Climbing Systems CB 240 and CB 160Safe working conditions withwall formwork at all heights
Important Notes:
Without exception, current safety regulations must be observed in those countries where our products are used.
The photos in this brochure were taken at vari-ous construction sites. Therefore, the safety as-pects and formwork tie details cannot be con-sidered as definitive.
Safety instructions and load instructions must be observed at all times. Any changes and devi-ations require separate static verification.
We reserve the right to make technical changes in the interest of progress.
PERI GmbHFormwork Scaffolding EngineeringP.O. Box 126489259 WeissenhornGermanyTel +49 (0)73 09.9 50- 0Fax +49 (0)73 09.9 51- 0info@peri.comwww.peri.com
Edition 04/2009
1
Contents
Climbing Systems CB 240 and CB 1602 Type-tested safety at all heights
4 For all heights and every ground plan
6 With VARIO GT 24, MAXIMO, TRIO or RUNDFLEX
8 Construction-compliant load assumptions, simple formwork adjustment
10 Wind loads, over-sized formwork elements
12 Even platform planking, Formwork Carriage CB 240
14 CB 240 climbing cycle sequence
16 Type-tested safety measures, moving procedure of the CB 160
18 Certified scaffolding anchoring
20 High level of working safety with system components
BR shaft platforms22 Application, support, details
Tables24 Load Tables and Charts CB 160
26 Load tables and Charts CB 240
28 Components
48 PERI International
2
Climbing System CB 160Type-tested safety at all heights
ApartmentsCB 240 and CB 160 brackets with VARIO GT 24.
Photo on the rightBridge pierArchitectural concrete with CB 240 and VARIO GT 24.
Environmental constructionHigh-quality architectural concrete with CB 240 brackets and VARIO GT 24.
CB climbing scaffold system with type tests provide high levels of safetyin all areas of application.
With the CB 240, the formwork is mounted on a carriage with roller bear-ings and can be moved by approx. 75 cm.This means sufficient space is available for cleaning the formwork and rein-forcement work. The 2.40 m wide plat-form planking is flush with the Carriage CB and free of any tripping hazards.
With the CB 160, the formwork is simply tipped backwards for striking.For both systems, the formwork is moved together with the scaffold in only one crane lift.
Type Test
CB 240 and CB 160 are type-tested. This makes time-consuming static calculations unnecessary.
3
4
Climbing System CBFor all heights and every ground plan
Hotel constructionCB 240 scaffold bracketscomplete with finishingplatform and TRIO.
30-storey apartmentbuildingCB 240 and CB 160scaffold brackets withVARIO GT 24.
CB 240Safe working areas andaccess with system com-ponents on the formworkand CB climbing scaffold.
5
Bridge pierArchitectural concrete with CB 240 and VARIO GT 24.
Administration buildingCB 240 with TRIO and VARIO GT 24.
SafetyPERI ladder for safe access to the finishing platform.
LNG liquid gas tanksCircular walls ø 77.50 m with CB 240 and VARIO GT 24.
6
CB 240 with VARIO GT 24Concreting height 3.60 – 5.40 m
Climbing System CBWith VARIO GT 24, MAXIMO, TRIO or RUNDFLEX
Strongback CB 270Strongback CB 380
Strongback Connector U 100-120
Adjustable Brace CB 164-224
Height Adjusting Unit CB
Carriage CB 240 with rack
Square-shaped timberor GT 24 girders,single or double.
CB 240
Handrail Post 200
Post Extension 180
Tension Anchor CB
Handrail Post 370
Platform Post 225
Platform Cantilever Beam CB
CB 160 with MAXIMO or TRIOConcreting height 3.60 – 5.40 m
Adapter TRIO/CB
Adjusting Unit CB 160
CB 160
Handrail Post 200
Post Extension 180
Tension Anchor CB
Handrail Post 370
Platform Post 225
Platform Cantilever Beam CB
Square-shaped timber orGirder GT 24.
Strongback CB 270Strongback CB 380
Adjustable Brace CB 164-224
7
Administration buildingCB 240 with finishing platform and TRIO.
Airport control tower46 m high, external ø 6,85 m.With PERI RUNDFLEX and CB 240 brackets.
8
Climbing System CB 160Construction-compliant load assumptions,simple formwork adjustment
Construction-compliant loadassumptions
The high loading capacity of the CBclimbing system allows wide spansresulting in large scaffold units withhigh load assumptions.
On the PERI CB 240, for example, rein-forcing bars can therefore be storedwhen the formwork is retracted.
Formwork carriage in workingposition
Concreting platform150 kg/m2
Working platform200 kg/m2
Finishing platform75 kg/m2
300kg/m2
Concreting platform150 kg/m2
Working platform200 kg/m2
Finishing platform75 kg/m2
Concreting platform150 kg/m2
Working platform200 kg/m2
Finishing platform75 kg/m2
Formwork carriage in concretingpostition
CB 240 CB 160
9
Simple adjustment of the formwork ele-ments for neat and tidy concrete joints
Move element sideways.By releasing the StrongbackConnector U 100-120.
Precise adjustment of theangle of inclination.With Adjustable BraceCB 164-224.
Element height adjustmentFor VARIO GT 24With Height Adjusting Unit CB
For MAXIMO and TRIOWith Adapter TRIO-CB
10
0
50
100
150
0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30
Climbing System CBWind loads, over-sized formwork elements
Wind loads
CB 240 and CB 160 are type tested and designed to handle high wind speeds.
CB 240 and CB 160 type tests are avail-able on request from PERI.
The PERI CB 240 provides type-testedwind safety at any position which means:Locking the formwork on the carriage takes place quickly and securely by means of a wedge.Complete safety against the wind im-mediately after mounting the tie rod.
CB 240 with VARIO GT 24 for construction of bridge piers.
Wind dynamic pressure for transition zone inland and with load reduction factor* for period of application < 24 months.* = 0.7
Wind forces increase accordingly with the height.The DIN 1055, which forms the basis for the design, deter-mines the wind loads according to wind zones, ground profiles and op-erating heights.
QO
ZO
DU
hG
ZZ
h S/2
600
h S35
0
1,80
h S
Wind loads for shoring according to EN 12812
Win
d Zo
ne 1
Win
d Zo
ne 2
Wind dynamic pressure [kN/m2]
Op
erat
ing
hei
gh
t ab
ove
gro
un
d [
m]
Win
d Zo
ne 3
Wind
Zon
e 4
11
Over-sized formwork ele-ments
The strong CB 240 und CB 160 scaf-fold brackets allow the formation oflarge elements.5.40 x 5.00 m = 27 m2 formwork sur-face area is possible on only 2 scaffoldbrackets also with wind speeds of164 km/h (1.3 kN/m2) with standardarrangement of the brackets.With less wind loads, larger elementsand bracket spacings are possible.
Extremely long platforms are also noproblem with the CB 240 and CB 160.
Instead of the usual square-shapedtimbers, GT 24 girders can be used asplatform main beams.With a double GT 24 girder position,platform lengths of up to maximum12.00 m are possible.
CB 240 with finishing platformand VARIO GT 24 for construc-tion of LNG gas tanks.
max
. 5.4
0 m
max. 5.00 m
max. 12.00 m
max. 7.20 m
12
Climbing System CBEven platform planking, Formwork Carriage CB 240
Even platform planking
The 2.40 m wide planking has no tripping hazards and allows easy and safe movement on the working plat-form – in front of and behind the formwork.
