Post on 18-Jan-2017
1/7
Hany Abdelfatah Ahmed Senior Mechanical Engineer
Cell #1: +966‐564‐541‐849 Email #1 : chf240@hotmail.com
Cell #2: +966‐596‐081‐407 Email #2 : hahmed@saudioger.com
Date of Birth: May, 30th 1979
Qualifications:
B.SC Mechanical Engineering
Mechanical Power Division
Faculty of Engineering
Cairo University‐ 2001
Grade:
Very Good with Honor Degree
Current Location:
Riyadh, Saudi Arabia
Professional Affiliates:
Egypt & Saudi Syndicate of
Engineers
Nationality : Egyptian
Marital Status : Married
Language: Arabic, English
Skills:
Excellent Coordination skills
Excellent Communication skills
Leadership personality
Hard worker, self‐motivated,
multi task personality
working with team spirit
willing to learn and improve
Listening and Analyzing
Research abilities, writing
effective reports and seeking
relevant information
Computer Skills:
Sprinkler Hydraulic Calculation
Software Program (Elite).
AutoCAD, MS Office, Design
Spreadsheets
Dear Sir,
Please find herein after a brief about my professional experience.
I am graduated from the Faculty of Engineering, Cairo University, Mechanical
Power Department 2001 (Very Good With Honor Degree).
I have 14 years of experience in mechanical design and contracting technical
office for Building & High Rise construction.
I worked as a Designer for Dar Al‐Handasah (Shair and Partners) Cairo Core
Team, Al‐Estishareyoon Zohair Fayez & Partnership (ZFP) Cairo Office, and
GHD global international, Cairo Office, and DPME.
I worked also as Main Contractor Technical Office Leader in Saudi Oger ltd in a
major project under ARAMCO supervision using ARAMCO standards.
During my professional experience I worked in major large scale building
construction projects; for example: ‐ Jabal Alkal'a (Abraj Albeit) Makkah, KSA
‐ Facility Management Buildings in Pearl, Qatar with Dar Al‐Handasah ‐ King
Abdulaziz Center for World Culture Dhahran, KSA with Saudi Oger ‐ JIMI Mall
UAE With GHD. Faculty of Education Taibah University Medina KSA with ZFP.
My work experience is extended to Plumbing Systems using all international
codes (UPC ‐ NPC –ASPE – BS ‐ Aramco Standard (SAES)) ‐ Fire Protection
Systems according to NFPA ‐ Irrigations Systems – Pump Station ‐ Swimming
Pools – Water Fountains ‐ LPG System ‐ ‐ Medical Gases ‐ External networks
for towns and compounds … etc.
In addition to experience about HVAC systems & Installations using ASHRAE.
I used to work in development, review, and approval of Design Drawings,
calculations, and issuance of Tender Documents & Shop Drawings
creation/approval & Preparation of BOQ’s, Material Submittals, Change
orders, Site Sketches, RFI’s, Value Engineering and RFI’s, and all
design/engineering related issues. In additions to skills of engineering team
management, and client management.
Sincerely, Hany Abdelfatah Ahmed
2/7
DETAILED WORKING EXPERIENCE
1‐ Saudi Oger Ltd,– KSA A leading main contractor in KSA From 09/04/2008 until present
1.1‐ King Abdulaziz Center for World Culture “KACWC” in Al‐Dhahran – Eastern District‐
KSA (13/06/2010 till 06/08/2015)
Center of Knowledge and culture includes an Auditorium, Library, Cinema Hall, 18 floors Tower, energy center, and
museum. The owner is Saudi Arabian oil Company (ARAMCO).
An innovative Architecture design from SNOHETTA (Norwegian office) and structural/electromechanical design by
BURO HAPPOLD (UK office).
The main task is preparation of the following: ‐
a. General concept
b. Study of IFC Tender documents from the designer.
c. Tender design review and evaluation and preparation of redesign where applicable.
d. Preparation of tender forms for subcontractors.
e. Evaluation of subcontractors offers
f. Preparation of Shop drawings
g. Preparation of Calculations Sheets
h. Preparation of Design Drawings of the delegated items.
i. Preparation of material submittals
j. Preparation of change orders.
