Item no. 1.04c, column no. 2 may be replaced as under.
S.No. Item
No.
Column
No.
Amendment
1 1.04C 2 “To the sanction of expenditure on new works out of turn in
respect of Users Amenities costing not more than Rs.30
lakhs in each case subject to conditions indicated in the
notes and not more than Rs 10 lakhs in each case in respect
of existing railways Schools, Hospitals, Dispensaries,
Institutes, officers club, Rest House and Holiday Homes,
etc. subject to the provision that the fund required for such
works as provided in the sanctioned budget for works in
these categories are not exceeded”.
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
West Central Railway
WCR/HQ/0100/Sopgen/GA/38/Works Date:04-10-04
CORRECTION SLIP No.2
TO CAPTER-I
WORKS MATTERS OFSOPGEN-2004 OF W.C.R
S.N Item No. Column No. Remarks
1 1.01to 1.06 1 to 7 Recast the existing item as per Annexure ‘A”
attached
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
CORRECTION SLIP No.1
TO CHAPTER-I
WORKS MATTERS OFSOP-2004 OF WCR
Item no. 1.04c, column no. 2 may be replaced as under.
S.No. Item
No.
Column
No.
Amendment
1 1.04C 2 “To the sanction of expenditure on new works out of turn in
respect of Users Amenities costing not more than Rs.30
lakhs in each case subject to conditions indicated in the
notes and not more than Rs 10 lakhs in each case in respect
of existing railways Schools, Hospitals, Dispensaries,
Institutes, officers club, Rest House and Holiday Homes,
etc. subject to the provision that the fund required for such
works as provided in the sanctioned budget for works in
these categories are not exceeded”.
CORRECTION SLIP No.2
TO CAPTER-I
WORKS MATTERS OFSOPGEN-2004 OF W.C.R
S.N Item No. Column No. Remarks
1 1.01to 1.06 1 to 7 Recast the existing item as per Annexure ‘A”
attached
Item No. EXTENT OF POWERS DELEGATED TO
Ref. to Rule
Nature of power HEAD QUARTER OFFICERS
DIVISIONAL OFFICERS
Remarks
PHOD/ CHOD/ SA
Grade
Other Officers
DRM / ADRM.
Other Officers
1 2 3 4 5 6 7
1.01 Rly.Bd letter
No.F(X)II-2003/pw/
10 dt: 09.01.04
Sanction to Detailed Estimates chargeable to Capital, Capital Fund, Depreciation Reserve Fund, Development Fund, and Open Line Works Revenue
Works included in the approved programme for the year (a) (i) Track Renewal Works
PHOD/ CHOD Up to Rs.10 crores SAG/CTE Up to Rs. 5 crores
DY CE (TRACK) Rs.3 Crores
Up to Rs 5 Crores
SG/JA Grade Up to Rs.2 Crores
Note : Vetting of Associated Finance should be obtained in each case.
(ii) Track Renewal work Up to Rs. 5 lakh each under lump sum grant provided the overall limit of lump sum grant is not exceeded.
Full Power SG/JA Grade Full
Power
Full Power. SG/JA Grade Full Power
Note: Finance concurrence should be obtained and estimate should be prepared in each case.
(b) Rolling stock items provided in the Rolling Stock approved Programme.
PHOD/ CHOD Rs.5 Crores SAG Up to Rs.3 Crores
SG/JAG Up to Rs 1
crores
Nil Nil 1. Finance concurrence is necessary
(c) (i) Other works (including M&P items) costing over Rs. 30 lakhs each.
PHOD/ CHOD Up to Rs.10 Crores SAG Up
SG /JA Grade Up to Rs.3 Crores
Up to Rs.3 Crores
SG/JA Grade Up to Rs. 2 Crores
Note: (1) For works which are approved in Works
Programme & M&P Programme. (2) Vetting of Associated Finance should be
Item No. EXTENT OF POWERS DELEGATED TO
Ref. to Rule
Nature of power HEAD QUARTER OFFICERS
DIVISIONAL OFFICERS
Remarks
PHOD/ CHOD/ SA
Grade
Other Officers
DRM / ADRM.
Other Officers
1 2 3 4 5 6 7
to Rs.5 Crores
obtained in each case.
(ii) Other works (including M&P items) costing over Rs.5 lakhs but below Rs.30 lakhs each.
Full Power SG/JA Grade Full Power
Full Power SG/JA Grade Full Power
Note: (1) For works which are approved in Works
Programme & in M&P Programme. (2) Vetting of Associated Finance should be
obtained in each case.
(d) Other works - New Minor works (including M & P items) Up to Rs. 5 lakhs each.
Full Power Within the lumpsum grant.
SG/JA Grade Full Power within the lumpsum grant
Full Power within the lumpsum grant allocated to the division concerned
SG/JA Grade Full Power within the lumpsum grant allocated to the division concerned
Note : Estimate should be prepared for works costing Rs.50,000/- and above and finance concurrence obtained.
1.02 Rly.Bd letter
No.F(X)II-2003/pw/
10 dt: 09.01.04 & letter No.
F(X)II/90/PW/2
dt. 6.8.98.
Sanction to Survey Estimates to the extent provided in sanctioned budget or Up to the limit as prescribed in the yardstick whichever is less. This will be applicable for Final Location Surveys also.
CE/CSTE/ CEE Up to Rs.5 lakhs for survey included in the sanctioned budget of the year.
Nil
Nil
Nil
Note : (1) Prior sanction of Board is necessary for
detailed estimates for surveys other than New Lines, Gauge Conversion & Doubling Works costing above Rs 5 lakhs.
(2) GM/AGM can sanction excess Up to 20%
on original estimate sanctioned by higher authority.
(3) Finance concurrence should be obtained
in each case.
Item No. EXTENT OF POWERS DELEGATED TO
Ref. to Rule
Nature of power HEAD QUARTER OFFICERS
DIVISIONAL OFFICERS
Remarks
PHOD/ CHOD/ SA
Grade
Other Officers
DRM / ADRM.
Other Officers
1 2 3 4 5 6 7
1.03 Rly.Bd letter
No.F(X)II-2003/pw/
10 dt: 09.01.04
OUT OF TURN WORKS
Lumpsum Works program
(A) To the sanction of incurrence of expenditure on lump sum works
(i) Traffic Facility Works costing less than Rs. 50 lakhs each
(ii) Safety Related Works under Bridge works, S&T and Track renewal plan heads – Costing less than Rs. 50 lakhs each
(iii) Other works costing not more than Rs. 30 lakhs each
Nil
Nil
DRMs Up to Rs.5 lakh for each work within the lumpsum grant allocated to the division concerned
Nil
1. Expenditure on works pertaining to New Lines, Gauge Conversions, Railway Electrification works, Metropolitan Railway Transportation Projects, Computerization, setting up of New Production Units, or Rolling Stock or Surveys not provided for in the sanctioned budget by Rly Bd, can not be incurred.
2. Pre vetting of associated finance is necessary for inclusion of works in the lump sum works programme
3. This is subject to total lumpsum provision made in the budget for such works is not exceeded.
4. Authority: item no.38 (a) of GM’s delegation
(B) To the sanction of incurrence of expenditure on lump sum Machinery & Plant works costing not more than Rs. 10 lakhs each
Nil Nil Nil Nil
1.04 OUT OF TURN WORKS
Other Than Lumpsum Works Program
(a) To the sanction of incurrence of expenditure on:
(i) Traffic facility works and line capacity works - costing less than Rs. 50 lakhs each
(ii) Safety related works under Bridge works, S&T works &
Nil Nil Nil Nil 1. Expenditure on works pertaining to New Lines, Gauge Conversions, Railway Electrification works, Metropolitan Railway Transportation Projects, Computerization, setting up of New Production Units, or Rolling Stock or Surveys not provided for in the sanctioned budget by Rly Bd, can not be incurred. 2. FA&CAO’s concurrence and GM approval should be obtained 3. This is subject to the budgetary ceiling of Rs. 10 crore (other than lump sum) (to be
Item No. EXTENT OF POWERS DELEGATED TO
Ref. to Rule
Nature of power HEAD QUARTER OFFICERS
DIVISIONAL OFFICERS
Remarks
PHOD/ CHOD/ SA
Grade
Other Officers
DRM / ADRM.
Other Officers
1 2 3 4 5 6 7
Track renewal plan heads - costing less than Rs. 50 lakhs each
(iii) Other works - costing not more than Rs. 30 lakhs each
monitored by CE) in a financial year, of which not more than Rs. 3 crore could be on other than safety related items with the provision that all safety works should be completed within a maximum period of 8 months from the date of sanction. 4. Authority: item no.38 (b) of GM’s delegation
(b) On new staff welfare work costing not more than Rs.1 lakh each other than buildings not essential to Rly working e.g. Railway Schools, Hospitals, Dispensaries, Institutes, officer’s club, Rest Houses & Holiday Homes etc.
CE & CPO Full Powers for works costing Up to Rs. 1 lakh each provided the lumpsum provision made in the sanctioned budget is not exceeded.
Nil
Nil
Nil
Note: 1. Prior finance concurrence should be obtained. 2 This will be subject to overall ceiling of RS. 10 crore for out of turn works.
Rly.Bd’s No.F(X)II-2003/pw/
10 dt: 09.01.04
(c) Below Rs.10 lakhs in each case in respect of existing Railway Schools, Hospitals, Dispensaries, Institutes, officer’s club, Rest Houses & Holiday Homes subject to provision that the funds required for such works as provided in the sanctioned Budget for works in these categories are not exceeded.
CE & CPO Full Powers
Nil
Up to Rs.1 lakh
Nil Note: 1. Prior finance concurrence should be obtained. 2. If the cost exceeds Rs.10 lakh, it will require Rly Bd’s sanction. 3. This will be subject to overall ceiling of RS. 10 crore (other than lump sum) for out of turn works 4. Authority: item no.38 (c) of GM’s delegation
(d) To the sanction of expenditure on new works in respect of Users Amenities within Rs.30 lakhs in each
Nil Nil Nil Nil 1. Emphasis should be on creation of amenities of durable and lasting nature and funds should not be frittered away on provision of superficial items like furnishings and
Item No. EXTENT OF POWERS DELEGATED TO
Ref. to Rule
Nature of power HEAD QUARTER OFFICERS
DIVISIONAL OFFICERS
Remarks
PHOD/ CHOD/ SA
Grade
Other Officers
DRM / ADRM.
