Post on 21-May-2018
SCHEME-WISE-CIT-CHAR-ENG.doc
24
DETAILS OF SCHEMES IMPLEMENTED AT
STATE / DISTRICT / TALUK LEVEL
SCHEDULED CASTE SUB PLAN (SCSP) :
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period
Remarks
1. Implementation & Monitoring of
Scheduled Caste Sub Plan
(SCSP)
IMPLEMENTATION :
• Karnataka is following the sectoral approach for earmarking State Plan Funds for the Scheduled Caste Sub Plan based on the guidelines issued by the Planning Commission. The State Government is allocating funds under Scheduled Caste Sub Plan & Tribal Sub Plan based on the percentage of population of Scheduled Caste & Scheduled Tribe.
• The SCSP is being
implemented through various Development Departments.
• The Social Welfare Department is the Nodal Department for the implementation and monitoring of SCSP.
Concerned Dev. Depts. Principal
Secretaries / Secretaries is
the Sanctioning Authority
Implementing Authority is the HOD
Overall
Monitoring Authority is Principal Secretary,
SWD
- - Within the
financial year
Any complaints
may be reported to CEO, ZP & concerned District
Officers of Dev. Depts.
If it is not solved at
District Level, they may approach concerned HODs / Principal
Secretaries of the
Development Departments
SCHEME-WISE-CIT-CHAR-ENG.doc
25
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period
Remarks
• The Empower Committee is constituted under the Chairmanship of Additional Chief Secretary & Dev. Commissioner will approve the Action Plans of all the Development Departments.
• After approval of Schemes the concerned Development Department will implement the Schemes.
• Every month Social Welfare Department in co-ordination with other Development Depts. obtain and consolidate monthly Progress Reports of SCSP and submit the same to Planning Department / Finance Department etc.,
SCHEME-WISE-CIT-CHAR-ENG.doc
26
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period
Remarks
MONITORING :
• The programmes imple-mented through various Development Departments under SCSP will be reviewed and monitored at State Level, District Level & Taluk Level Committees.
State Level :
• At State Level, progress of all the Development Departments will be reviewed by the Chief Secretary to Government every quarterly in Karnataka Development Programme (KDP) meeting.
• The Additional Chief Secretary to Government & Development Commissioner will review the Development Department’s progress reports in the Empower Committee and the Committee is constituted for review / approval / monitoring of the schemes.
SCHEME-WISE-CIT-CHAR-ENG.doc
27
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period
Remarks
• The Principal Secretary to Government, Social Welfare Department will review the SCSP progress of the schemes every month in the MPIC meeting.
• All Principal Secretaries / Secretaries to Government will review the SCSP progress report of their concerned Department in their MPIC meetings.
• The progress reports of all the Development Depart-ments are reviewed by the Hon’ble Minister for Social Welfare as and when required.
• The Hon’ble Chief Minister of the State will also review the progress of the Development Departments as and when required in the High Power Committee Meeting presided over by him.
SCHEME-WISE-CIT-CHAR-ENG.doc
28
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period
Remarks
District Level :
• The SCSP progress reports of all the Departments will be reviewed at the District Level under the Chairmanship of the Deputy Commissioner / Chief Executive Officer, Zilla Panchayat in the monthly Karnataka Development Programme (KDP) meeting.
Taluk Level :
• The progress reports of all the Departments will be reviewed at the Taluk Level under the Chairmanship of the Executive Officer of the Taluk Panchayat in the monthly KDP meeting.
SCHEME-WISE-CIT-CHAR-ENG.doc
29
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing /
Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period
Remarks
2 SCSP Pooled fund
allocation
• The pooled fund allocated to SWD is utilized by Commissioner, Social Welfare, Dr. B.R. Ambedkar Development Corporation, Dr. Babu Jagajivan Ram Leather Industries Development Corporation, Karnataka Thanda Development Corporation, KREIS, KSFC etc.,
• For the allocated Pooled Funds Action Plan will be prepared including ongoing schemes, new schemes announced in the Budget and other important direct benefit oriented and community development schemes formulated by Dept. & Corporations.
Sanctioning Authority is Principal
Secretary, SWD
Implemented by Commissioner, SWD & M.D. of
concerned Corporations, Society etc.,
Monitored by
Principal Secretary, SWD
Within the
financial year
Any complaints may be
reported to CEO, ZP & DSWOs
If it is not solved at
District Level, they may approach
Commissioner SWD / MD of concerned Boards &
Corporations / Principal
Secretary to Govt., SWD
SCHEME-WISE-CIT-CHAR-ENG.doc
30
Sl. No.
Name of the Scheme /
Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing /
Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period
Remarks
3 Special Central Assistance (SCA) to
Scheduled Caste Sub Plan
(SCSP)
• The SCA to SCSP is being provided to State Government as an additive to SCSP.
• Its main object is to give thrust to the development programmes for Scheduled Castes with regard to their occupational pattern and the need for income productivity and income from their limited resources.
• Every year Government of India releasing SCA to SCSP for implementation of specific schemes as per the guidelines issued by the GOI. Details are as under :
• 3% of funds are earmarked towards Administration / Supervising / Monitoring and Evaluation purpose.
• 5% of the funds are earmarked for the economic development (Self-employment) of differently abled persons among SCs.
• 10% of the funds are earmarked for the basic amenities and other infrastructural development programmes in SC colonies.
Commissioner, Social Welfare Dept. / MD, Dr. B.R. Ambedkar Development Corporation / Principal, Pre-examination
Training Centre is the
Sanctioning / Implementing /
Monitoring Authority
- - Within the financial
year
Any complaints may be reported to CEO, ZP &
DSWOs
If it is not solved at
District Level, they may approach
Commissioner SW / MD of concerned Boards &
Corporations / Principal, PETC
/ Principal Secretary to Govt., SW
SCHEME-WISE-CIT-CHAR-ENG.doc
31
Sl. No.
