normally; to establish environmental file and report to the PMO and environmental management departments at all levels. To sign entrusting monitoring agreement (contract) with environmental monitoring department and carrying out the implementation of the EMP. To formulate the emergency response plans for sudden accidents and participate in the emergency treatment for sudden accidents To consign and carry out environmental supervision, as well as write the Environmental Supervision Plan in the contract. Contractors should be capable of making sure that the EMP be carried out effectively.
Implementing agency
Construction institute
The contractor should implement the environmental measures in the construction period which are written in the bidding documents or design documents. To accept the supervision of UHRRWC and the EPA
60
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Agency nature Institute Agency responsibilities
on environmental protection.
Consulting services agencies
EIA consulting institute
To accept the commission of UHRRWC to formulate the EIA report.
Design consulting institute
To accept the commission of UHRRWC to prepare for feasibility studies and construction design, and ensure that the measures and programs in EMP should be implemented effectively.
ESI To accept the commission of UHRRWC to supervise and manage the daily construction activities of the project.
Monitoring agency
Environmental monitoring institute
To accept the commission of UHRRWC to monitor on environment quality in project area during construction and operation.
4.4.2 Environmental Protection Organization during Construction
The detailed activities of environment management organizations during construction are
listed in Table4.4-2.
Table 4.4-2 Environmental Protection Organization during Construction
Agency nature Institute Agency responsibilities
Supervision Agencies
EPB, water management departments, greening department, transportation management departments, sanitation and ant epidemic department at all levels
To supervise the implementation of environmental monitoring and environmental management in the whole process of the project according to law, including approval of EIA report, environmental monitoring and supervision in construction and operational phases.
Management Agency
UHRRWC
To establish “the environmental management engineering office” and clear the composition and duties of the office. To formulate procedures and systems of environmental management in construction phase. To incorporate the requirements of environmental protection measures into the bidding documents and construction contract. To develop an annual plan for environmental protection. To audit and arrange funding for annual environmental
61
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Agency nature Institute Agency responsibilities
management. To arrange annual environmental monitoring and delegation. To organize the implementation of environmental protection measures and arrange for monitoring. To supervise the implementation of environmental protection measures by construction institute. To coordinate environmental work between environmental management institute, environmental monitoring institute and other relevant institute. To deal with environmental pollution accidents and disputes during construction and report to higher authorities. To arrange for the preparation of monthly, quarterly, semi-annual and annual reports of the environmental protection and report to higher authorities. To organize environmental protection propaganda, education and training.
Implementing Agency
Contractors
To develop environmental annual work plan. To check the progress, quality, operation and inspection of environmental protection facilities, deal with problems during the implementation process. To accounting of the use of annual funding for environmental protection. To report the implementation of environmental provisions in the contract to construction institute and construction supervision institute regularly. To manage construction workers’ accommodation and occupational health matters. Security measures should be taken during the construction period in order to ensure construction safety, such as information signed on the construction site and setting barrier around the boundary of the construction site; to establish channels of communication with the public to ensure construction safety.
Consulting services agencies
EIA consulting institute
To carry out the onsite investigation for each project and evaluate its environment impacts. To assist in the preparation of EMP contents.
ESI
To develop the environmental supervision plan, determine the contents of environmental supervision. The environmental protection measures in construction period should be implemented item by item in the environmental supervising plan. To supervise the influence on the surrounding environment caused by the construction. To supervise the implementation of related environmental measures and effect. To solve environmental pollution events
62
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
Agency nature Institute Agency responsibilities
in construction timely. To inspect the restoration of the land after construction. To take charge of implementing environmental monitoring measures, examine and verify related environment reports, put forward corresponding requirements for project construction and management according to monitoring results for water quality, ambient air, acoustic environment, etc., minimize adverse effect of the project construction on environment.
Monitoring agency
Environmental monitoring institute
To conduct environmental monitoring for the project in construction and operation period according to the Environmental Monitoring Plan; to file the monitor documents and reporting to the PMO.
4.4.3 Environmental Protection Organization during Operation
The main contents of environmental management in operating period is to implement daily
management, operation and maintenance for pipelines, Songjiang mid-way pumping station
and water diversion point. During operation, the environment management functions of
Project Environmental Management Office in construction will be transferred to the project
operation and management institute. The environmental professionals should be employed to
carry out environmental protection work in operation period. The related environmental
measures should be entrusted to qualified company by contract. The main environmental
management responsibilities are as follows:
(1) Carry through national and local environmental protection laws and regulations,
policies and national, local and industrial environmental protection requirements;
(2) Manage the execution of environmental protection measures and establish
environmental management regulations in operating period;
(3) Coordinate with environmental monitoring agency and residents to settle
environmental issues.
(4) Deal with environmental emergencies when environment accident occurs.
63
Shanghai District Financing Vehicle (DFV)
Minfeng Raw Water Conveyors Project—Environmental Management Plan
4.5 The Budget of Environmental Protection
Environmental protection investment including environmental monitoring 、 interim
environmental measures、 independent environmental costs and basic reserve fee. The
estimated budget of the environmental protection is about CNY5,772,900. The investment
has been included in the project total investment and the final cost should be subjected to
actual expenditures.
64