Post on 15-Jul-2020
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_101Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 101 onSP282273.
Disclosure Plan for Proposed Lot 101 on SP282273Described as part of Lot 1 on RP170364
Existing Title Reference: 15963138
Locality of Morayfield
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
LEGEND
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
Parts of Lot 101 are subject to fill less than0.2m in depth.
Lot 101 contains Emt A on SP282273for services benefiting Moreton Bay RegionalCouncil & Unitywater.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
D TBG 14/07/16 Design Base Amended
Area of Cut
Area of Fill
Design Contours
Built to Boundary Wall
E TBG 16/03/17 Emt A amended as per engineering design.
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_102Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 102 onSP282273.
Disclosure Plan for Proposed Lot 102 on SP282273Described as part of Lot 1 on RP170364
Existing Title Reference: 15963138
Locality of Morayfield
B CTW 29/02/16 Legend, Notes & Emts Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
Parts of Lot 102 are subject to fill less than0.2m in depth.
Lot 102 contains Emt B on SP282273 forservices benefiting Moreton Bay RegionalCouncil & Unitywater and Emt AA on SP282273for services benefiting Unitywater.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
C TBG 14/07/16 Design Base Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Built to Boundary Wall
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_103Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 103 onSP282273.
Disclosure Plan for Proposed Lot 103 on SP282273Described as part of Lot 1 on RP170364
Existing Title Reference: 15963138
Locality of Morayfield
B CTW 29/02/16 Legend & Notes Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
Parts of Lot 103 are subject to fill less than0.2m in depth.
Lot 103 contains Emt C on SP282273 forservices benefiting Moreton Bay RegionalCouncil and Unitywater.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
C TBG 14/07/16 Design Base Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Built to Boundary Wall
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_104Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 104 onSP282273.
Disclosure Plan for Proposed Lot 104 on SP282273Described as part of Lot 1 on RP170364
Existing Title Reference: 15963138
Locality of Morayfield
B CTW 29/02/16 Legend & Notes Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
Parts of Lot 104 are subject to fill less than0.2m in depth.
Lot 104 contains Emt D on SP282273 forservices benefiting Moreton Bay RegionalCouncil and Unitywater.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
C TBG 14/07/16 Design Base Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Proposed Retaining Wall(Height shown on lower side of wall)
Proposed Building Pad
Finished Design Level
Built to Boundary Wall
D TBG 17/03/17 Ret Wall removed from lot
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_105Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 105 onSP282273.
Disclosure Plan for Proposed Lot 105 on SP282273Described as part of Lot 1 on RP170364
Existing Title Reference: 15963138
Locality of Morayfield
B CTW 29/02/16 Legend & Notes Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
Parts of Lot 105 are subject to fill less than0.2m in depth.
Lot 105 contains Emt E on SP282273 forservices benefiting Moreton Bay RegionalCouncil and Unitywater.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
C TBG 14/07/16 Design Base Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Depth of Fill Contours
Proposed Retaining Wall(Height shown on lower side of wall)
Proposed Building Pad
Finished Design Level
Built to Boundary Wall
D TBG 17/03/17 Retaining Wall Location Amended
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_106Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 106 onSP282273.
Disclosure Plan for Proposed Lot 106 on SP282273Described as part of Lot 1 on RP170364
Existing Title Reference: 15963138
Locality of Morayfield
B CTW 29/02/16 Legend & Notes Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
Parts of Lot 106 are subject to fill less than0.2m in depth.
Lot 106 contains Emt F on SP282273 forservices benefiting Moreton Bay RegionalCouncil and Unitywater.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
C TBG 14/07/16 Design Base Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Depth of Fill Contours
Proposed Retaining Wall(Height shown on lower side of wall)
Proposed Building Pad
Finished Design Level
Built to Boundary Wall
D TBG 17/03/17 Retaining Wall Location Amended
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_107Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 107 onSP282273.
Disclosure Plan for Proposed Lot 107 on SP282273Described as part of Lot 1 on RP170364 & Lot 5 on RP112907
Existing Title Reference: 15963138 & 14055076
Locality of Morayfield
B CTW 29/02/16 Legend & Notes Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
Parts of Lot 107 are subject to fill less than0.2m in depth.
Lot 107 contains Emt G on SP282273 forservices benefiting Moreton Bay RegionalCouncil and Unitywater.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
C TBG 14/07/16 Design Base Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Depth of Fill Contours
Proposed Retaining Wall(Height shown on lower side of wall)
Proposed Building Pad
Finished Design Level
Built to Boundary Wall
D TBG 17/03/17 Retaining Wall Location Amended
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_108Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 108 onSP282273.
Disclosure Plan for Proposed Lot 108 on SP282273Described as part of Lot 5 on RP112907
Existing Title Reference: 14055076
Locality of Morayfield
B CTW 29/02/16 Legend Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
Lot 108 contains Emt H on SP282273 forservices benefiting Moreton Bay RegionalCouncil and Unitywater.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
Parts of Lot 108 are subject to fill less than0.2m in depth.