Other Officers
1 2 3 4 5 6 7
case subject to conditions indicated in the remarks column subject to the provision that the funds required for such works as provided in the sanctioned budget for works in these categories are not exceeded
furniture etc. 2. Prescribed norms/ parameters regarding passenger population should be followed in providing the amenities and facilities 3. FA&CAO’s concurrence & GM approval shall be obtained. 4 This will be subject to overall ceiling of RS. 10 crore (other than lump sum) for out of turn works.
5. Authority: item no.38 (c) of GM’s delegation
NOTE: For 1.04 a,b, c,& d above
(1) The works thrown forward from previous years may be taken up only if the funds required for them can be found by reappropriation within the sanctioned allotment.
(2) The savings in the lump sum provision ( item 1.03 ) made in the sanctioned budget shall not be utilized for the category of works under item 1.04, without the prior approval of the Railway Board.
1.05 1101-E 1102-E 1468-E
To incur expenditure in the nature of item pertaining to ordinary repairs & maintenance.
PHOD/Co-ord. HODs Full Power all other HODs Up to Rs. 3 Crores
SG /JA Grade Up to Rs. 1 Crore.
Up to Rs.2 Crores
SG /JA Grade Up to Rs. 1 Crore.
Note : (1) Subject to the limitation of the allotted
funds. (2) Estimate, as required vide para 701-E for
works costing Rs.1lakh and above, will be prepared and sanctioned with Associated Finance vetting in each case.
(3) A rough estimate may be prepared and kept where the cost is below Rs. 1lakh
(4) Officers Quarters : Covered under item 1.13
1.06 Special works chargeable to PHOD/Co-ord. SG /JA Up to SG /JA Grade Note :
Item No. EXTENT OF POWERS DELEGATED TO
Ref. to Rule
Nature of power HEAD QUARTER OFFICERS
DIVISIONAL OFFICERS
Remarks
PHOD/ CHOD/ SA
Grade
Other Officers
DRM / ADRM.
Other Officers
1 2 3 4 5 6 7
Chap.VII of Engg. Code
ordinary revenue including accidents and floods damages (other than repairs and maintenance).
HODs Full Power SAG Up to Rs.5 Crores
Grade Up to Rs. 2 Crores
Rs. 3 Crores Up to Rs. 2 Crores Sr. Scale Officers Up to Rs. 50 Lakhs
(1) Subject to the limitation of the allotted
funds. (2) Estimate, as required vide para 701 - E for
works costing Rs.2Lakh and above, will be prepared and sanctioned with Associated Finance Vetting in each case.
(3) A rough estimate may be prepared and
kept where the cost is below Rs. 2Lakh .
West Central Railway
WCR/HQ/0100/Sopgen/GA/38/Works Date:19-11-04
CORRECTION SLIP No.3
TO CAPTER-I
WORKS MATTERS OFSOPGEN-2004 OF W.C.R
S.N Item No. Column No. Remarks
1 1.25(b) Note Recast the existing item as per Annexure ‘A”
attached
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
CORRECTION SLIP No.3
TO CAPTER-I
WORKS MATTERS OFSOPGEN-2004 OF W.C.R
S.N Item No. Column No. Remarks
1 1.25(b) Note Recast the existing item as per Annexure ‘A”
attached
Item No. EXTENT OF POWERS DELEGATED TO
Ref. to Rule
Nature of power HEAD QUARTER OFFICERS
DIVISIONAL OFFICERS
Remarks
PHODs/ CHODs/ SA
Grade
Other Officers
DRMs / ADRMs.
Other Officers
1 2 3 4 5 6 7
1.25 Bd’s letter
No. 94/CE-I/CT/4 Dated
22.10.01
(b) Variation in quantities for the contracts accepted by GM and below
upto 25% provided the value of contract is still within his powers of acceptance
SG/JA Grade/ Sr. Scale upto 25% provided the value of contract is still within his powers of acceptance
upto 25% provided the value of contract is still within his powers of acceptance
SG/JA Grade/ Sr. Scale upto 25% provided the value of contract is still within his powers of acceptance
Note:
1. For variation in quantities accounts concurrence will be required if variation is in excess/savings of 25 % of the
total value and individual item in a contract.
2. Chief Engineer (PHOD/CHOD) will have power to approve these changes in contract approved by the
GM/AGM and Railway Board upto a maximum of 25 % of contract value or Rs. 25 lakhs which ever is less for
each individual contract.
3. Total implication of variation in quantities and variation of items in a contract will be limited to 25 % of total
value of original contract. In case it is exceeding personal approval of GM or higher authority which approves the
original estimate and in whose competence the enhanced value lies will have to be obtained.
4. For controlling the payment in case agreemental value goes beyond (+) 25%, a regulatory mechanism as part of
the contract shall be built in as part of contract itself. For the first 15 % increase in value beyond 25 % of
agreemental value , the rates will have a reduction of 2 % in the incremental value of the agreement and for the
next 10 % increase in the value, rates will have an additional reduction of 2% in the further incremental value of
the agreement . The variation clause to this effect will be included in all works contract.
5. In terms of codal para 628-f1 & 1265-E the original accepting authority should approve the variation
provided the total value of the contract is still with in his power of acceptance . If the total value goes
beyond the competence of the original acceptance authority, the sanction of the higher competent
authority to be taken.
6. In case vitiation takes place due to variation in quantity, contract has to be treated like a single tender.
CORRECTION SLIP NO.4
TO CHAPTER-I
For Works Matter of SOP 2004
The item no. 4 of Annexure II Chapter 1 of SOP for Works matter may be amended and replaced as
under.
Item no 4A
Estimated Value of
tenders
Composition of Tender Committee Tender accepting authority
Tender costing over Rs.5
crore and up to Rs.10
crores.
a) SA Grade Officer of the
concerned Executive Deptt
(Convener)
b) SA Grade Officer of other
Executive Deptt nominated by
CAO ( C)/GM
c) SG+ Grade Officer of Accounts
Deptt.
PHOD/CHOD of concern
executive department.
Item no.4B
Estimated Value of
tenders
Composition of Tender Committee Tender accepting authority
Tender costing over Rs.
10 crore and up to Rs.15
crores.
a) SA Grade Officer of the
concerned Executive Deptt
(Convener
b) SA Grade Officer of other
Executive Deptt nominated by
CAO ( C)/GM
c) SA Grade Officer of Accounts
Deptt.
PHOD/CHOD of concern
executive department
Note:- Where there is no selection grade officer posted of A/cs deptt. working in construction unit, and
If JA grade officer is in independent charge of A/cs deptt. working in construction unit then JA Grade
officer will attend the TC meeting.
CORRECCTION SLIP No5
TO CHAPTER –1
Sub: WCR SOP-2004 CHAPTER 1(Works Matters)
The new item no 1.39 has been added in SOP chapter I works matter as under.
Item
No./R
ef to
Rule
Nature of powers Extent of powers delegated to
Remarks
Headquarters Office Headquarters Office
PHOD/CHOD
/
SAG
Other
Office
rs
DRM/ADRM/
CMS
Other
Officers
1.39 Proof checking of
designs by IITs .
Full powers
subjected to
note below
Nil Full powers
subjected to
note below
Nil
Note :
1. Total expenditure on account of proof checking of designs in a work should not exceed 1% of the value of
work. If it exceeds over 1% , sanction of GM/AGM to be obtained.
2. The executive to certify that no such departmental facility is available.
3. Finance concurrence is not required.
CORRECCTION SLIP No6
TO CHAPTER –1
Sub: WCR SOP-2004 CHAPTER 1(Works Matters)
The new item no 1.03 has been added in SOP chapter I works matter as under.
Item
No./R
ef to
Rule
Nature of powers Extent of powers delegated to
Remarks
Headquarters Office Headquarters Office
PHOD/
CHOD/
SAG
Other
Officers
DRM/ADRM Other
Officers
1.03 Out of turn
works
a) To the
sanction of
incurrence of
expenditure on
lump-sum works
Nil Nil DRMs up to Rs 10
lakh for plan head
29(level crossing) &
plan head 32(Bridge)
only being safety plan
heads and up to Rs.5
lakh each work with
in the lumpsum grant
allocated to the
division concerned.
Nil
Note :
No
change
WEST CENTRAL RAILWAY
WCR/HQ/0100/Sopgen/GA/38/Works Date:25-04-05
CORRECTION SLIP NO.4
TO CHAPTER-I
For Works Matter of SOP 2004
The item no. 4 of Annexure II Chapter 1 of SOP for Works matter may be amended and replaced as
under.
Item no 4A
Estimated Value of
tenders
Composition of Tender Committee Tender accepting authority
Tender costing over Rs.5
crore and up to Rs.10
crores.
d) SA Grade Officer of the
concerned Executive Deptt
(Convener)
e) SA Grade Officer of other
Executive Deptt nominated by
CAO ( C)/GM
f) SG+ Grade Officer of Accounts
Deptt.
PHOD/CHOD of concern
executive department.
Item no.4B
Estimated Value of
tenders
Composition of Tender Committee Tender accepting authority
Tender costing over Rs.
10 crore and up to Rs.15
crores.
d) SA Grade Officer of the
concerned Executive Deptt
(Convener
e) SA Grade Officer of other
Executive Deptt nominated by
CAO ( C)/GM
f) SA Grade Officer of Accounts
Deptt.
PHOD/CHOD of concern
executive department
Note:- Where there is no selection grade officer posted of A/cs deptt. working in construction unit, and
If JA grade officer is in independent charge of A/cs deptt. working in construction unit then JA Grade
officer will attend the TC meeting.
This is issued with the approval of Competent authority and finance concurrence.
(A.K.Jain)
DGM/WCR
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 21.06.2005
CORRECCTION SLIP No5
TO CHAPTER –1
Sub: WCR SOP-2004 CHAPTER 1(Works Matters)
The new item no 1.39 has been added in SOP chapter I works matter as under.
Item
No./R
ef to
Rule
Nature of powers Extent of powers delegated to
Remarks
Headquarters Office Headquarters Office
PHOD/CHO
D/
SAG
Other
Office
rs
DRM/AD
RM/CMS
Other
Officers
1.39 Proof checking of
designs by IITs .
Full powers
subjected to
note below
Nil Full
powers
subjected
to note
below
Nil
Note :
4. Total expenditure on account of proof checking of designs in a work should not exceed
1% of the value of work. If it exceeds over 1% , sanction of GM/AGM to be obtained.
