Demand Integration Update to DSWG ERCOT Emergency Responsive Service (ERS) Report to the Public...

Post on 03-Jan-2016

214 views 0 download

Transcript of Demand Integration Update to DSWG ERCOT Emergency Responsive Service (ERS) Report to the Public...

Demand Integration Update to DSWGERCOT Emergency Responsive Service (ERS)

Report to the Public Utility Commission of Texas for the 2013 ERS Program Year

Project No. 27706

Attachment B

Contents

04/20/23 ERS Annual Report2

Procurement Summary• Capacity (MW) offered and procured• Number & Average Size of ERS-10 Resources• Cumulative Individual Sites Participating in ERS-10

Suspensions Due to Availability or Load Test Failures

Settlement Summary

Detailed procurement results by Standard Contract Term

Fleet Level Summary for January 6, 2014 EEA Event

Standard Contract Terms & Time Periods

04/20/23 ERS Annual Report3

ERS is procured 3 times annually for 4-month Standard Contract Terms• February through May• June through September• October through January

Participants may offer to provide ERS for one or more Time Periods:• Business Hours 1: 8AM to 1PM Monday-Friday* • Business Hours 2: 1PM to 4PM Monday-Friday* • Business Hours 3: 4PM to 8PM Monday-Friday* • Non-Business Hours: All other hours

*Except ERCOT Holidays

Time Periods are designed to allow flexibility for customers during traditional business hours

Time Periods have been in effect in current form since the June-September 2008 EILS Contract Period

ERS-10 Capacity Procurement Trends (Business Hours 1)

04/20/23 ERS Annual Report4

ERS-10 Capacity Procurement Trends (Business Hours 2)

04/20/23 ERS Annual Report5

ERS-10 Capacity Procurement Trends (Business Hours 3)

04/20/23 ERS Annual Report6

ERS-10 Capacity Procurement Trends (Non-Business Hours)

04/20/23 ERS Annual Report7

Procurement Trends (number & avg. size of Resources)

04/20/23 ERS Annual Report8

Cumulative Individual Sites Participation

04/20/23 ERS Annual Report9

Suspension History

04/20/23 ERS Annual Report10

ERS Resources suspended during the 2013 program year due to availability failures, two consecutive load test failures, or event failures

• Suspended Resources may regain eligibility only after submitting a corrective action plan and successfully completing a load-shed test administered by ERCOT

Settlement Summary

04/20/23 ERS Annual Report11

*Adjustments may be made for the following reasons: availability, event performance, disputes, data corrections.

Standard Contract

Term

Projected cost based on procurement

Initial Cost* Final Cost* Final % of original

FebMay11 7,703,107.30$ 6,581,603.30$ 6,643,557.73$ 86.2%AprMay11 1,110,406.64$ 1,091,783.88$ 1,091,783.88$ 98.3%JunSep11 7,748,302.46$ 6,780,901.29$ 6,780,901.29$ 87.5%

Oct 11Jan12 8,731,702.58$ 8,364,694.14$ 8,364,694.14$ 95.8%Total 2011 25,293,518.97$ 22,818,982.61$ 22,880,937.04$ 90.5%FebMay12 $8,903,726.90 8,903,726.90$ 8,832,429.67$ 99.2%JunSep12 $11,621,720.72 11,278,038.52$ 11,278,038.52$ 97.0%

Oct12Jan13 $10,246,067.12 10,245,657.90$ 10,245,657.90$ 100.0%Total 2012 30,771,514.74$ 30,427,423.32$ 30,356,126.09$ 98.7%FebMay13 9,646,584.83$ 9,617,304.07$ 9,617,304.07$ 99.7%JunSep13 12,042,160.83$ 12,042,160.85$ N/A

Oct13Jan14 12,744,451.58$ N/ATotal 2013 34,433,197.24$ N/A N/A N/A

Demand Integration Update to DSWG

2013 Results by Standard Contract Term

February-May 2013 Standard Contract Term

04/20/23 ERS Annual Report13

Total Adjusted Cost for this Standard Contract Term: $ 9,617,304.07

June-September 2013 Standard Contract Term

04/20/23 ERS Annual Report14

Total Adjusted Cost for this Standard Contract Term: $ 12,042,160.85

October 2013-January 2014 Standard Contract Term

04/20/23 ERS Annual Report15

Total Projected Cost for this Standard Contract Term: $ 12,744,451.58

Demand Integration Update to DSWG

Summary for January 6, 2014 EEA Event

January 6, 2014 EEA Event Timeline

04/20/23 ERS Annual Report17

7:07:27 VDI-Deploy

All ERS 10 minute Resources were issued a simultaneous verbal deployment instruction (495.72 MW, 398 Resources, 649 Sites)

7:53:16 VDI-Recall All ERS 10 Resources were issued simultaneous verbal recall instruction

Time sequence on January 6, 2014 Deployment Event for ERS-10

Fleet Level Performance for 1/6/2014 Event

04/20/23ERS Annual

Report18

• Graph is based on 15-minute interval data. • Performance is based on a prorated obligation for the 1st partial interval and one full interval. • 1 Resource had prescheduled unavailability from HE0900 - 1600 on the day of the event (14.6 MWs)

04/20/23 ERS Annual Report19

This document is provided for informational purposes only.  Procurement and settlement data are subject to revision.