Post on 28-Apr-2015
STT200 CONCISE MANUAL
- 1 - EURC1.0.1.ENG
TOWER CRANE STT200 CONCISE MANUAL
- 2 - EURC1.0.1.ENG
- 3 - EURC1.0.1.ENG
- 4 - EURC1.0.1.ENG
- 5 - EURC1.0.1.ENG
STT2
00 C
ON
CISE
MA
NU
AL
- 6
- EU
RC
1.0.
1.EN
G
- 7
-
EUR
C1.
0.EN
G
-8- EURC1.0.ENG
PREFACE
Dear Customer
Jinlong Europe, a revolutionary evolution!
Reliability, quality, safety, and high technology are the success of Yongmao�s topless tower cranes all over the world.
In Europe all our cranes are CE approved. This is the result of a constant technological research.
The absence of tie-bars allows an optimized erection (quicker and safer).
The use of small sized mobile cranes saves air space. The best solution for installation in job sites next to airports or in the city with several cranes in use and interfering working areas.
Because of our relentless efforts to improve our products, technical updates are from time to time necessary. Therefore, the technical data in this manual are subject to change without warning.
Topless tower cranes, a revolutionary evolution.
Jinlong Europe
Zandvoorstraat 10/6 2800 Mechelen, Belgium
Tel: ++ 32/15 28 54 54 � Fax: ++32/15 20 96 80
Jinlong Europe UK & Ireland
Unit 14 The Enterprise Centre, Cranborne Road, Potters Bar EN6 3DQ Hertfordshire� U.K.
Tel: ++ 44/ 1707 600 199 � Fax: ++44/ 1707 600 188
-9- EURC1.0.ENG
CONTENTS
CHAPTER 1. TECHNICAL DATA........................................................................................... 111
1.1. SPECIFICATIONS.........................................................................................................................................12 1.1.1. MAST 2X2M L68A1.................................................................................................................................12 1.1.2. MAST 2X2 M � L68A1 � CHASSIS 6 X 6 M ............................................................................................12 1.1.3 MAST 1,6 X 1,6 M � S15 � CHASSIS 4,5 X 4,5 M.....................................................................................15
1.2. PREPARING THE CONSTRUCTION SITE ................................................................................................17 1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY............................................................................................17
1.2.1.1. INTRODUCTION...............................................................................................................................17 1.2.1.2. DIMENSIONS....................................................................................................................................18
1.3. CONCRETE FOUNDATION FOR FOUNDATION ANCHORS..................................................................20 1.3.1. PREPARATION.........................................................................................................................................20 1.3.2. SOIL PRESSURE AND CHOICE OF CONCRETE BLOCKS ON FIXING ANGLES................................21
1.3.2.1. STANDARD CONFIGURATION .......................................................................................................21 1.3.3. DIMENSIONAL FEATURES OF THE FOUNDATION ANCHORS ..........................................................26 1.3.4. INSTALLING THE FOUNDATION ANCHORS .......................................................................................27
1.4. CENTRAL BALLAST....................................................................................................................................29 1.4.1. INTRODUCTION .....................................................................................................................................29 1.4.2. CENTRAL BALLAST DETAILS ..............................................................................................................31
1.5. COUNTER-JIB BALLAST ............................................................................................................................33 1.5.1. INTRODUCTION .....................................................................................................................................33 1.5.2 DIMENSION OF COUNTER-JIB BALLAST.............................................................................................34
1.6. RE-REEVING (SEE FIG. 2.4.4.2.3-1).............................................................................................................41 1.6.1. FROM DUAL REEVING TO SINGLE REEVING....................................................................................41 1.6.2. FROM SINGLE REEVING TO DUAL REEVING.....................................................................................43
CHAPTER 2. WINCH UNIT ......................................................................................................45
2.1. EXPLANATION OF THE SYMBOLS...........................................................................................................46
2.2. COMPOSITION OF THE WINCH UNIT .....................................................................................................46
2.3. OPERATING PRINCIPLE.............................................................................................................................47
2.4. PARTS AND MAINTENANCE......................................................................................................................48 2.4.1. PROGRAMMABLE PLC CONTROLLER ................................................................................................48 2.4.2. FREQUENCY CONVERTER....................................................................................................................49
2.4.2.1. DIGITAL ACTUATOR USE DIRECTIONS........................................................................................49 2.4.2.2. OPERATING FUNCTIONS................................................................................................................50
-10- EURC1.0.ENG
CHAPTER 3. SLEWING MECHANISM...................................................................................57
3.1. EXPLANATION OF THE SYMBOLS...........................................................................................................58 3.1.1. DESCRIPTION .........................................................................................................................................58