5. The executive to certify that no such departmental facility is available.
6. Finance concurrence is not required.
This is issued with the approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHOD/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 24.10.2005
CORRECCTION SLIP No6
TO CHAPTER –1
Sub: WCR SOP-2004 CHAPTER 1(Works Matters)
The new item no 1.03 has been added in SOP chapter I works matter as under.
Item
No./R
ef to
Rule
Nature of powers Extent of powers delegated to
Remarks
Headquarters Office Headquarters Office
PHOD/
CHOD/
SAG
Other
Officers
DRM/ADRM Other
Officers
1.03 Out of turn
works
a) To the
sanction of
incurrence of
expenditure on
lump-sum works
Nil Nil DRMs up to Rs 10
lakh for plan head
29(level crossing) &
plan head 32(Bridge)
only being safety plan
heads and up to Rs.5
lakh each work with
in the lumpsum grant
allocated to the
division concerned.
Nil
Note :
No
change
This is issued with the approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHOD/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 16.02.2006
CORRECCTION SLIP No7
TO CHAPTER –1
Sub: WCR SOP-2004 CHAPTER 1(Works Matters)
S.N Item No. Column No. Remarks
1 1.03(a)&(b)
1.04(a)
1 To 7 Recast the existing item as per Annexure ‘A”
attached
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
CORRECCTION SLIP No7 TO CHAPTER –1 Dated: 16.02.2006 Annexure 'A'
Item No.
EXTENT OF POWERS DELEGATED TO
Ref. to Rule
Nature of power HEAD QUARTER OFFICERS
DIVISIONAL OFFICERS
Remarks
PHOD/ CHOD/
SA Grade
Other Officers
DRM / ADRM. Other Officers
1 2 3 4 5 6 7
1.03 Rly.Bd letter
No.F(X)II-
2003/pw/ 10 dt:
09.01.04 and dt.
22.12.2005
OUT OF TURN WORKS
Lumpsum Works program
(a) To the sanction of incurrence of expenditure on lump sum works
(i) Traffic Facility Works costing less than Rs. 50 lakhs each
(ii) Safety Related Works under Bridge works, S&T , Track renewal and Road safty works –Level crossing plan heads – Costing less than Rs. 50 lakhs each
(iii) Other works costing not more than Rs. 30 lakhs each
Nil
Nil
DRMs Up to Rs.10 lakh for plan head 29 (level crossing ) & plan head 32 (Bridge) only being safety plan heads and up to Rs.5 lakh each works for all other heads with in the lumpsum grant allocated to the division concerned
Nil
1. Expenditure on works pertaining to New Lines, Gauge Conversions, Railway Electrification works, Metropolitan Railway Transportation Projects, Computerization, setting up of New Production Units, Rolling Stock or Surveys not provided for in the sanctioned budget by Rly Bd. can not be incurred.
2. Prior vetting of associate finance is necessary for inclusion of works in the lump sum works programme
3. This is subject to total lumpsum provision made in the budget for such works is not exceeded.
4. Authority: item no.39 (a) of GM’s delegation .
(b) To the sanction of incurrence of expenditure on lump sum Machinery & Plant works costing not more than Rs. 10 lakhs eachfor Zona Railways and 30 lakh each for Production units.
Nil Nil Nil Nil
1.04 OUT OF TURN WORKS
Other Than Lumpsum Works Program
(a) To the sanction of incurrence of expenditure on:
(i) Traffic facility works and line capacity works - costing less than Rs. 50 lakhs each
(ii) Safety Related Works under Bridge works, S&T , Track renewal and Road safty works –Level crossing plan heads – Costing less than Rs. 50 lakhs each
(iii) Other works - costing not more than Rs. 30 lakhs each
Nil Nil Nil Nil 1. Expenditure on works pertaining to New Lines, Gauge Conversions, Railway Electrification works, Metropolitan Railway Transportation Projects, Computerization, setting up of New Production Units, or Rolling Stock or Surveys not provided for in the sanctioned budget by Rly Bd, can not be incurred. 2. FA&CAO’s concurrence and GM approval should be obtained 3. This is subject to the budgetary ceiling of Rs. 10 crore (other than lump sum) (to be monitored by CE) in a financial year, of which not more than Rs. 3 crore could be on other than safety related items with the provision that all safety works should be completed within a maximum period of 8 months from the date of sanction. 4. Authority: item no.39 (b) of GM’s delegation
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 02.05.2006
CORRECCTION SLIP No 8
TO CHAPTER –1
Sub: WCR SOP-2004 CHAPTER 1(Works Matters)
Item
No./Ref
to Rule
Nature of
powers
Extent of powers delegated to
Remarks
Headquarters
Office
Divisional Office
PHOD/
CHOD/
SAG
Other
Officers
DRM/ADRM Other
Officers
1.03 Rly.Bd letter No.F(X)II-2003/pw/ 10 dt: 09.01.04 and dt. 22.12.2005 & Rly.Bd letter No.F(X)II-2006/pw/2 dt: 30.03.06
Out of
turn
works
a) To the
sanction of
incurrence
of
expenditure
on lump-
sum works
Nil Nil DRMs up to Rs 10 lakh
for each work in all plan
heads and Rs.30 lakh in
respect of passenger
amenities ( touch and feel
items) for modal stations
and other important
stations under the plan
head ' passenger and
other user amenities with
in the lumpsum grant
allocated to the division
concerned.
Nil 1. Expenditure on works pertaining to New Lines, Gauge Conversions, Railway Electrification works, Metropolitan Railway Transportation Projects, Computerization, setting up of New Production Units, Rolling Stock or Surveys not provided for in the sanctioned budget by Rly Bd. can not be incurred.
2. Prior vetting of associate finance is necessary for inclusion of works in the lump sum works programme
3. This is subject to total lumpsum provision made in the budget for such works is not exceeded.
4. Authority: item no.39 (a) of GM’s delegation . & Rly.Bd letter No.F(X)II-2006/pw/2 dt: 30.03.06
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 23.04.2007
CORRECTION SLIP No 9
TO CHAPTER –1
Sub: Addition of new item 1.40 in WCR SOP-2004 CHAPTER 1(Works Matters)
The new item no.1.40 has been added as under . It is requested that all officers and staff working under
your control may be advised accordingly
Extent of powers delegated to
Headquarter officers Divisional officers
Item no.
Nature of powers
PHOD/CHOD/
SAG
Other
Officers
DRM/
ADRM/
Other
Officers
Remarks
1.40 (Item no
30(a) &(b) of
GM delegation
and Rly.Bd’s
letter No.
F(X)II-
2003PW/10
dated
09.01.2004&
F(X)II-
2006/PW/3
dated
27.02.2006,16.
05.2006,
09.08.2006&
18.10.2006
To the incurrence
of expenditure in
engaging/ obtaining
consultancy
services from
outside bodies (a)
not more Rs50lakh
in each case for
property
development
scheme i.e for
commercial
exploitation and (b)
not more than Rs.
25 lakh in each case
for other purposes
PCE/CE
(Coord) up to
Rs. 5 lakh per
case with
annual ceiling
limit of Rs.10
lakh with
Personal
concurrence of
FA&CAO
/FA&CAO(C )
Nil DRM
up to Rs.
50,000/- per
case with
annual
ceiling limit
of Rs.1 lakh
with
concurrence
of associated
finance
Nil 1. if the consultancy contract
is to be fixed only on a single
tender basis due to special
circumstances, GM's
personnel approval would be
required irrespective of the
value of the contract.
2.Detailed instructions laid
down in note to item no. 30(a)
& (b) of GM’s power vide
Railway Board’d letter no.F(x)
99-II/2006/PW/17
dt.18.10.2006 may be followed.
3.level and composition of TC
will also be governed as per
note to item no. 30(a) & (b) of
GM’s power vide Railway
Board’d letter no.F(x) 99-
II/2006/PW/17 dt.18.10.2006
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 17.09.2007
CORRECTION SLIP No 10
TO CHAPTER –1
The item no.1.29 Chapter 1 of SOP for works matter may be amended and replaced as under .
Extend of powers delegated to
Headquarter officers Divisional officers
Item
no.
Nature of powers
PHOD/CHOD/
SAG
Other
Officers
DRM/
ADRM/
CWM
Other
Officers
Remarks
1.29 Re-appropriation of grants : (i) Revenue-Ordinary working expenses (ii) Works (subject to) following the clear instruction given by the Rly. Board vide Para 377, 378, 379 of Financial code Vol. I
Full powers to re-appropriate from the detailed Head of accounts to another within a grant in respect of their own department.
Nil Full Powers to re-appropriate from one detailed head of accounts to another (relating to one Deptt) within a grant.
Nil Note: 1 Reappropriation of funds from one Deptt. To another even if it is under the same sub-head is not permissible. 2.Finance concurrence is not necessary 3. For works the work shall be live. 4.Re-appropriation to be done as per extent instructions.
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 26.09.2007
CORRECTION SLIP No 11
TO CHAPTER –1
WORKS MATTERS OF SOPGEN-2004 OF WCR
The Annexure I & II of Chapter 1 of SOP for Works matter have been combined in to one and
amended as per annexure ‘A’ enclosed .
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
CORRECCTION SLIP No11 TO CHAPTER –1 Dated: 26.09.2007
Composition of tender committee works contract open line & construction organization Annexure ‘A’ Sr.No Estimated Value of
tenders Composition of Tender Committee Tender accepting authority.
1. Up to Rs. 20 lakhs a) Sr.Scale Officer of the concerned Executive Deptt(Convener)
b) Jr.Scale Officer from accounts Deptt.
JAG Officer
2. Over Rs.20 lakhs and Up to Rs. 50 lakhs.
a) Sr.Scale Officer of the concerned Executive Deptt (Convener)
b) Sr.Scale Officer of any other Executive Deptt
c) Jr.Scale Officer of Accounts Deptt.
JAG Officer
3 Over Rs.50 lakhs and Up to Rs. 2 Crores
a) JAG Officer of the concerned Executive Deptt (Convener) b) JAG Officer of any other Executive Deptt c) Sr.Scale Officer of Accounts Deptt
DRM/ADRM in Divn. /SAG Officer in W/S, construction and HQ
4.