Name of the Scheme /
Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing /
Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period
Remarks
• 15% of fund are earmarked for the viable income generating economic development schemes / programmes (SC-Self Help Groups / Revolving Fund) for SC women.
• The remaining fund will be utilized for self employment programmes, skill development / job oriented training programmes like Nursing Course (B.Sc & GNM Nursing), Para-medical, NIFT, CIPET and other computer related training programmes.
• In addition to this, other economic development schemes / programmes are also being takenup for the overall development of Scheduled Castes through Dr. B.R. Ambedkar Dev. Corporation / Boards. The funds will be re-allocated / released to the districts for implementation. The training programmes are implemented through Commissioner, Social Welfare Department.
SCHEME-WISE-CIT-CHAR-ENG.doc
32
EMPLOYMENT & TRAINING : Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
1 Reservation in Appointment and Promotion
• Monitoring of implement-tation of Reservation for SC/ST’s in Appointment and Promotion.
• Collecting and compiling of information regarding representation of SC/STs in Appointment of Group- C posts in Form-4 from all Departments/ Boards / Corporations / Co-Operative Institutions / Universities / Educational Institutions etc,.
• Inspection of unit offices regarding enforcement of reservation, identi-fication of Backlog vacancies.
• Monitoring & supervising of filling up of Backlog vacancies in Direct Recruitment and Promotion in Departments / Boards / Corporations / Co-Operative Institutions / Universities/ Educational Institutions etc.
Deprived SC/ST
Employees from the
reservation policy, of
State Govt. Departments / Boards/Corpo-rations/Univer
sities /Co-Operative
Institutions etc., and where
Reservation is applicable.
Departments / Organizations /Associations
seeking clarification regarding
Reservation.
Letter of request with
relevant document
s.
Form -4
No Time limit
1st day of May every Year.
Joint Director (Admin) &
Deputy Director (E&T) may be contacted
SCHEME-WISE-CIT-CHAR-ENG.doc
33
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
• Deputation of officers to selection committees, Interviews in order to verify the implementation of reservation in Direct recruitments.
• Deputation of officers to Departmental promotion Committees in order to enforce reservation for SC/STs in Promotion.
• Guiding and giving clarification regarding maintaining of reservation in recruitment, Promotion.
• Giving clarification to SC/ST Commission regarding reservation related cases and inspection reports as per the direction of commission
• Providing Backlog vacancy particulars to State level High power committee, Cabinet subcommittee and legislative committee.
SCHEME-WISE-CIT-CHAR-ENG.doc
34
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
• Monitoring Reservation and false caste certificate related High Court and KAT cases through Government Advocates.
• Supervising the work related to The Karnataka Scheduled castes / Scheduled Tribes and other OBC’s (Reservation of Appointment etc.,) Act 1990, Rules 1992 and Amendments.
2 Reservation of
Admission in Educational Institutions
• Monitoring of imple-mentation of Reser-vation in Admission in Educational Institutions for SC/ST.
• Collecting and compi-lation of information for annual report in Form-6 from all Universities / Educational Institutions etc,. regarding represent-tation of SC/ST candidates in admission.
Deprived SC/ST
Students/ candi-dates / Associa-tions.
Educa-tional Insti-
tutions / Univer-sities etc.,
Letter of request with
relevant documents.
Form-6
No time limit
1st day of September every year
Joint Director (Admin) &
Deputy Director (E&T) may be contacted
SCHEME-WISE-CIT-CHAR-ENG.doc
35
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
3 Caste Certificate
related issues
Clarification regarding issue of Caste Certificates
Any person / Office /
Associations.
Letter of request with
relevant documents.
No time limit. Joint Director (Admin) &
Deputy Director (E&T) may be contacted
4 Validity Certificate
related issues
Clarification regarding issue of validity Certificates.
The employer can approach with
the written request to The
Deputy Commissioner/ District Social
Welfare Officer of the concern District in
respect of SC/ ST Candidates Selected for
employment for Validity
Certificate.
Any person/ Office/
Associations.
Letter of request with
relevant documents.
No time limit. Joint Director (Admin) &
Deputy Director (E&T) may be contacted
5. Appeal cases Hearing and Disposal of Appeal cases filed against the order of the District level Caste Verification Committee.
Any person aggrieved by an order passed by
the District Caste
Verification Committee can file an
appeal before the
Commissioner within 30
days from the date of
receipt of the order of
District Caste Verification Committee.
Appeal petition
with Order of District
Caste Verification Committee and other Relevant
documents.
30 days Joint Director (Admin) &
Deputy Director (E&T) may be contacted
SCHEME-WISE-CIT-CHAR-ENG.doc
36
STATE SECTOR - FOR EDUCATIONAL SUPPORTIVE SCHEMES : INFRASTRUCTURE FACILITIES :
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
1. Construction of Hostels under State
Budget
Hostel construction works will be taken up for the Hostels which are functioning in the rented buildings after obtaining either Government Sites / Purchased Sites (Civil Amenity Sites). Construction will be entrusted to Agencies as per KTTP Act.
Government is the
Sanctioning Authority
Implementing by concerned Construction
Agency
Monitoring by Commissioner, Social Welfare
As per the existing Rules &
Regulations in the
KTTP Act
As prescribed
in the Tender
Document
Construction should be completed
within 12 to 24 months as
per Work Order &
Agreement from the date
of Administrative
Approval
For more information
Commissioner / Joint Director,
Social Welfare may be
contacted.