With the PERI CB 240, the planking is positioned above the brackets.All possible tripping hazards are below the working platform.
The working platform can be transportedpre-assembled thus saving space and connected with the CB 240 brackets on the construction site.
Safe and secure movement on the CB 240 working platform.
Closed platform deck-ing for safe working.
Safe working conditions on the CB 240 in pro-tection of the formwork element.
13
The Carriage CB 240 is moved using the Ratchet Lever SW 19,Item no. 027180.
With the captive wedge, the carriage can be fixed in any moving position.
Carriage CB 240
With roller bearings for easy shuttering and striking.This means that large formwork elements can also be easily moved forwards and backwards.
75 cm working area when the form-work is retractedThis creates sufficient space for cleaning the formlining as well as installing the reinforcement.
Ratchet Lever SW 19
Bracket CB 240
Rack drive
Formwork Carriage
Roller bearings
Securing wedge
75 cm
14
Climbing System CBCB 240 climbing cycle sequence
1. The first wall section is concreted.Install the leading anchor according tospecifications.
2.After reaching the required concretestrength, mount the Scaffold Mount-ing Ring M24 and then attach the pre-assembled scaffold unit. Install theformwork and concrete the secondsection.
3.Retract the formwork and thenmount the Scaffold Mounting RingM24.
15
4.Lift the complete unit to the nextsection by means of the crane.If required, the finishing platform canbe fitted.
Note:Load-bearing capacity of the craneeye on the Strongback CB is 1.9 t.
5.Reinforcement work is now carriedout and, if required, the formwork isplaced at an angle.
6.Move the formwork forwards andconcrete. At this point. cycles continueas in Point 3.
16
Climbing System CBType-tested safety measures, moving procedure of the CB 160 and climbing traverse
CB 160 combined with CB 240
Adjusting Unit CB 160Item no. 051130
Ratchet Lever SW 19Item no. 027180
Type-tested safety measures
A type test is also available for the useof the PERI climbing system CB 160.
The formwork is simply tilted backwardswhen striking.With a platform width of 1.60 m, a suffi-cient working area is available.
Safe working conditions also on the CB 160 climbing system. An integrated ladder allows safe and secure access to the finishing platform.
Combining CB 160 and CB 240 is the cost-ef-fective solution for high walls.
CB 160 CB 240
17
CB 160moving procedure
Moving procedure withClimbing Traverse RCS
1. Lift the unit withthe crane.
2. Lift and then placein position.
3. Attach unit on theScaffold MountingRing M24.
Use a guide rope toensure that the movingpreocedure is fullyunder control.
The PERI Climbing Traverse RCS 10 t,Item no. 112986, is used when movinglarger or non-symmetrical units.
18
350
450
Climbing System CBCertified scaffold anchorage
With climbing systems, safety issignificantly determined through thequality of the tie system. Therefore,PERI tie systems are approved by thebuilding authorities.
The PERI Climbing Anchor M24/DW 15and M24/DW 20 are efficient in theiruse as well as guaranteeing safehandling.
Variant 1Standard anchoring with variable an-choring depth.With PERI Climbing Cone-2 M24/DW 15Building Authority ApprovalNo. Z-21.6-1767
Variant 2With PERI Screw-On Cone-2 M24/DW 20and Threaded Anchor Plate 20.
Variant 1With PERI Climbing Cone-2 M24/DW 15and Threaded Anchor Plate 15.
Variant 2Anchoring for thin walls and limited an-chor forces.With PERI Screw-On Cone-2 M24/DW 20Building Authority ApprovalNo. Z-21.6-1766
Approved by
building
authorities
The anchoring of thebrackets is officially appri-oved by the building au-thorities.
System Reusable components Lost components
M24/DW 15
M24/DW 20
M24x120-10.9Item no. 0295690
Scaffold MountingRing M24Item no. 029470
Climbing Cone-2M24 / DW15Item no. 031220
Tie Rod DW 15Item no 030030
M24x120-10.9Item no. 0295690
Scaffold MountingRing M24Item no. 029470
Screw-On Cone-2M24 / DW 20Item no. 030960
Threaded AnchorPlate 20Item no 030860
Threaded AnchorPlate 15Item no. 030840
19
5. Close anchor pointsThe remaining anchor hole is closed by means of the Concrete Cone KK. This results in an optically-pleasing concrete surface.
1. Leading anchor during strikingPosition Anchor Positioning M24 and fix by nailing into the plywood.Turn Climbing Anchor on the Anchor positioning. Secure the Threaded Anchor Plate by means of tie wire to the reinforcement.
2. Attach scaffold suspensionRelease the formwork from the concrete and retract (the nails are pulled through the plywood).Dismantle Anchor Positioning M24 using a pin wrench SW 14.Mount Scaffold Mounting Ring M24 using a Hex. Bolt M24 x 120.
3. Mount scaffold bracketsMount Scaffold Brackets CB 240 or CB 160 and immediately secure by means of safety pins.
4. Reusable anchor componentsScrew out the Hex. Bolt M24 x 120and cone from the finishing platform using the socket wrench SW 36.
Mounting of leading anchorAdvancing Bolt M24
Plywood is drilled through.E.g. with Wall Formwork VARIO GT 24.
Anchor Positioning M24
Plywood is not drilled through.E.g. with panel formwork MAXIMO TRIO
1. Leading anchor during strikingPosition leading anchor drill through plywood ø 25 mm.Screw climbing anchor and Advancing Bolt tightly together.
2. Attach scaffold suspensionRemove Advancing Bolt M24. Retract formwork.Attach Scaffold Mounting Ring M24 with Hex. Bolt M24 x 120.
20
Climbing System CBHigh level of working safety with system components
The system components for the CB 240 and CB 160 climbing systems provide a very high degree of safety.
Integrated ladders with hinged hatches and ladder cages ensure safe access to the finishing and concreting platforms.Handrail post for fixing the end and side handrails.
Easy access to the finishing platform with the PERI ladder.
Accessing the two finishing platforms is carried out with CB 240 and CB 160 system components.
Using VARIO platforms, the CB 240 climbing system ensures safe access to the concreting level.
21
A
B
Access ladderSafe and secure access to the CB 240 and CB 160 finishing platform at all heights.
Ladder 220/6
Ladder safety cage
Ladder 180/6
Sliding or hinged hatches.
A) Side handrail postFor fixing end handrails.It is mounted on the outer main beam at the end.
B) End handrail postWith larger cantivers, it is attached to the outer main beam.
Ladder Base 30, adjustable
22
10.0 8.0 20.0 0.15 1 x 5
12.0 9.6 23.9 0.18 1 x 5
14.0 11.2 27.9 0.21 1 x 6
16.0 12.8 31.9 0.24 1 x 6
18.0 14.4 35.9 0.27 1 x 6
19.1 15.3 38.0 0.29 1 x 8
BR shaft platformsApplication, support, details
Table of permissible bearing forces for gravity pivot plate
Considered tolerances:Clear width of the shaft ± 20 mm.Length of platform beam ± 3 mm.Clearance in the box out + 10 mm.
Remaining supporting depth min. 27 mm.
Application
Note:For suspension of the finishing platforms, only use Tie Rods B15 or Scaffold Tube ø 48.3 mm.
