SAMPLE MECHANICAL CHECKSHEET
MC – MECHANICAL COMPLETION CHECK SHEET
M02CR PUMP
M05CR FLANGE ALINGMENT
M18CR VENDOR SKID PACKAGE
M27CR COUPLING ALINGMENT REPORT
SC – STATIC COMMISSIONING CHECKSHEET
M02B CENTRIFUGAL TYPE
7/24/2019 DAFTAR CHECKSHEET
http://slidepdf.com/reader/full/daftar-checksheet 2/4
SAMPLE PIPING CHECKSHEET
MC – MECHANICAL COMPLETION CHECK SHEET
P01CR PIPING TEST PACK PACKAGE BY ISOMETRIC
P02CR PIPING INSTALLATION PRE HYDRO TEST LINE WALK
P03CR PIPING TEST PACK ACCEPTANCE CERTIFICATE
P04CR PIPING SYSTEM FLUSHING TESTING
P05CR BOLT TENSIONING TOR!UING
P0"CR PRE TEST CHECK SHEET
P15CR RE INSTATEMENT CERTIFICATE
P22CR PIPING CLEANLINESS CERTIFICATE
P24CR PIPE MARKING #FLOW CODING$
P25CR PAINTING OF PIPING LINES CERTIFICATEP2%CR PIPE SUPPORTS
SC – STATIC COMMISSIONING CHECKSHEET
P04B SERVICE TEST CERTIFICATE
7/24/2019 DAFTAR CHECKSHEET
http://slidepdf.com/reader/full/daftar-checksheet 3/4
SAMPLE ELECTRICAL CHECKSHEET
MC – MECHANICAL COMPLETION CHECK SHEET
E02CR LV CABLES
E05CR MV CABLES
E08CR CONTROL PANEL
E10CR ELECTRICAL MOTOR LVHV
SC – STATIC COMMISSIONING CHECKSHEET
E04B ELECTRICAL MOTOR
E1%B CONTROL PANEL
7/24/2019 DAFTAR CHECKSHEET
http://slidepdf.com/reader/full/daftar-checksheet 4/4
SAMPLE INSTRUMENT CHECKSHEET
MC – MECHANICAL COMPLETION CHECK SHEET
I01CR INSTRUMENT INSTALATION
I0"CR INSTRUMENTS MULTICONDUCTOR CABLE
I13CR INSTRUMENTS ORIFICE PLATE INSPECTION
I14CR INSTRUMENT CALIBRATION
I1%CR CALIBRATION ORIFICE PLATE
I24CR INSTRUMENTS PACKAGE
SC – STATIC COMMISSIONING CHECKSHEET
I01B INSTRUMENT CONTROL PANEL
I0%B ANALO!UE INSTRUMENT LOOP
I07B DIGITAL LOOP CHECK
I10B COMPLE& LOOP CONTROL FUNCTION
I11B CAUSE EFFECT LOGIC TEST