Over Rs. 2 Crores and Up to Rs.5 crores.
a) JAG Officer of the concerned Executive Deptt. (Convener)
b) JAG Officer of any other Executive Deptt
c) JAG Officer of Accounts Deptt. Or Sr.scale officer holding independent charge of a unit
DRM/ADRM in Divn. /SAG Officer in W/S, construction and HQ
5. Over Rs. 5 crores and Up to Rs. 10 crores.
a) SA Grade Officer of concerned Executive Department(Convener) b) SA Grade Officer of any other Executive deptt. C) JAG Officer of Accounts Deptt.
PHOD/CHOD
6. Over Rs 10 crores and Up to Rs. 20 Crores.
a) SA Grade Officer of concerned Executive Department (Convener)
b) SA Grade Office of any other Executive Department.
c) SA Grade Officer of A/c Department
PHOD/CHOD
7. Over Rs 20 crores and Up to Rs. 100 Crores.
a) PHOD/CHOD of concerned Executive Department ( Convenor) b) PHOD/CHOD of any other Executive Department. c) PHOD/CHOD of A/c Department
GM
Note:- 1) In Case of single tenders, tender committee and the accepting authority should be one step higher than in case of open tenders/limited tenders except where GM is the accepting authority.
2 ) 2) In workshops and other units where Sr. Scale Officer is independent in-charge of such establishment , the T.C. up to Rs. 20 lakhs will constitute of Asstt. Officer of concerned Executive Deptt. and the Accounts Deptt and the recommendations can be accepted by the Sr. Scale Officer.
3) In case of non-availability of an Officer in particular Grade, the higher Grade Officer will be Tender Committee member. 4) In case of Tenders beyond the powers of acceptance delegated to GM (i.e. Rs. 100 crores) the Tender Committee shall be constituted at the level of PHOD/CHODs as given in Sr. No. 7 above and such tenders should be sent to Railway Board through GM.
5) PHOD/CHOD in HQ , DRMs in divisions and CWMs in workshops are in powered to nominate standing tender committees up to their power of acceptance.
6) JAG officers include SG officers also.
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 27.05.2008
CORRECTION SLIP No 12
TO CHAPTER –1
WORKS MATTERS OF SOPGEN-2004 OF WCR
The Annexure I of Chapter 1 of SOP for Works matter which was issued vide correction no.
11 dt.26.09.2007 has been amended as per annexure ‘A’ & ‘ B’ enclosed .
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
Annexure ‘A’ Composition of tender committee works contract other than construction organization
SN Tender Value Level of Tender Committee member Tender Accepting Authority
Above Up to Convenor Finance Third
1 - 20 lakhs Sr.Scale
Jr.Scale - JAG
2 20 lakhs 50 lakhs Sr.Scale Sr.Scale Sr.Scale JAG
3 50 lakhs 1crores Sr.Scale Sr.Scale Sr.Scale SG(JAG where no SG is
available) 4 1crores 2crores JAG JAG or
Sr.scale holding
independent charge
JAG ADRM in Divn. /CWM in W/S/SAG in HQ, (DRM where no ADRM is posted)
5 2crores 5crores SG(JAG where no SG is available)
JAG SG(JAG where no SG is available)
DRM in Divn. /CWM in W/S/SAGin HQ
6 5crores 30crores SAG SAG SAG PHOD(HAG)/CHOD(SAG)
7 30crores 50crores SAG SAG SAG PHOD(HAG)/AGM
8 50crores 100crores PHOD/CHOD PHOD/CHOD PHOD/CHOD GM
* In respect of item no. 7 of table above , when PHOD in HAG/AGM is not available ,then tender
committee will consist of PHOD/CHODlevel and accepting authority will be GM Note:-
1) In Case of single tenders, tender committee and the accepting authority should be one step higher except where GM is the accepting authority.
2) In case of non-availability of an Officer in particular Grade, relevent higher Grade Officer can be Tender Committee member/tender accepting authority
3) In case of Tenders beyond the powers of acceptance delegated to GM (i.e. Rs. 100 crores) the Tender Committee shall be constituted at the level of PHOD/CHODs as above and such tenders should be sent to Railway Board through GM.
4) PHOD/CHOD in HQ , DRMs in divisions and CWMs in workshops are empowered to nominate standing tender committees up to their power of acceptance.
5) In case of non availability of Sr, Scale officer under a JA Grade officer , the J.A Grade officer will be tender committee member for all tenders up to Rs. 2 crores and the tender shall be accepted by ADRM in DIV../SAGofficer in W/S and HQ.
DGM(G)
Annexure ‘B’ Composition of tender committee works contract for construction organization
SN Tender Value Level of Tender Committee member Tender Accepting Authority
Above Up to Convenor Finance Third
1 - 20 lakhs Sr.Scale
Jr.Scale - JAG
2 20 lakhs 2crores. Sr.Scale Sr.Scale Sr.Scale JAG
3 2crores 8crores JAG JAG or Sr.scale holding
independent charge
JAG SAG
4 8crores 15crores SAG JAG SAG PHOD(HAG)/ CHOD (SAG)
5 15crores 30crores SAG SAG SAG PHOD(HAG)/ CHOD (SAG)
6 30crores 50crores SAG SAG SAG PHOD(HAG) /AGM
7 50crores 100crores PHOD/CHOD PHOD/CHOD PHOD/ CHOD GM * In respect of item no. 6 of table above , when PHOD in HAG/AGM is not available ,then tender
committee will consist of PHOD/CHOD level and accepting authority will be GM Note:- 1) In Case of single tenders, tender committee and the accepting authority should be one step higher except where GM is the accepting authority.
2) In case of non-availability of an Officer in particular Grade, relevant higher Grade Officer can be Tender Committee member/tender accepting authority
3) In case of Tenders beyond the powers of acceptance delegated to GM (i.e. Rs. 100 crores) the Tender Committee shall be constituted at the level ofPHOD/CHODs as above and such tenders should be sent to Railway Board through GM. 4) PHOD/CHOD in HQ, DRMs in divisions and CWMs in workshops are empowered to nominate standing tender committees up to their power of acceptance. 5) JAG officers include SG officers also.
6) In case of non availability of Sr, Scale officer under a JA Grade officer , the J.A Grade officer will be tender committee member for all tenders up to Rs. 8 crores and the tender shall be accepted by SAG officer. DGM(G)
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 06.06.2008
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
Sub:- Amendment in delegation of power in SOP chapter II works matter
(composition of tender committee .)
Ref.:- Correction slip no.12 issued vide this office letter no WCR/HQ/100/GA/38/
Works dt.27.05.2008
The Correction slip no.12 issued vide this office letter no WCR/HQ/100/GA/38/works
dt.27.05.2008 may be kept pending for other than construction organization (i.e Annexure A) as the
same is under review.
This has the approval of GM
DGM(G)
WCR/JBP
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 27.05.2008
CORRECTION SLIP No 13
TO CHAPTER –1
WORKS MATTERS OF SOPGEN-2004 OF WCR
The Annexure A of Chapter 1 of SOP for Works matter which was issued vide correction no.
12 dt.27.05.2008 has been amended as per annexure ‘A’ enclosed .
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
Annexure ‘A’
Composition of tender committee works contract other than construction organization
SN Tender Value Level of Tender Committee member Tender Accepting Authority
Above Up to Convenor Finance Third
1 - 20 lakhs Sr.Scale
Jr.Scale - JAG
2 20 lakhs 50 lakhs Sr.Scale Jr.Scale Sr.Scale JAG
3 50 lakhs 1crores Sr.Scale Sr.Scale Sr.Scale SG(JAG where no SG is available)
4 1crores 2crores JAG Sr.Scale JAG DRM/ADRM in Divn. CWM( in SA Grade) in work shop & SAG in HQ
5 2crores 5crores JAG JAG JAG DRM/ADRM in Divn. CWM( in SA Grade) in work shop & SAG in HQ
6 5crores 30crores SAG SAG SAG PHOD(HAG)/CHOD(SAG)
7* 30crores 50crores SAG SAG SAG PHOD(HAG)/AGM
8 50crores 100crores PHOD/CHOD PHOD/CHOD PHOD/CHOD GM
* In respect of item no. 7 of table above , when PHOD in HAG/AGM is not available ,then tender
committee will consist of PHOD/CHODlevel and accepting authority will be GM Note:-
1) In Case of single tenders, tender committee and the accepting authority should be one step higher except where GM is the accepting authority.
2) In case of non-availability of an Officer in particular Grade, relevent higher Grade Officer can be Tender Committee member/tender accepting authority
3) In case of Tenders beyond the powers of acceptance delegated to GM (i.e. Rs. 100 crores) the Tender Committee shall be constituted at the level of PHOD/CHODs as above and such tendersshould be sent to Railway Board through GM.
4) PHOD/CHOD in HQ , DRMs in divisions and CWMs in workshops are empowered to nominate standing tender committees up to their power of acceptance.
5) In case of non availability of Sr, Scale officer under a JA Grade officer , the J.A Grade officer will be tender committee member for all tenders up to Rs. 2 crores and the tender shall be accepted by a SAGofficer .
DGM(G)
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 14.08.2008
CORRECTION SLIP No 14
TO CHAPTER –1
WORKS MATTERS OF SOPGEN-2004 OF WCR
The Annexure B of Chapter 1 (Composition of tender committee works contract for
construction organization) of SOP for Works matter which was issued vide correction slip no. 12
vide letter no. WCR/HQ/100/GA/38/works dated.27.05.2008 has been amended as per annexure
‘B’ enclosed.
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
Annexure ‘B’
Composition of tender committee works contract for construction organization
SN Tender Value Level of Tender Committee member Tender Accepting Authority
Above Up to Convenor Finance Third
1 - 20 lakhs Sr.Scale
Jr.Scale - JAG
2 20 lakhs 2 corers. Sr.Scale Sr.Scale Sr.Scale JAG
3 2 corers 8 corers JAG JAG or Sr.scale holding
independent charge
JAG SAG
4 8 corers 15 corers SAG JAG SAG PHOD(HAG)/ CHOD (SAG)
5 15 corers 30 corers SAG SAG SAG PHOD(HAG)/ CHOD (SAG)
6* 30 corers 50 corers SAG SAG SAG PHOD(HAG) /AGM
7 50 corers 100 corers PHOD/CHOD PHOD/CHOD PHOD/ CHOD GM * In respect of item no. 6 of table above, when PHOD in HAG/AGM is not available, then tender committee will consist of PHOD/CHOD level and accepting authority will be GM Note:- 1 In Case of single tenders, tender committee and the accepting authority should be one step higher except where GM is the accepting authority. 2 In case of Tenders beyond the powers of acceptance delegated to GM (i.e. Rs. 100 crores)
the ender Committee shall be constituted at the level of PHOD/CHODs as above and such tenders should be sent to Railway Board through GM.