3.2. SLEWING UNIT.............................................................................................................................................59 3.2.1. DESCRIPTION .........................................................................................................................................59 3.2.2. OPERATION.............................................................................................................................................60 3.2.3. RTC SCHEMATIC DIAGRAM .................................................................................................................62
3.3. MALFUNCTIONS..........................................................................................................................................64
3.4. SLEW BRAKE................................................................................................................................................66 3.4.1. RELEASING THE BRAKE MANUALLY (SEE FIG. 3-4-1)......................................................................66 3.4.2. ELECTRICALLY CONTROLLED WEATHERVANING ...........................................................................69
3.4.2.1. DESCRIPTION...................................................................................................................................69 3.4.2.2. OPERATING PRINCIPLE ..................................................................................................................69
3.4.3. SLEWING BRAKE MAINTENACE .........................................................................................................70 3.4.4. WIRING DIAGRAM (ZIE FIG. 5.4.4-1) ....................................................................................................71
CHAPTER 4. TROLLEY WINCH ..............................................................................................72
4.1. EXPLANATION OF SYMBOLS....................................................................................................................73
4.2. COMPOSITION OF THE TROLLEY WINCH UNIT..................................................................................74
4.3. TROLLEY BRAKE ........................................................................................................................................76 4.3.1. DESCRIPTION (SEE FIG. 6.3.1-1) ............................................................................................................76
4.4. WIRING DIAGRAM ......................................................................................................................................78
STT200 CONCISE MANUAL
-11- EURC1.0.ENG
CHAPTER 1. TECHNICAL DATA
STT200 CONCISE MANUAL
12
1.1. SPECIFICATIONS
1.1.1. MAST 2X2M L68A1 1.1.2. MAST 2X2 m � L68A1 � CHASSIS 6 X 6 m
Fig.1.1.1-a
3.0t
4.3t
3.7t
2.7t50m
40m
44m
54m
60m
62.0m
12t 3.6m
16.2m
30m
6.0t
5.2t
34m
2.2t
3.0m
3.8m
STT200 CONCISE MANUAL
13
Table 1.1.1-a
Fig.1.1.2a
R Fall R(max
) m
C(max) t
20 25 30 34 40 44 50 54 60
IV 14.20 12.0 7.94 6.34 4.76 4.03 3.22 2.80 2.30 2.04 1.70 60 II 25.80 6.0 6.00 6.00 5.05 4.37 3.61 3.22 2.76 2.51 2.20
IV 14.80 12.0 8.37 6.69 5.05 4.29 3.44 3.00 2.48 2.20 54 II 27.30 6.0 6.00 6.00 5.39 4.67 3.87 3.46 2.97 2.70
IV 14.90 12.0 8.43 6.75 5.09 4.32 3.46 3.02 2.50 50
II 27.60 6.0 6.00 6.00 5.46 4.73 3.91 3.50 3.00 IV 15.40 12.0 8.79 7.05 5.34 4.54 3.65 3.20
44 II 28.90 6.0 6.00 6.00 5.75 4.99 4.14 3.70 IV 15.70 12.0 9.02 7.25 5.51 4.70 3.80
40 II 29.90 6.0 6.00 6.00 5.98 5.18 4.30 IV 15.60 12.0 8.96 7.22 5.50 4.70
34 II 30.00 6.0 6.00 6.00 6.00 5.20 IV 15.50 12.0 9.16 7.56 6.00
30 II 30.00 6.0 6.00 6.00 6.00
H
197. 4mH
616263
17
123456789
1213141516
1011
484950
17
123456789
1213141516
1011
393837
17
123456789
1213141516
1011
252627
17
123456789
1213141516
1011
17
123456789
1213141516
1011
3m
117m
153m
81m 81m
45m45m45m
59. 4m
89. 4m
125. 4m
161. 4m
H
H
H
2423
2726252423
2726252423
2726252423
3536
3938373635
3938373635
47
5049484746
6059
51
7.5m
22.93
H(m)
2x2m
17
1516
53.4
56.4
59.4H(m)
1213
11
10
44.4
38.4
41.4
47.4
32.4
26.4
23.4
29.4
8
5
67
9 35.4
14 50.4
7.5m
3m12
.4m
20.4
17.4
11.4
14.4
43
12
0.15
m
7.5m
3m
2x2m
6mx6m
10
1211
13
1514
16
F2 F3F1
L68G
21
L68G
21
L68B1
L68B1
58.9
61.9
52.9
55.9
46.9
937.9
40.9
43.9
76 31.9
34.9
4 25.9
28.95
8
49.9
216.9
19.9
1L68A1
L68A1
L68G22
STT200 CONCISE MANUAL
14
Table 1.1.2-a
F2 129t 161t F1 87.5t 130t F3 84t 121t 102t
107t In service Out of service Crane weight without load
or ballast with longest jib and at maximum height.
Crane mechanism specifications
Table 1.1.2-3
Speed/ Hoist weight Name Code
m/min t m/min t Rope capacity Motor
kW
55LFV30 0�44
0�53 0�88
6.0 4.8 1.2
0�22 0�27 0�44
12.0 9.6 2.4
580m >580m* 55
Hoisting
70RCS30 0�40 0�80
6.0 3.0
0�20 0�40
12.0 6.0
550m >550m* 51.5
Trolleying DTC120 0→68 m/min 120N.m
RTC290 0�0.8 rpm 2x 145N.m Slewing
YMD100 0�0.8 rpm 2x10.5 Traveling RT 12.5-25m/min 4x2.6/5.2
* Please consult us
STT200 CONCISE MANUAL
15
1.1.3 MAST 1,6 x 1,6 m � S15 � CHASSIS 4,5 x 4,5 m
Fig. 1.1.2-1
Table 1.1.2-2
STT200 CONCISE MANUAL
16
Table 1.1.2a
F2 129t 161t F1 81.2t 61t F3 84t 121t 102T
107T In service Out of service Craneweight without load
or ballast with longest jib and maximum height.
Crane mechanism specifications
Table 1.1.3a
Speed / Hoist weight Name Code
m/min t m/min t Rope capacity Motor
kW
55LFV30 0�44
0�53 0�88
6.0 4.8 1.2
0�22 0�27 0�44
12.0 9.6 2.4
580m >580m* 55
Hoisting
70RCS30 0�40 0�80
6.0 3.0
0�20 0�40
12.0 6.0
550m >550m* 51.5
Trollying DTC120 0→68 m/min 120N.m
RTC290 0�0.8 rpm 2x 145N.m Slewing
YMD100 0�0.8 rpm 2x10.5 Travelling RT 12.5-25m/min 4x2.6/5.2
* Please consult us
STT200 CONCISE MANUAL
17
1.2. PREPARING THE CONSTRUCTION SITE 1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY 1.2.1.1. INTRODUCTION This brochure provides the dimensions of the space requirements
for the crane.
They consist of two sets:
- The entire crane with indication of the most important
dimensions.
- The crane is shown in three parts:
− Foundation anchors and undercarriage
− Mast composition
− Range and jib length
Based on the provided dimensions, you can prepare the assembly of the crane. ATTENTION: The provided dimensions do not take account of sagging
under load or any manufacturing tolerances.
