DEMONSTRATION OF IN-SITU SEWAGE DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON TREATMENT TECHNOLOGIES ON
RIVER GANGA RIVER GANGA (Proposal under NGRBA)(Proposal under NGRBA)
CENTRAL POLLUTION CONTROL BOARD
IST
IST
IST
IST
Sewage Drain
Sewage Drain
Sewage Drain
Sewage Drain
River
River
DEMONSTRATION OF IN-SITU SEWAGE TREATMENT DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES THROUGH BIOREMEDIATION TECHNOLOGIES THROUGH BIOREMEDIATION
PROCESSPROCESS
1. Budha Nala, Ludhiana (Punjab)
2. Morigate Nala, Allahabad (UP)
3. City Drain, Farukhabad (UP)
4. Bakarganj Nala, Patna (Bihar)
5. Uttarakhand (Muni ki Reti, Haridwar)
6. West Bengal (Tolly’s/ Taldanga, Kolkata)
7. Jharkhand (Sahebganj/ Rajmahal)
GENESIS OF PROJECTGENESIS OF PROJECT
Gap in Sewage treatment
Generation : 38,255 MLD
Treatment : 11,787 MLD
Sewage Treatment Plants;
(Ex-situ) * Costing
* O & M
* Performance
Target : 2020 Action Plan
PROJECT PROPOSAL - CHRONOLOGY
• Expression of Interest : April, 2010
• Response : 7 Firms
• Technical Review in CPCB : June, 2010
• CPCB’s proposal to MoEF : August, 2010
• Meeting in MoEF and suggestion to demonstrate IST on Ganga
: August, 2010
• Forwarded 7 proposals on Ganga to MoEF
: September/ October, 2010
• Comments of NRCD to revise the Proposals
: November, 2010
Contd….
PROJECT PROPOSAL - CHRONOLOGY
• Committee to examine the proposals
: December, 2010
• Examination, Conditions, recommendation of proposals
: February, 2011
• Research Advisory Committee - Recommended
: 28th February, 2011
• Admn. Approval and ES of MoEF : 6/11 April, 2011
• Suggested to seek Performance BG, TPA, Patent & MoA
: May/ June, 2011
• CPCB confirmation on MoA, BG : July, 2011
• Review by Secretary : 02 August, 2011
• Funds Transfer : Awaited
IN-SITU SEWAGE TREATMENTIN-SITU SEWAGE TREATMENT(IST)(IST)
In-situ Sewage Treatment refers to treatment of
sewage in the running battery of flow without
displacing; and by employing microbial consortia
in aerobic and facultative environment to degrade
sewage into CO2 and H2O and remove odour.
IST- TECHNOLOGIES
Principle:
Microbial consortia act on sewage to degrade into simpler forms under aerobic/anaerobic/ facultative environment-Extracellular Enzymes/Nutrients-added.
Technologies: Free release-Tablets/ Blocks/ Spraying Blocks on Bottom- porous blocks embedded
with microbes Horizontal media/microbe loaded filters-
Green Bridge Self-Cleansing (Bio-Mimicry)
SELECTED DRAINS FOR DEMO
Drains Flow (MLD)
Characterization Disposal
Budha Nala(Punjab)
600 BOD: 60-200 mg/lCOD: 350-650mg/lSS: 200-400 mg/l FC: 108- 109 MPN/100ml
Sutlej
Morigate Nala (UP)
40 BOD: 96- 138 mg/lCOD: 280- 348 mg/lSS: 188- 239 mg/lpH: 7.43DO: 0.7 mg/l
Ganga
Bakarganj Nala(Bihar)
21 BOD: 110 mg/lCOD: 240 mg/lSS: 326 mg/lFC: 72400 MPN/100ml
Ganga
Farrukhabad (UP)
16 BOD: 105 mg/lCOD: 161 mg/lTSS: 74 mg/lFC: 1.5 X106 MPN/100ml
Ganga
CLAIMED PERFORMANCES
Drains Technology Project Cost
Expected Results
Budha Nala (Ludhiana)
Green Bridge- microbial and plants
Rs. 15.28 Cr BOD: <30 mg/lCOD: < 150 mg/lTSS: < 80 mg/lFC: 90% reduction
Morigate Nala (Allahabad)
Inoculation –slow release of microbial consortia (Tablets/Blocks)
Rs. 1.38 Crore BOD: < 30 mg/lCOD: < 250 mg/lTSS: < 100 mg/l
Bakarganj Nala (Patna)
Microbes embedded in porous blocks (Eco-Bio-Blocks)
Rs. 2.24 Crore BOD: 50 mg/lCOD: 100 mg/lSS: 130 mg/lDO:: 0.5 mg/lFC: 55% reduction
City Drain (Farrukhabad)
Physical/Biological-Bio-Mimickry (Self purification capacity of river)
Rs. 0.94 Crore BOD: <30 mg/lCOD: < 100mg/lTSS: < 100 mg/lFC: <1000 MPN
PROJECT IMPLEMENTATION
i. CPCB awarded work order to 4 firms based on AA and ES of MoEF
ii. MoA drafted for seeking concurrence of MoEF
iii. CPCB as the Nodal Agency to implement the project
iv. ‘Monitoring Committee’ at State level through State Pollution Control Board (SPCB)
v. Provision of ‘Third Party Inspection’ through IITs/ Universities
vi. Project Implementing Agencies(PIAs);• M/s Green Infrastructure, Pune (Budha Nala, Ludhiana) • M/s Amrit Clean water technologies, Gurgaon (Morigate,
Allahabad)• M/s US Environ, New Delhi (Bakarganj, Patna)• M/s Clover Organic, Dehradun (Farrukhabad, UP)
ROLE OF CPCB
Monitoring Performance at 4 locations
R & D components- Investigations
Evolving Guidelines/ Protocols.