3 PHOD/CHOD in HQ are empowered to nominate standing tender committees up to their power of acceptance.
4 JAG officers include SG officers also.
5 In case of non availability of officer of any grade in a construction unit, the officer of Corresponding grade may be drafted from other unit (open line/ workshop etc.) for participation in tender committee. This will be nominated by concerned PHOD/CHOD.
DGM(G)
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 25.11.2008
CORRECTION SLIP No 15
TO CHAPTER –1
WORKS MATTERS OF SOPGEN-2004 OF WCR
The item no.1.01 (a,b,c&d) has been amendment as under .It is requested that
all officers and staff working under you control may be advised accordingly.
S.N Item No. Column No. Remarks
1 1.01(a,b,c&d) 1 To 7 Recast the existing item as per Annexure
‘A” attached
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
Correction slip no. 15 dt.25.11.2008 Annexure ‘A’
Item No. EXTENT OF POWERS DELEGATED TO
Ref. to Rule Nature of power HEAD QUARTER OFFICERS DIVISIONAL OFFICERS
Remarks
PHOD/ CHOD/SA
Grade
Other Officers
DRM / ADRM.
Other Officers
1 2 3 4 5 6 7
1.01 Rly.Bd letter No.F(X)II-2006/pw/ 17dt:
04.12.2006 Item no.40(1)(a)
Sanction to Detailed Estimates Chargeable to Capital, Capital Fund, Depreciation Reserve Fund, Development Fund, and Open Line Works Revenue
Works included in the approved programme for the year.
(a) Track Renewal Works
PHOD/ CHOD Up to Rs.30 crores SAG/CTE Up to Rs. 25crores
Nil Up to Rs
20Crores
SG/JA Grade Up to Rs.5 Crores
Note : Vetting of Associate Finance should be obtained in each case.
(b) Rolling stock items provided in the Rolling Stock approved Programme.
PHOD/ CHOD Rs.20 Crores SAG Up to Rs.10Crores
SG/JAG Up to Rs 3
crores
Nil Nil 1. Finance concurrence is necessary
(c) Other works including M&P items
PHOD/ CHOD Up to Rs.30 Crores SAG Up to Rs.25 Crores
SG /JA Grade Up to Rs.5Crores
Up to Rs.20Crores
SG/JA Grade Up to Rs. 5 Crores
Note: 1.For works which are approved in Works Programme & M&P Programme.
2.Vetting of Associate Finance should be obtained in each case. 3.For the works sanctioned by General Manager, the estimate cost should be within the limit of General Manager to sanction new works under the plan head. 4. For the works sanctioned in Divisional works programme, the estimate cost should be within the limit of DRM to sanction new works under the plan head. 5. CWMs in workshops shall exercise powers similar to DRM/ADRM in Divisions.
ly.Board L.No.2007/CE-1/CT/18 dt.07.03.2008
(d) Sanction of part estimates to incur expenditure towards preliminary activities viz.FLS, Geotechanical studies,Design, Preparation of plans, Drawings etc. as per Rly.Board L.No.2007/CE-1/CT/18 dt.07.03.2008
PHOD/ CHOD Up to Rs.60 lakh CE/C Up to Rs.50 Lakh
Nil Nil Nil Note : 1. Finance concurrence is necessary 2. The cost of part estimate should not be more than 2% of the total value of the work.
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 21.05.2009
CORRECTION SLIP No 16
TO CHAPTER –1
WORKS MATTERS OF SOPGEN-2004 OF WCR
The item no.1.16 has been amendment as under .It is requested that all
officers and staff working under you control may be advised accordingly.
S.N Item No. Column No. Remarks
1 1.16 1 To 7 Recast the existing item as per Annexure
‘A” attached
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
Correction slip no. 16 dt.21.05.2009 Annexure ‘A’
Item No.
Ref. to
Rule
Nature of Powers
Extent of powers delegated to
Remarks Headquarter Officers Divisional Officers
PHOD/ CHOD/SAG
Other Officers DRM/ ADRM
Other Officers
1 2 3 4 5 6 7 1.16
Board’s
letter No.
90/CE-1/
CT/1 dt
14.12.90
, Bd.
Letter no
94/CE-I/C
T/4 Dated
17.10.02.& 2007/CE-I/CT/18/Pt.dt 05.03.2009
To decide in the
public interest and in
connection with works
not to invite tenders
and award works
contract.
Up to
Rs. 4 Lakh
in each case
subjected to
annual ceiling
limit of
Rs. 40 Lakh
each.
NB: These powers shall be exercised only by field officers and their controlling HODs and not by other HQ officers incharge of the planning ,Design etc.
SG/JA Grade
Up to Rs. 2 Lakh
in each case
subjected to
annual ceiling
limit of
Rs. 20 Lakh each
NB: These powers shall be exercised only by field officers and their controlling HODs and not by other HQ officers incharge of the planning ,Design etc
Up to
Rs. 4 Lakh
in each case
subjected to
annual ceiling
limit of
Rs. 40 Lakh
each.
SG/JA Grade
Up to Rs. 2 Lakh
in each case
subjected to
annual ceiling
limit of
Rs. 20 Lakh each
Sr. Scale
(incharge) in the
Division holding
independent
charge Rs.1 lakh-
in each case sub-
ject to aggregate
of Rs. 5 Lakh in
a financial year.
Note: These power s will be exercised by the officers with their own administrative approval and no separate administrative approval is necessary.
1. Normally powers to dispense with calling of tenders should be exercised sparingly. The circumstances under which quotations have to be called should be spelt out.
2. The work should not be split up for the purpose of bringing it with in the ambit of this dispensation.
3. The reasonableness of rates should be gone in to objectively and in detail by the accepting authority.
4. Quotation should not be for items which can be executed through the existing contracts including Zonal contracts.
5. Quotations should not be for fancy (expensive but of low utility) Items.
6. Quotation should only be for works which are urgent
in nature. 7 Quotation should normally be invited from at least
three well experienced contractors/ agencies
working in that area not necessarily be born on the
approved list.
8. Accepting Authority must take precautions to see
that the quotations are from genuine firms (and not
from fictitious firms)
9. A Register showing the full particulars of works
authorised through quotations will be maintained by
the officer having powers to dispense with calling of
tenders. The register shall be sent to associate
finance while seeking their concurrence.
WEST CENTRAL RAILWAY
L.No.: WCR/HQ/100/GA/38/works Dated: 25.06.2009
CORECTION SLIP No. 17
TO CHAPTER –1
The item no.1.18 Chapter 1 of SOP for works matter may be amended and replaced as under .
Item No.Ref. to
Rule
Nature of Powers
Extent of powers delegated to
Remarks
Headquarter Officers Divisional Officers PHOD/
CHOD/SAG Other Officers
DRM/ ADRM
Other Officers
1 2 3 4 5 6 7
1.18 Railway Bd’s letterNo2007/CE/1/CT/18 dt.28.09.2007(Para 2.4.4.5)
To invite
tender from approved
contractor.
PHOD/CHOD
More than 1 crore and up to Rs.5 crore each case. SAG more than 25 Lakh and up to Rs 1 crore in each case.
SG/JA Grade
Up to
Rs.25 Lakh
in each case.
More than Rs 25 lakh and up to Rs 1 crore in each case.
SG/JA Grade
Up to
Rs.25 Lakh
in each case.
Note : 1. Limited tenders shall be invited only from approved contractors. For this, finance concurrence is not necessary. In case of Special limited tenders, the tender notice should be sent to all the approved contractors in addition to certain other pre-selected or short listed contractors. If some approved contractors are to be excluded from the list of invitees, then detailed reasons for the same shall be recorded and finance Concurrence obtained.
2. Approved list of the contractor to be framed as per item 1.15(a)&1.15(b)
Note:- Special limited tender
1.Special limited tender may be adopted in the following situation in consultation with FA&CAO.
(a). Works of specialized nature (to be approved by PHOD/CHOD personally).
(b) Works of urgent nature (to be approved by GM personally).
(c ) Consultancy work (to be approved by GM personally).
2.CAO(C)with concurrence of FA& CAO(C)may invite SLT not only for specialized nature of works but all types of works
depending upon merit of the case
3.Special limited tender may be invited form specialized/reputed contractors/organizations/agencies.
4.A proposal detailing the circumstances and necessity for going in for SLT should be initiated and got concurred by
FA&CAO in respect of open line and FA&CAO (C) in respect of construction organization before personal approval of
PHOD/CHOD is obtained.
5.Tenderers from whom SLT are to be invited should preferably more than six but not less than four.
6.Tenderers need not necessarily be borne on the approved list.
This is issued with approval of competent authority and finance concurrence.
DGM(G)
WCR/JBP
All PHODs/CHOD
DRM-JBP,BPL,KTT
CWM-BPL,KTT
CORECCTION SLIP No17TO CHAPTER –1 Dated: 25.06.2009
Item No.Ref. to
Rule
Nature of Powers
Extent of powers delegated to
Remarks
Headquarter Officers Divisional Officers PHOD/
CHOD/SAG Other Officers
DRM/ ADRM
Other Officers
1 2 3 4 5 6 7
1.18 Railway Bd’s letterNo2007/CE/1/CT/18 dt.28.09.2007(Para 2.4.4.5)
To invite
tender from approved
contractor.
PHOD/CHOD
More than 1 crore and up to Rs.5 crore each case. SAG more than 25 Lakh and up to Rs 1 crore in each case.
SG/JA Grade
Up to
Rs.25 Lakh
in each case.
More than Rs 25 lakh and up to Rs 1 crore in each case.
SG/JA Grade
Up to
Rs.25 Lakh
in each case.
Note : 1. Limited tenders shall be invited only from approved contractors. For this, finance concurrence is not necessary. In case of Special limited tenders, the tender notice should be sent to all the approved contractors in addition to certain other pre-selected or short listed contractors. If some approved contractors are to be excluded from the list of invitees, then detailed reasons for the same shall be recorded and finance Concurrence obtained.