2 Construction of Hostels
under Central
Government Grant
GOI provide 100% grants to construct Girls Hostels and 50% grants for construction of Boys Hostel under Babu Jagajivan Ram Chhatravas Yojana
Government is the Sanctioning
Authority
Implementing by concerned Construction
Agency
Monitoring by Commissioner, Social Welfare
As per the existing Rules &
Regulations in the
KTTP Act
As prescribed
in the Tender
Document
Construction should be completed
within 12 to 18 months as
per Work Order &
Agreement from the date
of Administrative
Approval
For more information
Commissioner / Joint Director,
Social Welfare may be
contacted.
SCHEME-WISE-CIT-CHAR-ENG.doc
37
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing /
Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
3 SC Colony Development
To create a hygienic environment in the Colony and to improve the living conditions of SC families, the Colony is developed by providing Cement Concrete Roads / Drainages / Drinking Water Facilities / Construction of Individual / Community Toilets / Street Lights etc.,
Deputy Commissioners
are the Sanctioning Authority
Work
implementation by concerned
Agencies
Monitoring by District / Taluk Social Welfare
Officers of concerned Districts
As per the existing Rules &
Regulations in the
KTTP Act
As prescribed
in the Tender
Document
As prescribed in the Work
Order
Any complaints pertaining to the quality of work,
they may approach concerned Deputy
Commissioners for more
information
If it is not solved at District Level, the aggrieved party may approach
Commissioner, Social Welfare &
Principal Secretary to Govt., SWD
4 Construction of Dr. B.R. Ambedkar Bhavans / Jagajivan
Ram Bhavans / Community
Halls
Bhavans & Community Halls are constructed wherein the SC population is high for the purpose of Marriages / Cultural Programmes / Meetings / Training Programmes etc., As per the G.O dated 28.09.2011 Construction of Bhavans & Community Halls will be takenup at Village Level (@ Rs.10.00 lakhs) / Hobli Level (@ Rs.50.00 lakhs) /
Government is the Sanctioning
Authority
Implemented by Deputy
Commissioners
Monitored by Commissioner, Social Welfare
As per the existing Rules &
Regulations in the
KTTP Act
As prescribed
in the Tender
Document
As prescribed in the Work
Order
Any complaints pertaining to the quality of work,
they may approach concerned Deputy
Commissioners for more
information
If it is not solved at District Level, the aggrieved party may approach
Commissioner, Social Welfare &
Principal Secretary to Govt., SWD
SCHEME-WISE-CIT-CHAR-ENG.doc
38
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing /
Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
Taluk Level (@ Rs.100.00 lakhs) / District Level (@ Rs.300.00 lakhs) / State Level (@ Rs.500.00 lakhs) Additional funds if required, will be mobilized through Local Bodies / MP & MLA Grants etc.,
The constructed Bhavans & Community Halls are
coming under the jurisdiction
of DC at District Level / Tahsildar at Taluk Level / Panchayat
Development Officer at Panchayat
Level
5 Hostel Repairs
Funds are released to the Government Hostels functioning in own buildings to takeup all kinds of repair works and upgrade the existing hostels as “maintenance free hostels” by laying vitrified tiles in toilets, bathrooms, kitchen, dining hall, dormitory, veranda etc.,
Commissioner, SW is the
Sanctioning Authority
Implemented by Deputy
Commissioner / DSWOs /
TSWOs
Monitored by Commissioner, Social Welfare
As per the existing Rules &
Regulations in the
KTTP Act
As prescribed
in the Tender
Document
As prescribed in the Work
Order
Any complaints pertaining to the quality of repairs and other works,
they may approach concerned Deputy
Commissioners / DSWO / TSWO
for more information
If it is not solved at District Level, the aggrieved party may approach
Commissioner, Social Welfare &
Principal Secretary to Govt., SWD
SCHEME-WISE-CIT-CHAR-ENG.doc
39
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
6 Providing other
facilities to hostel
inmates
Students admitted in both Pre-matric & Post-matric Hostels, the required facilities like beddings, cots, trunks, sports materials, water purifier, solar water heater, solar lights, steam cooking etc., are provided to each Hostel.
Commissioner, SW is the
Sanctioning Authority
Implemented by Deputy
Commissioner / DSWOs /
TSWOs
Monitored by Commissioner, Social Welfare
As per the existing Rules &
Regulations in the
KTTP Act
As prescribed
in the Tender
Document
As prescribed in the Work
Order
Any complaints pertaining to the
supply of purchased
materials, they may approach
concerned Deputy
Commissioners / DSWO for more information
If it is not solved at District Level, the aggrieved party may approach
Commissioner, Social Welfare &
Principal Secretary to Govt., SWD
7 Financial Assistance to
GIA Institutions to takeup building
constructions
GIA hostels run by NGOs recognized by the Department are provided one time financial assistance for building construction @ 75% of the estimated cost or maximum of Rs.25.00 lakhs which- ever is less.
Govt. is the Sanctioning Authority
Implemented
by Chief Executive
Officer, Zilla Panchayat /
DSWO
Monitored by Commissioner, Social Welfare
- - - Any complaints may be
reported to CEO, ZP & DSWOs.
If it is not solved at
District Level, the aggrieved party may approach
Commissioner, Social Welfare & Principal Secretary to Govt., SWD
SCHEME-WISE-CIT-CHAR-ENG.doc
40
INCENTIVES TO MERITORIOUS STUDENTS :
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
8 Incentive to SSLC
students
SC students who secure 60% to 74.99% & 75% and above in the SSLC Board Exam are provided incentives @ Rs.5,000/- & Rs.10,000/- respectively
Commissioner, SW is the
Sanctioning Authority
Implemented by Director, SSLC Board / DDPI / BEO
Monitored by Commissioner, Social Welfare
- - - The incentives are
disbursed through
Cheque / DD directly to the
eligible students by Education
Dept.
