Post on 14-Apr-2018
7/30/2019 Clear Case Open Make Process
1/27
Clear Case base line creation Process
Worksapce : ArunWorkspace
Projects: IFC, IFC_UI
Step 1: Copy the changed flex files to their corresponding folders as below.
7/30/2019 Clear Case Open Make Process
2/27
Step 2:
It will ask for overwrite as shown below, proceed by pressing yes.
7/30/2019 Clear Case Open Make Process
3/27
Step 3:
It will ask for clear case password for checking out the file. Use Mukunds ID mxs8259 password
Oct@2010.
7/30/2019 Clear Case Open Make Process
4/27
Step 4:
After that it performs check out activity as show below. Click on New to create new activity for check
out.
7/30/2019 Clear Case Open Make Process
5/27
Step 5:
Enter activity name and create the check out activity.
7/30/2019 Clear Case Open Make Process
6/27
Step 6:
Complete the checkout by clicking on apply.
7/30/2019 Clear Case Open Make Process
7/27
Step 7:
After completing the above operation you can see the tick mark on the checkout files as below
7/30/2019 Clear Case Open Make Process
8/27
Step 8:
After pasting the flex files, clean the flex project. It will generate the html and swf files under bin-
debug folder. Copy the files and paste them on IFC java project. As shown below.
7/30/2019 Clear Case Open Make Process
9/27
Now follow the same procedure above to checkout the file on java.
7/30/2019 Clear Case Open Make Process
10/27
Step 9:
To check in the changed checked out file. Follow the below screen shots. Right click on the clear case
project and select ClearCase Search.
7/30/2019 Clear Case Open Make Process
11/27
Step 10:
Click on search.
7/30/2019 Clear Case Open Make Process
12/27
Step 11:
Search displays the results below. Select all the checked out resource and proceed with check in as
highlighted below.
7/30/2019 Clear Case Open Make Process
13/27
Step 11:
Check in the files as below.
7/30/2019 Clear Case Open Make Process
14/27
Step 12:
After check in the files will be in the status as below as loaded.
7/30/2019 Clear Case Open Make Process
15/27
Step 13:
After check in right click on the project and select Deliver stream for Delivering the project to clear
case. And follow the below screen shots.
7/30/2019 Clear Case Open Make Process
16/27
7/30/2019 Clear Case Open Make Process
17/27
7/30/2019 Clear Case Open Make Process
18/27
7/30/2019 Clear Case Open Make Process
19/27
7/30/2019 Clear Case Open Make Process
20/27
It is mandatory to complete the deliver operation for others to deliver. Hence after completing the
deliver stream press on the complete deliver operation as highlighted below.
Step 14:
Creating Base line. To do so change to the clear case perspective and follow the screen shots below.
7/30/2019 Clear Case Open Make Process
21/27
7/30/2019 Clear Case Open Make Process
22/27
7/30/2019 Clear Case Open Make Process
23/27
7/30/2019 Clear Case Open Make Process
24/27
Make a note of this base line. We need the above info for open make.
7/30/2019 Clear Case Open Make Process
25/27
Recommending the base line.
7/30/2019 Clear Case Open Make Process
26/27
OM Package Creation
1. Click on the OM workflow perspective2. Click on workflow summary3. Select the TMSIFC workflow, right click and chose edit.4. Click on configure tab.5. Under Configure environment, click on the CC Baseline.6. Click on edit and replace the value with the latest base line which we have created above. Do
the same procedure for other variables like MEISTER_EMAIL_SUCCESS and
MEISTER_EMAIL_FAILURE and replace with your email ID.
7. Save the workflow and click on execute. After few mins you will receive the deploymentsuccess email.
7/30/2019 Clear Case Open Make Process
27/27
Follow the link on the mail and look for the package name. It should be
smiliar to hd-tcgrid-tp-IFC-1.0-8.x86_64.rpm .
With this info request the Policy captains to do a deployment.