Cleaning out the stable for the girls

Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them

Inside the bathroom

Screen needs replacing, two tiny holes

New windows in the upper north bedroom

This one is finished, just outer edges of trim to paint

Bathroom window installed

Tackling the dormer – three new windows go here

One new window fits in the opening for the original two

Then we create openings for new windows on each side. This way the roof is supported

Ready to rip and tear

I’ll have a nap after lunch

Door at the top of the stairs

Vent pipe in the way so Pete helps Ryan remove it and patch the roof. It had been cut off in the basement but never removed when the new one was installed

Three new windows in the dormer, repairs underway

Checking the chimney flashing

Inside the dormer, new windows installed

Carter likes to steal gloves and run around the house with them

Window jambs for the replacement windows

Kitchen gets new windows in a box, this is the base

You can see the angle braces

Insulating the floor

Small patch on the basement concrete floor

Prest Electric has ‘ HUGGIES’

Kitchen window box taking shape

A better view

A view of the new kitchen window through the old window opening.

The new windows installed

Ready for trim

Gloves on the ladder top protect the wood

Caulking finished, ready for primer and paint