Tie
Rod
B15
or
Sca
ffol
d Tu
be
Tie
Rod
B15
or
Sca
ffol
d Tu
be
Concrete cube strength[N/mm2]
Concrete cylin-der strength[N/mm2]
perm. vertical bearing load[kN]
Reinforcement against tensile splitting BST 500 [cm2]
Diameter of reinforcement[mm]
23
Perm. load-bearing capacity 25 kN Perm. load-bearing capacity max. 38 kNSupport on Folding Bracket 25 Support on gravity pivot plate
70 442 25 115 327
Assembly sequencePlatform Beam BR with gravity pivot plate
2. With square-shaped timber
Hook Strap HBfor Profile U 100 / U 120Hook Strap HB2for Profile U 140 / U 160
Hook Strap HB 24-100/120for Profile U 100 / U 120Hook Strap HB 24-140/160for Profile U 140 / U 160
Installation of platform decking1. With Girder GT 24
1. Bearing Box BR installed 2. Struck 3. Platform supported 4. Platform lifted
max. 100 mm timber
80
Drilled hole ø 20
Note:The external platform beam (timber)may not obstruct the unhinderedfolding of the gravity pivot plate.
24
0.80 30 150 75 kg/m2 – – –
0.80 30 150 – – – –
1.60 50 200 200 kg/m2 133 kg/m2 133 kg/m2 –
1.15 50 75 37.5 kg/m2 – – –
Climbing SystemCB 160
QO
ZO
DU
hG
ZZ
Wind from the front
Wind from the rear
h S/2
600
h S35
0
1.80
h S
* Maximum permissible live load for operating condition “Working”.– Loads are evenly distributed. One-sided loading of cantilevered
platform areas is not permitted.– Working: if loading of several platform levels, only one level
can be fully loaded - all other platform levels only up to 50%.– Storm: Reduced load on the working platform for material
left behind.
Static system and load combinations
The charts are for detailed determina-tion of the bearing reactions whilst taking into account realistic load combi-nations. For all load combinations (A – working and B – storm), the safe transfer of the bearing forces into the building structure has to be verified.
With higher wind loads, the permis-sible widths of influence must be reduced accordingly and the bearing forces determined through a static calculation.
Width of influence bApplication height hG
Formwork height hS
Formwork weight max. 60 kg/m2
Wind flow pressure qAerodynamic wind factor cW = 1.3
Load Combination A – Working
Wind load:q = 0.25 kN/m² v = 72 km/h
– Working on all platforms is allowed.– Material storage on the working
platform is allowed.
Load Combination B – Storm
Wind load:q = 0.8 kN/m2 v = 129 km/h
q = 1.1 kN/m2 v = 151 km/h
q = 1.3 kN/m2 v = 164 km/h
– Working not permitted– Material can be left on the working
platform.
Load assumptions
Platform Platform width [m]
Dead load of the platform
[kg/m²]
Permissible live load*[kg/m²]
Decisive load combinations [kg/m²] for calculating the bearing reactions
Working A Storm B1 Storm B2 Storm B3
from the rearfrom the rearfrom the frontfrom the frontWind direction
Finishing platform
Working platform
Intermediate platform**
Concreting platform
**if necessary
25
q = 0.8 kN/m2 q = 1.1 kN/m2 q = 1.3 kN/m2
hS 3.00 m 4.00 m 5.40 m 3.00 m 4.00 m 5.40 m 3.00 m 4.00 m 5.40 m
6.55 m 4.40 m 2.90 m 5.55 m 3.60 m 2.40 m 5.05 m 3.25 m 2.05 m
A
QO 47.2 kN 36.9 kN 28.1 kN 40.4 kN 30.9 kN 23.9 kN 37.1 kN 28.3 kN 21.0 kN
ZO 30.9 kN 26.5 kN 23.3 kN 26.4 kN 22.0 kN 19.5 kN 24.1 kN 19.9 kN 16.8 kN
DU 24.2 kN 20.6 kN 18.0 kN 20.6 kN 17.1 kN 15.2 kN 18.9 kN 15.5 kN 13.1 kN
B1
QO 34.7 kN 28.6 kN 22.6 kN 29.9 kN 24.1 kN 19.3 kN 27.5 kN 22.1 kN 17.1 kN
ZO 52.8 kN 50.1 kN 48.6 kN 58.1 kN 53.9 kN 53.6 kN 61.0 kN 56.5 kN 53.5 kN
DU 33.3 kN 32.8 kN 33.5 kN 35.4 kN 34.6 kN 36.4 kN 36.6 kN 35.8 kN 36.1 kN
B2
QO 45.9 kN 45.0 kN 44.9 kN 46.2 kN 44.9 kN 46.5 kN 46.5 kN 45.4 kN 45.2 kN
ZO* -26.2 kN -24.4 kN -22.2 kN -32.5 kN -28.5 kN -25.8 kN -35.9 kN -30.9 kN -26.3 kN
ZZ 13.0 kN 17.9 kN 23.4 kN 19.1 kN 22.8 kN 28.5 kN 22.2 kN 25.5 kN 29.5 kN
B3
QO 40.5 kN 41.5 kN 42.7 kN 41.7 kN 42.1 kN 44.7 kN 42.4 kN 42.9 kN 43.6 kN
ZO* -29.8 kN -26.2 kN -23.1 kN -35.6 kN -30.0 kN -26.6 kN -38.7 kN -32.2 kN -26.9 kN
ZZ 20.0 kN 22.4 kN 26.3 kN 25.0 kN 26.5 kN 30.9 kN 27.6 kN 28.8 kN 31.5 kN
Load Tables and Charts CB 160Bearing reactions for the permissible width of influence (perm. b)
Formwork height hS [m]
Width of influenceperm. b [m]
q = 0.8 kN/m2
q = 1.3 kN/m2
q = 1.1 kN/m2
5.40
5.00
4.50
4.00
3.50
3.002.00 3.00 4.00 5.00 6.00 7.00
Width of influence CB 160
The permissible widths of influence correspond to the type test. The bearing reactions differ to the type test, because the type test does not distinguish between different operating condi-tions.
The calculation of types according to current standards is being prepared.
max. wind flow pressure during storm
Load
cas
e
perm. b
*if ZO < 0, then a compressive force affects the anchorage.intermediate values can be interpolated linear. Maximum values are in bold.Load factor - wind loads:Load Combination A = 1.0. Load Combination B = 0.9
Formulae to calculate the forces for actual width of influence (actual b)
QO (actual b) =
ZO (actual b) =
DU (actual b) =
ZZ (actual b) =
actual b
perm. b
actual b
perm. b
actual b
perm. b
actual b
perm. b
∙ (QO (perm. b) - 3.8 kN) + 3.8 kN
∙ (ZO (perm. b) - 1.3 kN) + 1.3 kN
∙ (DU (perm. b) - 1.3 kN) + 1.3 kN
∙ ZZ (actual b)
Climbing SystemCB 160
26
30 150 75 – – –
30 150 – – – –
50300 300 – – –
200 200 133 133 –
50 75 37.5 – – –
Climbing SystemCB 240
QO
ZO
DU
hG
ZZ
h S/2
600
h S45
0
1.80
h S
* Maximum permissible live load for operating condition “Working”.– Loads are evenly distributed. One-sided loading through
cantilevered platform areas is not permitted.– Working: if loading several platform levels, only one level
can be fully loaded - all other platform levels only up to 50%.– Storm: reduced load on the working platform for material
left behind.