1.2‐ Construction of GSE (Ground Service Equipment) Tunnel in KAIA (King Abdulaziz
International Airport) Jeddah KSA. (01/08/2009 to 12/06/2010) The main task is preparation of the following: ‐
1.3‐ General concept.
1.4‐ Tender documents for subcontractors
1.5‐ Evaluation of subcontractors offers
1.6‐ Execution (Shop drawings)
1.7‐ Calculations
3/7
1.3‐ Renovation of existing King Abdullah International Convention Center Project in
Jeddah district. (09/04/2008 to 12/06/2010) An existing 20 floors hotel tower above a two floors podium of 60,000 m2. The building has been constructed from
30 years. Renovation of some areas is required.
The main task is preparation of the following: ‐
1.4‐ General concept
1.5‐ Tender documents for subcontractors
1.6‐ Evaluation of subcontractors offers
1.7‐ Execution (Shop drawings)
1.8‐ Calculations
1.9‐ Material submittals
1.4‐ Saudi Oger Head Office Building in Riyadh – KSA .. From 08/08/2015 till the
moment.
1.4‐1. Saudi Oger Jeddah Highway Camp , Jeddah ‐ KSA 50 m2 Camp occupying 7200 persons.
1.4‐1‐1 Design of Water Supply & Drainage networks.
1.4‐1‐2 Design & Sizing of Water Storage Tanks (GLS Steel Tanks) with pump room.
1.4‐1‐2 Design & Sizing of Sewage Holding Tank (Underground Concrete Tank) with Pump room.
1.4‐2. Al‐Safa Palace, Makkah – KSA++ Al‐Safa Royal Palace in Makkah consists of 67 buildings.
1.4‐1‐1 Study the fire strategy with the specialist to provide automatic water mist firefighting system.
1.4‐1‐2 Coordination with supplier to prepare the detailed design drawings & BOQ for the building needs automatic
fire mist system.
2‐ Dar Al‐Handasah (Shair & Partners), Cairo Office From 01/03/2007 until 01/04/2008.
Providing consulting services that mainly design & supervising on the execution of the following selected projects: ‐
2.1‐ Jabal Alkal'a (Abraj Albeit) Makkah, K.S.A. Review and approval of plumbing and fire protection shop drawings
Review and approval of material submittals
4/7
2.2‐ Toilet Block around Makkah Haram, Makkah, K.S.A. 4 Huge public toilet blocks (944 Asiatic water closets in one toilet block)
Preparation of plumbing design and sewage/waste water pumping stations from A to Z
2.3‐ Burj Albaher Complex, Tripoli, Libya. Three towers (Hotel, Residential, and Office) about 80m
height, with common podium.
Preparation of Design drawings for all plumbing and fire
protection systems.
2.4‐ Tunnels Storm water pumping station,
Muzdalifah, K.S.A Designing of pump station with storm water collecting tank and dry pit pumps.
2.5‐ Facility Management Buildings in Pearl, Qatar. Communication building, medical center, fire station, main laundry and warehouse.
Preparation of design drawings for water supply and drainage systems, fire sprinklers/FM‐200 system, steam boiler,
fuel oil tanks, medical gases network, LPG network.
5/7
3‐ GHD global international, Cairo Office From 01/01/2007 till 28/02/2007.
3.1‐ JIMI Mall, Abu Dhabi (UAE) With ALDAR PROPERTIES Preparation of design drawings for plumbing and fire fighting systems
4‐ AL‐ESTISHAREYOON Zohair Fayez & Partnership (ZFP) Cairo Office From 26/08/2006 till 31/12/2006
4.1‐ Medical Center Expansion in Jubail & Yanbu K.S.A Under Supervision of Royal Commission of Jubail & Yanbu
Preparation of design drawings for plumbing, firefighting and medical gases systems
4.2‐ Faculty of Education Taibah University, Medina K.S.A. Prepare of design drawings for plumbing and firefighting systems)
5‐ (DPME) Design & Project Management Engineering Co. in Giza – Egypt
From 26/11/2002 till 25/08/2006 in Cairo head office, Design Department.
