CMS ESR. May, 2004 HCAL TriDAS 1
HCAL TPG Status
Tullio GrassiUniversity of Maryland
May 2004
CMS ESR. May, 2004 HCAL TriDAS 2
Clock & BC0 Distribution
• “RX_CLK” and “RX_BC0” signals for all CAL TPGs transmission• Implement this requirement using 2 or 3-stage fanout scheme• Details to be defined with ECAL.
Rack-to-Rack CAT 6/7
HTR
DCC
HTR
HTR
HTR
FANOUT
HTR
DCC
HTR
HTR
HTR
FANOUT
FANOUT
FANOUT
FANOUT
TTC Minicrate
16 HCAL VME Crates
ECAL (18 crates)
CMS ESR. May, 2004 HCAL TriDAS 3
Fanout board - features
• Built by J. Mans and C. Tully at Princeton• Fanout 4 differential LVPECL signals over
cat6 with RJ45 connectors: – RX_CLK,– RX_BC0– TTC serial stream – 80MHz Ref_Clk
• Board operates in 2 modes– Global (unique board for ECAL and HCAL)– Crate
• Successfully used in 2003 testbeam and all current HCAL R&D test stands
• J.C. da Silva received one board for evaluation and “blessing”
CMS ESR. May, 2004 HCAL TriDAS 4
Fanout Board - diagram
TTC fiber
Clk80
P1
P2
Input from GLOBAL Fanout
18 Identical
Outputs
(also as timing)
40MHz TTC_CLK
RX_CLK
RX_BC0
INT_BC0
RX_CLK
RX_BC0
QPLL
80MHz
QPLL can run stand-alone
TTCrx
EXT_BC0
TTC Broadcast
QPLL implemented this way allows RX_CLK to be “cleaned” at each board if needed
G
C
G
C
FPGA
Progr.Delay
DecodingG
C
G
CMS ESR. May, 2004 HCAL TriDAS 5
Complete path of a 40MHz RX_CLK
TTC fiberCLK40_Des1
FPGACAT7 (RX_CLK,RX_BC0)
TTCrx
QPLL
FPGA
TTCrx
QPLL
Fanout board in Crate-mode
Fanout board in Global-mode
3.3V CMOS • Path is 3.3V differential PECL unless otherwise stated.• Path of RX_BC0 is similar but comes from the FPGA rather the QPLL• In the Global-mode card, do not mount the buffers for CLK80 and TTC
CAT7 (RX_CLK, RX_BC0, TTC, CLK80) HTR
SLB
SLB
SLB
SLB
SLB
SLBMax skew on HTR traces is 0.7 ns.
TPG spec is:Skew < 6 nsacross HCAL and ECAL
CMS ESR. May, 2004 HCAL TriDAS 6
TTC-PMC mezzanine (UMD)
– Carry TTCrx onto HCAL boards (HTR, DCC, Fanout)– Money-saver as it eliminated a lot of optical components
and Fine-Line BGAs on 9U boards.
Production is done (~350 boards)• The assembly house mounted all LEDs backward• Test in progress (100% yield so far)
CMS ESR. May, 2004 HCAL TriDAS 7
HTR Schematic
RX_CLK40
SLB
SLB
SLB
SLB
SLB
SLB
RX_BC0TTC
TTCrxmezzanine
CLK80
Crystal
Serial FE-Data
Ref Clk
Deserializers (8)
20Recovered Clk
TPG Path
SY
S4
0 C
lk
TTC Broadcast Async Fifo
PLLTTC 40 Clk x2
XILINX
LC
Fiber Data
SY
S8
0 C
lk
Fanout Card(1/VME crate)
CMS ESR. May, 2004 HCAL TriDAS 8
HTR Rev4 Status
• Current (Rev4) board – 3 in lab now– Testing:
Links/Clocks (same as Rev3, no problems, no mystery at UMD)
DAQ path exactly same as Rev3
Trigger Primitive Generation (basic features)
Integration with SLB (next slide)
CMS ESR. May, 2004 HCAL TriDAS 9
Trigger link and SLB testing
– Control of SLB (“Local Bus”) seems ok– JTAG working (connector on P3 area of motherboard)– Link tests between SLB and Wisconsin receiver board (STC)
• HP signal generator 120MHz clock for Receiver-STC• 120MHz divided by 3 and injected into TTC system• SLB runs with RX_CLK extracted from TTC+QPLL• 1.2Gbaud copper link: verified
– Some tests of Cat6 cable showed BER increases by ~10 compared to skew-clear cables.• This could be fine, depending on the final cable length
CMS ESR. May, 2004 HCAL TriDAS 10
Trigger link and SLB testing
Problems
In our setup we have seen 2 problems, but we had not much time to investigate:
1. Two pairs seem swapped (we see A,B,D,C instead of A,B,C,D)
2. Data are mis-aligned from pair-to-pair. The mis-alignement changes every time we restart.
We think that these are not a hardware or PCB problems, but cabling or firmware.