Trainings and Mass Awareness
ROLE OF SPCBSROLE OF SPCBS UP, Bihar and Punjab to constitute ‘Monitoring Committee’
represented by Municipality, Water Supply & Sewerage Board, Jal Nigam, State Urban Authority, Irrigation Department, NGOs, etc.
Guide Project Implementing Agency (PIA) at local level-including site visits
Coordinate with PIA and concerned agencies for required clearances, if any;
Undertake laboratory analyses for performance evaluation of technology(Random-basis).
R & D COMPONENTSR & D COMPONENTS(CPCB)(CPCB)
i. Standardization of the design parameters of In-situ sewage treatment technology in terms of working methodology, microbial dosing, and working optimum ranges of pH, temperature, time, hydraulics, etc.
ii. Assessing efficacy and effectiveness of each treatment process with regard to removal of pollutants and elimination of pathogens.
iii. Developing treatment packages with microbial dosing Vs MLD of sewage to be treated and taking care of microbial population control.
R & D COMPONENTSR & D COMPONENTS(CPCB)(CPCB)
iv. Listing of microbes used in consortia to rule-out
‘secrets’ and having no doubts on harmful microbes.
v. Study the formulation of intermediary compounds for
assessing complete degradation.
vi. Studying inhibitory/ antagonistic parameters effecting
in-situ treatment.
vii. Evolving Protocol and guidelines for implementation in
other parts of the country.
SAMPLING AND ANALYSIS SAMPLING AND ANALYSIS SCHEDULESCHEDULE
S. No.
Parameters to be monitored
Sampling frequency for
per Centre
Months per
Centre
Total Samples
Total samples at 4
Centre
1 Flow, Temperature, pH, Oil and Grease, BOD, COD,
NO3, NH3-N, PO4-P
Weekly Fort-nightly monthly
336
1266
482424
12 24 96
2 Heavy Metals and Pesticides
Fort-nightly Monthly
39
69
2436
12 15 60
3 Bacteriology (FC, E.coli, Streptococcus, Salmonella, Shigella, Vibrio, Pseudomonas)
Weekly Fort-nightly Monthly
336
1266
482424
12 24 96
MEMORANDUM OF AGREEMENT(DRAFT CONDITIONS)
i. Bank Guarantee against amount released.
ii. Bank Guarantee for Performance claimed.
iii. No charges for Royalty or Patent.
iv. No GMOs.
v. No major alteration/modification of the drain.
vi. Provisions for Third Party Inspection/ Monitoring.
vii. Fortnightly Progress Reports (monthly/ quarterly basis).
RELEASE OF FUNDS RELEASE OF FUNDS
Release of funds in 4 equal installments (to PIAs). [However, felt need for 75 % fund at-
once]
Bank Guarantees (against installments/ Performance) will be obtained from PIAs
Release of funds on receipt of UCs, Physical progress and Monitoring Reports
PRESENT STATUSPRESENT STATUS
MoEF Accorded – Administrative Approval
and Expenditure Sanction on 6th and 11th
April, 2011 to 4 Projects.
CPCB has proposed for transfer of funds for
further releasing to PIA subject to the receipt
of two BGs and signing of MoA (total cost
Rs. 19.84 Crore-first installment: 4.96 Crore).
LOCATION- 1 LOCATION- 1
In-situ Treatment of Sewage through
Bioremediation at Budha Nala, Ludhiana, Punjab
BUDHA NALA, LUDHIANABUDHA NALA, LUDHIANA
Budha Nala originates at Kumbkalam and runs parallel to River Sutlej and joins at Gorsian Kadar Baksh.