Wind from the front
Wind from the rear
Static system and load combinations
The charts are for detailed determina-tion of the bearing reactions whilst taking into account realistic load combi-nations. For all load combinations (A – working and B – storm), the safe transfer of the bearing forces into the building structure has to be verified.
With higher wind loads, the permis-sible widths of influence must be reduced accordingly and the bearing forces determined through a static calculation.
Width of influence bApplication height hG
Formwork height hS
Formwork weight max. 60 kg/m²Wind flow pressure qAerodynamic wind factor cW = 1.3
Load combination A – working
Wind load:q = 0.25 kN/m² v = 72 km/h
– The formwork is retracted (75 cm), or is in the concreting position.
– Working on all platforms is permitted.– Storage of materials on the working
platform is permitted.
Load combination B – storm
Wind load:q = 0.8 kN/m2 v = 129 km/h
q = 1.1 kN/m2 v = 151 km/h
q = 1.3 kN/m2 v = 164 km/h
– Formwork in concreting position– Working not permitted– Material can be left on the working
platform.
Platform Dead load of the platform
[kg/m²]
Permissible live load*[kg/m²]
Decisive load combinations [kg/m²] for calculating the bearing reactions
Working A Storm B1 Storm B2 Storm B3
from the rearfrom the rearfrom the frontfrom the front
Concreting platform
Intermediate platform (if required)
Working platform
Finishing platform
Wind direction
Wall side
Guardrail side
27
q = 0.8 kN/m2 q = 1.1 kN/m2 q = 1.3 kN/m2
hS 3.00 m 4.00 m 5.40 m 3.00 m 4.00 m 5.40 m 3.00 m 4.00 m 5.40 m
4.80 m 3.90 m 3.16 m 4.28 m 3.40 m 2.68 m 3.95 m 3.12 m 2.50 m
A
QO 48.8 kN 44.2 kN 39.3 kN 44.0 kN 39.1 kN 34.0 kN 40.9 kN 36.3 kN 32.1 kN
ZO 39.1 kN 38.4 kN 38.6 kN 35.1 kN 33.8 kN 33.1 kN 32.6 kN 31.2 kN 31.1 kN
DU 34.1 kN 33.1 kN 32.8 kN 30.7 kN 29.2 kN 28.2 kN 28.5 kN 27.0 kN 26.5 kN
B1
QO 33.6 kN 31.8 kN 29.3 kN 30.3 kN 28.3 kN 25.5 kN 28.3 kN 26.3 kN 24.1 kN
ZO 46.9 kN 51.1 kN 58.3 kN 52.2 kN 56.8 kN 64.4 kN 54.6 kN 59.7 kN 69.4 kN
DU 32.6 kN 35.8 kN 41.8 kN 34.7 kN 38.5 kN 45.2 kN 35.5 kN 39.8 kN 48.2 kN
B2
QO 33.6 kN 37.2 kN 42.3 kN 34.1 kN 38.0 kN 43.3 kN 34.1 kN 38.2 kN 44.9 kN
ZO* -14.3 kN -18.6 kN -22.4 kN -20.7 kN -24.3 kN -27.3 kN -23.9 kN -27.2 kN -30.7 kN
ZZ 0.0 kN 6.3 kN 14.3 kN 4.9 kN 11.4 kN 19.5 kN 7.6 kN 14.0 kN 22.9 kN
B3
QO 40.5 kN 41.5 kN 42.7 kN 41.7 kN 42.1 kN 44.7 kN 42.4 kN 42.9 kN 43.6 kN
ZO* -20.3 kN -22.3 kN -24.6 kN -26.1 kN -27.5 kN -29.2 kN -28.9 kN -30.1 kN -32.4 kN
ZZ 9.4 kN 13.3 kN 19.7 kN 13.4 kN 17.5 kN 24.1 kN 15.4 kN 19.6 kN 27.1 kN
q = 0.8 kN/m2
q = 1.3 kN/m2 q = 1.1 kN/m2
5.40
5.00
4.50
4.00
3.50
3.002.00 2.50 3.00 3.50 4.00 4.50 5.00
The permissible widths of influence correspond to the type test. The specified bearing reactions differ to those of the type test because no differentiation between several operating condi-tions are given there.
The type calculation according to current standards is being prepared.
Width of influenceperm. b [m]
Formwork height hS [m]
Width of influence CB 240
Load tables and charts CB 240Bearing reactions for permissible widths of influence (perm. b)
*if ZO < 0, a compressive force then affects the anchorage.Intermediate values can be linear interpoliert. Maximum values are in bold.Load factor - wind loads:Load combination A = 1.0. Load Combination B = 0.9
Formulae to calculate values for actual width of influence (actual b)
Q O (actual b) =
ZO (actual b) =
DU (actual b) =
ZZ (actual b) =
actual b
perm. b
actual b
perm. b
actual b
perm. b
actual b
perm. b
∙ (QO (actual b) - 4.6 kN) + 4.6 kN
∙ (ZO (actual b) - 2.7 kN) + 2.7 kN
∙ (DU (perm. b) - 2.7 kN) + 2.7 kN
∙ ZZ (perm. b)
max. wind flow pressure
Load
cas
e
perm. b
Climbing SystemCB 240
28
Item no. Weight kg
CB Climbing System, BR Shaft Platform
051000 112,000 Climbing Bracket CB 240Complete Climbing Scaffold Bracket CB 240.
Complete with2 x 017040 Screw-On Coupling AK 48, galv.1 x 715977 Handrail Post CB 2401 x 710222 Hex. Bolt ISO 4014 M16 x 80-8.8, galv.1 x 070890 Nut ISO 7042 M16-8, galv.NoteDelivery condition: handrail post attached to trans-portation bracket.
1100
5044
044
0
3214
30 2326
400
228
2411
1800
350
051020 33,900 Carriage CB 240For mounting to the Climbing Bracket CB 240.Can be assembled in 2 positions: for platformbeams with Girder GT 24 or timber 8 x 16 cm.
Complete with1 x 710944 Toothed Wedge, FWNoteSpanner size SW 19.
1175
625
90
250
165
/24
5
SW 19
027180051040
1,7608,440
AccessoriesRatchet Lever SW 19Rack CB 240
29
Item no. Weight kg
CB Climbing System, BR Shaft Platform
051040 8,440 Rack CB 240For Carriage CB 240.
Complete with1 x 018050 Pin Ø 16 x 65/86, galv.1 x 018060 Cotter Pin 4/1, galv.
3010
33
2240
64
73
051010 0,930 Lifting Eye CB 240, galv.For mounting to the Climbing Bracket CB 240when used as a working platform.
Complete with1 x 018050 Pin Ø 16 x 65/86, galv.1 x 018060 Cotter Pin 4/1, galv.Safety instructionsLoad-bearing point: lifting capacity 700 kg.
62
140
051100 79,000 Climbing Bracket CB 160Complete Climbing Bracket CB 160.
Complete with2 x 017040 Screw-On Coupling AK 48, galv.1 x 715977 Handrail Post CB 2401 x 710222 Hex, Bolt ISO 4014 M16 x 80-8.8, galv.1 x 070890 Nut ISO 7042 M16-8, galv.NoteDelivery condition: handrail post attached to trans-portation bracket.