STT200 CONCISE MANUAL
18
1.2.1.2. DIMENSIONS 1.2.1.2.1. Total crane
Fig.1.2.1-1
5 2. 0x2. 0x3. 0m1
2. 1m16. 2m 60. 0m
2. 0x2. 0x3. 0m
6x6m
20 18 17 12 11109
7
13 14 16 15
2
3
4
6
8
19
STT200 CONCISE MANUAL
19
N° Name N° Name
1 Foundation anchor 11 Slewing mechanism
2 Brace strut 12 Tower head
3 Central ballast (untercarriage) 13 Jib
4 Bogie 14 Trolley mechanism
5 Mast section 15 Trolley
6 Mast section 16 Hook assembly
7 Telescoping cage 17 Counter jib
8 Telescoping mechanism 18 Hoist mechanism
9 Lower slewing 19 Electric control system
10 Upper slewing 20 Counterweight
STT200 CONCISE MANUAL
20
1.3. CONCRETE FOUNDATION FOR FOUNDATION ANCHORS 1.3.1. PREPARATION TO BE PREPARED BY THE CLIENT:
The concrete foundation of the foundation anchors must be executed on basis of
the parameters in Table 1.3.2.1.
ATTENTION: The listed parameters are minimum values to be observed,
taking account of the stability requirements of the crane.
Please contact us in case of deviating conditions1.
1 Jinlong Europe � Zandvoorstraat 10/6 � 2800 Mechelen � Belgium - Tel: ++ 32/ 15 28 54 54 � Fax: ++32/ 15 20 96 80 and � Jinlong Europe UK & Ireland � Unit 14 The Enterprise Centre, Cranborne Road, Potters Bar � EN6 3DQ Hertfordshire � U.K. Tel: ++ 44/ 1707 600 199 � Fax: ++44/ 1707 600 188
STT200 CONCISE MANUAL
21
h
lb
eFg
FvFh
Mv
1.3.2. SOIL PRESSURE AND CHOICE OF CONCRETE BLOCKS ON FIXING ANGLES. 1.3.2.1. STANDARD CONFIGURATION
Mv: Over turning moment(kNm)
Fv: Crane weight(kN) Fh: Horizontal force(kN)
L: Jib length(m) n: Mast section n° (stationary) YM: Types of concrete blocks Fg: Concrete block weight ES: In service HS: Out of service
e: Offset(m) b: Dimension of concrete blocks(m)
pB: Soil pressure(kN/m2) [pB]: Admissible soil pressure(kN/m2)
Table 1.3.1-1
H n R=60 Es Hs
Mv 2824 3756
Fh 35 145 59.4 17
Fv 912 812
Table 1.3.1-2 H n YM101N YM126N YM142N YM169N
Fg 1010 1260 1420 1690
pB 341 181 218 159
b 5.60 6.25 5.90 6.45 59.4 17
h 1.35 1.35 1.70 1.70
3b
FFhFMe
gv
hv ≤+
⋅+=
[ ]BgvB p
blFF
p ≤+
=3
)(2
3b
FFhFMe
gv
hv ≤+
⋅+=
STT200 CONCISE MANUAL
22
M101N
L=560cm;I=560cm;H=135cm;V=42m3
2 33HA25x625 ( e=17)
2 33HA25x625 ( e=17)
135 70
555
555
1 33HA25x625 ( e=17)
1 33HA25x625 ( e=17)
560
560
55520 20
555
280
130
11x11HA16x155 ( e=51)3
STT200 CONCISE MANUAL
23
M126N
L=625cm;I=625cm;H=135cm;V=53m3
625
D: 2. 4
625
7013
5
1 52HA25x690 ( e=12)
2 52HA25x690 ( e=12)
201 52HA25x680 ( e=12)
2 52HA25x680 ( e=12)
2020620
20620
20610
20610
20
3 14x14=196HA16 ( e=48)
20
130
STT200 CONCISE MANUAL
24
M142N
L=590cm;I=590cm;H=170cm;V=59m3
590
D: 2. 4
170
70
620
20
20 20
620
2 38HA25x655 ( e=15. 5)
1 38HA25x655 ( e=15. 5)20
202 38HA25x645 ( e=15. 5)
1 38HA25x645 ( e=15. 5)59
0
58520
585
20 20
3 12x12=144HA16x190 ( e=46. 5)
130
STT200 CONCISE MANUAL
25
M169N
L=645cm;I=645cm;H=170cm;V=71m3
170
70
20640
20
2 55HA25x710 ( e=12)
1 55HA25x710 ( e=12)
6401 55HA20x700 ( e=11. 8)
2 55HA20x700 ( e=11. 8)20
20
645
D: 2. 4
64020
20
3 13x13=169HA20x190 ( e=47)
645
20640
20
165
STT200 CONCISE MANUAL
26
1.3.3. DIMENSIONAL FEATURES OF THE FOUNDATION ANCHORS
The foundation anchors are placed symmetrically in the foundation block and
are to form a 2-by-2 m square, based on the dimensions of the mast to be
erected (see Fig. 1.3.3-1).
The distance between the topside of the mounting plate and the topside of the
foundation block must be 150 mm.
Fig.1.3.3-1
ATTENTION: Cutting or reducing the reinforcement in the foundation is
prohibited.
2000
Earthing
600
600
150
2000
STT200 CONCISE MANUAL
27
1.3.4. INSTALLING THE FOUNDATION ANCHORS The foundation anchors are mounted by means of:
− 4 foundation anchors and 8 associated pins − 1 foundation framework and 8 associated pins − 1 standard mast section − 1 plumb line or measuring device
- Check the framework for any deformation during transport. The difference between respectively the diagonals and the bearing surface heights may be at the most 2 mm.
- Install the foundation anchor on the reinforcement and adjust by means of filling plates.
- Check perpendicularity in both directions after assembly of the lower mast section on the framework. Adjust if necessary.