And in Qatar branch from 23/04/2005 till 08/07/2005 and from 19/11/2005 till 09/02/2006.
In this office I designed tens of projects, Here are some selective projects: ‐
5.1‐ First industrial zone in Suez for Suez industrial development co. (part of Orascom) Preparation of design works and profiles for water supply, fire protection, storm water, Sewage networks.
5.2‐ Al Areen Residential Tower, Dafna, Doha, Qatar 2 basement + ground + 34 typical floors
Preparation of Shop Drawings for plumbing and fire protection systems
for JETTCO Company.
5.3‐ Al Za’abi Residential Tower, Dafna, Doha, Qatar 2 basement + ground + 32 typical floors
Preparation of plumbing and firefighting Shop Drawings for plumbing
and fire protection systems for COMMODOR Qatar Contracting
Company.
6/7
5.4‐ 90th street main Road Tunnels in Altajamoa Alkhames – Egypt Preparation of design works for fire protection and pumping station with Muharram Bakhoum Consultant Office.
5.5‐ Al Rabwah‐2 mall (50’000 m2) in Al Riyadh‐K.S.A Preparation of design works for pluming and fire protection systems for Al‐Othayem Group
5.6‐ MAC Textile Factory, Egypt. Preparation of design drawings for fire sprinklers, stand pipe, CO2, pump station and fire water storage tank.
In addition; site supervision on the execution and testing the networks.
5.7‐ conference building (dream land): Preparation of design drawings for plumbing & fire sprinklers, stand pipe, pump station and fire water storage tank.
In addition; site supervision on the execution and testing the networks.
5.8‐ SPA building (dream land): Design & supervision of plumbing installations
5.9‐ Morgan palace (Saudi Arabia): Preparation of design drawings for plumbing works.
5.10‐ Al‐Essaiy villa (Saudi Arabia) – (8‐ villa): Preparation of design drawings for plumbing works.
5.11‐ Jeddah Hospital & Medical clinic (Saudi Arabia): Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
Getting approval from the client consultant
5.12‐ Ain‐Shams Hospital (delivery rooms): Modification of plumbing installations and rerouting of existing services and adding medical gases system.
5.13‐ Teachers Syndicate Hospital (ALSHARQIA): Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
Getting approval from the client consultant
5.14‐ VACSEERA Hospital (virus building): Design & coordination of plumbing works including steam network.
5.15‐ Testing Laborite of Egyptian Committee for Import & Export Supervision/Aswan &
Portsaid Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
Getting approval from the client consultant
5.16‐ Misr Insurance company building : Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
Getting approval from the client consultant
7/7
5.17‐ Minia AlQamh Mall (ALSHARQIA): Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
Getting approval from the client consultant
5.18‐ Sayed Darwish Theater (Alexandria): Redesign & Supervision of firefighting installations (sprinklers & FM‐200)
5.19‐ Hamza company building : Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
5.20‐ Misr Insurance company building : Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
Getting approval from the client consultant
5.21‐ CIB Bank AL ASHRAF building branch – Cairo: Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
Getting approval from the client consultant
5.22‐ SALEH ELRASHED Hotel – ALMADINA‐ KSA: Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
Getting approval from the client consultant
5.23‐ ALMENIA MUISIUM – EGYPT: Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
Getting approval from the client consultant
5.24‐ PORT SAID THEATER: Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
Getting approval from the client consultant
5.25‐ ALFASHN HOSPITAL: Preparation of design drawings for plumbing & firefighting works including BOQ, specification & calculation note.
Getting approval from the client consultant
5.26‐ Hilton Extension Dream Land Supervision on all plumbing, firefighting, pump station system.
5.27‐ Hurgada Paradise Hotel Supervision on all plumbing, firefighting, pump station system.
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner