Post on 08-Mar-2016
description
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
Copyright © 2012
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
[mission statement] The City of San Angelo Development Corporation working with economic development partners will retain, strengthen and diversify the job base of the community to ensure a vibrant business climate for San Angelo and the region.
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
[table of contents]
Leadership Message............................................................................3
Economic Snapshot............................................................................4
Marketing & Business Recruitment..............................................5-6
Recruitment Projects...........................................................................7
Business Retention & Expansion.......................................................8
Planning for the Future.......................................................................9
Strategic Plan for Economic Development.....................................9
Key Strategies for Economic Development..................................10
Existing Business Survey..................................................................11
Business Climate Indicators.............................................................11
Development Process Improvement Plan....................................12
Transportation.............................................................................13-14
Aff ordable Housing.....................................................................15-16
Community Development Projects..........................................17-19
Board of Directors.............................................................................21
Professional Staff ...............................................................................21
Local & State Partnerships...............................................................22
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
Shawn LewisEXECUTIVE DIRECTOR
Larry Teague
CHAIRMAN
2011 was a year of transition for the City of San Angelo Development Corporation. With a new executive director, three other new COSADC staff members, five new directors on the board and a new head of the Chamber’s economic development division, 2011 could have been a year to sit back, get oriented and plan for the future.
Instead, staff and the new board hit the ground running, undertaking a slew of new projects:
• Creating the board’s first professionally-compiled strategic plan
• Acquiring and bidding construction of a one-of-a-kind Business
Resource Center
• Funding an air service marketing study to recruit a second airline
• Conducting the most comprehensive existing business survey to-
date
• Approving incentive offers to Ethicon and MedHab and making
formal incentive offers to three other prospective firms
• Creating a new target industry list
• Developing a plan for a new Business Retention & Expansion Program
• Funding significant improvements to the City’s development review process
[leadership message]
But simply being satisfied with our progress this past year and those prior will not make San Angelo’s economy stronger. It will take more effort, more creativity and more commitment from the Corporation, economic development partners and the entire community to continue to retain, strengthen and diversify the job base of the community.
re communityy to
• Sponsoring the Ports-to-Plains Annual Conference & West Texas Trade Summit
• Building six new homes through the Affordable Housing Program
• Issuing almost $20 million in bonds to fund critical projects such as the Hickory Aquifer and Concho River improvements
3
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
[economic snapshot]
4
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
Through a contract with the San Angelo Chamber of Commerce, COSADC markets San Angelo and recruits companies by attending trade shows, participating in state and national associations, distributing marketing pieces, placing advertising outside of the community, responding to requests for proposals and information from prospective companies and coordinating details when business prospects visit San Angelo.
This work is accomplished by the Chamber’s Economic Development Division which includes John
Dugan, Vice President for Marketing & Recruitment and Hope Barron, Economic Development Specialist.
elo kets y
,
2011 TRADE SHOWS INCLUDE:
• Solar Power International (Dallas, Texas) Representing High Ground of Texas
• Specialty Equipment Manufacturers Association (Las Vegas, Nevada) Representing High Ground of Texas
• Consultant’s Forum (Austin, Texas)
• American Wind Energy Show (Anaheim, California) Representing High Ground of Texas
[marketing & business recruitment]
5
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
LIST OF ASSOCIATION EVENTS
• Dinner and Conversation – TMCN• Lone Star Solar Summit – San Angelo• Executive Committee Meeting – TMCN• Ports-to-Plains – San Angelo • Network Luncheon – TMCN• Texas Midwest Day in Austin – TMCN• Board Meeting – High Ground of Texas • Transmission Summit – Wind Energy
Consortium• Marketing Committee Meeting – High
Ground of Texas • West Texas Regional Leadership Dinner –
San Angelo• Texas Small Business Industrial
Development Board – San Angelo• New York Recruitment Trip with First Lady Anita Perry – TexasOne
PROSPECTS HOSTED
• PROJECT UPSTREAM Service Center • MEDHAB Medical Device Manufacturer • PROJECT WIND Site Selector Consultant
• PROJECT EDUCATION• PROJECT STEEL• PROJECT APOLLO• PROJECT UPSTREAM• PROJECT MEDHAB • PROJECT DEMETER • PROJECT MEXICO• PROJECT BIG TOP • PROJECT CALL CENTER• PROJECT SMARTPHONE• PROJECT ARMADILLO TECH • PROJECT COLORADO
sanangelo.org
REQUESTS FOR PROPOSALS
6
MARKETING & TRADE SHOWS
• Ads placed in trade magazine 15
• Contacts made at trade shows UNLIMITED
• Marketing material mailed to trade show contacts 450
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
Once the Chamber of Commerce has successfully added San Angelo to a company’s list of possible cities in which to locate, COSADC staff , with direction from the COSADC Board and City Council, formulate an incentive off er which the Chamber of Commerce and/or COSADC staff communicate to the prospective company.