- Pour the concrete block and wait until it is completely hardened before removing the mast section and the framework
STT200 CONCISE MANUAL
28
150
Plumb line
Standard section
2 Pins in each corner
Perpendicular
4 Fixing angles
2 Pins in each corner
Fig.1.3.4-1
Mast section
Perpendicular
STT200 CONCISE MANUAL
29
1.4. CENTRAL BALLAST 1.4.1. INTRODUCTION The central ballast consists of reinforced concrete blocks symmetrically placed on the undercarriage for the chassis. The blocks are marked with the letters C or D. Required minimum soil pressure: 2.0 kg/cm2 (200kN/m2). The central ballast must be composed according to the table below (taking account of the mast composition). The ballast is to be supplied by the client in accordance with Fig. 1.4.2-1, 1.4.2-2. - CHASSIS L68A1
CP HUH NR ND LD 2+1+1 13.4m 3 6C+6D 31.8t 2+2+1 14.4m 3 6C+6D 31.8t 2+3+1 17.4m 3 6C+6D 31.8t 2+4+1 20.4m 3 6C+6D 31.8t 2+5+1 23.4m 3 6C+6D 31.8t 2+6+1 26.4m 3 6C+6D 31.8t 2+7+1 29.4m 3 6C+6D 31.8t 2+8+1 32.4m 3 6C+6D 31.8t 2+9+1 35.4m 3 6C+6D 31.8t
2+10+1 38.4m 3 6C+6D 31.8t 2+11+1 41.4m 3 6C+6D 31.8t 2+12+1 44.4m 3 6C+6D 31.8t 2+13+1 47.4m 4 8C+8D 42.4t 2+14+1 50.4m 6 12C+12D 63.6t 2+15+1 53.4m 7 14C+14D 74.2t 2+16+1 56.4m 8 16C+16D 84.8t 2+17+1 59.4m 10 20C+20D 106.0t
CP: Mast composition
HUH: Hook height
NR: Number of layers
ND: Number of blocks
LD: Ballast obtained
DC CD
STT200 CONCISE MANUAL
30
- TYPE YZ48X
B blok A blok A blok A blok A blok A blok A blok
CP HUH NR ND LD 2+1+1 13.9m 7 6A+1B 70.2t 2+2+1 19.4m 7 6A+1B 70.2t 2+3+1 23.9m 7 6A+1B 70.2t 2+4+1 29.4m 7 6A+1B 70.2t 2+5+1 34.9m 7 6A+1B 70.2t 2+6+1 40.4m 7 6A+1B 70.2t 2+7+1 45.9m 7 6A+1B 70.2t
STT200 CONCISE MANUAL
31
R20
115
(※)
250
450
900
420
750
100500
1 2
150
7501500
3
250
4
540
R10R30
R30
220
1
2
220
1.4.2. CENTRAL BALLAST DETAILS
C
Fig. 1.4.2-2
All dimensions tolerances: ±1cm
Rep : Serial No. & : Diameter N : Quantity Lu : Unit length cm Lt : Total length cm Form: Form M : Material
REP & mm N L.u L.t Form M
1 40 2 50 100 2 10 8 90 720 ※
3 10 4 220 880 4 10 3 160 480
Q23
5-B
Reinforced concrete
P:2800kg D:2.3
STT200 CONCISE MANUAL
32
R20
115
(※)
220
450
900
420
750
100500
1
150
250
500
2
1500
3
R10R30
R30
220
1
2
250
4
750
540
500
D
Fig. 1.4.2-2
All dimensions tolerances: ±1cm
Rep : Serial No. φ : Diameter N : Quantity L.u : Unit length cm L.t : Total length cm Form : Form M : Material
REP & mm N L.u L.t Form M
1 40 2 50 100 2 10 8 90 720 ※
3 10 4 220 880
4 10 3 160 480
Q23
5-B
Reinforced concrete
P:2500kg D:2.3
All authorized dimensions +/- 1 cm
Pos: Reference & Diameter in mm
N Number
Lu Length in cm
Lt Total length in cm
Form Reinforcement type
M Material
STT200 CONCISE MANUAL
33
1.5. COUNTER-JIB BALLAST 1.5.1. INTRODUCTION
The counter-jib ballast consists of various reinforced concrete blocks A, B or
C. The counter-jib ballast is governed by the length of the jib. These blocks are
suspended one by one at the rear of the counter-jib.
The ballast is to be supplied by the client in accordance with Fig. 1.5.2-1.
During installation, care must be taken to ensure that they cannot be chipped or
become loose while operating the crane.
Composition and structural dimensions are dealt with in point 5.2.
The admissible tolerance is 500
+ kg per block. To allow for concrete density
changes, alter dimension X to bring the blocks within the indicated tolerance.
We recommend weighing the concrete blocks and marking their weight with
paint on a visible side of the block.
STT200 CONCISE MANUAL
34
1.5.2 DIMENSION OF COUNTER-JIB BALLAST
Length of jib 30 34 40 44 50 54 60
Length of counter jib 16.2 16.2 16.2 16.2 16.2 16.2 16.2
Blocks 2A+B+C 3A 3A+C 3A+B 4A 4A+C 4A+B During working
and telescoping weight(kg) 11000 12000 13000 14000 16000 17000 18000
Block type Density (t/m3) Weight(kg) Tolerance
A 2.4 4000 ±1%
B 2.4 2000 ±2%
C 2.4 1000 ±2%
The dimension and parameter of counterweight see the following counterweight drawing in details.
STT200 CONCISE MANUAL
35
STT200 CONCISE MANUAL
36
STT200 CONCISE MANUAL
37
T 742719-1 4000 kg
STT200 CONCISE MANUAL
38
T 742719-2 2000 kg
STT200 CONCISE MANUAL
39
T 742719-3 1000 kg
STT200 CONCISE MANUAL
40
STT200 CONCISE MANUAL
41
1.6. RE-REEVING (SEE FIG. 2.4.4.2.3-1) 1.6.1. From dual reeving to single reeving
- Bring the trolley against the jib foot and fasten it.
