Post on 22-Jul-2020
Energy Saving Group | May, 16 2014 | Darmstadt, Germany
Company IPES - WOBI
Country Italy
City Bolzano - Bozen
Name and surname Gianfranco MinottiFerdinand Tavernini
Energy Saving Group | May, 16 2014 | Darmstadt, Germany
Pilot site name Brescia 1-3-5 (AJB)
City Bolzano - Bozen
Year of construction
1978
N° of dwellings 106
N° of floors 7 + 1
Total floor surface 7.830 m²
Pilot site overall informations
Please paste a map showing the
location of your pilot site here
Energy Saving Group | May, 16 2014 | Darmstadt, Germany
Pilot site overall informations
Please paste a picture of your
pilot site here
Energy Saving Group | May, 16 2014 | Darmstadt, Germany
Pilot site overall informations
Energy Saving Group | May, 16 2014 | Darmstadt, Germany
Energy consumption(energy certification)
178,3 kWh/m²
Generator for heating
District heating
Generator for hot water
District heating
Type of windows State of art 1978
Walls insulated(Y/N)
No
Roof insulated(Y/N)
No
Floor insulated(Y/N)
No
Mechanical ventilation(Y/N)
No
Pilot site thermal informations
Please paste a thermal picture (if
available) of your pilot site here or
another interesting image
Energy Saving Group | May, 16 2014 | Darmstadt, Germany
Pilot site overall informations
Energy Saving Group | May, 16 2014 | Darmstadt, Germany
Description of the expected works to be realized
external thermal damping of wall and roof,replacement of external windows, rehabilitation balustrade of the balconies, in discussion mecanical ventilation and floorheating
Expected design begin date
2015
Expected works begin date
2016
Tenants will stay inside
yes
Is there an energy consumption target?
Reducing the energieconsumption to 35 kW (Klimahaus B) or better
Budget for works € 3.500.000,00
Prevision of works
Please paste pilot site’s plan here