CMS ESR. May, 2004 HCAL TriDAS 11
Trigger Link testing
• So far, used Wisconsin STC boards. For commissioning and mass-production we need something different: – More channels– Programmable to optimize the test setup
• Layout underway for an SLB/Vitesse mezzanine transition – Allows to plug a Vitesse-Rx-mezzanine on each SLB post.– Run backwards into motherboard
• Board is now under design– Delays as an engineer left.
HTR
SLB site
UW Vitesse receiver mezzanine card
CMS ESR. May, 2004 HCAL TriDAS 12
Production Issues
Fiber Optics• Some problems not fully understood.• Seem more related to optical cables, connectors, laser• Changing the receiver (HTR) is not considered
Yield (excluding optics)• Last year batch (Rev3) had 5 bad boards out of 30• Only 1 was fixed (assembler mounted wrong part)• Not much time to find out the problems• Assembler seems the best in the area.
CMS ESR. May, 2004 HCAL TriDAS 13
HTR Plans
HTR-RCT Integration test in Wisconsin– Start on May 24th
– Will try to put energy on a given bunch and generate an L1A
– Main goal is to validate all hardware
If Wisconsin and Maryland groups are satisfied with the Integration Tests, we will launch the HTR
production.
Testbeam04 in CERN– At some point we want to use the last version (Rev4)– Issue: we only have 3 now.– HF needs 2 HTRs to run
CMS ESR. May, 2004 HCAL TriDAS 14
Level 1 Latency
Item HB HE HF
BX to QIE input 2 2 4
QIE to GOL (FE) 9 9 8
Optical Link (75-90m@1clock/5m)
15 15-18 15-18
HTR → SLB 12 12 12
SLB ? 4 4 4
TPG Cables (15m) 3 3 3
TOTAL 45 45-48 46-49
HCAL O-E QIE CCA HTR SLB RCTBX TOF To RBX Data To RCT
RBXHPD or PMT (HF)
46 clocks = 1,147.7ns
GOL
• Nothing has changed (46 clock tick budget)– FPGA logic does not include summing!– Estimates: probably 1 more clock cycle
in HF– Eliminating summing in overlap might be
ok for MET/Jet triggers• But would still have the 1→ 6 summing in
HF
12-13
CMS ESR. May, 2004 HCAL TriDAS 15
TPG Alignment
• Align so that all ECAL and HCAL data from same bucket reaches RCT inputs at same time– Achieved by delaying each channel individually
– Method for establishing this delay implemented inside SLB• Histogram data over threshold, look for LHC structure pattern
– Issue: For some detectors, occupancy is very low (HO, especially at low lumens)
Ch N
Ch N+1
Ch N+2
RX_BC0 (Global)
CMS ESR. May, 2004 HCAL TriDAS 16
Absolute (and Relative) Timing
• Relative timing within HCAL via:– Laser and LEDs
• Have to consider random latency variation after resynching optical links– Cross-check with BC0 from FE
• Absolute synchronization for Level 1– SLB histograms ET – Looks for LHC beam structure– Does this work? (esp at low luminosity?)
• Salavat has been working on this– Min bias events, some with Orca and
some with fast sim
• Occupancy at 1034 shown here– 250MeV per ADC count
• Question: how many orbits to establish the LHC beam structure per detector?
CMS ESR. May, 2004 HCAL TriDAS 17
Summary (from Salavat)
HCAL Element Cut (ADC counts) # LHC Orbits Required (88s/orbit)
HB, ~0 ≥6 5x105
HB, ~1.4 ≥6 105
HE, ~1.6 ≥5 104
HE, ~2.8 ≥5 102
HF, 13, ~2.9 ≥5 104
HF, 13, ~3.4 ≥5 103
HO, ring 2 ≥8 >107
• At 2x1033
CMS ESR. May, 2004 HCAL TriDAS 18
Summary (from Salavat)
• For HB, HE, and HF probably easy to remeasure “on the fly”– Fill SLB histograms, read out over VME, calculate offset…
• For HO, probably will take few hours to maybe even a day– OK as long as absolute (non random) latency is stable over long
periods– Need more simulation, checks…in progress
CMS ESR. May, 2004 HCAL TriDAS 19
Occupancy Implications and Alignment
• Bottom line: Will try to develop the following algorithm:– Whatever it takes, we measure the absolute alignment
• If it takes hours, then so be it...
– We hope that this absolute alignment will not change over time– Keep track of the relative alignment by:
• Sending up a BC0 signal from the FE– Keep track of this. If the links go down and we reset, then we measure the
relative alignment and adjust accordingly
• Problems:– If we are off by an order of magnitude or more...
• Needs some more simulation, computing resources, etc.
– Assumes long term stabilities which will have to be tracked
CMS ESR. May, 2004 HCAL TriDAS 20
Another Latency Issue
• TTCrx chip has a chip-to-chip variation in latency of ~20ns– Affect only the DAQ-path
• How well known is this?• Need a scheme for insitu calibration of the TTCrx latency
– Probably can come up with something for HTR/DCC/Fanout– Not sure what to do about TTCrx in FE...