Perennial freshwater source and gets polluted in Ludhiana.
water used for irrigation near Ferozpur.
Carries treated/untreated industrial wastewater of Ludhiana city.
Buddha Nala, Ludhiana, Punjab Geographical Location Buddha Nala, Ludhiana, Punjab Geographical Location
PHYSICAL FEATURES PHYSICAL FEATURES
Length : 36 km. (Kumbkalan to Ludiana 13 km
& Ludhiana to Sutlej
River confluence
point 23 km)
Width of the Drain : 12-24 meter Average water depth : 0.6-1.8 meter Average Flow : 600 MLD
(Monitored by CPCB)
PROJECT OBJECTIVES PROJECT OBJECTIVES
Demonstration of ‘In-situ Sewage Treatment’ in Budha Nala
Treatment of wastewater by application of microbial consortia augmented with aquatic plants
Standardization of the technology for replication after assessment of performance
TECHNOLOGY : GREEN-BRIDGE TECHNOLOGY : GREEN-BRIDGE
Green-bridge and three to four hydro-cell construction for flow control and effective treatment of sewage.
Green –Bridge acts as a reservoir of microbes
Microbial storage at the green bridges and mingling by bottom of the hydro-cells.
Microbes feed on the pollutants and treat the water
Aquatic plants grown on Green-bridges & along drain-bank absorb nutrients to treat waste water.
Green Bridges for Buddha Nala RestorationGreen Bridges for Buddha Nala Restoration
WORKING PRINCIPLEWORKING PRINCIPLE Placement of Bar screen before green bridge to trap
garbage and other floating materials
Waste water to pass through green bridges placed in a Zig-zag manner.
The green bridges made of boulder provided with microbial doses and aquatic plants grown over it.
Microbial doses released from the Green Bridge and also from bottom of hydro-cells
Regular monitoring of water quality
Regular cleaning of Green bridges and maintenance of aquatic plants.
CLAIMED RESULTSCLAIMED RESULTS
Parameters
Existing Quality
Reduction
After Treatment
BOD 85 to 165 mg/l 55- 70% 25 to 50 mg/l
COD 387 to 526 mg/l 55- 70% 115 to 150 mg/l
TSS 201 to 398 mg/l 55- 80% 40 to 80 mg/l
Cr+ 0.46 mg/l 55- 60% 0.18 mg/l
Pb+ 0.21 mg/l 55-60% 0.08 mg/l
Ni+ 0.47 mg/l 55-60% 0.18 mg/l
Zn+ 2.40 mg/l 55-60% 0.96 mg/l
DEMONSTRATED CASE STUDIES DEMONSTRATED CASE STUDIES
Ahar River for Eco-restoration, Pune
Udaisagar lake for Eco-restoration - Udaipur
COST OF THE PROJECTCOST OF THE PROJECT
Rs. 15.28 Crore Rs. 15.28 Crore (including one year O&M cost)(including one year O&M cost)
LOCATION-2LOCATION-2
Morigate Nala, AllahabadMorigate Nala, Allahabad
MORIGATE NALA, ALLAHABADMORIGATE NALA, ALLAHABAD
Morigate Nala carries 40 MLD sewage from Allahabad city to River Ganga
Two drains coming from Katra and Rambagh, meets at Parade Ground and outfalls into River Ganga through Morigate
As per High Court Order, the Nala has been blocked, but spill over still reaching River Ganga.
