Post on 09-Jul-2020
WISCONSIN DEPARTMENT OF TRANSPORTATION
PROJECT I.D. 5992-10-02MEIER ROAD
(MILLPOND RD - FEMRITE DR)DANE COUNTY
MEIER ROAD EXTENSIONCONCEPTUAL INTERSECTION LAYOUTS
PUBLIC INVOLVEMENT MEETINGAPRIL 7, 2016
CONCEPTUAL SIGNALIZED INTERSECTION LAYOUT CONCEPTUAL STOP CONTROL INTERSECTION LAYOUT(2-WAY OR 4-WAY STOP)
CONCEPTUAL ROUNDABOUT INTERSECTION LAYOUT
0 100' 200'50'
INTERSECTION ALTERNATIVES SHOWN ARE CONCEPTUAL.ANALYSIS IS ONGOING TO EVALUATE SAFETY, TRAFFICOPERATIONS, TURN LANES, ACCESS, AND COSTS OF THETHREE ALTERNATIVES. DISCUSSIONS WITH AREAPROPERTY OWNERS AND BUSINESSES WILL BE ONGOINGAS THE DESIGN PROGRESSES.