- Lower the hoist hook down to the ground (vertical position).
- Remove the connecting pin (8), connecting arm (5) and single hook block (4).
- Reinstall the connecting pin (8) on the single hook block and secure it with cotter pins.
- Fig.2.4.4.2.3-1
8
9
4 3
5
STT200 CONCISE MANUAL
42
Hoist the single hook block (4) against the trolley (jib) (see Fig. 2.4.4.2.3.1-2).
- Remove the trolley connection pin (8) between both trolleys (1) and (2).
- When the trolley (2) is being run out, both trolleys become separated.
- Reinstall the connecting pin (8) and cotter pins (9) on the rear trolley.
- This concludes the transition from dual (4-rope) reeving to single (2-rope) reeving.
Fig.2.4.4.2.3-2
ATTENTION:
- If operating a significant amount of time with single reeving, the following periodic maintenance must be performed.
- Convert to dual reeving; let the trolley run a few times over the entire jib length while veering and hoisting the load hook over the entire hoisting height.
- Revert to single (2-rope) reeving
8
9
1 2
4
STT200 CONCISE MANUAL
43
1.6.2. From single reeving to dual reeving
- Bring the front trolley (2) against the rear trolley (1) (opposite the jib foot).
- Press the switch button on the operating panel.
- Connect both trolleys with the connecting pin (8) and secure it with the cotter pins (9).
- Lower the single hook block (4) down to the ground.
- Connect both hook blocks (4 and 3) by means of the fittings (8, 9 and 10) (see Fig. 2-5-10).
- This concludes the transition from single to dual reeving.
Fig.2.4.4.2.3.1
8
9
2
4
3
6
STT200 CONCISE MANUAL
44
ATTENTION:
- Working in single reeving configuration with cranes installed above freestanding mast height.
- The crane is designed to work with single reeving up to the maximum freestanding height.
- In case of higher heights, an imbalance can occur. Please contact us on this. In that case, the hook blocks must be ballasted, which will lead to diminished hoisting capacities.
- The traveling wheel (nylon wheel) of the trolley must be replaced every two year.
STT200 CONCISE MANUAL
45
CHAPTER 2. WINCH UNIT
STT200 CONCISE MANUAL
46
2.1. EXPLANATION OF THE SYMBOLS LFV (EX. 90LFV60) 2.2. COMPOSITION OF THE WINCH UNIT The LFV winch unit consists of the following components: See Fig. 4.2-1
Fig. 4.2-1 - Frequency controlled driving motor (1) - Brake mechanism (2) - Gear box (3) - Hoisting drum (4) - Limiter (5) - Motor ventilator (6) - Support frame [chassis] (7)
Speed code, D for high speed motor Load capacity of single wire Frequency controlled Motor power in kW
STT200 CONCISE MANUAL
47
2.3. OPERATING PRINCIPLE
The LFV frequency controlled system allows conversion of the 3-phase supply (through an AC transformer) to a frequency controlled supply voltage. Schematic electric diagram:
XL Joystick PLC Programmable controller Lfa Brake PG Converter LM Hoisting motor frequency-converter
STT200 CONCISE MANUAL
48
2.4. PARTS AND MAINTENANCE 2.4.1. PROGRAMMABLE PLC CONTROLLER
The PLC must be checked regularly for proper operation.
Part Description Parameter
Supply voltage PLC voltage L.N: AC 220V
Control panel Dust-free ambient temperature and humidity
0°C~55°C 30% ~ 85% RH
I/O voltage Operating voltage Input/output voltage DC24V
Connecting conditions
Actual connecting parameters
Battery backup
Replace the batteries regularly +/- 3 year
Failure message: ERR: fire because of low battery backup voltage. ATTENTION: The battery must be replaced within 1 month.
STT200 CONCISE MANUAL
49
2.4.2. FREQUENCY CONVERTER
Connect the frequency converter CIMR-G7A to the vector
controller connection according to the wiring diagram.
2.4.2.1. DIGITAL ACTUATOR USE DIRECTIONS. The following shows the name and function of the key.
Drive Mode Indicators FWD: Lit when there is a forward run
command input REV: Lit when there is a reverse run
command input SEQ: Lit when the run command from
the control circuit terminal is enabled.
REF: Lit when the frequency reference from control circuit terminals A1and A2 is enabled.
ALARM: Lit when an error or alarm has occurred.
Data Display Displays monitor data, constant numbers, and settings. Mode Display (Displayed at upper left of data display.) DRIVE: Lit in Drive Mode. ADV: Lit in Advanced Programming
Mode. VERIFY: Lit in Verify Mode. Keys Execute operations such as setting user constants: monitoring, jogging, and auto tuning.
Name and function for digital actuator
STT200 CONCISE MANUAL
50
NOTE: When disconnecting the power, actuator discharge can take several minutes. During that period, there is a risk of electrocution when touching the components or the wiring.
STT200 CONCISE MANUAL
51
2.4.2.2. OPERATING FUNCTIONS General:
Key Name Function
LOCAL/REMOTE Key .Switches between operation via the Operator (LOCAL)and control circuit terminal operation(REMOTE).This Key can be enabled or disabled by setting user constant 02-01
MENU Key Selects menu items (modes )
ESC Key Returns to the status before the DATA/ENTER
Key was pressed
JOG Key Enables jog operation when the Inverter is
being operated from the Digital Operator.
FWD/REV Key
Selects the rotation direction of the motor when the Inverter is being operated from the Digital Operator
Shift/RESET Key
Sets the number of digits for user constant settings. Also acts as the Reset Key when a fault has occurred.
Increment Key
Selects menu items sets user constant numbers, and increments set values. Used to move to the next item or data.
Decrement Key
Selects menu items sets user constant numbers, and increments set values. Used to move to the previous item or data.
DATA/ENTER Key
Pressed to enter menu items, user constants, and set values. Also used to switch from one display to another.
RUN Key Starts the Inverter operation when the Inverter is
being controlled by the Digital Operator.