2. Approved list of the contractor to be framed as per item 1.15(a)&1.15(b)
Note:- Special limited tender
1.Special limited tender may be adopted in the following situation in consultation with FA&CAO.
(a). Works of specialized nature (to be approved by PHOD/CHOD personally).
(b) Works of urgent nature (to be approved by GM personally).
(c ) Consultancy work (to be approved by GM personally).
2.CAO(C)with concurrence of FA& CAO(C)may invite SLT not only for specialized nature of works but all types of works depending upon merit of the case
3.Special limited tender may be invited form specialized/reputed contractors/organizations/agencies.
4.A proposal detailing the circumstances and necessity for going in for SLT should be initiated and got concurred by FA&CAO in respect of open
line and FA&CAO (C) in respect of construction organization before personal approval of PHOD/CHOD is obtained.
5.Tenderers from whom SLT are to be invited should preferably more than six but not less than four.
6.Tenderers need not necessarily be borne on the approved list.
Composition of tender committee works contract other than construction organization Annexure ’ Sr.No Estimated Value of tenders Composition of Tender Committee Tender accepting authority.
1. Up to Rs. 20 lakhs (a) Sr.Scale Officer of the concerned Executive Deptt(Convener) (b) Jr.Scale Officer from accounts Deptt.
JAG Officer
2. Over Rs.20 lakhs and Up to Rs. 50 lakhs
(a) Sr.Scale Officer of the concerned Executive Deptt (Convener) (b) Sr.Scale Officer of any other Executive Deptt (c) Sr.Scale Officer of Accounts Deptt.
JAG Officer
3 Over Rs.50 lakhs and Up to Rs. 1 Crores
(a) Sr.Scale Officer of the concerned Executive Deptt (Convener) (b) Sr.Scale Officer of any other Executive Deptt (c) Sr.Scale Officer of Accounts Deptt.
SG(JAG where no SG is available)
4.
Over Rs. 1Crores and Up to Rs.2crores.
(a) JAG Officer of the concerned Executive Deptt. (Convener) (b) JAG Officer of any other Executive Deptt (c) JAG Officer. or Sr.scale officer holding independent charge of a unit of Accounts Deptt
ADRM in Divn. /CWM in W/S/SAG in HQ, (DRM where no ADRM is posted)
5. Over Rs. 2 crores and Up to Rs. 5crores.
(a) SG(JAG where no SG is available) Grade Officer of concerned Executive Department (Convener) (b) SG(JAG where no SG is available) Officer of any other Executive deptt. (c) JAG Officer of Accounts Deptt.
DRM in Divn. /CWM in W/S/SAGin HQ
6. Over Rs 5crores and Up to Rs. 30 Crores.
(a) SA Grade Officer of concerned Executive Department (Convener) (b) SA Grade Office of any other Executive Department. (c) SA Grade Officer of A/c Department
PHOD(HAG)/CHOD(SAG)
7.* Over Rs 30 crores and Up to Rs. 50Crores.
(a) SA Grade Officer of concerned Executive Department (Convener) (b) SA Grade Office of any other Executive Department. (c) SA Grade Officer of A/c Department
PHOD(HAG)/AGM
8 Over Rs 50 crores and Up to Rs. 100 Crores.
(a) PHOD/CHOD of concerned Executive Department ( Convener) (b) PHOD/CHOD of any other Executive Department. (c) PHOD/CHOD of A/c Department
GM
* In respect of item no. 7 of table above , when PHOD in HAG/AGM is not available ,then tender committee will consist of PHOD/CHODlevel and accepting authority will be GM
Note:- 1) In Case of single tenders, tender committee and the accepting authority should be one step higher except where GM is the accepting authority.
2 ) 2) In case of non-availability of an Officer in particular Grade, relevent higher Grade Officer can be Tender Committee member/tender accepting authority 3) In case of Tenders beyond the powers of acceptance delegated to GM (i.e. Rs. 100 crores) the Tender Committee shall be constituted at the level of PHOD/CHODs as above and such tenders should be sent to Railway Board through GM.
4) PHOD/CHOD in HQ , DRMs in divisions and CWMs in workshops are empowered to nominate standing tender committees up to their power of acceptance.
5) In case of non availability of Sr, Scale officer under a JA Grade officer , the J.A Grade officer will be tender committee member for all tenders up
to Rs. 2 crores and the tender shall be accepted by ADRM in DIV../SAGofficer in W/S and HQ.
Composition of tender committee works contract for construction organization Annexure ‘B’
Sr.No Estimated Value of tenders
Composition of Tender Committee Tender accepting authority.
1. Up to Rs. 20 lakhs a) Sr.Scale Officer of the concerned Executive Deptt(Convener)
b) Jr.Scale Officer from accounts Deptt.
JAG Officer
2. Over Rs.20 lakhs and Up to Rs. 2 Crores
a) Sr.Scale Officer of the concerned Executive Deptt (Convener)
b) Sr.Scale Officer of any other Executive Deptt
c) Sr.Scale Officer of Accounts Deptt.
JAG Officer
3 Over Rs. 2 Crores and Up to Rs. 8 Crores
a) JAG Officer of the concerned Executive Deptt (Convener) b) JAG Officer of any other Executive Deptt c) JAG Officer. or Sr.scale officer holding independent charge of a unit of Accounts Deptt
SAG
4.
Over Rs. 8 Crores and Up to Rs.15 crores.
a) SAG Officer of the concerned Executive Deptt. (Convener)
b) SAG Officer of any other Executive Deptt
c) JAG Officer of Accounts Deptt.
PHOD(HAG)/CHOD(SAG)
5. Over Rs. 15 crores and Up to Rs. 30 crores.
a) SAG Officer of the concerned Executive Deptt. (Convener) b) SAG Officer of any other Executive Deptt c) SAG Officer of Accounts Deptt.
PHOD(HAG)/CHOD(SAG)
6.* Over Rs 30 crores and Up to Rs. 50Crores.
a) SAG Officer of the concerned Executive Deptt. (Convener) b) SAG Officer of any other Executive Deptt c) SAG Officer of Accounts Deptt.
PHOD(HAG)/AGM
7. Over Rs50 crores and Up to Rs. 100 Crores.
a) PHOD/CHOD of concerned Executive Department ( Convenor) b) PHOD/CHOD of any other Executive Department. c) PHOD/CHOD of A/c Department
GM
* In respect of item no. 6 of table above , when PHOD in HAG/AGM is not available ,then tender committee will consist of PHOD/CHOD level and accepting authority will be GM
Note:- 1) In Case of single tenders, tender committee and the accepting authority should be one step higher except where GM is the accepting authority.
2 ) 2) In case of non-availability of an Officer in particular Grade, relevant higher Grade Officer can be Tender Committee member/tender accepting authority 3) In case of Tenders beyond the powers of acceptance delegated to GM (i.e. Rs. 100 crores) the Tender Committee shall be constituted at the level of PHOD/CHODs as above and such tenders should be sent to Railway Board through GM.
4) PHOD/CHOD in HQ, DRMs in divisions and CWMs in workshops are empowered to nominate standing tender committees up to their power of acceptance. 5) JAG officers include SG officers also.
6) In case of non availability of Sr, Scale officer under a JA Grade officer , the J.A Grade officer will be tender committee member for all tenders up to Rs. 8 crores and the tender shall be accepted by SAG officer .
CORRECCTION SLIP No10 TO CHAPTER –1 Dated: 17.09.2007
Extend of powers delegated to
Headquarter officers Divisional officers
Item
no.
Nature of powers
PHOD/CHOD/
SAG
Other
Officers
DRM/
ADRM/
CWM
Other
Officers
Remarks
1.29 Re-appropriation of grants : (i) Revenue-Ordinary working expenses (ii) Works (subject to) following the clear instruction given by the Rly. Board vide Para 377, 378, 379 of Financial code Vol. I
Full powers to re-appropriate from the detailed Head of accounts to another within a grant in respect of their own department.
Nil Full Powers to re-appropriate from one detailed head of accounts to another (relating to one Deptt) within a grant.
Nil Note: 1 Reappropriation of funds from one Deptt. To another even if it is under the same sub-head is not permissible. 2.Finance concurrence is not necessary 3. For works the work shall be live. 4.Re-appropriation to be done as per extent instructions.
CORRECCTION SLIP No9 TO CHAPTER –1 Dated: 23.04.2006
Extent of powers delegated to
Headquarter officers Divisional officers
Item no.
Nature of powers
PHOD/CHOD/
SAG
Other
Officers
DRM/
ADRM/
Other
Officers
Remarks
1.40 (Item no 30(a)
&(b) of GM
delegation and
Rly.Bd’s letter No.
F(X)II-2003PW/10
dated 09.01.2004&
F(X)II-2006/PW/3
dated
27.02.2006,16.05.20
06, 09.08.2006&
18.10.2006
To the incurrence of
expenditure in engaging/
obtaining consultancy
services from outside
bodies (a) not more
Rs50lakh in each case for
property development
scheme i.e for commercial
exploitation and (b) not
more than Rs. 25 lakh in
each case for other
purposes
PCE/CE
(Coord) up to Rs. 5
lakh per case with
annual ceiling limit
of Rs.10 lakh with
Personal
concurrence of
FA&CAO
/FA&CAO(C )
Nil DRM
up to Rs.
50,000/- per
case with
annual ceiling
limit of Rs.1
lakh with
concurrence of
associated
finance
Nil 1. if the consultancy contract is to
be fixed only on a single tender
basis due to special circumstances,
GM's personnel approval would be
required irrespective of the value of
the contract.
2.Detailed instructions laid down in
note to item no. 30(a) & (b) of GM’s
power vide Railway Board’d letter
no.F(x) 99-II/2006/PW/17
dt.18.10.2006 may be followed.
3.level and composition of TC will
also be governed as per note to item
no. 30(a) & (b) of GM’s power vide
Railway Board’d letter no.F(x) 99-
II/2006/PW/17 dt.18.10.2006
CORRECCTION SLIP No8 TO CHAPTER –1 Dated: 02.05.2006
Item No./Ref
to Rule
Nature of
powers
Extent of powers delegated to
Remarks
Headquarters Office Divisional Office
PHOD/CH
OD/
SAG
Other
Officers
DRM/ADRM Other
Officers
1.03 Rly.Bd letter No.F(X)II-2003/pw/ 10 dt: 09.01.04 and dt. 22.12.2005 & Rly.Bd letter No.F(X)II-2006/pw/2 dt: 30.03.06
Out of
turn
works
a) To the
sanction of
incurrence
of
expenditure
on lump-sum
works
Nil Nil DRMs up to Rs 10 lakh for
each work in all plan heads
and Rs.30 lakh in respect of
passenger amenities ( touch
and feel items) for modal
stations and other
important stations under
the plan head ' passenger
and other user amenities
with in the lumpsum grant
allocated to the division
concerned.