TECHNOLOGY: BIO-AUGMENTATIONTECHNOLOGY: BIO-AUGMENTATION
‘EmTech’ patented product used in tablet and liquid
form to release microbial consortia
Degrade organic matters, oil & grease, reduces sludge
and remove odour
WORKING PRINCIPLEWORKING PRINCIPLE
Physical cleaning at dosing points to maintain flow
Bar screen to be installed before dosing points
Sprayer and slow release tablets to be applied at upstream of drain
Installation of spraying devices for microbial dosing at selected sites of microbes at selected sites
Operation of Fixed mist sprayer for consistent mix of microbes with wastewater
CLAIMED RESULTSCLAIMED RESULTS
Parameters
Existing Quality After Treatment
BOD 96 to 138 mg/l < 30 mg/l
COD 280 to 348 mg/l < 250mg/l
SS 188 to 239 mg/l < 100 mg/l
COST OF THE PROJECTCOST OF THE PROJECT
Rs. 1.38 Crore (including one year O&M cost)
LOCATION-3Bakarganj Nala,Patna
BAKARGANJ NALA, PATNABAKARGANJ NALA, PATNA
Length : 2.5 km Width : 2 – 5 meters Depth : 2-3 ft. Flow : 21 MLD Joins River Ganga
TECHNOLOGY: ECO-BIO-BLOCK TECHNOLOGY: ECO-BIO-BLOCK
EBB contains “fermented soya bean bacillus”
Made of porous volcanic rock, cement, beneficial bacteria and nutrients that released regularly in water
EBB structure designed according to hydrodynamics and placed
Number of EBB requested is based on pollution load
DIFFERENT STRUCTURES OF EBB BLOCKSDIFFERENT STRUCTURES OF EBB BLOCKS
INTERLOCKING OF ECO-BIO BLOCKSINTERLOCKING OF ECO-BIO BLOCKS
Construction and Placement of EBB in River
WORKING PRINCIPLEWORKING PRINCIPLE
Pre-analysis of water quality for Block Placement
Installation of Bar screen to check floating materials
Installation of EBB reactor and bottom lining
De-silting of the drain at regular intervals
EBB bacteria degrade organic matters into carbon dioxide and water and helps in rapid oxidization (anaerobically) converting ammonia into nitrite and nitrate, nitrates are naturally absorbed by plants and microbes and release nitrogen gas
EBB bacteria in contact of water, propagate and multiply every half an hour to cleanse water
DEMONSTRATED EBB CASE DEMONSTRATED EBB CASE STUDIESSTUDIES
Mayur Vihar Phase-I Drain, Delhi
Alandur, Chennai
CLAIMED RESULTS (EBB)CLAIMED RESULTS (EBB)
Parameters Existing water quality
After Treatment
pH 7.26 6.5 to 8
DO 0.5 mg/l 0.5 mg/l
BOD 110 mg/l 50 mg/l
COD 240 mg/l 110 mg/l
TSS 326 mg/l 130 mg/l
Fecal Coliform
- 5-55% reduction
COST OF THE PROJECTCOST OF THE PROJECT
Rs. 2.24 Crores Rs. 2.24 Crores (including one year O&M cost)(including one year O&M cost)
LOCATION- 4LOCATION- 4(City Drain, Farrukhabad)(City Drain, Farrukhabad)
CITY DRAIN/HATHIKHANA DRAIN, CITY DRAIN/HATHIKHANA DRAIN, FARRUKHABADFARRUKHABAD
The City Drain of Farrukhabad(UP) carries 16 MLD untreated sewage into Ganga River
Physical Features of the DrainPhysical Features of the DrainHathikhana DrainHathikhana Drain
PARTICULARS/ PARAMETERS VALUE
Approximate Length of the drain (From Nekpur to river Ganga)
10 Km
Drain Width 18.50 feet
Drain Depth 5.00 feet
Sludge accumulation 2.50 feet
Perennial Flow 16 MLD
BOD 105 mg/l
COD 161 mg/l
TSS 94 mg/l
TDS 973 mg/l
Total Coliform 3,07,18,800 MPN/l
Faecal Coliform 1,51,00,000 MPN/l
TECHNOLOGY: BIO-MIMICRYTECHNOLOGY: BIO-MIMICRY
Bio-mimicking designed the stretch of a drain/river enhancing self cleansing process supported by application of natural materials and NatureVel-WW products for water purification
Strategies made for adsorption, degradation, aeration, filtration and sedimentation through biofilter made of boulders, charcoal and mud balls.
NatureVel-WW, the patented product is applied/ sprayed for treatment of water pollutants
WORKING PRINCIPLEWORKING PRINCIPLE The stretch of the drain is mended as Rapids and Pool with
boulder and charcoal
The Rapids helps in adsorption, aeration and filtration of sewage and the Pool helps in sedimentation
Wood charcoal dipped in NatureVel-WW is packed in fishnet bag
Mud ball of clay and rice bran mixed with microbes are tied with charcoal balls for slow release of doses
River banks are treated and inoculated with spray of Naturavel-WW
Pool
Rapids
SELF-CLEANSING MECHANISM OF RIVERSELF-CLEANSING MECHANISM OF RIVER
AERATION
ABSORPTION & DEGRADATION
SEDIMENTATION
FILTRATION
Rapids Rapids
PoolPool
CLAIMED RESULTSCLAIMED RESULTS
Parameters Current Values
Projected after 6 Months
BOD 105 mg/l <30 mg/l
COD 161 mg/l <100 mg/l
TSS 94 mg/l <100 mg/l
Total Coliform 3,07,18,800 MPN/100ml
< 1,000 MPN
Faecal Coliform 1,51,00,000 MPN/100ml
< 1,000 MPN
COST OF THE PROJECTCOST OF THE PROJECT
Rs. 0.94 Crore Rs. 0.94 Crore (including one year O&M cost)(including one year O&M cost)