[recruitment projects]
MedHabCompany Commitment• 85 manufacturing,
distribution, technical assistance, healthcare provider support, and management jobs in Phase I
• 227 jobs in full production with annual payroll $5-$6M
• $500,000 in an existing building
• $2M capital equipment
COSADC Commitment• $7,929 for each new job
created, up to $1.8 million • 25% rebate of costs to
remedy code issues in building, up to $12,500
• 15% rebate of capital equipment costs up to $300,000
• 52% rebate of costs to renovate building in San Angelo, up to $575,000
• Lease fee reimbursement prior to purchase up to $108,000 or use of COSADC Business Incubator for $1 annually
Agreement not fi nalized
Martifer-HirschfeldCompany Commitment• Phase 1 - $23M Capital
Investment• Phase 2 - $20M Capital
Investment• Create up to 225 jobs • COSADC Commitment• Land Purchase - $280,000• Investment of fi rst $15M -
$500,000• Completion of Phase 1 -
$500,000• $6,000 per job paying a
minimum of $31,531 per year in 2010 increasing annually to $38,671 in 2015
Executed agreement December 2010
Glazers’ Wholesale Drug Company, Inc.Company Commitment• $7.2 M Capital Investment• Over 79 jobs created • Retain 45 jobs
COSADC Commitment• $7,500 per job retained
(45 maximum)• $7,500 per job created
(79 maximum)Executed agreement May 2010
Multi-ChemCompany Commitment• Relocate Corporate offi ce
to San Angelo• Secure 5 year lease• Retain 30 existing
positions• Create up to 145 new
positions at an average wage of $50,000
• Maintain positions for minimum of 3 years
COSADC Commitment• Incentive - $10,000 per
job (averaging $50,000) up to 145 jobs -$1.45M
• Incentive paid to date - $700,000 for 30 positions retained and 70 created
Executed original agreement December 2004Executed second agreement May 2008
7
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
STRATEGIC PLANNING
RECOMMENDATIONS
5.2.1 Develop goals and performance metrics for the retention and expansion program which should be administered and conducted by the San Angelo Chamber of Commerce, with involvement from the COSADC and other economic development partners as necessary.
5.2.2 Using the Chamber’s existing annual business survey as a starting point, survey existing businesses through online surveys and in-person interviews every six months.
Visits and surveys should include all companies and should not be limited to only Chamber member companies.
5.2.3 Develop an annual retention and expansion report based upon the survey and interview fi ndings which can be shared with local offi cials and residents and should be used to track any changes in service quality.
5.2.4 Address issues identifi ed by employers by working with city, county, or state offi cials.
• Utilize the retention and expansion program to better understand the needs and challenges of local businesses.
• Establish a “SWAT Team” of city and county employees that proactively go out into the community and work with local businesses to identify problems and develop solutions.
5.2.5 Use the retention and expansion program to probe supplier opportunities and to better understand and support the growth trends of local businesses.
5.2.6 Visit corporate headquarters of fi rms with major local operations that are not headquartered in San Angelo.
5.2.7 Establish an Ambassador Program in which Chamber members that volunteer as Ambassadors play an active role in business retention by engaging with new Chamber member businesses to encourage networking amongst San Angelo businesses and to promote participation in Chamber programs.
[business retention and expansion]
ETHICON INCENTIVES SUMMARYCompany Commitment• Retain 30 existing at risk positions • Retrain up to 30 at-risk positions • Capital Investment between $18M and $28M• City Commitment• $5,000 per identifi ed at-risk position, up to
$150,000• Up to an additional $5,000 per position for
individuals retrained and receiving at least a 10% pay increase, up to $150,000
Retraining incentive is on an incremental scale as follows:• $37,500 - $1,000• $40,000 - $2,000• $42,500 - $3,000• $45,000 - $4,000• $50,000 - $5,000Agreement nearing completion
8
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
[planning for the future]BUSINESS RESOURCE CENTER
Description: A one-stop shop for business resources
Mission: To grow and retaining local businesses by providing exceptional business services and to strengthen San Angelo’s appeal as a place to do business
Goals:• Consolidate many of San Angelo’s
economic development agencies into one facility
• Create an improved environment for small businesses and the recruitment of businesses
• Increase knowledge sharing and synergy among economic development partners• Provide ASU and Howard College students with service learning opportunities
Business /Prof Srvc (52.2%)
Renewable Energy (42.9%)
Information Tech (41.5%)
Manufacturing (38.4%)
Energy (30.8%)
Retail (29.9%)
Tourism & Hosp (29.9%)
Healthcare (26.8%)
Education (25.9%)
Life Sciences/Research (25.4%)
The following industries were chosen as desirable targets for attraction or expansion by at least 25% of San Angelo residents.
9
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
Strategy 1.1: Continue to invest in regional transportation infrastructure, partnering with the Ports-to-Plains Alliance and TXDOT.
Strategy 1.2: Expand opportunities for international trade in San Angelo, both for local businesses seeking to import/export, as well as for foreign enterprises seeking to locate facilities within the U.S. market.
Strategy 1.4: Continue to aggressively pursue additional air travel connections.
Strategy 2.1: Continue to support investment in San Angelo’s most unique natural resource, the Concho River, to capitalize on its economic development potential.
Strategy 2.2: Identify specifi c opportunities for additional businesses and employers to locate in downtown San Angelo.
Strategy 3.1: Involve Angelo State University (ASU) more closely as a key regional economic development partner.
Strategy 3.2: Leverage ASU’s unique strengths for economic development purposes and provide support to ASU programs and research that are related to San Angelo’s target industries.
Strategy 3.3: Continue the strong collaborative relationship between Goodfellow Air Force Base (GAFB), the City of San Angelo, Tom Green County, and the San Angelo Chamber of Commerce.
Strategy 3.4: Proactively retain military retirees from Goodfellow Air Force Base (GAFB), many of whom have advanced technology skills.
Strategy 4.2: Support and promote San Angelo’s vibrant network of small businesses and entrepreneurs to create a culture of creativity.
Strategy 5.1: Collectively agree upon operating guidelines which describe roles and responsibilities and advance the goal of strong teamwork toward the economic development of San Angelo.
Strategy 5.2: Implement a formalized Business Retention and Expansion Program (BREP) with regular outreach to existing San Angelo businesses.
Strategy 6.1: Promote the “Advance San Angelo” campaign as a unifying initiative for San Angelo’s regional economic development partners.
Strategy 6.3: Launch a “Beautify San Angelo” initiative to improve the city’s physical attractiveness, especially at gateways into the city and downtown area and along major transportation corridors.
Strategy 7.2: Retain and attract more young people to San Angelo.
[key strategies for
economic development]
10
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
[existing business survey]Economic development partners and key business leaders met in October 2010 to implement a formal Business Retention and Expansion Program (BREP). This 19-member team developed a survey to gauge perceptions of the current business climate. The survey was published in March 2011, and 126 business owners and managers responded and provided comments. Almost every industry in San Angelo was represented.
Ninety-four percent of respondents were companies operating inside the city limits, and 65 percent had operated for 10 or more years.
Survey results were used as the basis for the Development Process improvement eff orts undertaken by the City’s Community and Economic Development Department.
The survey results were used as the basis for the Development Process improvement eff orts undertaken
by the City’s Community and
Economic Development Department.
[bu
sin
ess
cli
ma
te i
nd
ica
tors
]
11
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
[development process
improvement plan]Recognizing the importance of a consistent, straight-forward development process, as well as excellent customer service from City staff , COSADC funded the Development Review Process & Organizational Culture Improvement Plan.
The goal of the plan was to improve San Angelo’s business climate by making improvements to the processes and services provided by the Community & Economic Development Department.
Creating an improvement plan started with a survey of developers, architects, contractors, engineers and others in the development community. For two days, the consulting fi rm of Innes Strategies interviewed departmental staff , City leaders and members of the development community through focus groups and other meetings. Concurrently, TechSolve, a non- process improvement organization mapped the development process from start to fi nish fi nding duplication, unnecessary steps and other ineffi ciencies.
The result of the eff ort was a streamlined development process with an action plan containing 70 diff erent items for improvement.
12
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
San Angelo is a member of the Ports-to-Plains
(PTP) Alliance, an advocacy group dedicated to delivering infrastructure, food, and fuel to secure the quality of life of America’s great cities. The City of San Angelo, Tom Green
County, and San Angelo Chamber of Commerce participate as partners in the PTP Alliance. Council Member Dwain Morrison represents San Angelo on the PTP Board.
COSADC co-sponsored the 2nd Annual West Texas Trade
Summit in February 2011, and the City of San Angelo leadership helped established a Southern Work Group to focus eff orts on transportation connectivity issues from West Texas to the Mexican ports. COSADC also co-sponsored the annual PTP meeting held in San Angelo during October 2011, with more than 170 attendees.
[transportation]
MEXICAN TRADE VISITS
COSADC was represented on a trade visit to Mexico June 2011. The visit was in was conjunction with the Southern Work Group Meeting of the Ports-to-Plains Alliance. Mayor Alvin New, Assistant City Manager Elizabeth Grindstaff , and Tony Villarreal (Chamber and COSADC representative) participated in the trip in which the San Angelo delegation met with local and state offi cials in cities along the Ports to Plains Corridor. Mr. Villarreal also met with representatives of Mexican companies during the trip to discuss business opportunities in San Angelo.
Ports to Plains advocates roadway improvements
for San Angelo.
Loop 306 at Paint Rock Rd was funded under Texas Proposition 14. $22,441,977
In total, the PTP is advocating for more than of $328M funding for planning and construction eff orts on 22 projects in seven states along the corridor.
Ports -to- Plains Trade Corridor
13
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
RAIL SERVICEUpdate on Texas Pacifi co rail line
About the Company: Texas Pacifi co operates freight rail service over 391 miles of rail previously known as the South Orient Railroad, running from the San Angelo Junction 5 miles southwest of Coleman, south to Presidio at the Texas/Mexico border.
Recent Rail Upgrade Funding Sources
• $14.01 million—American Recovery & Reinvestment Act
• $212,000—remaining balance of 2004 federal Omnibus appropriation
• $910,000—matching funds from Texas Pacifi co• $4.6 million—Texas Pacifi co for rail upgrades in
lease agreement• $3 million—Texas Legislature• $1 million—Congressional appropriation
Improvements Made
• Line upgrades between San Angelo and Coleman• Bridge replacement at Ballinger• San Angelo grade crossings upgrades
Pending Funding
$21.6 million TIGER 2 federal grant pending for tie replacement, bridge upgrades and rail replacement between Sulfur Junction and Fort Stockton.
TRADE VISIT TO MEXICOIn November 2011, Assistant City Manager Elizabeth Grindstaff traveled with COSADC Executive Director Shawn Lewis and Chamber representative Luke Brame to Mexico City to meet with Fer-romex, the parent company of Texas Pacifi co, which operates the rail line from Presidio to Coleman. The group discussed future rail demand, pending contracts for service along the rail line, Texas Pacifi co staffi ng needs in San Angelo, the impact of oil and gas production along the rail line, and the opportunities for constructing an intermodal facility in San Angelo.
BNSFBNSF
San AngeloMcCamey
Fort Stockton BCFPTAlpine
Paisano
PresidioUPUP
BNSFBNSF
San Angelo Jct.
Brownwood
FortWorthDallas
UPUP
Ojinaga
MEXICOMEXICO
EUA EUA (TEXAS)(TEXAS)
Ricker
to Lubbockto Lubbock
Sulphur Jct.
Rankin
San Angelo Junction - Presidio, Tx
AIR SERVICEMarketing Plan
COSADC recognizes that air service in San Angelo is critical to the economic vitality of the community. Based on extensive market research, a community survey, leakage analysis, and signifi cant community input, COSADC funded a contract with a nationally-recognized air service company, SH&E, Inc.
Staff has identifi ed three goals for SH&E and future
service:
1. Maintain American Eagle Service to DFW by monitoring service performance.
2. Promote growth by improving existing services, more frequencies, jet service, and better timed fl ights.
3. Secure new service with competitive air fares to new markets and new airlines.
San Angelo Mathis Field
14
transportation is vital to future
prosperity
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
Approved by voters in 2004, an annual allocation of $335,000 is granted by COSADC to the City’s Aff ordable Housing Assistance Program (AHAP).
AHAP is a program designed to provide gap reduction/mortgage buy down assistance to fi rst time homebuyers who meet eligibility criteria. The assistance provided is up to 40% of the housing unit’s sales price (not to exceed $100K) in addition to the closing costs.
In 2011, COSADC approved construction of six speculative homes in the Blackshear target area at a cost of $400,748.
By the end of 2011, COSADC had sold all six of the homes constructed. Since 2004, the COSADC’s annual allocation has led to the construction of 28 new homes in the City’s four areas targeted for revitalization: Rio Vista, Fort Concho, Reagan, & Blackshear.
Through thousands of volunteer hours, COSADC’s $60K leveraged funds to side,
repair, and paint 32 additional homes for a total of 47 homes.
[aff ordable housing]
Number of homes
constructed
2009-2011 2009 4 homes 2010 6 homes 2011 13 homes
Number of homes assisted through
buy-down program
2009-2011 2009 4 homes 2010 6 homes 2011 13 homes
15
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
strong neigborhoods build a stable
& vibrant community
PROTECTING A NEIGHBORHOODThe Aff ordable Housing Fund expended $5,396 to purchase materials to build a fence (approx 300 ft.) that now provides an attractive barrier between the Blackshear neighborhood and an unsightly junkyard. Dozens of volunteers pitched in to install the fence at no cost.
NEIGHBORHOOD BLITZ$60K in AHAP allowed contractors to install siding, purchase paint and supplies for 15 homes in the Rio Vista area.
TARGET AREAS
PR
U
N R
IVE
R D
R
W RIV ER DR
LAKE DR
AP
AC
HE
TR
L (G
AF
B)
W 11TH ST
SAM ST
E AVENUE K
INDUSTRIAL AVE
CATALINA
DR
GARDEN RD
E 39TH ST
E AVENUE D
W 42ND ST
CUMBERLAND DR
LIN
DA
LEE
DR
E 43RD ST
WILSON ST
SH
ELT
ON
ST
VANCE CIR
(GAFB)
PARKVIEW
DR
W 31ST ST
SPRA
GU
E S
T
SWEETBRIA
R DR
E 30TH ST
VAN ZANDT ST
EDGEWOOD DR
WY
NN
E A
VE
MIS
SI O
N A
VE
EV
ELY
N A
VE
LAKE DR
R
W 36TH ST
SMU AVE
FUSSELMAN DR
E 37TH ST
CA
W 37TH ST
ALTA LOMA CIR
VICTORY LN
PERMIAN DR
PETRO RD
NU
EC
ES
DR
ALLEN ST
MILBURN
WAY (PVT.)
RI C
HA
RD
ST
S M
AR
IE S
T
TECH AVE
STANFORD DR
SP
RA
BE
RR
Y D
R
W 24TH ST
JAD
E D
R
PE
CA
N S
T
N M
AG
DA
LE
N S
T
ERLIN
E D
R
OG
DE
N R
D
CORDELL DR
E 37TH ST
TR
AVIS
ST
E 25TH STE 26TH STE 27TH STE 28TH ST
E 35TH ST
PAINT ROCK RD
E 14TH ST
E 33RD ST
W 39TH ST
VOLN
EY
ST
E 36TH ST
E 20TH ST
TON DR
GIB
BS
DR
LOGAN ST
FO
RD
ST
MCDEVITT ST
WO
OL
ST
E COLLEGE AVE
JUANITA
AVE
DENA DR
E 4TH ST
CY
ND
I LN
W 38TH
ST
N HARRISON
ST
VECK ST
W 28TH
ST
E 2ND
ST
WO
OD
RU
FF
ST
CL
AIR
MO
NT
ST
AR
DM
OR
E S
T
BL
UM
ST
N HAVEN
CT
RU
ST
ST
MCKINLEY ST
ADRIAN STCAM
ERON ST
ERIN ST
YUCCA LN
ST
MA
RY
S S
T
N B
ISH
OP
ST
N B
AZ
E S
T
MID
GE
T S
T
MILLS AVE
SP
EN
CE
R S
T
PO
WE
LL S
T
S E
ME
RIC
K S
T
GR
O
VE CIR
ALGERITA DR
N M
IL TON
ST
E 6TH ST
LOUIS DR (PVT.)
N O
AK
ES S
TG
RO
VE
DR
E 7TH ST
W AVENUE Q
W AVENUE O
S H
AR
RIS
ON
ST
PATRICK ST
CRENSHAW ST
LIN
DE
N W
AY
E 18TH ST
W AVENUE M
N M
AD
ISO
N S
T
N JA
CK
SON
ST
W AVENUE I
S LIN
CO
LN ST
CO
LIS
EU
M D
R
AUST
IN ST
S G
ARR
ETT
ST
W 35TH ST
E 5TH ST
HA
SS
ELL ST
KER
ST
MARTIN ST
N V
AN B
UR
EN ST
41S
T P
L
HIL
LTO
P D
R
S B
AZ
E S
T
STEPHEN ST
FAR
R S
T
RAILR
OA
D ST
XPY
E HOUSTON HAR
AR
MS
TR
ON
G S
T
S CHADBOURNE ST
W BEAUREGARD AVE
OD
ES
SA
S
PEC
AN
ST
CLAYTON ST
ANGELO BLVD
GR
AP
E C
RE
EK
RD
HARBOR
CT
A&M CIR
E 6TH ST
HUMBLE RD
S OAKES
ST
CA
RD
INA
L S
T
OLD BAL
E 42ND ST
W 29TH ST
BO
WIE
ST
EDMUND BLVD
W 14TH ST
E 24TH ST
E 23RD ST
E 22ND ST
E 21ST ST
CULWELL STN
CE
CIL
ST
HUGHES STHUGHES ST
N E
ME
RS
ON
ST
VELMA ST
N A
RC
HE
R S
T
MAGNOLIA ST
BEACON ST
LA FOLLETTE ST
N M
ON
TA
GU
E A
VE
N B
ELL
ST
PR
UIT
T D
R
1ST ATLAS
HU
GO
LN
HE
NR
Y L
N
JAM
ES
LN
JAC
IE L
N
WALNUT ST
PECOS ST
S AD
AM
S S
T
S BIS
HO
P STS
JACK
SO
N S
T
W BEAUREGARD AVE
W HOUSTON HARTE EXPY
W HARRIS AVESHERWOOD W
AY
S JOHN
SON ST
W AVENUE NW AVENUE N
KNICKERBOCKER R
D
E AVENUE L
W 34TH ST
N CH
ADB
OU
RNE ST E 31ST ST
E 32ND ST
E 39TH ST
GO
LIA
D S
T
E 38TH ST
E 29TH ST
E 40TH ST
E 41ST ST
OA
KLAW
N B
L VD
MA
RX
ST
E 19TH STE 19TH 1/2 ST
E 25TH ST
E 20TH ST
E 14TH ST
N P
OE
ST
N P
OP
E S
T
N B
RO
WN
ING
ST
PREUSSER ST
N B
EL
L S
T
N M
AR
IE S
T
UPTON ST
N A
RC
HE
R S
T
N IR
EN
E S
T
N B
UC
HA
NA
N S
TSPAULDING ST
PREUSSER ST
E HARRIS AVE
COKE ST
S B
EL
L S
T
SCHWARTZ ST
S C
EC
IL S
T
S A
RC
HE
R S
T
TARVER ST
S PO
PE
ST
S IR
EN
E S
T
N C
EC
IL S
T
N F
LOR
EN
CE
ST
PULLIAM ST
E HARRIS AVE
N P
OE
ST
N E
ME
RIC
K S
T
N M
AL
ON
E S
T
N E
ME
RS
ON
ST
KOBERLIN ST
RIO CONCHO D
R
E CONCHO AVEE TWOHIG AVE
S M
AG
DA
LEN
ST
E BEAUREGARD
AVE
NEFF'S
WAY
S C
HA
DB
OU
RN
E S
T
W HIGHLAND BLVD
MONTECITO DR
W AVENUE H
W AVENUE A
E AVENUE G
E AVENUE H
PA
RS
ON
S S
T
HENRY O. FLIPPER ST
BAKER ST
BU
RG
ES
S S
T
W TWOHIG AVE
S O
AK
ES
ST
W 4TH ST
W 5TH ST
W 3RD ST
W 2ND ST
ME
TC
ALF
E S
T
DU
GG
AN
ST
E AVENUE I
W AVENUE J
W AVENUE K
W AVENUE L
S CONCHO PARK DRLIVE OAK ST
W AVENUE D
WARD ST
GR
IER
SO
N S
T
S M
AD
ISO
N S
T
PA
SE
O D
E V
AC
A S
T
WILLOW ST
SHILOH ST
NORTH ST
N GA
RFIELD ST
JUNIUS ST
HA
TCH
ER
ST
SHIR
LEY S
TB
ER
THA
ST
BELM
ON
T STC
LAS
SEN
BL V
D
HOUSTON ST
ABILENE ST
W WACO STCOLEMAN ST
CH
ILDR
ES
S S
T
WES
TLAN
D A
VE
FREELAND AVE
ALEXA
ND
ER
ST
SAN ANTONIO ST
RIO GRANDE STGUADALUPE ST
LLAS ST
N H
AR
RIS
ON
ST
N H
OW
AR
D S
T
MA
RTIN LU
THER K
ING
DR
W 16TH STW 17TH STW 18TH ST
W 20TH STW 21ST STW 22ND STW 23RD ST
W 25TH ST
W 27TH ST
W 24TH ST
W 18TH ST
W 17TH ST
W 16TH ST
W 15TH ST
L ILL IE AV
E
BR
OW
N S
TH
UD
SO
N S
T
AB
BI T
TR
L
S JACKSO N ST
MAR
KET ST
WES
TER
N C
T
IDAHO AVE
KANSAS AVE
PARKVIEW DREXECUTIVE D
R
R R
DSUNSE
BIL
LIE
B
OLI
N D
R
LINDENWOOD DR
TA NGLEWOOD DR
O AK FOREST DR
HEMLOCK DR
VILLAGE EA S T CIR (P V T.)
VISTA DE L ARROYO DR SU
L RO
SS
ST
OXFORD AVE
YALE AVE
RICE AVE
UNIVERSITY AVE
HARVA RD AVE
TC
U A V E
TU
LA
NE
ST
A&
M A
VE
COLORADO AVE
W TWOHIG AVE
LIVE OAK ST
W A VENUE J
S JA
CK
SO
N S
T
S V
AN
BU
RE
N S
T
S M
ON
RO
E S
T
S D
AV
ID S
T
W AVENUE I
S F
I LL
MO
RE
ST
VA
RS
ITY
DR
CAVNESSAVE
VA
UG
HN
ST
TEXAS AVEMURPHY S
T
W AVENUE Y
ANTONIO ST
SAN JACINTO ST
JULIAN ST
W AVENUE Z
HU
LL
ST
FO
ST
ER
ST
W A
VENUE V
W AVENUE XW AVENUE W
W AVENUE V
W AVENUE U
W AVENUE P
BE
N F
ICK
LIN
RD
W AVENUE R
W AVENUE S
HIL
L S
T
S I
RV
ING
ST
S C
HA
DB
OU
RNE ST
W AVENUE J
S P
AR
K S
T
HIL
L S
T
S I
RV
ING
ST
W AVENUE B
W AVENUE C
W AVENUE D
OR
IEN
T S
T
S K
OE
NIG
HE
IM S
T
S A
BE
ST
W WASHINGTON DR
AU
ST
IN S
T
KE
NW
OO
D D
R
W AVENUE M
BU
RG
ES
S S
T
E HIGHLAND BLVD
E WASHINGTON DR
E AVENUE A
BIRD S
T
WEBB ST
CO
UR
T
ST
SU R B
ER
DR
S D
AV
ID S
T
SA
NTA
FE PA
R K DR
ELM S
T
N P
AR
K S
T
HIC
KO
RY
ST
W 8TH ST
E 11TH STE 12TH STE 13TH ST
FAR
R S
TN
IRV
ING
ST
W 9TH ST
W 7TH ST
W 10TH ST
N BRYA
NT BLVD
IN DU STR YST W 6TH ST
VANDERVENTER AVE
RO
SE
MO
NT
DR
NASWORTHY DR
JANN DR
S JE
FFER
SO
N S
T
S MAD
ISON
ST
S MO
NR
OE
ST
S V
AN
BU
REN
ST
GR
AC
E
ST
S M
ILTON
ST
PO
LK S
T
S T
YLER
ST
S TAY
LOR
ST
S PIE
RC
E S
TS
FILLMO
RE
ST
S J
AC
KS
ON
ST
CHESTNUT ST
N VA
N B
UR
EN S
T
CADDO ST
N A
DA
MS
ST
N B
ISH
OP S
T
N JEF
FER
SO
N ST
N W
AS
HIN
GTO
N S
TC
OTTO
NW
OO
D S
T
LO
CU
ST
ST ( P
VT
.)M
ES
QU
ITE
ST
N D
AV
ID S
T
W 4TH ST
W HARRIS AVE
W 1ST ST
VOLN
EY ST
N O
AKE
S ST
PEC
AN ST
N M
AG
DA
LEN
ST
AKIN
STH
OLC
OM
B S
TE 15TH ST
HO
LCO
MB
ST
WA
DE
ST
JONES ST
SCOUT STN M
AIN
ST
N M
AIN
ST
N M
AIN
ST
N M
AIN
ST
W 43RD ST
W 40THSTLA
JUNT
AST
PAINT ROCK RD
W CONCHO AVE
WEBSTER
AVE
SPR
AGU
EST
W 361/2 ST
ST ANN ST
ROOSEVELT ST
GIL
BE
RT
ST
WR
IGH
TST
LOVE ST
WEBSTER
AVEWEBSTER
AVEWEBSTER
AVE
LOU
ISE
DR
RICKS DR
LN
(PV
T.)
O L
N (
PV
T.)
BE
N F
ICK
LIN
RD HOLLY LN (PVT. )
WAREHOUSE RD
HOBBS ST
GLENMORE ST
PENROSE ST
CHURCHILL BLVD
GREER ST
IRIS ST
WINDHAM ST
LA S
ALL
E D
R
RIVER OAKS ST
OAKWOOD ST
E RIVERSIDE AVE
MARYLAND ST
BELAIRE AVE
MEDINA ST LU
NA
ST
KENNEDY DR
RIO CONCHO DR
KE
AR
NY
BLV
D (
GA
FB
)
VANCE ST (GAFB)
PA
TR
OL
RD
(G
AF
B)
FO
RT
GR
IFF
IN A
VE
(G
AF
B)
TEXAN ST (GAFB)
FARROW
ST
(GAFB)
ADOBE DR
S J
OH
NS
ON
ST
HAMILTO
N
WAY
JACK BATE
S D
R
DE
VO
NIA
N D
R
TOW N &COUNTRY CT
TO
WN
& C
OU
NT
RY
DR
W AVENUE W
TERRACE DR
GLA
DB
OU
RN
E L
N
DELLWOOD DRAMBERWOOD DR
CRESTW O OD DR
INWOOD DR
B E LIND A S T
ST ONEWALL DR
STATE COURT DR
ST
AT
E S
T
ERA ST
AR
LIN
GT
ON
ST
FU
LT
ON
ST
CL
OV
IS S
T
WY
NN
E A
VE
WA
ND
A S
T
BE
RY
L S
T
AL
PH
A C
IRT
OD
D C
I R
LESTER LNTRES RIOS DR
TRES RIOS DR
HOLIDAY ST
ESTELLA DR
ALM
ON
D C
IRA
L LIS
ON
CIR
TOD
D L
N
TOB
Y L
N
LIPAN D
R
MORRIS AVE
JOR
D
AN ST N S
ELL
ER
S S
T
BELAIRE AVE
LA S
ALL
E D
R
KIS
TL
ER
ST
MIC HA EL D R
FU
LT
ON
ST
CL
EO
ST
LU
NA
ST
M A CA NN ST
M EDINA S T
NORMA ST
CL
EO
ST
ST
ON
EH
AM
ST L A
ME
SA
LN
OR
LN
(P
VT
.)
ION
LN
(P
VT
.)
AN
LN
(P
VT
.)
LN
(P
VT
.)
DE
LN
(P
VT
.)
ARROYO DRTURNER S T
M ARIN ER
TE
R
GE
MIN
I DR
CENTURY DR
AP
OLL
O L
N
M O BILE PA RK DR (P VT .)
SLOO
PV
T. )
BE
DR
(P
VT
. )
NE
LO
OP
(P
VT
. )
MO
NT
ER
RE
Y S
TLA
CR
UZ
ST
WOODLAND CIR
CLARK DR SAC AVE
MC
KE
E L
N
HO
RN
ST
CO
RN
EL
L AV
E
TR
I NIT
Y A
VE
D R
UNIVERSITY AVE
C
ULVE R AVE
A&M AVE
PRINCETO N AVE
CA
MB
RID
GE
ST
BAYLOR AVE
E S
TA
DIU
M D R
IES
TM
ILLSPA
UG
H S
TH
AS
SELL S
T
HA
SS
ELL ST
WE
ST
WEBSTER AVE
STANTON ST
LAKESIDE AVE
GLENWOOD DR
ANEY STJOMAR ST
GREENWOOD ST
N HO
WAR
D ST
BA
SIL CT
W 19TH ST
N A
DAM
S ST
HU
DS
ON
STLIL LIE A
VE
FIELD ST
CHAPMAN ST
FIE
LD S
T
GREEN W
OO
D S
T
DOVE C
RE
EK
DR
S PRIN
G C
RE
EK
DR
MEA
DO
WB
RO
OK
DR
LINDELL
AVE
JUANITA AVE
N H
AR
RIS
ON
ST
N M
ON
RO
E S
T
WOODLAWN DR
WEAV
ER
ST
ART ST
SKILL S
T
CRAFT
ST
RIV
ER
SIDE
GO
LF CLU
B RD (P
VT.)
N BRYANT BLVD
N M
AG
DALE
N ST
E 18TH ST
W 30TH ST
W 32ND ST
OFFICE
PARK DR
CREE
K SID
E
D R(PV
T. )L IN
DENWOO D C T
VISTA CT
L IN D ENW O OD DR
CIE
LO VIS TA P
LZ
(PV
T.)
V
ILLAG E P ARK
DR
(PVT.)
C UMB ERL AND
CT
CO
MMER
CE
ST
S JACKSON ST
MA
RG
IE S
T
NORWOOD DR
E 23RD ST
E 22ND ST
E 21ST ST
N E
ME
RIC
K S
T
N M
AIN
ST
E 18TH ST
E 17TH ST
N M
AG
DA
LEN
ST
N O
AK
ES
ST
W 34TH ST
N B
RY
AN
T BLVD
E 43RD ST
E 42ND ST
E 41ST ST
ALA
MO
ST
SH
OR
T S
TW 42ND ST
W 41S T S T
W 40TH S T
GA
RN
ET
BO
WIE
ST
E 39TH ST
OA
KLA
WN
ST
E 40TH ST
E 39TH ST
ELLIS ST
UPTON ST
VECK ST
ELLIS ST
N C
EC
IL S
T
N A
RC
HE
R S
T
N S
CH
RO
ED
ER
AV
E
PRODUCERS DR
LO
WR
IE A
VE
ECKERT ST
BREWER ST
KOBERLIN ST
SPAULDING ST
E 28TH ST
E 25TH ST
E 26TH STN
MA
I N S
T
E 22ND S
T
SE
NIS
A T
RL
CA
RLE
Y S
T
E 24TH ST
E 24TH 1/2 ST
JF
K D
R
MA
RX
ST
BL
UM
ST
NM
AG
DA
LE
N
ST
E 21ST ST
E24TH
1/2ST
N O
AK
ES
ST
E 25TH 1/2 S T
FAR
R S
T
E 24TH ST
E 23RD ST
E 22ND ST
E 21ST ST
AR
TH
UR
ST
ME
MO
RIA
LS
DR
(P
V T.)
