Agenda
Deployment - Overview
ATD Calculation
Different Horizons in Deployment
Deployment Methods
Deployment Rules
Fair share rules
Push Rules
Discussion & Feedback
8/3/2019 Deployment - Rules in SNP
3/13
2008 MindTree Consulting
Deployment - Overview
Deployment adjusts Stock
Transfers according to short-termchanges
Determines when and in what
quantity inventory & Planned
receipts can be deployed to DCs
If ATD quantities are in-sufficient
then Fair share rules determine
which DCs to prioritize.
If supply exceeds, push rules used
to move excess to DCs
Generates Feasible, Optimized
distribution plan which can be
transferred to ECC for execution
Slide 3
Planning Process
8/3/2019 Deployment - Rules in SNP
4/13
2008 MindTree Consulting
ATD Quantity Calculation
Determines how much isdeployable quantity to DCs
Receipt elements are grouped
under ATR
Demand/Issue elements aregrouped under ATI
Defined in Location Master [Else
default category considered]
Can also be maintained atLocation-product level
Slide 4
8/3/2019 Deployment - Rules in SNP
5/13
2008 MindTree Consulting
Different Horizons
Push Horizon (Defn - Supply Profile in
SNP 2 Tab of Prod-loc master):-
Specifies the No. of Days from
todays date, over which you want to
take into account the receipts for
todays deployment
Pull Horizon (Defn - Demand Profile in
SNP 2 Tab of Prod-loc master):-
Specifies the No. of Days from
todays date, over which you want to
take into account the demands for
todays deployment
Deployment Horizon :-
Specifies the No. of Days from
todays date, over which you want
confirm STRs during todays
deployment
Slide 5
8/3/2019 Deployment - Rules in SNP
6/13
2008 MindTree Consulting
Deployment Methods
Deployment Heuristics
Hierarchical view of Supply chain
Deployment Optimizer
Replenishment for a product within the
network
Real time deployment
Change in Demand & Supply situation
post Heuristics
Slide 6
8/3/2019 Deployment - Rules in SNP
7/13 2008 MindTree Consulting
Deployment - Rules
Fair Share rules
Fair Share rule A (Deployment Heuristics /
Optimizer)
Fair Share rule B (Deployment Heuristics)
Fair Share rule C (Deployment Heuristics)
Fair Share rule D (Deployment Heuristics)
Fair Share rule X - User Defined BADI
(Deployment Heuristics)
Push Rules
Push Rule P
Push Rule X
Push Rule Q
Push Rule S
Push Rule UUser Defined BADI
Slide 7
8/3/2019 Deployment - Rules in SNP
8/13 2008 MindTree Consulting
Deployment Fair Share Rule : A (Proportionate to Demand)
Slide 8
Deployment Fair Share Rule A
8/3/2019 Deployment - Rules in SNP
9/13 2008 MindTree Consulting
Shortages across all DCs made equal - No Fair share applies
Distribute proportionate to Stock/Target stock level
Slide 9
Deployment Fair Share Rule : B (% of Target stock level)
8/3/2019 Deployment - Rules in SNP
10/13 2008 MindTree Consulting
Rule C :- By Outbound Quota arrangement
Rule D :- By Priority defined in Lane
Rule X :- Custom User defined
Slide 10
Deployment Fair Share Rule : C, D, X
8/3/2019 Deployment - Rules in SNP
11/13 2008 MindTree Consulting
Push Rules
Rule P (Push-Pull distribution) - Supply distributed immediately for demand with in Pull
Horizon
Rule Q - Push by Quota
Rule X - Push supplies in Push horizon for all demands in the system
Rule S - Push by SS horizon
Rule U - User Defined
BADI
Slide 11
200
8/3/2019 Deployment - Rules in SNP
12/13 2008 MindTree Consulting
Reference
Slide 12
8/3/2019 Deployment - Rules in SNP
13/13 2008 MindTree Consulting
Feed back must
Thank You