Delivering Major Minnesota Bridges Hastings Bridge Design Build Project

Post on 07-Jan-2016

26 views 0 download

description

Vincent Gastoni, PE. March 5, 2013. Delivering Major Minnesota Bridges Hastings Bridge Design Build Project. Redundancy and Service Life. MnDOT – ACEC/MN Annual Conference Leading Together- Innovative Solutions for an Evolving Industry. Project Location Map. Base Map Source: Google Maps. - PowerPoint PPT Presentation

Transcript of Delivering Major Minnesota Bridges Hastings Bridge Design Build Project

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Delivering Major Minnesota Bridges

Hastings Bridge Design Build ProjectRedundancyand Service Life

March 5, 2013 Vincent Gastoni, PE

MnDOT – ACEC/MN Annual Conference

Leading Together-Innovative Solutions for an Evolving Industry

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Project Location Map

2

Base Map Source: Google Maps

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Project Overview - Existing Bridge

3

• Project replaces 1950 steel arch truss

• Lowest 1% in the state for overall sufficiency

• Highway 61 over Mississippi River

• Highest daily two-lane highway traffic volume in the state

• MnDOT Chapter 152 Bridge

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Project Overview - Aerial Plan

4

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Project Overview - Design-Build Process

• Design-Build SOQ Issued: October 2009

• Design Build Selection: June 2010

• MnDOT identified two acceptable alternatives

• RFP allowed Alternative Technical Concepts (ATC’s)

• Design Build Team:

5

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Project Overview - Design-Build Process

INNOVATIVE RFP FEATURES

• Alternative Technical Concepts (ATC’s)– Allow innovation and flexibility

• Pre Approved Elements (PAE)– Reduce risk and provide best value opportunities

o Redundancy Concepts for the Main Structure Segmento Scour Analysis Methodo Bridge Fixity and Thermal Expansion of Bridge No. 19004o Refined Analysis Method

6

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Project Overview - Design-Build Process

TECHNICAL PROPOSAL SCORING

• Bridge 34 Points

• Environmental Management 6 Points

• Maintenance of Traffic 5 Points

• Public Communications 2 Points

• Schedule 3 Points

7

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Project Overview - Design-Build Process

TECHNICAL PROPOSAL SCORING

• Bridge 34 Points

– Durability/Quality of Bridge No. 19004 13 Points

– Inspection/Maintenance 9 Points

– Geotechnical 5 Points

– Erection of Bridge No. 19004 4 Points

– Demolition of Bridge No. 5895 3 Points

8

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

SCORING DRIVES INNOVATION

• Selection =

Bid Price Technical Score

Project Overview - Design-Build Process

9

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

SCORING DRIVES INNOVATION

• Selection =

• Win Strategy=

Bid Price Technical Score

Minimize Bid PriceMaximize Technical Score

Project Overview - Design-Build Process

10

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

SCORING DRIVES INNOVATION

• Selection =

• Win Strategy=

• Use innovative ATC’s & PAE’s to:– Minimize Risks– Optimize Design Solution

Bid Price Technical Score

Minimize Bid PriceMaximize Technical Score

Project Overview - Design-Build Process

11

Need A Better Mouse Trap

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Design-Build Process – Base Concepts

MnDOT RFP Baseline Options

12

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Design-Build Process – Base Concepts

MnDOT Cable Stayed Option

13

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Design-Build Process – Base Concepts

MnDOT Arch Option

14

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Base Concept Evaluation

• Evaluate Base Designs

– Preliminary engineering analysis

– Cost estimating exercises

• Produce Comprehensive Evaluation Matrix Tool

– Material costs & risks

• Develop Alternative Designs

15

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovation – Develop Alternatives

• Evaluate Alternative Designs

– Prescriptive design/performance criteria

– Aesthetic requirements

– Technical scoring criteria

– Cost & schedule impacts

• Add to Comprehensive Evaluation Matrix Tool

• Develop Overall Best Value Technical Approach

16

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovation – Develop Alternatives

Lunda/Ames-Parsons Alternatives

17

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovation – Develop Alternatives

18

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovation – Develop Alternatives

19

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Winning Alternative

20

Project Architect: Bradley Touchstone, Touchstone Architecture

• Successful Proposal-Free Standing Tied Arch $120M

• 545 ft. Main Span

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Winning Alternative

21

Project Architect: Bradley Touchstone, Touchstone Architecture

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Visual Quality Process & Color Selection

22

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Aesthetic Lighting

23

Lighting Design: Illumination Arts

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Concrete Tie

• Best value solution

• Higher level of redundancy

• Ease of inspection/maintenance

24

• More durable than steel box

• No shop assembly and fit-up issues

• Active tension control

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Concrete Knuckle

• Framed into pier and rib

• Improved durability/fit-up

25

• Post-tensioned anchorage

• Highly redundant

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features – Steel Box Arch Rib

• Aesthetically pleasing

• Improved maintenance

26

• Simplified fabrication

• Best Value solution

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Floor System Redundancy

27

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

28

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

29

• Build low

TEMP TIE & FORMS

TEMP BRACING

FLOOR SYSTEM

ARCH RIB

TEMP LIFTING CONNECTION

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

30

• Build Low On Land

TEMP TIE & FORMS

TEMP BRACING

FLOOR SYSTEM

ARCH RIB

TEMP LIFTING CONNECTION

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

31

• Build Low On Land

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Erection

32

• Move onto Barges Using SPMT’s

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

33

• Move onto Barges Using SPMT’s

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

34

• Float

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

35

• Float

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

36

• Skid

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

37

• Skid

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

38

• Skid

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

39

• Lift

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

40

• Lift

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

41

• Lockoff

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Innovative Features - Erection

42

• Get Some Sleep

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Other Innovative Features

43

• Column Supported Embankment

• Long Span Precast Concrete Beams

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Other Innovative Features

44

COLUMN SUPPORTED EMBANKMENT• 4” over 25 years• CSE -10’x10’ Pile Grid• Conc. Caps• Sand/Geogrid

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Other Innovative Features

45

LONG SPAN PRECAST BEAMS

• Precast Pretensioned Concrete Beams

• 5 Spans of 9-Girder Lines

• 173’-7” Long Span

• Longest Beam Overall length = 174’-3”

• Innovative beam design became the basis of MnDOT’s new MW Long Span Precast Concrete Beam Standards

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Other Innovative Features

Photos: Joel Mich, Cretex

46

LONG SPAN PRECAST BEAMS

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Other Innovative Features

Photos: Joel Mich, Cretex

47

LONG SPAN PRECAST BEAMS

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Other Innovative Features

48

LONG SPAN PRECAST BEAMS

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Summary

49

• Innovative RFP Process

• Best Value Approach Drives Innovation

• MnDOT Partnering in Innovation

• Continued Commitment to Innovation

HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE

Thank You

50