30 1521
630
1025
440
440
50
3135
228
1606
1800
30
Item no. Weight kg
CB Climbing System, BR Shaft Platform
051130 12,900 Adjusting Unit CB 160For Climbing Bracket CB 160.
Complete with2 x 711084 Hex. Bolt ISO 4014 M20 x 150-8.8, galv.2 x 781053 Nut ISO 7042 M20-8, galv.NoteSpanner size SW 19.
260 83
SW 19
237
051120 4,560 Platform Connection CB 160For connection of platform decking to the ClimbingBracket CB 160 for use as working scaffold.
Complete with2 x 711078 Hex. Bolt ISO 4014 M20 x 130-8.8, galv.2 x 781053 Nut ISO 7042 M20-8, galv.Safety instructionsLoad-bearing point: load capacity 500 kg.
130 90
235
5570
051060051150
73,400103,000
Strongback CBStrongback CB 270Strongback CB 380For mounting of system formwork to the ClimbingBrackets CB 240 and CB 160. For formworkheights up to 5.40 m.
Complete with1 x 715936 Pin with Tension Sleeve1 x 018060 Cotter Pin 4/1, galv.Safety instructionsLoad-bearing point: load capacity 1.9 t.
120
86
196
160
90/
Nx
60=
1430
7x
6024
0=
420
480
/162
0
2730
/38
00
31
Item no. Weight kg
CB Climbing System, BR Shaft Platform
051030 5,320 Height Adjusting Unit CBFor height adjustment of VARIO GT 24 elementson the Strongback CB.
Complete with1 x 715936 Pin with Tension Sleeve1 x 018060 Cotter Pin 4/1, galv.NoteSpanner size SW 19.
240
60 55
82
190
max
182Ø25
SW 19
051110 25,000 Adjustable Brace CB 164-224For exact adjustment of the Strongback CB.
Complete with2 x 715936 Pin with Tension Sleeve2 x 018060 Cotter Pin 4/1, galv.
1580
min 1640 max 2240
89
051090 13,500 Adapter TRIO-CBFor the connection of TRIO panels to theStrongback CB. Horizontal or vertical use ispossible. With built-in height adjustment.
Complete with1 x 715936 Pin with Tension Sleeve1 x 018060 Cotter Pin 4/1, galv.NoteSpanner size SW 19.
100
400
82
180
Ø25
415
SW 19
32
Item no. Weight kg
CB Climbing System, BR Shaft Platform
110059 2,620 Strongback Connector U 100-120For the connection of VARIO GT 24 elements onthe Strongback CB or Steel Waler SRU.
284
80
126
Ø16
80 - 145 76
120
107007 3,410 Tension Anchor Connector CBFor securing against tilting due to wind loads usingDW 15 Tie Rod.
Complete with1 x 710219 Hex. Bolt ISO 4014 M16 x 100-8.8, galv.1 x 070890 Nut ISO 7042 M16-8, galv.
400
6064
M 16x100
30
DW 15
107008 4,100 Wall Tension ConnectorFor securing against tilting due to wind loads usingDW 15 Tie Rod.
Complete with1 x 027170 Pin Ø 16 x 42, galv.1 x 018060 Cotter Pin 4/1, galv.
331
180
100
100
255
DW 15Ø26
50
026430 0,334AccessoriesHex. Bolt ISO 4014 M24 x 70-10.9
051260 3,300 Belt Connector CBFor securing against tilting due to wind loads withTension Belt.
Complete with1 x 710219 Bolt ISO 4014 M16 x 100-8.8, galv.1 x 070890 Nut ISO 7042 M16-8, galv.
400
6059
25
Ø20 M 16x100
33
Item no. Weight kg
CB Climbing System, BR Shaft Platform
051270 1,620 Belt Connector WallFor securing against tilting due to wind loads usinga Tension Belt.
100 12
8012
0
Ø25
Ø50
026430 0,334AccessoriesHex. Bolt 4014 M24 x 70-10.9
026430 0,334 Hex. Bolt ISO 4014 M24 x 70-10.9High tensile bolt for the anchoring of climbingsystems.
NoteSpanner size SW 36.
70
M24
SW 36
051250 2,790 Tension Belt l = 5,70 m, 25 kN Technical dataPermissible tension force 25.0 kN.
1000
5700min 1600 max
051230 17,000 Platform Cantilever Beam CBFor mounting finishing platforms.
Complete with4 x 710232 Hex. Bolt ISO 4014 M16 x 130-8.8, galv.4 x 070890 Nut ISO 7042 M16-8, galv.
232 965
1230
8027
0
16 965 249
M 16x130
150
80
86
Ø17
34
Item no. Weight kg
CB Climbing System, BR Shaft Platform
051200 44,400 Platform Post CB 225For mounting finishing platforms. For concretingheights up to 3.60 m. In combination with PostExtension CB 180 for concreting heights 3.60 to5.40 m.
Complete with2 x 710232 Hex. Bolt ISO 4014 M16 x 130-8.8, galv.2 x 070890 Nut ISO 7042 M16-8, galv.
200
3020
020
030
500
1750
710
1000
800
2510
Ø17Ø22
86M 16x130
051050 26,400 Post Extension CB 180For mounting finishing platforms. In combinationwith Platform Post CB 225 for concreting heightsfrom 3.60 m up to 5.40 m.
Complete with2 x 710232 Hex. Bolt ISO 4014 M16 x 130-8.8, galv.2 x 070890 Nut ISO 7042 M16-8, galv.
200
2020
020
020
500
1300
995
1195
2040
85
Ø17
M 16x130
35
Item no. Weight kg
CB Climbing System, BR Shaft Platform
051190 17,400 Handrail Post CB 200For assembling guardrails to the finishing plat-forms. Basic extension for Handrail Post CB 190and 370.
Complete with2 x 710232 Hex. Bolt ISO 4014 M16 x 130-8.8, galv.2 x 070890 Nut ISO 7042 M16-8, galv.
200
200
500
3030
8080
60 385
440
440
500
460
2225
1125
280
820
M 16x130
Ø17
86
051210051220
19,00034,600
Handrail Post CBHandrail Post CB 190Handrail Post CB 370For assembling guardrails to the finishing plat-forms. Handrail Post CB 190 for concreting heightsup to 3.60 m. Handrail Post CB 370 for concretingheights from 3.60 m up to 5.40 m.
Complete with2 x 710232 Hex. Bolt ISO 4014 M16 x 130-8.8, galv.2 x 070890 Nut ISO 7042 M16-8, galv.
200
200
3030
1895
/369
5
2155
/395
5
8080
80 330
440
440
500
Nx
Ø17
M 16x130
Ø9
36
Item no. Weight kg
CB Climbing System, BR Shaft Platform
026415026417026411026412026413026414026419026418
3,5500,0003,5507,100
10,65014,20017,75021,600
Scaffold Tube Steel Ø 48,3 x 3,2Scaffold Tube Steel Ø 48.3 x 3.2, special lengthsCutting costs for scaffold tubesScaffold Tube Steel Ø 48.3 x 3.2, l = 1.0 mScaffold Tube Steel Ø 48.3 x 3.2, l = 2.0 mScaffold Tube Steel Ø 48.3 x 3.2, l = 3.0 mScaffold Tube Steel Ø 48.3 x 3.2, l = 4.0 mScaffold Tube Steel Ø 48.3 x 3.2, l = 5.0 mScaffold Tube Steel Ø 48.3 x 3.2, l = 6.0 m
L
100020003000400050006000
Ø48,3x3,2L
017010 1,400 Swivel Coupling DK 48/48, galv.For Scaffold Tubes Ø 48 mm.