9 Incentive to PUC students
SC students who secure 85% and above in Pre-university Board Exam in Arts / Commerce / Science faculties are provided Rs.10,000/- for 5 students in each faculty in each District
Commissioner, SW is the
Sanctioning Authority
Implemented by Director, PU Board /
DDPU
Monitored by Commissioner, Social Welfare
- - - The incentives are
disbursed through
Cheque / DD directly to the
eligible students by PU Board
SCHEME-WISE-CIT-CHAR-ENG.doc
41
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
10 Incentive to Degree Rank
Holders
SC students who secure 1 to 5 ranks in the final year exams are eligible to get Rs.20,000/- including Arts / Commerce / Science faculties
Commissioner, SW is the
Sanctioning, Implementing & Monitoring
Authority
Rank Holders (faculty-wise)
Final Year Degree
Marks Card / Rank
Certificate / Caste
Certificate / Certification
from the concerned College Principal
- Eligible students
should submit the prescribed application to Commissioner, SW through
the Institutions / Universities.
The incentives are remitted to the bank accounts of the eligible students
through RTGS
11 Incentive to Post-
graduate Rank Holders
SC students who secure 1 to 5 ranks in the final year exams of the PG Course in all Subjects are eligible to get Rs.25,000/- as incentives.
Commissioner, SW is the
Sanctioning, Implementing & Monitoring
Authority
Rank Holders (subject-wise)
Final Year PG Degree Marks Card / Rank Certificate /
Caste Certificate / Certification
from the concerned College Principal
- Eligible students should
submit the prescribed
application to Commissioner, SW through the Institutions / Universities.
The incentives are remitted to
the bank accounts of the
eligible students
through RTGS
SCHEME-WISE-CIT-CHAR-ENG.doc
42
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
12 Incentive to Professional
Courses
SC students who secure 1 to 5 ranks in Engineering / Dental / Indian Medicine are eligible to get Rs.25,000/- as incentives.
Commissioner, SW is the
Sanctioning, Implementing & Monitoring
Authority
Rank Holders
(Engineering / Dental /
Indian Medicine)
Final Year Marks Card /
Rank Certificate /
Caste Certificate / Certification
from the concerned College Principal
- Eligible students
should submit the prescribed application to Commissioner, SW through
the Institutions / Universities.
The incentives are remitted to the bank accounts of the eligible students
through RTGS
For Medical Rank Holders Rs.35,000/- is paid as an incentive
Commissioner, SW is the
Sanctioning, Implementing & Monitoring
Authority
Rank Holders (Medical Course)
Final Year Marks Card /
Rank Certificate /
Caste Certificate / Certification
from the concerned College Principal
-
SCHEME-WISE-CIT-CHAR-ENG.doc
43
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
13 Financial assistance to students who
have admitted in Prestigious Institutions like IIT / IIM / IISc / NIT
etc.,
One time financial assistance of Rs.1.00 lakh
OR compulsory fees payable + boarding charges whichever is less is paid for the entire course to the candidates who are admitted in Prestigious Institutions like IIT / IIM / IISc / NIT
Commissioner, SW is the
Sanctioning, Implementing & Monitoring
Authority
Those who are
admitted in Institutions
and not eligible for
GOI scholarship
Selected candidates
has to produce Caste
& Income Certificate, Entrance Exam Pass Certificate, Certification from Head of
the Institution, Receipt of
fees paid etc.,
Grants will be released within 30
days
Eligible students should
submit the prescribed
application to Commissioner, SW through the Institutions.
The incentives are remitted to
the bank accounts of the
eligible candidates
through RTGS
In case of any complaints,
may be reported to Principal
Secretary, SWD
14 Admission of SC students
in Prestigious Institutions
like Ramakrishna
Ashrama School, Mysore
The prescribed fees will be payable to the SC Students who are admitted and continuing the studies in Prestigious Institutions at District Level selected through Entrance Exam.
Commissioner, SW is the
Sanctioning Authority
Implemented by Deputy
Commissioners / DSWOs
Commissioner,
SW is the Monitoring Authority
- - - The fees payable to the Institutions are released
through RTGS.
SCHEME-WISE-CIT-CHAR-ENG.doc
44
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period / Completion Period
Remarks
15 Release of grants to new GIA hostels
In order to encourage the NGOs run by SC Management & Others in opening Pre-matric & Post-matric hostels funds are released for maintenance of such hostels
Government is the
Sanctioning Authority
Implemented & Monitored by CEO, ZP &
DSWOs
The NGOs who have obtained
prior permission from Govt. and run the Institution successfully for 2 years on their
own funds
Government Permission
Letter, Annual Report, Audit
Report & Proceedings of the NGO meetings, bye-law,
Registration & Renewal Certificate,
List of Board
Members, class-wise
students list
Proposals will be sent to
Government
within 15 days
The Commissioner SW will release the funds to
CEO, ZP of the concerned Districts
through RTGS
If any complaints
may be reported to Principal Secretary,
SWD
SCHEME-WISE-CIT-CHAR-ENG.doc
45
DISTRICT SECTOR :
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
16 Maintenance of
Residential School from I to V Std.
Free education with Boarding & Lodging facilities will be provided to SC students who are already admitted and studying in I to V Std. 68 Residential Schools are functioning in the SC populated localities with a sanctioned strength of 125.
Implemented by TSWOs
Monitored by
DSWOs
Students age should be within 5½ years
and should belong to SC community
Birth & Caste
Certificates
- Any complaints
may be reported to CEO, ZP / DSWOs
If it is not solved at
District Level, they may approach
Commissioner Social Welfare & Principal Secretary to Govt., SWD
17 Admission to Post-matric hostels and
its maintenance
Hostel facilities including boarding and lodging will be provided to all SC college students who are residing more than 5 to 7 kms. away from the college and whose parents annual income is less than Rs.2.00 lakhs.
