TWSd – New Best Practices
TWS Education & Training
© 2009 IBM Corporation
IBM Presentation Template Full Version
Agenda
Global options
Scheduling FINAL
Monitoring FINAL
EDWA/external monitoring/auto-ticketing
Monitoring EDWA
Other integrations
Other tips
© 2009 IBM Corporation
IBM Presentation Template Full Version
Global options
enLegacyId / li = NO–YES was useful only for network with 8.2 FTAs
enTimeZone / tz = YES–Even with a single TZ, YES should be the preferred option
enLegacyStartOfDayEvaluation / le = NO–Easier to understand but it changes the schedulation
© 2009 IBM Corporation
IBM Presentation Template Full Version
Global options – enLegacyStartOfDayEvaluation=NO
April, 12
April, 12Rome
Miami06
:00
06:0
0
06:0
0
06:0
0
Start Of Day = 0600
© 2009 IBM Corporation
IBM Presentation Template Full Version
Global options – enLegacyStartOfDayEvaluation=YES
April, 12
April, 12Rome
Miami(Master)
06:0
0
06:0
0
12:0
0
12:0
0
Start Of Day = 0600
© 2009 IBM Corporation
IBM Presentation Template Full Version
Scheduling FINAL
12:00
07:00
Every working day at 7AM we extend the plan until 12PM of the next working day
12:00 of next
working day
© 2009 IBM Corporation
IBM Presentation Template Full Version
Scheduling FINAL
Required settings– enCarryForward / cf = ALL
– extension to next work day w/ buffer• FINAL to run on every workday (at 7:00)• HOLIDAYS calendar defined• ignoreCals / ic = NO• Makeplan to be changed to extend until next work day
MakePlan –to `datecalc today + 1 workday pic mm/dd/yyyy` 1200 TZ America/NewYork
– Set Until Time on JS to remove from plan uncompleted JS• with cf=ALL JS are not removed when a new plan is created
Optional settings– startOfDay / sd = 0000
– enPreventStart = ???
© 2009 IBM Corporation
IBM Presentation Template Full Version
Monitoring FINAL
STARTAPPSERVER
MAKEPLAN Can be scheduled in advance
SWITCHPLAN Most critical
CREATEPOSTREPORTS No production impact
UPDATESTATS No production impact
© 2009 IBM Corporation
IBM Presentation Template Full Version
Monitoring FINAL
Monitor FINAL jobs status (EDWA or external product)
SwitchPlan abend may not be reported since TWS is down
– Monitor SwitchPlan long duration (EDWA or external product)
– E.g.: alerting if SwitchPlan does not complete within the double of its normal
duration
Periodically check FNCJSI
– the size of Pre-Production plan is related to that
> planman showinfo
...
Start time of first not complete preproduction plan job stream instance: 03/25/2011 00:00 TZ CET
© 2009 IBM Corporation
IBM Presentation Template Full Version
Monitoring FINAL
Job Status ChangedFINAL.SWITCHPLAN
to status EXEC
Job Status ChangedFINAL.SWITCHPLAN
to status SUCC, ABEND, FAIL
Timeout Action:Send mail to administrator
Timeout = double of normal time
© 2009 IBM Corporation
IBM Presentation Template Full Version
EDWA/external monitoring/auto-ticketing
Use monitoring tools to be notified of failure in TWS–Job abends–Unlinked WS (outside FINAL timeframe)
–TWS processes down on masternetman mailman batchman jobman WAS monman
–TWS mailbox size
Forward the identified problem to ticketing application to automatically generate a ticket
© 2009 IBM Corporation
IBM Presentation Template Full Version
EDWA/external monitoring/auto-ticketing
EDWA– Can be used to monitor Jobs, unlinked WS, TWS processes, TWS mailbox
size– Need to monitor EDWA itself
IBM Tivoli Monitoring– Integration provided with TWS can be used to monitor Jobs, TWS processes,
TWS mailbox size– Monitor unlinked WS currently not provided in the integration
• Can be implemented using BMEvents.conf events
Other monitoring tool– Jobs, unlinked WS can be implemented using BMEvents.conf events– Evtsize can be called to determine mailbox usage– TWS processes should be monitored through OS (pids directory contains TWS
processes pids)
© 2009 IBM Corporation
IBM Presentation Template Full Version
Monitoring EDWA
Monitor WAS is running– This can be done monitoring the java process
Monitor that agents are monitoring (coming soon)– Agent monitoring status is turned off if the monitoring process are down or
agent is not able to send events.
– BMEvents.conf can be used to generate events on the master when an agent monitoring status goes down (261,262).
Monitor for failed Rule Actions– Message AWSAHL007E is written in SystemOut.log when the action fails
© 2009 IBM Corporation
IBM Presentation Template Full Version
Other integrations
Self service (via conman/Java APIs)
–Allow your end-users to operate directly on their scheduling activities–Product like IBM Tivoli Service Request Manager can be used to
implement an approval process before the action is performed–Custom GUIs can provide a simplified and limited interface design on
the enduser need
Change management (via composer/Java APIs)
–Promote your scheduling defintion from Dev to Q&A and from Q&A to Prod
–Product like IBM Tivoli Service Request Manager can be used to implement an approval process before the action is performed
© 2009 IBM Corporation
IBM Presentation Template Full Version
Other tips
“conman” always return rc 0, you can workaround this limitation with a wrapper script that intercept returned errors and exit with different rc accordingly
http://www-01.ibm.com/support/docview.wss?uid=swg21470088
Unlink Tool (coming soon)–“Check Health Status” command fron conman and WebUI diagnose
unlink problems, .msg and Symphony files
Prevent losing events with EDWA–Modify EIF/monmaneif.templ and ssm/eif/tecad_snmp_eeif.templ
setting: ConnectionMode=connection_less
© 2009 IBM Corporation
IBM Presentation Template Full Version
Other tips (TDWC)
Windows Domain Users?–Consider accessing it as LDAP user registry instead as LocalOS
Improve TDWC scalability–Set maxOpenConnections=“20000” for WC_adminhost and WC_adminhost_secure in eWAS/profiles/twaprofile/config/cells/DefaultNode/nodes/DefaultNode/servers/twaserver/server.xml
Improve Graphical View scalability–Set isGrowable=“true” for TWSWebUIWorkManager in eWAS/profiles/twaprofile/config/cells/DefaultNode/nodes/DefaultNode/servers/twaserver/resources-pme.xml