NoteSpanner size SW 19.
(27)
SW 19
017040 0,850 Screw-On Coupling AK 48, galv.For Scaffold Tubes Ø 48 mm.
NoteSpanner size SW 30, SW 19.
SW 30
SW 19
12()
051160 0,894 Handrail Connector CBFor mounting Scaffold Tubes Ø 48 mm to handrailposts.
NoteSpanner size SW 19.
95
60
9
Ø48
SW 19
024140 0,033AccessoriesF.H. Bolt DIN 603 M8 x 70 MU, galv.
37
Item no. Weight kg
CB Climbing System, BR Shaft Platform
051610 6,940 Side Handrail PostFor mounting handrails at the front side.Screwed to platform main beam.
440
5044
0 1270
4019
0
10050
340
Ø9
Ø7
051640 0,014AccessoriesHex. Wood Screw DIN 571 6 x 80, galv.
051630 11,000 End Handrail PostFor assembling of handrails on larger cantilevers.Screwed to platform main beam.
230
1270
50
110
30
190
440
440
50
120
280
Ø7
Ø9
051640 0,014AccessoriesHex. Wood Screw DIN 571 6 x 80, galv.
051640 0,014 Hex. Wood Screw DIN 571 6 x 80, galv. NoteSpanner size SW 10.
SW 10
80
38
Item no. Weight kg
CB Climbing System, BR Shaft Platform
065066 15,100 End Guardrail Frame 55Clampable end guardrail frame for all PERI scaffoldplatforms and climbing systems.
560 400
1360
1020
max
417
051650 0,060 F. H. Bolt DIN 603 M6 x 180 MU, galv.With nut.
NoteSpanner size SW 10.
180
M 6 17
SW 1024
710240024360108834
0,0500,0580,085
F. H. Bolt DIN 603 M8, galv.F. H. Bolt DIN 603 M8 x 100 MU, galv.F. H. Bolt DIN 603 M8 x 125 MU, galv.F. H. Bolt DIN 603 M8 x 180 MU, galv.With nut.
L B100 80125 115180 28
NoteSpanner size SW 13.
029470 0,723 Scaffold Mounting Ring M24, galv.Anchoring System M24.For anchoring climbing systems.
NotePermissible load: see PERI product information.
73
73Ø
029560 0,535AccessoriesHex. Bolt ISO 4014 M24 x 120-10.9
39
Item no. Weight kg
CB Climbing System, BR Shaft Platform
029560 0,535 Hex. Bolt ISO 4014 M24 x 120-10.9High tensile bolt for anchoring climbing systems.
NoteSpanner size SW 36.
120
SW 36
M24
114158 1,030 Screw-On Cone-2 M24/DW 20, galv.Anchoring System M24.For anchoring of climbing systems.
NotePermissible load: see PERI product information.Spanner size SW 36.
20D
W
65
150
7024M
SW 36
030860 0,801AccessoriesThreaded Anchor Plate DW 20
030860 0,801 Threaded Anchor Plate DW 20For the use with Tie Rod DW 20, B 20 orScrew-On Cone-2 M24/DW 20. For anchoring intothe concrete.
NotePermissible load: see PERI product information.Lost anchor component.
100
32
65DW 20
Ø6
031220 1,010 Climbing Cone-2 M24/DW 15, galv.Anchoring System M24.For anchoring of climbing systems.
NotePermissible load: see PERI product information.Spanner size SW 36.
50
100 25
M24
DW
15
70
SW 36
030840030030030740
0,5161,4401,550
AccessoriesThreaded Anchor Plate DW 15Tie Rod DW 15 special lengthTie Rod B 15 special length
030840 0,516 Threaded Anchor Plate DW 15For use with Tie Rod DW 15 or B 15.For anchoring in concrete.
NotePermissible load: see PERI product information.Lost anchor component.
60DW 15
Ø6
80Ø
27Ø
40
Item no. Weight kg
CB Climbing System, BR Shaft Platform
030030030050
1,4400,000
Tie Rod DW 15Tie Rod DW 15 special lengthCutting Costs DW 15, B 15
NoteNon-weldable! Observe construction approval!Technical dataPermissible load 90 kN.
DW 15
030740030050
1,5500,000
Tie Rod B 15Tie Rod B 15 special lengthCutting Costs DW 15, B 15
NoteWeldable! Observe construction approval!Technical dataPermissible load 85 kN.
B 15
029270 0,331 Advancing Bolt M24, galv.For connecting Anchor System M24 if the formlin-ing can be drilled through.
NoteSpanner size SW 19.
70
M 24
SW 19
029280 0,196AccessoriesAnchor Positioning Plate M24, galv.
029280 0,196 Anchor Positioning Plate M24, galv.For connecting Anchor System M24 if the formlin-ing can be drilled through.
60
Ø25
Ø7
80
6
029440 0,005AccessoriesHex. Wood Screw DIN 571 6 x 20, galv.
41
Item no. Weight kg
CB Climbing System, BR Shaft Platform
029440 0,005 Hex. Wood Screw DIN 571 6 x 20, galv. NoteSpanner size SW 10.
20
M 6
SW 10
026420 0,123 Anchor Positioning Stud M24, galv.For mounting Anchor System M24 if the plywoodis not drilled through.
NoteAllen Key SW 14.
60
40
M 24Ø5
SW 14
027212710312
0,4450,005
AccessoriesAllen Key SW 14, longWire nails 3 x 80
051410 11,700 Ladder 180/6, galv.For accessing PERI formwork systems.
Complete with4 x 710224 Hex. Bolt ISO 4017 M12 x 40-8.8, galv.4 x 710381 Nut ISO 7042 M12-8
14905 x 298 = 83
1960
450
051420 12,800 Ladder 220/6, galv.For accessing PERI formwork systems.
Complete with4 x 710224 Hex. Bolt ISO 4017 M12 x 40-8.8, galv.4 x 710381 Nut ISO 7042 M12-8
8943 x 298 =
2265
400
450
42
Item no. Weight kg
CB Climbing System, BR Shaft Platform
109105 5,070 Ladder Base 30 adjustable, galv.For horizontally fixing ladders on the platformdecking.
0-3
20
525
443
423
95
170
13,5
051460 2,180 Ladder Base, galv.As bottom end piece and for preventing theladders sliding on platform decking.
405
210
50
103718 0,684 Ladder Hook, galv.To adjust the lower ladder. Always use in pairs.
Complete with2 x 710266 Hex. Bolt ISO 4017 M12 x 25-8.8, galv.2 x 710381 Nut ISO 7042 M12-8
330 SW 18
104132051450
15,60025,200
Ladder Safety CageLadder Safety Cage 75, galv.Ladder Safety Cage 150, galv.Safety cage for PERI access ladders.