Implemented and monitored
by TSWOs
Applications may be
obtained from TSWO Office
Students whose parents annual income is less than
Rs.2.00 lakhs. The eligible students for
hostel admission will be selected
based on merit by the
Committee Headed by
MLA.
Application, Caste & Income
Certificates, SSLC / PUC Marks Card / conduct
certificate / distance
certificate / Certification by the College Principal
Admission will be made in
the month of June /
July
Any complaints
may be reported to CEO, ZP / DSWOs
If it is not solved at
District Level, they may approach
Commissioner SW & Principal Secretary to Govt., SW
SCHEME-WISE-CIT-CHAR-ENG.doc
46
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
18 Sanction of prize money
Prize money will be sanctioned to SC college students who have passed the final exams in first class in first attempt. Prize money of Rs.750/- will be sanctioned to PUC students, Rs.1,000/- to Degree students, Rs.1,250/- to PG Degree students and Rs.1,500/- to Professional Courses students
Sanctioning & Implementing Authority by
DSWOs
Applications may be
obtained from DSWO Office
Those who have passed
the final exams in first class and in first attempt
Caste Certificate, Marks card of previous year and
certification from the College Principal
- Any complaints
may be reported to CEO, ZP / DSWOs
If it is not solved at
District Level, they may approach
Commissioner SW &
Principal Secretary to Govt., SW
19 Other concessions to students those who
are studying in Technical
Courses
Equipments like Scientific Calculators, Mini Drafter will be given to the students @ Rs.700/- in the beginning of the Course.
Sanctioning Implementing & Monitoring Authority by
DSWOs
DSWOs will collect the SC students list
from the concerned Colleges.
Those who have
admitted in Technical Education Institutions
Caste Certificate, Marks card of previous year and
certification from the College Principal
- Any complaints
may be reported to CEO, ZP / DSWOs
If it is not solved at
District Level, they may approach
Commissioner SW &
Principal Secretary to Govt., SW
SCHEME-WISE-CIT-CHAR-ENG.doc
47
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
20 Training to SC students
to get admission in
Sainik Schools
Training will be given to V Std Students to get through the Entrance Test conducted by Sainik School, Bijapur. Every year total 50 students will be selected on merit-cum-entrance test basis. These students will be accommodated in Department Hostel by providing free accommodation and food. This scheme is being implemented only in Bijapur District.
Sanctioning Implementing & Monitoring Authority by
DSWOs
DSWOs will invite
applications in the month of
June and select the eligible
students by conducting
entrance test.
Students should have passed IV Std. final
exam
Caste certificate &
IV Std. Marks Card
- Any complaints
may be reported to CEO, ZP / DSWOs
If it is not solved at
District Level, they may approach
Commissioner SW &
Principal Secretary to Govt., SW
21 Assistance to GIA Hostels
In order to encourage the NGOs, hostels run by SC Management & Others will be given financial assistance @ Rs.500/- per student for pre-matric hostels & Rs.600/- per student for post-matric hostels.
CEO, ZP is the Sanctioning Authority
Implemented & Monitored by DSWOs
The hostels run by NGOs which are recognized
by Government are eligible
for this financial assistance
Registration & Renewal Certificate,
List of Board
Members, class-wise
students list
Based on the Inspection Reports of TSWO & DSWOs financial assistance
will be sanctioned
Any complaints may be reported
to CEO, ZP / DSWOs
If it is not solved at District Level,
they may approach
Commissioner SW & Principal Secretary to Govt., SW
SCHEME-WISE-CIT-CHAR-ENG.doc
48
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
22 Starting & maintenance
of Book Banks in Technical Course
Institutions
In the College Library SC students may not get good reference books for their studies. For the use of such SC students separate book banks are maintained in that College Library. Books under this scheme will be issued to only SC students, after completion of the Course students will return back the books to the Book Bank maintained in that College.
CEO, ZP is the Sanctioning Authority
Implemented & Monitored by
DSWOs
DSWO will collect the students list and reference
books details from the concerned
College Principal and Purchase the books as per Rules under KTTP Act and provide the
same to the colleges.
Preference will be given
to Govt. Colleges /
Institutions or Aided
Institutions where more number of
SC students are studying
and who avail GOI
scholarship
- Any complaints
may be reported to CEO, ZP
If it is not solved at District
Level, they may
approach Commissione
r SW & Principal
Secretary to Govt., SW
23 Upgradation of merit
To get admission in Technical & Medical Courses, SC students who are studying in IX to XII Std. will be given coaching for CET @ Rs.15,000/- per annum per student including food charges, pocket money, stationery, text books and honorarium to Principals & Guest Lecturers.
CEO, ZP is the Sanctioning Authority
Implemented & Monitored by
DSWOs
The students who have passed VIII Std. final
exam
Caste Certificate, Certification from the
H.M.
- Applications should be
submitted to DSWO through
Schools / Colleges
Any complaints may be reported
to CEO, ZP
If it is not solved at
District Level, they may approach
Commissioner SW & Principal Secretary to Govt., SW
SCHEME-WISE-CIT-CHAR-ENG.doc
49
TALUK PANCHAYAT SECTOR :
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
24 Pre-matric hostels
Rural SC students who are studying from V to X Std. and who are residing more than 7 kms. away from the schools are given admission in the hostel. The students are provided free boarding and lodging, stationery, beddings, uniforms, soaps, hair oil etc.,
TSWO is the Sanctioning & Implementing
Authority
Monitored by CEO, ZP & DSWOs
The students who have passed IV Std. final exam.