STOP Key
Stops Inverter operation. This Key can be enabled or disabled when operating from the control circuit terminal by setting user constant o2-02.
STT200 CONCISE MANUAL
52
Indicator light on the left or the RUN, STOP key, the indicator light operating condition is light up, glitter and crush out. DB (incipient excitation) RUN key is glitter and STOP key is light up.
The following showing about the indicator light showing or RUN
key and STOP key operating
Indicator light and showing The parameter set and converter adjusted in the factory. The
setting code ensures that system could run right, stably and safely.
Customer can operate by joysticks and the digital actuator is for
repairing, checking and setting the parameter. Therefore, the
customer could operate at actuator instead of open the electric
control box during system is normal.
Monitor malfunction and maintenance for frequency converter
STT200 CONCISE MANUAL
53
Monitor malfunction and maintenance for frequency converter
Display Explanation Cause Solution
UV1 Main Circuit Under voltage
1. An open-phase occurred with the input power supply
2. A momentary power loss occurred
3. The wiring terminals for the input power supply are loose.
4. The voltage fluctuations in the input power supply are too large.
Reset the fault after correcting its cause
1. The deceleration time is too short and the regenerative energy from the motor is too large.
Increase the deceleration time or connect a braking resistor (or Braking Resistor Unit). Alternatively, enable (set to 1) the stall prevention selection during deceleration (L3-04).
2. The regenerative energy when an overshoot occurs after acceleration is completed is too large
In vector control, enable (set to 1) the over voltage inhibit selection (L3-11)
OV Main Circuit Over voltage
3. The power supply voltage is too high.
Decrease the voltage so it�s within specifications.
OC Over current
A short-circuit or ground fault occurred at the Inverter output. (A short or ground fault can be caused by motor burn damage, worn insulation, or a damaged cable.)
The load is too large or the acceleration / deceleration time is too short.
A special-purpose motor or motor with a capacity too
Reset the fault after correcting its cause.
STT200 CONCISE MANUAL
54
Display Explanation Cause Solution
large for the Inverter is being used.
A magnetic switch was switched at the Inverter output.
GF Ground Fault
A ground fault occurred at the Inverter output. (A ground fault can be caused by motor burn damage, worn insulation, or a damaged cable.)
Reset the fault after correcting its cause.
UV2 Control Power Fault
1. Try turning the power supply off and on.
2. Replace the Inverter if the fault continues to occur.
PF Main Circuit Voltage Fault
1. An open-phase occurred in the input power supply.
2. A momentary power loss occurred.
3. The wiring terminals for the input power supply are loose.
4. The voltage fluctuations in the input power supply are too large.
5. The voltage balance between phases is bad.
Reset the fault after correcting its cause
1. There is a broken wire in the output cable
2. There is a broken wire in the motor winding.
3. The output terminals are loose
Reset the fault after correcting its cause.
LF Output Open-phase
The motor being used has a capacity less than 5% of the Inverter�s maximum motor capacity
Check the motor and Inverter capacity
STT200 CONCISE MANUAL
55
Display Explanation Cause Solution
The ambient temperature is too high. Install a cooling unit
There is a heat source nearby
Remove the heat source
OH Cooling Fin Overheating
The Inverter�s cooling fan has stopped
Replace the cooling fan (Contact our sale representative)
The load is too heavy. The acceleration time, deceleration time, and cycle time are too short.
Check the size of the load and the length of the acceleration, deceleration, and cycle times.
The V/f characteristics voltage is too high.
Check the V/f characteristics.
OL1 Motor Overload
The Motor Rated Current (E2-01) is incorrect.
Check the Motor Rated Current (E2-01)
The load is too heavy. The acceleration time, deceleration time and cycle time are too short.
Check the size of the load and the length of the acceleration, deceleration, and cycle times
The V/f characteristics voltage is too high.
Check the V/f characteristics.
OL2 Inverter Overload
The Inverter capacity is too low.
Replace the Inverter with one that has a larger capacity.
Overshooting/Undershooting are occurring Adjust the gain again
The reference speed is too high
Check the reference circuit and reference gain
OS Over speed
The settings in F1-08and F1-09 aren�t appropriate
Check the settings in F1-08 and F1-09
There is a break in the PG wiring
Fix the broken/disconnected wiring
The PG is wired incorrectly Fix the wiring
PGO PG Disconnection Detected
Power isn�t being supplied to the PG
Supply power to the PG properly
STT200 CONCISE MANUAL
56
Display Explanation Cause Solution
—
Check for open circuit when using brake (motor)
The load is too heavy Reduce the load
The acceleration time and deceleration time are too short
Lengthen the acceleration time and deceleration time
The load is locked Check the mechanical system
The settings in F1-10and F1-11
Check the settings in F1-10 and F1-11
DEV Excessive Speed Deviation
— Check for open circuit when using brake (motor)
— Try turning the power supply off and on again CPF02 Base block
circuit error The control circuit is damaged
Replace the Inverter
— Try turning the power supply off and pm again CPF03 EEPROM
error The control circuit is damaged Replace the Inverter
— Try turning the power supply off and on again CPF04
CPU internal A/D converter error The control circuit is
damaged Replace the Inverter
— Try turning the power supply off and on again CPF05
CPU external A/D converter error The control circuit is
damaged Replace the Inverter
The Option Card is not connected properly
Turn off the power and insert the Card again CPF06
Option Card connection error The Inverter or Option Card
is faulty Replace the Option Card or the Inverter
NOTE: User needn�t alter setting, otherwise bring any change could influence running normally.