Nil 1. Expenditure on works pertaining to New Lines, Gauge Conversions, Railway Electrification works, Metropolitan Railway Transportation Projects, Computerization, setting up of New Production Units, Rolling Stock or Surveys not provided for in the sanctioned budget by Rly Bd. can not be incurred.
2. Prior vetting of associate finance is necessary for inclusion of works in the lump sum works programme
3. This is subject to total lumpsum provision made in the budget for such works is not exceeded.
4. Authority: item no.39 (a) of GM’s delegation . & Rly.Bd letter No.F(X)II-2006/pw/2 dt: 30.03.06
Item No. EXTENT OF POWERS DELEGATED TO
Ref. to Rule
Nature of power HEAD QUARTER OFFICERS
DIVISIONAL OFFICERS
Remarks
PHOD/ CHOD/ SA Grade
Other Officers
DRM / ADRM.
Other Officers
1 2 3 4 5 6 7
1.01 Rly.Bd letter No.F(X)II-2006/pw/
17dt: 04.12.2007
Sanction to Detailed Estimates chargeable to Capital, Capital Fund, Depreciation Reserve Fund, Development Fund, and Open Line Works Revenue
Works included in the approved programme for the year (a) Track Renewal Works
PHOD/ CHOD Up to Rs.50 crores SAG/CTE Up to Rs. 30 crores
DY CE (TRACK) Up to Rs.12Crores
Up to Rs 20Crores
SG/JA Grade Up to Rs.8 Crores
Note : Vetting of Associate Finance should be obtained in each case.
(b) Rolling stock items provided in the Rolling Stock approved Programme.
PHOD/ CHOD Rs.20 Crores SAG Up to Rs.10Crores
SG/JAG Up to Rs 3 crores
Nil Nil 1. Finance concurrence is necessary
(c) Other works including M&P items
PHOD/ CHOD Up to Rs.50 Crores SAG Up to Rs.30 Crores
SG /JA Grade Up to Rs.12 Crores
Up to Rs.15Crores
SG/JA Grade Up to Rs. 8 Crores
Note: 1.For works which are approved in Works Programme & M&P Programme.
2.Vetting of Associate Finance should be obtained in each case. 3.For the works sanctioned by General Manager, the estimate cost should be within the limit of General
Item No. EXTENT OF POWERS DELEGATED TO
Ref. to Rule
Nature of power HEAD QUARTER OFFICERS
DIVISIONAL OFFICERS
Remarks
PHOD/ CHOD/ SA Grade
Other Officers
DRM / ADRM.
Other Officers
1 2 3 4 5 6 7
Manager to sanction new works under the plan head. 4. For the works sanctioned in Divisional works programme, the estimate cost should be within the limit of DRM to sanction new works under the plan head.
Rly.Board L.No.2007/CE-1/CT/18 dt.07.03.2008
(d) Sanction of part estimates to incur expenditure towards preliminary activities viz.FLS, Geotechanical studies,Design, Preparation of plans, Drawings etc. as per Rly.Board L.No.2007/CE-1/CT/18 dt.07.03.2008
PHOD/ CHOD Up to Rs.1 Crores SAG Up to Rs.60 Lakh
Nil Nil Nil Note : 1. Finance concurrence is necessary 2. The cost of part estimate should not be more than 2% of the total value of the work.
Item No. EXTENT OF POWERS DELEGATED TO
Ref. to Rule
Nature of power HEAD QUARTER OFFICERS
DIVISIONAL OFFICERS
Remarks
PHOD/ CHOD/ SA
Grade
Other Officers
DRM / ADRM.
Other Officers
1 2 3 4 5 6 7
1.10 Rly.Bd letter
No.F(X)II-2006/pw/
17dt: 04.12.2007
Excess over Estimates sanction of - (A)For works included in approved Works Programme including Track Renewal Works and in approved Rolling Stock Programme
Rly.Bd letter No.F(X)II-2006/pw/ 17dt: 04.12.2007
(a) Increase in cost due to escalation.
Up to 80% of the original estimate within their power of sanction.
Up to 40% of the original estimate within their power of sanction.
Up to 40% of the original estimate within their power of sanction.
Nil
Rly.Bd letter
No.F(X)II-2006/pw/
17dt: 04.12.2007
(b) Increase in cost due to reasons other than escalation.
Up to 20 % of original estimate or 10 crore which ever is less within their power of sanction.
Nil
Nil
Nil
Note : (i) These are overall variations on the original estimate and cannot be exceeded even if more than one revised estimate is sanctioned.
(ii) This delegation will not affect rules in force regarding material modification.
WEST CENTRAL RAILWAY
No.: WCR/HQ/100/GA/38/Works Dated: 02.04.2013
CORECTION SLIP No. 20
Sub : Revision of SOPGEN Item No. 1.12 (a&b)
*********** The Item No. 1.12 (a) has been amendment and a new Item No. 1.12(b) is added in SOP Works Matters. It is requested that all officers and staff working under your control may be advised accordingly.
This is issued with approval of competent authority and finance concurrence. Enclosed: Item No. 1.12(a&b)
(Ajay Shrivastava)
DGM(G)/WCR/JBP
All PHOD/CHOD DRM-JBP, BPL, KTT CWM-BPL, KTT
Item no.
Nature of powers
Extend of powers delegated to Headquarter officers Divisional officers
PHOD/CHOD/SAG
Other Officers
DRM/ADRM
Other Officers
Remarks
WCR
Proposed 1.12(A)
Estimate for deposit works-To sanction estimate for works chargeable to other Govt. Deptt. Local bodies or private persons (except works to be executed in Loco carriage work shops)
Full Power Subject to the total aggregate
cost not exceeding their
power of sanction vide item No.1.01
& subject to Finance
concurrence and their share of the cost of the work being deposited by the applicant
prior to the commencement
of works.
SG/JA Grade Full Power
subject to the total aggregate
cost not exceeding their
power of sanction vide
item No.1.01 & subject to Finance
concurrence and their share of the cost of
the work being deposited by the applicant prior to the
commencement of work.
Full Power subject to the total aggregate cost not
exceeding their power of sanction
vide Item No. 1.01 &
subject to Finance
concurrence and their
share of the cost of the work being
deposited by the applicant prior to the commencement of work..
SG/JA Grade Full Power
subject to the total aggregate
cost not exceeding their
power of sanction vide item No. 1.01 and subject to
Finance concurrence
and their share of the cost of
the work being deposited by the applicant prior to the
commencement of work.
1. For works which are approved in works programme & M&P Programme. 2. Vetting of Associate Finance should be obtained in each case. 3. For the works sanctioned by General, the estimate cost should be within the limit of General Manager to sanction new works under the plan head. 4.For the works sanctioned in Divisional works programme, the estimate cost should be within the limit of DRM to sanction new works under the plan head.
5. CWMs in workshops shall exercise powers similar to DRM/ADRM in Divisions.
(B) For private and assisted siding
NIL NIL Full Power NIL 1. The detailed estimate for sidings shall be approved by DRM keeping the GM duly nominated. 2. However for the execution of common user facility by the party through railways approved contractors/consultants; approval of GM is required. 3. All other instructions contained in Railway Board letter No.99/TC/(FM)/26/I/Pt.II Dated 30.01.2012 has to be followed. 4. These powers are subject to the restrictions stipulated in Codes, Railway Board letters and GM’s instructions from time to time in particular provision of Para 1827(b).
West central Railway WCR/HQ/100/Sopgen/GA/38/Works Date: 16-09-2013
CORRECTION SLIP No.21 TO CHAPTER-I WORKS MATTERS OF SOP-2004 OF WCR
Item no. 1.19 & 1.20 is replaced as under
Item No.
Ref. to
Rule
Nature of Powers
Extent of powers delegated to
Remarks
Headquarter Officers Divisional Officers
PHOD/CHOD/SAG Other Officers DRM/ ADRM
Other Officers
1 2 3 4 5 6 7 REPLACED 1.19
Approval to invitation of tenders for works and services other than consultancy works. (a) Open tenders
PHOD/CHOD- Upto Rs. 50 cr. SAG- Upto Rs. 25 cr PCE/CAO (C) upto Rs. 80 cr. (Where AGM is not available)
SG/JAG upto Rs. 2 cr
DRM- Upto Rs.8 cr.
SG/JAG upto 2 cr
SS upto 20 lakh.
Rly. Bd’s L.no. 2007/CE-1/CT/18 dtd. 28.09.07 (CP- 209)
(b) To invite limited tender from approved (Monetary slabs for limited tenders)
PHOD – More than Rs.1cr and up to Rs. 5 cr in each case. SAG- More than Rs. 25 lakhs and up to Rs.1 cr in each case.
Dy CE (C) / SG/JAG up to Rs. 25 lakhs in each case.
DRM- More than Rs. 25 lakhs and up to Rs. 1 cr. in each case.
Sr. DEN- up to Rs. 25 lakhs in each case
1. Limited tenders should be invited from the contractors borne on the “Approved List”. 2. Notice for inviting limited tenders shall be published in local news papers and displayed on the notice board kept in the concerned “Railway Office” and also put up on internet, wherever possible. It will be the duty of the prospective tenderers to keep track of the tender notices issued through any of these media. 3. Invitation of limited tenders more than Rs. 5 crore will require the approval of Railway Board. 4. Contractors approved in the higher monetary slab for a particular category of work may not be allowed to participate for works in the lower monetary slab unless they are separately registered in the lower monetary slab for a particular category of work
Rly. Bd’s L.no. 94/CE-I/CT/4 dtd. 17.10.02, 04.06.03 & 11.06.03
(c) To invite Special Limited Tenders.