Eligible
students are selected
through the Taluk Level Committee Headed by
MLA
Marks Card, Caste
Certificate, Certification from the
H.M.
- Students who are seeking admission to hostels may obtain and submit the
application to TSWOs.
Any complaints may be reported to CEO, ZP &
DSWOs
If it is not solved at
District Level, they may approach
Commissioner SW & Principal Secretary to Govt., SW
25 Pre-matric Scholarship
(GOK Scheme)
To encourage the SC students to continue their studies, scholarship will be sanctioned to students whose parents annual income is less than Rs.2.00 lakhs.
For Boys – I to VII Std. – Rs.250/- per annum per student VIII Std. – Rs.500/- per annum per student
For Girls – I to V Std. – Rs.250/- per annum per student VI to VII Std. – Rs.350/- per annum per student VIII Std. – Rs.700/- per annum per student
TSWO is the Sanctioning & Implementing
Authority
Monitored by CEO, ZP & DSWOs
Annual income
should be below
Rs.2.00 lakhs
SC Students
have to enroll their
names online
through the Software
prepared by the
Department
Caste & Income
Certificates, Certification from the
H.M.
- Any complaints
may be reported to CEO, ZP & DSWOs
If it is not solved at
District Level, they may approach
Commissioner SW & Principal Secretary to Govt., SW
SCHEME-WISE-CIT-CHAR-ENG.doc
50
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
26 Pre-matric Scholarship (GOI Scheme)
For students studying in IX & X Std. scholarship will be sanctioned as per the GOI guidelines. For hostellers maintenance allowance of Rs.350/- per month per student and Rs.1,000/- towards stationery and text books will be provided. Similarly, for Days Scholars maintenance allowance of Rs.150/- per month per student and Rs.750/- towards stationery and text books will be provided.
TSWO is the Sanctioning & Implementing
Authority
Monitored by CEO, ZP & DSWOs
Annual income
should be below
Rs.2.00 lakhs
SC Students
have to enroll their
names online
through the Software
prepared by the
Department
Caste & Income
Certificates, Certification from the
H.M.
- Any complaints
may be reported to CEO, ZP & DSWOs
If it is not solved at District
Level, they may
approach Commissione
r SW & Principal
Secretary to Govt., SW
27 Pre-matric scholarship to students
whose parents are engaged in uncleaned occupation (GOI – CSS)
Scholarship is being provided to the students whose parents are engaged in uncleaned occupation like tanning, flaying etc. irrespective of their caste. For hostellers (from III to X Std.) maintenance allowance of Rs.700/- per month per student and Rs.1,000/- towards stationery and text books will be provided. Similarly, for Days Scholars (from I to X Std.) maintenance allowance of Rs.110/- per month per student and Rs.750/- towards stationery and text books will be provided.
TSWO is the Sanctioning & Implementing
Authority
Monitored by CEO, ZP & DSWOs
Eligible Students have to
enroll their names online
through the Software
prepared by the
Department
Certificate from
Municipal Administration Officers regarding occupation
of the parents and certification
from the H.M.
- Any complaints
may be reported to CEO, ZP & DSWOs
If it is not solved at District
Level, they may
approach Commissione
r SW & Principal
Secretary to Govt., SW
SCHEME-WISE-CIT-CHAR-ENG.doc
51
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
28 Post-matric scholarship (GOI – CSS)
To encourage the SC students to continue their studies, scholarship will be sanctioned to students whose parents annual income is less than Rs.2.00 lakhs. Scholarship includes maintenance allowance to the students and compulsory payable fees to the Colleges. Details of Maintenance allowance are furnished below Group Days
Scholar per month
per student
Hostellers per month per student
I Rs.550/- Rs.1200/-
II Rs.530/- Rs.820/-
III Rs.300/- Rs.570/-
IV Rs.230/- Rs.380/-
This expenditure is met out of GOI funds & State fund (Committed Liability)
TSWO is the Sanctioning & Implementing
Authority
Monitored by CEO, ZP & DSWOs
Annual income
should be below
Rs.2.00 lakhs
SC Students
have to enroll their
names online
through the Software
prepared by the Dept.
Caste & Income
Certificates,
Certification from the Principal of
the concerned colleges.
- Any complaints
may be reported to CEO, ZP & DSWOs
If it is not solved at District
Level, they may
approach Commissione
r SW & Principal
Secretary to Govt., SW
29 Extra Boarding & Lodging Charges
The State Government is providing to the Hostel Inmates @ Rs.850/- per month per student. But the GOI is sanctioning maintenance allowance less than this amount for Group `II’ `III’ & `IV’ students. Hence to meet the difference amount EBL is being sanctioned to the college Hostel Warden.
TSWO is the Sanctioning & Implementing
Authority
Monitored by CEO, ZP & DSWOs
Annual income
should be below
Rs.2.00 lakhs
- - Any complaints
may be reported to CEO, ZP & DSWOs
If it is not solved at
District Level, they may approach
Commissioner SW & Principal Secretary to Govt., SW
SCHEME-WISE-CIT-CHAR-ENG.doc
52
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period /
Completion Period
Remarks
Group EBL charges per month per student
I -
II Rs.30/-
III Rs.280/-
IV Rs.470/-
SC Students have to enroll their names
online through the Software prepared by
the Department
The students
who are eligible for Post-matric Scholarship can avail this
facility
30 Hostel Repairs
Repair works will be takenup in Government Hostels functioning in own buildings at Taluk Level.