STT200 CONCISE MANUAL
57
Display Explanation Cause Solution
Up impulse/ under impulse Adjust gain
Appointed speed too high Adjust appointed return circuit and gain OS Over speed
F1-08, F1-09 setting error Confirm the setting value
Wire of PG broken Connecting broken wire
PG connecting error Correct wiring PGO Wire of PG broken
PG without supply Supply normally
Overload Reduce load
Accelerating time too long Prolong accelerating time
Speed of load is locking state Check winch
DEV Deviation of speed too
F1-10, F1-11 setting error Confirm setting value
OPR Digital actuator contacting not good
Check signal PG disturbance Confirm actuator input
CPF02 Base electrode locking not good
Controlling return circuit broken
Regulate supply ON/OFF Replace the converter
CPF03 Not good Controlling return circuit broken
Regulate supply ON/OFF
CPF04 Controlling return circuit broken
Regulate supply ON/OFF
CPF05 Controlling return circuit broken
Regulate supply ON/OFF
Selection card connecting error Supply OFF, insert card
CPF06 PG-B2 connecting not good Selection card broken Replace card
NOTE: User needn�t alter setting, otherwise bring any change could influence running normally.
STT200 CONCISE MANUAL
58
CHAPTER 3. SLEWING MECHANISM
STT200 CONCISE MANUAL
59
3.1. EXPLANATION OF THE SYMBOLS: R T C (ex. RTC435)
3.1.1. DESCRIPTION:
Select the slewing speed suitable for the required movement. Gradually increase or decrease the slewing speed. Slow down gradually instead of stopping the load abruptly with the slew brake.
The slew brake may only be used to position the jib during hoisting at wind speeds < 13 m/s (46 km/h).
Avoid simultaneous slewing and hoisting to prevent damage to the hoist rope (rope twisting risk).
Couple (Nm) Eddy current Voltage timing Slewing mechanism
STT200 CONCISE MANUAL
60
3.2. SLEWING UNIT 3.2.1. DESCRIPTION
The RTC slewing unit consists of:
- Motor with squirrel-cage armature turning at constant speed in the desired direction.
- Electrodynamics coupling/brake to perform the speed changes.
- A gearwheel in which the clutch engages directly on the slewing ring.
- Safety brakes mounted on the electrodynamics coupling/brake.
- Techno-dynamo, for speed control.
- Slewing limiter.
- The crane can be put in weathervaning both manually and electrically.
STT200 CONCISE MANUAL
61
3.2.2. OPERATION
- Make the motor run in the desired direction.
- The brake releases.
- The electrodynamics brake inductor is supplied with direct current.
- An amperage change in the inductor produces a speed change. In that way, the desired speed can be obtained by means of the control box.
At Standstill:
- The power supply to the motor is switched off, power is supplied to the inductor of the electrodynamics brake and the jib is brought to a stop;
- The safety brake only locks when, in case of necessity, the operator presses the slewing brake button (XRFS).
ATTENTION: Stopping the jib by counter-slewing is prohibited.
At the end of the workday, the jib must be placed in weathervaning.
STT200 CONCISE MANUAL
62
1. Motor
2. Gearbox
3. Weathervaning mechanism
4. Slewing ring
5. Limit switch
6. Eddy current brake
Fig. 5.2.2-1
5
4
2
6
3
1
STT200 CONCISE MANUAL
63
3.2.3. RTC SCHEMATIC DIAGRAM
Functional diagram Name RP: Potentiometer IC: Signal amplifier Operation: The control signal of the potentiometer RP (slewing
mechanism RTC) is converted through the amplifier IC to a single and three-phase AC-voltage that directly controls the driving motor.
The slewing direction is controlled through a separate signal.
IC
IC
IC
IC
-V
Contactor clockwiseContactor counterclockwise
Adjustable 3-
phase AC-
Voltage feedback
RP
+ V
STT200 CONCISE MANUAL
64
Wiring diagram
RMRD
RG
RDi A
B
C
AC48V
RR
STT200 CONCISE MANUAL
65
3.3. MALFUNCTIONS
- The slewing mechanism is provided with an electronic control device that:
- Controls slewing acceleration and deceleration - Prevents changing of the slewing direction by a control
error
- If a malfunction occurs, working with the crane must be stopped and its cause must be eliminated.
Table 5.3-1
Operation Normal Abnormal
Slewing movement from �0� position on joystick
Slewing starts gradually up to its maximum speed
Slewing starts abruptly. The tower deforms
Slewing movement towards �0� position
The slewing movement slows down and stops after 7-10 seconds
Slewing stops instantly. The tower deforms
Shunt bridging Free slewing Slewing stops suddenly.
STT200 CONCISE MANUAL
66
NOTE: These malfunctions can have the following causes:
- Incorrect connection of the 380VAC/48VAC power upply; excessive voltage fluctuations.
- Potentiometer and joystick are not compatible or are incorrectly adjusted with reference to the resistance O-R/2.
- Check if the inverter is intact and operates properly within the parameters.
- Check the connections of each part for damage and/or improper tightening.
- Check if the control box still works within the given parameters.
STT200 CONCISE MANUAL
67
3.4. SLEW BRAKE
3.4.1. RELEASING THE BRAKE MANUALLY (SEE FIG. 3-4-1)
1) Weathervaning:
Engage the manual brake lever (1), according to movement A.
When the button (2) is pushed, the clamp (3) comes under the brake lever (1).
Release the manual brake lever (1) to let it rest on the clamp (3) and lock it.
Release the pushbutton (2). There may be no clearance at the brake lever (1). Adjust if necessary.
When putting in weathervaning is complete, the slewing mechanism must rotate freely.
2) Locking of the weathervaning:
Set the manual brake lever upright (1), according to movement A.
The clamp (3) releases by the spring (4) action.
Release the manual brake lever (1).
When weathervaning locking is complete, the slewing mechanism should be locked.
ATTENTION: Locking of the weathervaning can jeopardize crane stability in case of high wind speeds.
STT200 CONCISE MANUAL
68
Fig. 3-4-1
4
3
A
1
2
STT200 CONCISE MANUAL
69
1. Brake coupled
3)Operating principle
Fig. 5.4.1-2 REMARK: �E� is the brake clearance. This value must lie between
0.8 mm and 1.2 mm. Adjust if necessary.