1) Special Limited Tenders may be adopted in the following situations in consultation with FA&CAO or FA&CAO(C) as the case may be:-
(a) Works of specialized nature (to be approved by PHOD/CHOD personally) (b) Work of urgent nature (to be approved by the GM personally) (c) Consultancy works (to be approved by the GM personally). In Construction Projects, the consultancy work will be
approved by CAO(C) within his power. 2) Special Limited Tenders may be invited from specialized and reputed Contractors/Organizations/Agencies. 3) A proposal detailing the circumstances and the necessity for going in for Special Limited Tenders should be
initiated and got concurred by FA&CAO (in respect of open line) and FA&CAO (C) in respect of Construction Organization before personal approval of the PHOD is obtained.
4) Tenders from whom special limited tenders are to be invited should preferably be more than six but not less than four.
5) Tenderers need not necessarily be borne on the “Approved list”.
Rly. Bd’s L. no. 97/CE-I/
CT/32 dt. 27.08.97
(d) single tender with finance concurrence in emergency and restoration works.
For PHOD/CHOD upto 20 lacs per case, ceiling limit 1 cr in a year.
Nil DRM upto 10 lacs per case ,ceiling limit 50 lacs in a year
Nil Note :
1. Single Tender to be invited only in case of Accidents,
Breaches.
2. In other situation, Single tender can be invited with personal approval of GM subject to following provision.
(i) Prior concurrence of FA&CAO is obtained.
(ii) No Post Facto sanction /ratification will be allowed.
(iii) Single tender should be resorted to only after exhausting the Open tender/Special limited tender routes
(iv) Tight targets and urgency cannot be accepted as a reason for calling Single tender. (v) The instructions contained in Board’s letters cited under Col.1 shall be strictly followed
Note- For item no. 1.19 (c) SPECIAL LIMITED TENDER:
1. Special limited tender may be adopted in the following situation in consultation with FA&CAO. (a). Works of specialized nature (to be approved by PHOD/CHOD personally). (b) Works of urgent nature (to be approved by GM personally). (c ) Consultancy work (to be approved by GM personally). 2.CAO(C)with concurrence of FA& CAO(C)may invite SLT not only for specialized nature of works but all types of works depending upon merit of the case 3. Special limited tender may be invited form specialized/reputed contractors/organizations/agencies. 4.A proposal detailing the circumstances and necessity for going in for SLT should be initiated and got concurred by FA&CAO in respect of open line and FA&CAO (C) in respect of construction organization before personal approval of PHOD/CHOD is obtained. 5. Tenderers from whom SLT are to be invited should preferably more than six but not less than four.
6. Tenderers need not necessarily be borne on the approved list.
Two Packet tendering system may be adopted in specifically identified situations for obtaining consultancy services for highly technical works where parameters can not be precisely pre-defined or for execution of works which are either technically complicated or specialized in nature and/or which are executed rarely.
2. The “qualifying criteria” in respect of two packet tender system in the tender documents for selecting the tenderer should be precisely defined
duly concurred by FA&CAO/FA&CAO(C) and approved by GM/CAO .
Authority : Bd. Letter no 94/CE-I/CT/4 Dated 17.10.02
REPLACED 1.20
Item 47
of Bd’s
L.No. F(X)II-2010/pw/ 2dt: 11.10.2010
Tender Committee for
consideration of tenders
and/or for conducting
negotiations with the
tenderers in respect of
tenders other than single
tender (works tender).
(i) Open Line/construction
See Note under remarks column
See Note under remarks column
See Note under remarks column
See Note under remarks column
Note : Composition of tender
committee is shown in
Annexure I (for Open line &
Construction). In case of
Single tenders, Tender
Committee should be one
step higher than in
case of open
tenders/limited tenders
except where GM is the
accepting authority.
This is issued with approval of competent authority and finance concurrence.
(AJAY SRIVASTAVA)
DGM(G)/WCR/JBP
All PHODs/CHODs,
DRM/JBP, BPL, KTT
CWM/BPL, KTT
As per Central Railway Annex II COMPOSITION OF TENDER COMMITTEE FOR O/L & CONST.-(WORKS CONTRACT) Annexure-I
Sr.No. Value of Lowest Tender inclusive of
all taxes Composition of Tender Committee Tender Accepting Authority
1. Tender costing over Rs. 10,000/- and upto Rs. 20 Lakh
a. Sr. Scale Officer of the concerned Executive Deptt. (Convener) b. Jr. Scale/Sr. Scale Officer from Accounts Deptt.
JAG Officer
2. Tender costing over Rs. 20 Lakh and upto Rs. 30 Lakh
a. Sr. Scale Officer of the concerned Executive Deptt. (Convener) b. Sr. Scale Officer of any other Executive Deptt. c. Jr. Scale Officer from Accounts Deptt.
SG/JAG Officer
3. Tender costing over Rs. 30 Lakh and upto Rs. 2 Cr
a. Sr. Scale Officer of the concerned Executive Deptt. (Convener) b. Sr. Scale Officer of any other Executive Deptt. c. Jr. Scale Officer from Accounts Deptt.
SG/JAG Officer
4. a. Tender costing over Rs. 2 Cr and upto Rs. 5 Cr
a. SG/JA Grade Officer of the concerned Executive Deptt. (Convener) b. SG/JA Grade Officer of any other Executive Deptt. c. JAG/independent incharge in Sr. Scale of Accounts Deptt.
SAG Officer in construction DRM/ADRM in Division
b. Tender costing over Rs. 5 Cr and upto Rs. 8 Cr
a. SG/JA Grade Officer of the concerned Executive Deptt. (Convener) b. SG/JA Grade Officer of any other Executive Deptt. c. SG/JA Grade Officer of Accounts Deptt.
SAG Officer in construction DRM/ADRM in Division
5. Tender costing over Rs. 8 Cr and upto Rs. 15 Cr
a. SAG Officer of the concerned Executive Deptt. (Convener) b. SAG Officer of other Executive Deptt. Nominated by PHOD/CHOD c. SAG Officer of Accounts Deptt.
PHOD/CHOD
6. Tender costing over Rs. 15 Cr and upto Rs. 50 Cr
a. SAG Officer of the concerned Executive Deptt. (Convener) b. SAG Officer of other Executive Deptt. Nominated by PHOD/CHOD c. SAG Officer of Accounts Deptt.
PHOD/CHOD
7. Tender costing over Rs. 50 Cr and upto Rs. 100 Cr
a. PHOD/CHOD of executive deptt. (Convener) b. PHOD/Co-ord. HOD of any other Executive Deptt. Nominated by GM. c. FA&CAO
GM
8. Tender costing over Rs. 100 Cr a. PHOD/CHOD of executive deptt. (Convener) b. PHOD/Co-ord. HOD of any other Executive Deptt. Nominated by GM. c. FA&CAO
To be sent to Railway Board through General Manager
WEST CENTRAL RAILWAY
No.: WCR/HQ/100/GA/38/Works Dated: 25.10.2013
CORRECTION SLIP No.22 TO CHAPTER-I
WORKS MATTERS OFSOP-2004 OF WCR
Sub : Corrigendum to Correction Slip No. 21 of SOP Chapter 1/2004, Works Matter.
***********
The item no. 1.20 of Correction Slip No. 21 in Annexure I Composition of Tender Committee for O/L & Const.-(Work Contract) Chapter 1 of SOP for Works matter 2004 may be amended and replaced by revised Annexure I.
This is issued with approval of competent authority and finance concurrence.
Attached: Revised Annexure I.
(Sudhir Sarvaria) DGM(G)/WCR/JBP
All PHOD/CHOD DRM-JBP, BPL, KTT CWM-BPL, KTT
Annexure-I
COMPOSITION OF TENDER COMMITTEE FOR O/L & CONST.-(WORKS CONTRACT)
Sr.No. Value of Lowest Tender inclusive of all
taxes
Composition of Tender Committee Tender Accepting Authority
1 Tender costing over Rs. 10,000/- and
upto Rs. 20 Lakh
a. Sr. Scale Officer of the concerned Executive Deptt.
(Convener)
b. Jr. Scale/Sr. Scale Officer from Accounts Deptt.
JAG Officer
2 Tender costing over Rs. 20 Lakh and
upto Rs. 30 Lakh
a. Sr. Scale Officer of the concerned Executive Deptt.
(Convener)
b. Sr. Scale Officer of any other Executive Deptt.
c. Jr. Scale Officer from Accounts Deptt.
SG/JAG Officer
3 Tender costing over Rs. 30 Lakh and
upto Rs. 2 Cr
a. Sr. Scale Officer of the concerned Executive Deptt.
(Convener)
b. Sr. Scale Officer of any other Executive Deptt.
c. Sr. Scale Officer from Accounts Deptt.
SG/JAG Officer
4 (a) Tender costing over Rs. 2 Cr and
upto Rs. 5 Cr
a. SG/JA Grade Officer of the concerned Executive Deptt.
(Convener)
b. SG/JA Grade Officer of any other Executive Deptt.
c. JAG/independent incharge in Sr. Scale of Accounts Deptt.
DRM/ADRM in Division. SAG
Officer in W/S, construction & HQ.
(b) Tender costing over Rs. 5 Cr and
upto Rs. 8 Cr
a. SG/JA Grade Officer of the concerned Executive Deptt.
(Convener)
b. SG/JA Grade Officer of any other Executive Deptt.
c. SG/JA Grade Officer of Accounts Deptt.
DRM/ADRM in Division. SAG
Officer in W/S, construction & HQ.
5 Tender costing over Rs. 8 Cr and upto
Rs. 15 Cr
a. SAG Officer of the concerned Executive Deptt. (Convener)
b. SAG Officer of other Executive Deptt. nominated by
PHOD/CHOD
c. SAG Officer of Accounts Deptt.
PHOD/CHOD
6 Tender costing over Rs. 15 Cr and upto
Rs. 50 Cr
a. SAG Officer of the concerned Executive Deptt. (Convener)
b. SAG Officer of other Executive Deptt. nominated by
PHOD/CHOD
c. SAG Officer of Accounts Deptt.
PHOD/CHOD
7 Tender costing over Rs. 50 Cr and upto
Rs. 100 Cr
a. PHOD/CHOD of executive deptt. (Convener)
b. PHOD/Co-ord. HOD of any other Executive Deptt. nominated
by GM.
c. FA&CAO
GM
8 Tender costing over Rs. 100 Cr a. PHOD/CHOD of executive deptt. (Convener)
b. PHOD/Co-ord. HOD of any other Executive Deptt. nominated
by GM.
c. FA&CAO
To be sent to Railway Board through
General Manager