Implemented by TSWOs
Monitored by CEO, ZP & DSWOs
As per the existing Rules &
Regulations in the KTTP
Act
As prescribed
in the Tender
Document
As prescribed in the Work
Order
Any complaints
pertaining to the quality of repairs and other works, they may approach concerned CEO, ZP & DSWO for
more information
If it is not solved at
District Level, the aggrieved party may approach
Commissioner, Social Welfare & Principal Secretary to Govt., SWD
SCHEME-WISE-CIT-CHAR-ENG.doc
53
CO-ORDINATION (STATE SECTOR) :
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period
Remarks
1 Providing relief and
rehabilitation to the
victims / dependants of atrocities.
Under the Prevention of Atrocities Act, the State Govt. is required to undertake various measures like
• Payment of monitory relief i.e. compensation will be paid as per G.O dated 28.03.2012 to the atrocity victims depending upon the nature and gravity of the offences like injuries / rape / murder / different types of abusing / social boycott etc.
• Providing various
temporary and permanent rehabilitation measures to atrocity victims as proposed by D.C.
• Providing enough Police protection including legal aid.
• Providing TA & maintenance expenses to witnesses at the time of trial.
Deputy Commissioner
is the Sanctioning Authority
Implemented by Tahsildar / DSWO / TSWO
& District Manager, Dr.B.R.
Ambedkar Dev. Corp.
Monitored by Commissioner, Social Welfare
Any SC / ST person affected under the
Act
FIR copy, Caste
Certificate, Photos, report
from Superintenden
t of Police, Post-mortem /
medical examination
report
- Immediate action and relief will
be provided to the victims
affected in atrocity cases.
SCHEME-WISE-CIT-CHAR-ENG.doc
54
Sl. No.
Name of the Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period
Remarks
2 Eradication of Untouchability and Intercaste
Marriage
Financial assistance of Rs.50,000/- is given to Intercaste married couples in two instalments. Out of this amount Rs.25,000/- will be paid in cash and the remaining Rs.25,000/- will be paid in the form of NSC
Sanctioning Authority is the CEO, ZP
Implemented by TSWO /
DSWO
Monitored by Commissioner,
SW
One of the couple belongs to SC his / her spouse should belong to a High Caste
Hindu
The total income of the couple should not exceed Rs.50,000/- per annum.
The assistance under the
scheme shall be given only to the lawfully
married couples whose marriage has
been registered in a Registration
Office, though they might
have married under any custom.
Marriage Registration
Certificate issued by the Sub-Registrar
Separate Income Certificate of
husband and wife issued by competent authority
Caste Certificate of husband and wife issued by
the concerned author
ity.
Joint photo of the married
couple
Residential Certificate issued by the concerned
authority
The maximum age limit for women is 42 years and for men 45 years.
-
SCHEME-WISE-CIT-CHAR-ENG.doc
55
Sl. No.
Name of the
Scheme / Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing / Monitoring Authority
Eligibility criteria
Documents required
Eligibility Period
Remarks
3 Conducting Seminars
and Workshops
Seminars & Workshops are being conducted in State, District & Taluk level to bring Awareness Programmes among public regarding Removal of Untouchability & awareness Programmes on the Provision of PCR 1955 Act & POA Act 1989
Sanctioning Authority Deputy
Commissioner
Implemented by TSWO / DSWO /
Monitored by Commissioner,
SW
Seminar & Workshops
will be conducted at Village /
Hobli / Taluk / District Levels in atrocity
prone areas to all
categories
- -
4 Financial Assistance
to Law Graduates
SC Law Graduates who are selected at the District Level Selection Committee will be assisted by providing Rs.2,000/- per month as stipend over a period of 4 years and also provide one time financial assistance of Rs.5,000/- to set-up his Office to continue his Profession. The eligible candidates shall submit an application in the prescribed proforma along with relevant documents to the concerned DSWOs
Sanctioning Authority Deputy
Commissioner
Implemented by DSWO
Monitored by Commissioner,
SW
Candidate should have passed the Bachelor of
Law Examination.
Should belong to SC
community
Annual Income should
be within Rs.2.00 lakhs
The maximum age limit of
the applicant should be 40
years
Caste & Income Certificates issued by the competent
authority
Residential certificate issued by the competent
authority
Law Graduation certificate.
-
SCHEME-WISE-CIT-CHAR-ENG.doc
56
PRE-EXAMINATION TRAINING CENTRE (PETC), BANGALORE
Sl.No.
Name of the Scheme/
Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing /
Monitoring Authority
Eligibility criteria
Document required
Eligibility Period
Remarks
1 Coaching for UPSC
Civil Service Exami-nations (IAS/IPS)
etc.
SC meritorious candidates selected through Entrance Exam conducted by the Social Welfare Department are sponsored to reputed IAS / IPS Coaching Centres at Delhi, Hyderabad & Bangalore. The duration of the course is 6-8 months including Prilims and Mains Exam. The entire course fees will be borne by the Dept. alongwith stipend ranging from Rs.1,000/- to Rs.6,000/- based on location of institution.
Sanctioning Authority is
Commissioner, Social Welfare
Implemented by Principal
PETC, Bangalore
SC Candidates with any
Degree & their family income
should be below Rs.2.00 lakhs p.a. from
all sources
Caste & Income
certificates issued by competent authority,
Degree marks cards,
Convocation Certificate
Application has to
be submitted within 30 days
For more information candidates may contact
Principal Pre Exami-
nation Training Centre, Dr.B.R.
Ambedkar Bhavan, Vasanth-nagar,
Bangalore.
Ph : (080) 22207784
2 Coaching for KPSC
Civil Service Exami-nations (KAS)
The Department provide free coaching for 2-3 months to SC candidates who have applied for KPSC Competitive Exam. The coaching classes will be conducted at PETC, Bangalore.