2. Brake released E
STT200 CONCISE MANUAL
70
1. Brake coupled
3.4.2. ELECTRICALLY CONTROLLED WEATHERVANING
3.4.2.1. DESCRIPTION:
The electromagnetic brake becomes coupled when the current is cut. It has its own independent power supply.
3.4.2.2. OPERATING PRINCIPLE
Fig. 5.4.2.2
REMARK: �E� is the brake clearance. This value must be at least 0.8 mm and at the most 1.2 mm. If not within these values, adjust brake clearance.
2. Brake released
E
STT200 CONCISE MANUAL
71
3.4.3. SLEW BRAKE MAINTENANCE
Fig. 5.4.3
- Intermediate maintenance
Maintenance must be performed if:
- Insufficient braking moment is generated because of wear or damage of the brake disc (friction disc).
- The control lamp no longer lights up.
- Programmed maintenance Every 200 hours or every month.
- Check air slot and brake torque, as well as the condition of the brake linings. Replace before they are completely worn.
- Check for presence of foreign matter between the brake linings (cement, sand, grease, etc.)
ATTENTION: The brakes must free from dust and foreign matter
(such as cement, sand, grease, etc.).
STT200 CONCISE MANUAL
72
STT200 CONCISE MANUAL
73
7~9
HVeM
HVeM
8
1~9、11~16H
R 1~4
31
2 4
7
5、6
6
5
RRa
19~22
47、48、49、46
9
11~14
LFa11 12
15、16
G1Fa
1314
15
16
F
RM
RM
3.4.4. WIRING DIAGRAM (see fig. 5.4.4-1)
Fig. 5.4.4-1
terminal terminal
Terminal strip for the connecting box of slewing
(R panel)
STT200 CONCISE MANUAL
74
CHAPTER 4. TROLLEY WINCH
STT200 CONCISE MANUAL
75
4.1. EXPLANATION OF SYMBOLS
D T C (EX. DTC55)
Remark: The trolley speed must be selected according to
the distance to be run. Increase and decrease speeds gradually
Couple Voltage regulator, brake Voltage regulator Trolley winch
STT200 CONCISE MANUAL
76
4.2. COMPOSITION OF THE TROLLEY WINCH UNIT The DTC trolley winch unit consists of the following components (see Fig. 6.2-1):
- Rope drum - Gearbox - Electric squirrel-cage motor - Electromagnetic brake - Disk brake
Three speeds are available: MV: Low speed, realized by a combination of actuation of
the electromagnetic brake and running of the motor at lower voltage (230 -260 V).
PV1: Medium speed, realized by partial actuation of the
electromagnetic brake and control of the motor voltage (380 V).
PV2: High speed; the motor is run at its rated voltage (380
V) without excitation of the electromagnetic brake. The disk brake of the trolley winch unit is of the regular closed type (i.e. release through voltage control). Normal brake clearance is 0,8 � 1,2 mm. The brake clearance is set in an identical way as for the slewing motor. The brake torque is set by a spring screw Fig. 6.2-1 item 14.
STT200 CONCISE MANUAL
77
Fig. 4.2-1 1. Outer support plate
2. Connecting rod
3. Drum and gear housing
4. Limit switch pin
5. Inner support plate
6. Limit switch, model DXZ-4/FW
7. Motor brake field excitation voltage DC-20 V
8. Motor, synch rev. 1500 rpm
9. Motor brake field excitation voltage DC-20 V
10. Protection cover locknut
11. Manual brake release lever
12. Fixing nut
13. Screw M8 for disc brake
14. Brake pressure adjusting spring.
15. Brake disc locknut
16. Protection
17. Spindle connection
18. Bearing type 80212
19. Transmission axle
20. Gear coupling, speed ratio r = 30.36
21. Bearing type 60209
22. Sealing ring 23. Trolley rope clamp
19 18
1
23
42 3
1516 14 13
12865 7 119 10
17
22
21 20
STT200 CONCISE MANUAL
78
4.3. TROLLEY BRAKE 4.3.1. Description (SEE FIG. 6.3.1-1): The electromagnetic brake starts operating as soon as the power supply is cut. Brake clearance in the active range is automatically adjusted.
1. Operating principle
Fig. 6.3.1-1 Brakes:
When the current is cut, the electromagnetic attractive force disappears. The brake spring (2) pushes the pressure disc (6) back on the brake disc (5). This closes the brake. The brake is of the regular, closed type.
Releasing the brake:
When the excitation coils (1) is energized, the pressure disc (6) is attracted and the brake pressure spring (2) is pressed in. By this, the brake discs open up.
Brake clearance:
Normal brake clearance is 0.8 to 1.2 mm. Check the brake clearance for soiling (oil - grease).
Brake moment adjustment:
The brake moment was factory-set
1. excitation coil 2. Spring 3. Brake yoke nut4. Movable plate5. Brake plate 6. Pressure disc 7. Brake lining 8. Screw 9. Cover E Brake
STT200 CONCISE MANUAL
79
Releasing the brake manually: The brake can be released manually by loosening the brake yoke (3).
PROGRAMMED MAINTENANCE
- Every 200 hours once a month:
- Check brake clearance and brake moment, as well as the condition of the brake discs. Brake clearance is to be 0.8 � 1.2 mm.
- Attention: replace brake discs before they are completely worn.
- Check if there is any foreign matter in the brake and if it is free from oil and grease.
ATTENTION: The brake must immediately be inspected if:
- It does not work properly - It is overheating - Abnormal vibrations are noticed - Braking torque is insufficient
STT200 CONCISE MANUAL
80
4.4. WIRING DIAGRAM
XD
GV
XD
Ar
XD
GV
XD
PVX
DPV
XD
AV
PD DA
V
SD DFa
DA
r
DM
V
DG
V
DPV
1
DM
V1
DPV
0档
RXDAr
SDAv SDM0
RDMr RXDAv
SDAr
SD
DPv 1 S
1 SDPv
Engaged when energized
Holding position
Disengaged in de-energized condition
STT200 CONCISE MANUAL
81