C TBG 14/07/16 Design Base Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Depth of Fill Contours
Proposed Retaining Wall(Height shown on lower side of wall)
Proposed Building Pad
Finished Design Level
Built to Boundary Wall
D TBG 17/03/17 Retaining Wall Location Amended
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_109Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 109 onSP282273.
Disclosure Plan for Proposed Lot 109 on SP282273Described as part of Lot 5 on RP112907
Existing Title Reference: 14055076
Locality of Morayfield
B CTW 29/02/16 Legend & Notes Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
Lot 109 contains Emt I on SP282273 forservices benefiting Moreton Bay RegionalCouncil and Unitywater.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
Parts of Lot 109 are subject to fill less than0.2m in depth.
C TBG 14/07/16 Design Base Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Depth of Fill Contours
Proposed Retaining Wall(Height shown on lower side of wall)
Proposed Building Pad
Finished Design Level
Built to Boundary Wall
D TBG 17/03/17 Retaining Wall Location Amended
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_110Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 110 onSP282273.
Disclosure Plan for Proposed Lot 110 on SP282273Described as part of Lot 5 on RP112907
Existing Title Reference: 14055076
Locality of Morayfield
B CTW 29/02/16 Legend Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
Lot 110 contains Emt J on SP282273 forservices benefiting Moreton Bay RegionalCouncil and Unitywater.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
C TBG 14/07/16 Design Base Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Depth of Fill Contours
Proposed Retaining Wall(Height shown on lower side of wall)
Proposed Building Pad
Finished Design Level
Built to Boundary Wall
D TBG 17/03/17 Retaining Wall Location Amended
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_111Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 111 onSP282273.
Disclosure Plan for Proposed Lot 111 on SP282273Described as part of Lot 5 on RP112907
Existing Title Reference: 14055076
Locality of Morayfield
B CTW 29/02/16 Legend & Emts Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTESThis plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
Lot 111 contains Emt K SP282273 for servicesbenefiting Moreton Bay Regional Council &Unitywater and Emt KK for services benefitingUnitywater.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
Parts of Lot 111 are subject to fill less than0.2m in depth.
C TBG 14/07/16 Design Base Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Depth of Fill Contours
Proposed Retaining Wall(Height shown on lower side of wall)
Proposed Building Pad
Finished Design Level
Built to Boundary Wall
D TBG 17/03/17 Retaining Wall Location Amended
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_112Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 112 onSP282273.
Disclosure Plan for Proposed Lot 112 on SP282273Described as part of Lot 5 on RP112907
Existing Title Reference: 14055076
Locality of Morayfield
A CTW 29/02/16 Legend & Emts Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
Parts of Lot 112 are subject to fill less than0.2m in depth.
C TBG 14/07/16 Design Base Amended. Area Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Depth of Fill Contours
Proposed Building Pad
Built to Boundary Wall
D TBG 09/03/17 Lot Area & Dims amended
Issu
es
No. by Date Description
surveying town planning urban design environmental management landscape architecture
saundershavillgroup
Saunders Havill Group Pty Ltd ABN 24 144 972 949
Brisbane Emerald Rockhampton
head office 9 Thompson St Bowen Hills Q 4006
phone 1300 123 SHG web www.saundershavill.com
APPROVEDCOMPANY
ISO9001Quality
Management Systems
CertificationServices
APPROVEDCOMPANY
ISO14001Environmental
Management Systems
CertificationServices
Dwg No. 7712 S 11 DP E_113Scale @A3 1: 200
Level Datum: AHD der.Origin of Levels: PM104103
Contour Interval: 0.2mRL of Origin: 15.59
This plan shows details of Proposed Lot 113 onSP282273.
Disclosure Plan for Proposed Lot 113 on SP282273Described as part of Lot 5 on RP112907
Existing Title Reference: 14055076
Locality of Morayfield
A CTW 29/02/16 Legend Amended
This Disclosure Plan is prepared for the sole purpose ofsatisfying the Disclosure requirements of the Land SalesAct and SHOULD NOT be used for any other purpose,particularly As-constructed purposes. This information iscompiled from Design plans only, unless otherwisestated, and thereon is subject to final survey andconstruction of operational works.
NOTES
This plan has been prepared from preliminarysurvey plan (SP282273) and engineeringplans provided on the 17/02 & 11/07/2016, andthe 08/03/2017 by Umbrella Civil ConsultingEngineers.
Development approval has been received forthis subdivision (Approval 30362/2015/V3RL)from the Moreton Bay Regional Council(14/12/2015).
Development Approval has been granted forOperational Works for the proposed lot.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
All fill shall be placed and compacted in acontrolled manner so that Level 1 level ofresponsibility may be achieved and certified asper AS3798-2007.
Parts of Lot 113 are subject to fill less than0.2m in depth.
Lot 113 contains Easement L on SP282273 forservices benefiting Unitywater.
C TBG 14/07/16 Design Base Amended
LEGEND
Area of Cut
Area of Fill
Design Contours
Depth of Fill Contours
Proposed Building Pad
Built to Boundary Wall
D TBG 09/03/17 Lot dims and area amended. Emt added