Sanctioning Authority is
Commissioner, Social Welfare
Implemented by
Principal PETC, Bangalore
SC Candidates with any
Degree & their family income
should be below Rs.2.00 lakhs p.a. from
all sources
Caste & Income
certificates issued by competent authority &
Degree marks cards,
Convocation Certificate
Application has to
be submitted within 30 days
For more information candidates may contact
Principal PETC,
Bangalore
SCHEME-WISE-CIT-CHAR-ENG.doc
57
Sl.No.
Name of the Scheme/
Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing /
Monitoring Authority
Eligibility criteria
Document required
Eligibility Period
Remarks
The candidates are selected based on the merit in Degree Exams. The admitted candidates for the coaching will be paid monthly stipend of Rs.1,000/- for local candidates & Rs.2,500/- for candidates from outside Bangalore.
3 Coaching for FDA / SDA & other
Competitive Exami-nations
The Department provide free coaching for 2-3 months to SC candidates who have applied for FDA & SDA Cadre through KPSC. The coaching classes will be conducted at PETC, Bangalore. The candidates are selected based on the merit in Degree & SSLC Exams. The admitted candidates for the coaching will be paid stipend of Rs.125/- p.m for local candidates & Rs.350/- p.m for candidates from outside Bangalore.
Sanctioning Authority is
Commissioner, Social Welfare
Implemented by
Principal PETC, Bangalore
SC Candidates with any
Degree/PUC & family income
should be below
Rs.2.00 lakh p.a.
Caste Certificate & Income certificate issued by competent authority &
Degree marks cards/PUC Marks card
15-30 days
For more information candidates may contact
Principal PETC,
Bangalore
SCHEME-WISE-CIT-CHAR-ENG.doc
58
Sl.No.
Name of the Scheme/
Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing /
Monitoring Authority
Eligibility criteria
Document required
Eligibility Period
Remarks
4 Financial assistance
to SC candidates to pursue Higher
Education in abroad
To encourage SC student to pursue higher studies / education in Master Degree & Ph.D outside India in reputed Universities. The Department provide actual course fees and maintenance cost Rs.6.00 lakhs per year per student. Selection is done through Selection Committee under the Chairman-ship of Principal Secretary to Govt. SWD.
Sanctioning Authority is
Commissioner, Social Welfare
Implemented & Monitored by
Principal PETC, Bangalore
For Ph.D - 60% marks and above in relevant
Masters Degree.
For Master Degree-
60% marks and above in relevant Bachelors Degree.
Age : Below 35 years
The family
income should not exceed Rs.25,000/-
p.m
Caste & Income
certificates issued by competent authority &
Degree marks/
convocation Certificate Offer letter
from University in
Abroad.
Every year
online appli-cations
are invited between May & July
For more
information candidates may contact
Principal PETC,
Bangalore
5 GNM & BSc Nursing courses
The Department sponsor SC candidates for 4 years B.Sc & 3½ years GNM Nursing Courses. Eligible students have to submit their applications online through the Software prepared by the Department.
Sanctioning Authority is
Commissioner, Social Welfare
Implemented by
DSWO
Monitored by PETC, Bangalore
Minimum of 40% marks in II PUC Science
(PCBE) for B.Sc Nursing
Minimum of 35% in II PUC
Arts/Commerce / Science for GNM Nursing
course
Caste & Income
certificates issued by competent authority, PUC marks
cards
Every year
between August & September
For more information candidates may contact
Principal PETC,
Bangalore
SCHEME-WISE-CIT-CHAR-ENG.doc
59
Sl.No.
Name of the Scheme/
Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing /
Monitoring Authority
Eligibility criteria
Document required
Eligibility Period
Remarks
The candidates are selected on merit basis and admitted to various Nursing Schools & Colleges recognized by INC & KNC. All the expenses of the candidates for the entire course will be borne by the Department. The stipend of Rs.1,000/- p.m are remitted to the candidate’s bank account through RTGS.
The annual income of the family from all sources should
be below Rs.2.00 lakh
6 Para Medical Courses
The Department sponsor SC candidates for various para-medical courses to the recognized Para-medical Colleges. The candidates are selected to Government quota seats on merit basis. Eligible Students have to submit their applications online through the Software prepared by the Department
Sanctioning Authority is
Commissioner, Social Welfare
Implemented by
DSWO
Monitored by PETC, Bangalore
SSLC & PUC Science pass. The duration of the course is 3 years for SSLC students & 2 years for PUC (Science)
Students. The Family income from all sources should be
below Rs.2.00 lakhs p.a.
Caste & Income certificates issued by competent authority
and SSLC & PUC marks
cards
Every year
between August & September
For more information candidates may contact
Principal PETC,
Bangalore
SCHEME-WISE-CIT-CHAR-ENG.doc
60
Sl.No.
Name of the Scheme/
Programme
Brief description of the Scheme / Programme
Sanctioning / Implementing /
Monitoring Authority
Eligibility criteria
Document required
Eligibility Period
Remarks
7 Training in Plastic
Engineering Technology
through CIPET, Mysore
The Department sponsor SC candidates for various Plastic Engineering Technology Courses. The applications are invited by DSWOs and the same are forwarded to CIPET, Mysore. The eligible candidates are selected by the Institution.
Sanctioning Authority is
Commissioner, Social Welfare
Implemented & Monitored by
PETC, Bangalore
SSLC, ITI, Degree,
Diploma in Mechanical Engineering,
etc. depending on the course. The Family income from all sources should be
below Rs.2.00 lakhs p.a
Caste & Income
certificates issued by competent
authority and marks cards of
SSLC/ ITI, Degree, Diploma course.
Subject to 4(g) exemp-tion &
based on the
availabi-lity of funds.
For more information candidates
may contact Principal PETC,
Bangalore
8 Other training
programmes
Subject to 4(g) exemption of the participa
ting Insti-
tution & based on
the availabi-lity of funds.