Demonstrating the Benefits and Costs of ITS: Using the Enhanced … · 2015. 10. 6. ·...

Post on 17-Aug-2020

1 views 0 download

Transcript of Demonstrating the Benefits and Costs of ITS: Using the Enhanced … · 2015. 10. 6. ·...

Demonstrating the Benefits and Costs of ITS: Using the Enhanced Knowledge Resources for your Next ITS Project

T3 Webinars are sponsored by ITS Professional Capacity Building Program, ITS Joint Program Office, U.S. Department of Transportation

Liz Greer, Noblis

2U.S. Department of TransportationITS Joint Program Office

Case Studies

Ramp Metering – Kansas City Adaptive Signal Control - Nationwide

Image Source: USDOT

Image Source: USDOT

3U.S. Department of TransportationITS Joint Program Office

Kansas City Scout

http://www.itsknowledgeresources.its.dot.gov/its/bcllupdate/FreewayMGT/

• Case Study section of Freeway Management Fact Sheet

• Based on Benefit 2013-00852 in the ITS Knowledge Resources

4U.S. Department of TransportationITS Joint Program Office

Kansas City Scout – Benefits of Ramp Metering

http://www.itsknowledgeresources.its.dot.gov/its/bcllupdate/FreewayMGT/

5U.S. Department of TransportationITS Joint Program Office

Adaptive Signal Control Technology

How do you develop your own case study? Here are some things from the ITS Knowledge Resources to help:

▪ Deployment Statistics▪ Benefits▪ Cost ranges▪ Interactive graphs▪ Lessons learned

Image Source: ThinkStock

6U.S. Department of TransportationITS Joint Program Office

2000 - 2013 Deployment Statistics

7U.S. Department of TransportationITS Joint Program Office

Adaptive Signal Control BenefitsArterial Management Fact Sheet Table:

8U.S. Department of TransportationITS Joint Program Office

Adaptive Signal Control BenefitsITS Knowledge Resources Search

9U.S. Department of TransportationITS Joint Program Office

http://www.itscosts.its.dot.gov/its/benecost.nsf/SingleCostTax?OpenForm&Query=Arterial%20Management

10U.S. Department of TransportationITS Joint Program Office

Distribution of ASCT Installation Costs per Intersection

Frequency Costs per intersection

(US $)2 $20,0003 $30,0006 $40,0005 $50,0002 $60,0004 $70,0002 more than

$70,000

http://www.itscosts.its.dot.gov/ITS/benecost.nsf/ID/5A53F0D1919AA5EE8525798300819B6E?OpenDocument&Query=CApp

0

1

2

3

4

5

6

7

$20,000 $30,000 $40,000 $50,000 $60,000 $70,000 $70,000+

Cost ID: 2012-00249

11U.S. Department of TransportationITS Joint Program Office

http://www.itscosts.its.dot.gov/ITS/benecost.nsf/ID/34ACAD7692BB577585257B20006C7649?OpenDocument&Query=CApp

Adaptive Signal Control Technology –Implementation Costs - NationwideRange $15,000 - $37,500 per

intersectionAverage $28,725 per intersection

12U.S. Department of TransportationITS Joint Program Office

Adaptive Signal Control Interactive Graphs

13U.S. Department of TransportationITS Joint Program Office

Adaptive Signal Control Lessons Learned

http://www.itsknowledgeresources.its.dot.gov/