Complete with4 px 710266 Hex. Bolt ISO 4017 M12 x 25-8.8, galv.4 x 701763 Clamping Plate Fl 25 x 10 x 90
750
/150
0
710
704
43
Item no. Weight kg
CB Climbing System, BR Shaft Platform
051430 37,900 Sliding Hatch CoverNon self-closing hatch for ladder access. Clearopening dimensions approx. 73 x 55 cm.
Complete with4 x 710266 Hex. Bolt ISO 4017 M12 x 25-8.8, galv.4 x 710381 Nut ISO 7042 M12-8
730
830
550
1140
103
110608 15,600 Hatch 55 x 60, foldableSelf-closing hatchway for ladder access. Clearopening dimensions approx. 55 x 60 cm.
820
662
60
560
710
386
66
600
550
027180 1,760 Ratchet Lever SW 19For moving Carriage CB 240 and SKSF 240.
NoteSpanner size SW 19.
795
031480 2,460 Socket Spanner SW 36, chrome-platedFor diverse uses.
510
44
Item no. Weight kg
CB Climbing System, BR Shaft Platform
027212 0,445 Hex. Wrench Key SW 14, longTo remove the Anchor Positioning Studs M24,M30 and M36.
230
SW 14
020320020510020310020520
21,80027,40032,80038,600
Platform Beam BRPlatform Beam BR U100Platform Beam BR U120Platform Beam BR U140Platform Beam BR U160As cross beam for shaft platforms.
NoteThe specified item no. applies only to the 2Platform Beam profiles. The required accessoriesare to be ordered separately.Permissible load: see PERI Design Tables.
L
52
120
UU10
0
U14
0U
160
50
54 123
==
700 700 700 700
50
50
115 273
020620105401020330020600
0,5612,210
12,1006,740
AccessoriesSpacer for Platform Beam BRCrane Eye BR 2.5 tFolding Bearing Plate 25Gravity Pivot Plate BR
020620 0,561 Spacer por Platform Beam BRFor Platform Beam BR.
Complete with1 x 710226 Hex. Bolt ISO 4014 M20 x 90-8.8, galv.1 x 781053 Nut ISO 7042 M20-8, galv.NoteSpacing; maximum 700 mm.Number according to length of the Platform Beam.Spanner size SW 30.
52
M 20x90SW 30
105401 2,210 Crane Eye BR 2.5 tAs attachment point for moving climbing systemsor Platform Beam BR.
Technical dataLoad-bearing point: laod capacity 2.5 t.
245
135
100 75
15Ø60
020620 0,561AccessoriesSpacer for Platform Beam BR
45
Item no. Weight kg
CB Climbing System, BR Shaft Platform
020600 6,740 Gravity Pivot Plate BRFor supporting the Platform Beam BR in wallbox-outs. 2 pieces per platform beam.
Complete with1 x 781053 Nut ISO 7042 M20-8, galv.1 x 710226 Hex. Bolt ISO 4014 M20 x 90-8.8, galv.NoteSpanner size SW 30.Technical dataPermissible load: see PERI product information
437
130 237
75 125
8065
7045 52
48
SW 30
M 20x90
108162 1,610AccessoriesBearing Box BR
108162 1,610 Bearing Box BRTo create wall box-outs for supporting with theGravity Pivot Plate.
140
170 21
0
70
30° M 24
029270 0,331AccessoriesAdvancing Bolt M24, galv.
020330 12,100 Folding Bearing Plate 25For supporting the Platform Beam BR with theAnchor System M24. 2 pieces per platform beam.
Technical dataPermissible load 25.0 kN.
234
258
291 35
0
50
140
162
25
026430 0,334AccessoriesHex. Bolt ISO 4014 M24 x 70-10.9
46
Item no. Weight kg
CB Climbing System, BR Shaft Platform
024070 0,460 Hook Strap HB 24-100/120, galv.For mounting GT 24 Girders to Steel Walers SRZand SRU, Profile U100 - U 120.
152 (U 100) 82
M 8x70
162 (U 120)
024080 0,676 Hook Strap HB 24-140/160, galv.For mounting GT 24 Girders to Steel Walers SRZand SRU, Profile U140 - U 160.
030740030050030150
1,5500,0000,420
Tie Rod B 15Tie Rod B 15 special lengthCutting Costs DW 15, B 15Tie Rod B 15 l = 0.30 m
NoteWeldable! Observe construction approval!Technical dataPermissible load 85 kN.
B 15
030370 1,560 Wingnut Pivot Plate DW 15, galv.With articulated, captive nut. Maximum angle ofinclination of the anchors 8°.
Technical dataPermissible load 90 kN.
117
Ø10
110
72
030070 0,222 Hex. Nut DW 15 SW 30/50, galv.For anchoring with Tie Rod DW 15.
NoteSpanner size SW 30.Technical dataPermissible load 90 kN.
50
SW 30
DW 15
47
Item no. Weight kg
CB Climbing System, BR Shaft Platform
026230 1,010 Anchor Sleeve M24For anchoring of platform systems.
NotePermissible load: see Product information.
68
100
1208
15
12
31Ø
DW 20
026240026250
0,0130,005
AccessoriesCone for Anchor Sleeve M24Plug Ø 26 mm for Anchor Sleeve M24
026240 0,013 Cone for Anchor Sleeve M24Results in a concrete covering of 24 mm.
50
39
24
Ø31
026250 0,005 Plug Ø 26 mm for Anchor Sleeve M24For closing Cones for Anchor Sleeve M24.
2726
Ø
23Ø
026430 0,334 Hex. Bolt ISO 4014 M24 x 70-10.9High strength bolt for anchoring climbing systems.
NoteSpanner size SW 36.
70
M24
SW 36
48
02PERI S.A.S.77109 Meaux Cedexperi.sas@peri.frwww.peri.fr
03PERI AG8472 Ohringeninfo@peri.chwww.peri.ch
04PERI S.A. SociedadUnipersonal28110 Algete/Madridinfo@peri.eswww.peri.es
05N.V. PERI S.A.1840 Londerzeelinfo@peri.bewww.peri.be
06PERI B.V.5480 AH-Schijndelinfo@peri.nlwww.peri.nl
07PERI Formwork Systems, Inc.Elkridge, MD 21075info@peri-usa.comwww.peri-usa.com
08PT Beton Perkasa WijaksanaJakarta 10210bpw@betonperkasa.comwww.peri.de
09PERI S.p.A.20060 Basiano (MI)info@peri.itwww.peri.it
10PERI Japan K.K.Tokyo 103-0015info@perijapan.jpwww.perijapan.jp
11PERI Ltd.Rugby, CV23 0ANinfo@peri.ltd.ukwww.peri.ltd.uk
12PERI Kalıp ve İskeleleriKıraç - Büyükçekmece/Istanbul 34500info@peri.com.trwww.peri.com.tr
13PERI Kft..1181 Budapestinfo@peri.huwww.peri.hu
14PERI Formwork Malaysia43300 Seri Kembangan,Selangor DEinfo@perimalaysia.comwww.perimalaysia.com
15PERI ASIA Pte. LtdSingapore 387355pha@periasia.comwww.periasia.com
16PERI Ges.mbH3134 Nußdorf ob der Traisenoffice@peri.atwww.peri.at
17PERI spol. s r.o.252 42 Jeseniceinfo@peri.czwww.peri.cz
18PERI Danmark A/S2670 Greveperi@peri.dkwww.peri.dk
19PERI Suomi Ltd. Oy05460 Hyvinkääinfo@perisuomi.fiwww.perisuomi.fi
20PERI NORGE AS3036 Drammeninfo@peri.nowww.peri.no
21PERI Polska Sp. z o.o.05-860 Płochocininfo@peri.pl.plwww.peri.pl.pl
22PERIform SVERIGE AB30013 Halmstadperi@periform.sewww.periform.se
23PERI (Korea) Ltd.Seoul 135-080info@perikorea.comwww.perikorea.com
24PERIcofragens Lda.Linda-a-Pastora2790-326 Queijasinfo@peri.ptwww.peri.pt
25PERI S.A.(1625) Escobar/Prov. Bs. As.info@peri.com.arwww.peri.com.ar
26PERI Formas eEscoramentos Ltda.CEP 06730-000Vargem Grande PaulistaSão Pauloinfo@peribrasil.com.brwww.peribrasil.com.br
27PERI Chile Ltda.Colina, Santiago de Chileperich@peri.clwww.peri.cl
28PERI România SRL077015 Baloteşti - ILFOVinfo@peri.rowww.peri.ro
29PERI SLOWENIEN2000 Mariborperi.slo@triera.netwww.peri.de
30PERI spol. s r.o.903 01 Senecinfo@peri.skwww.peri.sk
31PERI Australia Pty. Ltd.Glendenning NSW 2761info@periaus.com.auwww.periaus.com.au
32PERI AS76401 Saku valdHarjumaaperi@peri.eewww.peri.ee
33PERI Hellas Ltd.194 00 Koropiinfo@perihellas.grwww.perihellas.gr
34PERI SIA1057 Rigainfo@peri-latvija.lvwww.peri-latvija.lv
35PERI (L.L.C.)Dubaiperillc@perime.comwww.perime.com
2
1
3
4
5
6
9
11
12
1316
17
18
19
20
22
21
24
2829
30
32
33
34
38
41
42
46
48
52
53
61
01 PERI GmbHRudolf-Diesel-Strasse89264 Weissenhorninfo@peri.comwww.peri.com
France
Switzerland
Spain
Belgium/Luxembourg
Netherlands
USA
Indonesia
Italy
Japan
United Kingdom/Ireland
Turkey
Hungary
Malaysia
Singapore
Austria
Czech Republic
Denmark
Finland
Norway
Poland
Sweden
Korea
Portugal
Argentina
Brazil
Chile
Romania
Slovania
Slovakia
Australia
Estonia
Greece
Latvia
United Arab Emirates
PERI International
49
36PERI Formwork Systems, Inc.Bolton, OntarioL7E 1K1info@peri.cawww.peri.ca
37PERI GmbHBeirutP.O. Box 90 416 Jdeidetlebanon@peri.dewww.peri.de
38PERI UAB02300 Vilniusinfo@peri.ltwww.peri.lt
39PERI S.A.Tangerperi25@menara.mawww.peri.de
40PERI FormworkEngineering Ltd49002 Israelinfo@peri.co.ilwww.peri.co.il
41PERI BULGARIA EOOD1839 – Sofiaperi.bulgaria@peri.bgwww.peri.bg
42MEST ltd.,220 Hafnarfjordurmest@mest.iswww.mest.is
43TOO PERI Kazakhstan050010 Almatyperi@peri.kzwww.peri.kz
44OOO PERI142403 Noginskmoscow@peri.ruwww.peri.ru
45PERI Wiehahn (Pty.) Ltd.Bellville 7535ask@wiehahn.co.zawww.periwiehahn.co.za
46TOW PERI Ukraina02002 Kiewperi@peri.uawww.peri.ua
47PERI GmbH11361 HeliopolisCairoinfo@peri.com.egwww.peri.com.eg
48PERI Oplate d.o.o.11070 Novi Beogradoffice@peri.co.yuwww.peri.co.yu
49PERI Cimbras y Andamios,S.A. de C.V.Estado de México,C.P. 54680info@peri.com.mxwww.peri.com.mx
50PERI Kalıp ve İskeleleriBakuperibaku@peri.com.trwww.peri.com.tr
51PERI Kalıp ve İskeleleri744035 Aşgabatperiashgabat@peri.com.trwww.peri.com.tr
52PERI Belarus220030 Minskperi@mail.belpak.bywww.peri.com.tr
53PERI oplate i skele d.o.o.10 250 Donji Stupnik/Zagrebinfo@peri.com.hrwww.peri.com.hr
54PERI GmbHBuilding No. 4P.O. Box 1939793669Teheran-Iraniran@peri.irwww.peri.ir
55PERI (India) Pvt LtdMumbai – 400064info@peri.inwww.peri.in
56PERI Jordan11947 Ammanjordan@peri.dewww.peri.de
57PERI Kuwait13011 Kuwaitkuwait@peri.dewww.peri.de
58PERI Saudi ArabiaJeddah - 21463K.S.Asaudi-arabia@peri.dewww.peri.de
59PERI Qatar LLCDohaqatar@peri.dewww.peri.de
60Société PERI S.A.S.Kouba - Algerperi.alger@peri.frwww.peri.fr
61Autostrada TIRANE-DURRESTirane / ALBANIAinfo@peri.com.trwww.peri.com.tr
62PERI Peruana SACLima/Perujeanpierre.saux@peri.com.pe
63PERI Panama Inc.587 Panama Cityjohny.fernandezc@gmail.comwww.peri.com
7
8
10
1415
23
25
26
27 31
35
36
3739 40
43
44
45
4749
50 51
54
595558
5760 56
62
63
Canada
Libanon
Lithuania
Marocco
Israel
Bulgaria
Iceland
Kazakhstan
Russian Federation
South Africa
Ukraine
Egypt
Serbia
Mexico
Azerbaijan
Turkmenistan
Belorussia
Croatia
Iran
India
Jordan
Kuwait
Saudi Arabia
Qatar
Algeria
Albania
Peru
Panama
D e
04/
2009
5m
a A
rt.-N
r.: 7
9018
7 ©
Cop
yrig
ht b
y P
ER
I Gm
bH
Wall FormworkPanel FormworkGirder FormworkCircular FormworkFacade FormworkBrace Frame
Column FormworkSquareRectangularCircular
Slab FormworkPanel FormworkBeam Grid FormworkGirder FormworkSlab TableBeam Formwork
Shoring SystemsSteel Slab PropsAluminium Slab PropsTower SystemsHeavy-Duty Props
Climbing SystemsClimbing ScaffoldSelf-Climbing SystemClimbing Protection PanelPlatform Systems
Scaffold, Stairways,Working PlatformsFacade ScaffoldWorking PlatformWeather Protection RoofStairway Access
Bridge and TunnelFormworkCantilevered Parapet CarriageCantilevered Parapet PlatformEngineer’s Construction Kit
ServicesFormwork AssemblyCleaning / RepairsFormwork PlanningSoftwareStaticsSpecial Constructions
Additional SystemsPlywoodFormwork GirdersStopend SystemsPalletsTransportation Containers
PERI GmbHFormwork Scaffolding EngineeringP.O. Box 126489259 WeissenhornGermanyTel +49 (0)73 09.9 50- 0Fax +49 (0)73 09.9 51- 0info@peri.comwww.peri.com
PERI Product Range