GU
TH
RIE
STM
ILLSP
AU
GH
ST
CHESTNUT ST
CH
ILDR
ESS
ST
N L IN
CO
LN S
T
WE
STLAN
D A
VE
MO
RIT
Z C
IR
LSU AVE
R E BE
CC
A D
RS
HAMROCK DR
DENA D R
D
ELKE
R D
R
NOTRE DAME AVE
S O UT HWE ST ERN A V E
RU
TG
ER
S S
T
S PA
RK
WA
Y S
T
N P
IER
CE
ST
E 16TH ST
E 34TH ST
COX LNGO
OD
NIG
HT
TR
L
DAKOTA DR
RO
DE
OD
R
A
AM
ER
ICA
N A
VE
(P
VT
.)
S F
LO
RE
NC
E S
T
BL
UM
ST
RU
BY
LEE
LN(P
VT
.)
YM
CA
DR
DA
NH
AN
KS
LN
NORWO ODDR
E 28TH ST
N BRYANT
BLVD
N RIVER DR
N B
ELL
ST
N BE
LL ST
S CONCHO
PARK DR
S C
HA
DB
OU
RNE ST
³±1223
GLE
NN
A D
R
S C
O
NCHO
PARK
DR
PR
UIT
T D
R
CH
RIS
TO
VA
L R
D
OLD EOLA RD
N B
ELL
STN
BELL
ST£¤277
LAKE DR
PR
UIT
T D
R
W 11TH
ST
EXE
CU
TIV
E D
R
SAM ST
LAKE DR
AP
AC
HE
TR
L (G
AF
B)
PULLIAM ST
E 39TH ST
LAKE DR
W 26TH ST
WILSON ST
N
RIV
ER DR
RICE AVE
S CHADBOURNE ST
N BRYANT BLV
D
W 40TH
STSH
OR
T S
T
OLD
BALLINGER HWY
JOMAR
ST
ELLIS ST
W 29TH
ST
IDAHO AVE
CA
TAL I
NA
DR
FO
ST
ER
ST
E 40TH ST
DALLAS ST
CH
RIS
TO
VA
L R
D
£¤87
COKE ST
CATALINA DR
W R
IVER
DR
W 37TH ST
ERA ST
ARDEN RD
KENNEDY DR
N B
RY
AN
T B
LVD
DENA DR
W 19TH
ST
W 19TH ST
S IR
VIN
G S
T
E 23RD ST
ELL
EN
ST
DENA DR
JOMAR ST
E 3RD ST
BAILEY ST
ERA ST
MARTIN ST
N M
ON
TA
GU
E A
VE
W 26TH ST
E 26TH ST
E 27TH ST
E 18TH ST
RICKS DR
DIA
NA
LN
E 4TH ST
E 13TH ST
E 8TH ST
E 37TH ST
E 28TH ST
COKE ST
E 24TH ST
W 14TH STS
BE
LL
ST
N O
AK
ES
ST
A&M AVE
E 13TH STS
CE
CIL
ST
S JA
CK
SO
N S
T
CULWELL
ST
S K
OE
NIG
HE
IM S
T
RU
ST
ST
E 22ND ST
S IR
EN
E S
T
PULLIAM ST
VISTA CIR
E 19TH ST
E 24TH ST
E 37TH ST
E 7TH ST
BR
IAN
T S
T
E 41ST ST
E 14TH ST
SH
ELTO
N ST
BR
OW
N ST
E 6TH ST
HU
DS
ON S
T
W 10TH
ST
W 8TH
ST
E 29TH ST
FM 765
A&
M A
VE
E 38TH ST
E 17TH ST
NORTH ST
E 7TH ST
S P
AR
K S
T
S A
BE
ST
VECK ST
ELLIS ST
E 37TH ST
E 42ND ST
W HARRIS
AVE
BR
IAN
T S
T
E 28TH ST
S JO
HN
SO
N S
T
LAKE DR
W 1ST ST
E 26TH ST
N B
ELL
ST
W AVENUE N
DENA DR
S PA
RK
ST
WA
DE
ST
W HARRIS
AVE
N G
AR
FIELD
ST
W BEAUREGARD
AVE
N BRYANT
BLVD
A&
M AVE
NORTH ST
W 29TH ST
E 15TH ST
SAC AVE
JAC
KR
AB
BIT
TR
L
S B
RY
AN
T B
LVD
N B
EL
L S
T
N P
OE
ST
PE
CA
N S
T
A&
M A
VE
N M
AIN
ST
COX LN
ER
IN ST
W 1ST
ST
STA
TE
STW AVENUE N
N RIVER
DR
N G
AR
FIE
LD ST
LA
CR
UZ
ST
PECOS ST
W 6TH ST
N M
AIN
ST
E 6TH
ST
YALE AVE
N P
OE
ST
HUMBLE
RD
LAKE DR
W AVENUE M
WEBSTER
AVE
1 inch equals 3,600 feet
City of San AngeloPlanning Division72 W. College AvenueSan Angelo, TX 76903 ´ Community Development
Target Area Map
16
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
HICKORY AQUIFERTotal Project Budget - $120,000,000COSADC Contribution - $15,000,000 (12.5%)
Description:Project consists of a well fi eld made up of 9 wells near Melvin, Texas including 9.5 miles of well fi eld piping; a pump station with 4 pumps and associated controls; and 62 miles of 30 inch transmission main.
Water from the well fi eld will be pumped via the pump station to a high point near Eden, Texas and will fl ow by gravity from there. When complete the system will provide 6 million gallons (MGD) of water per day.
After 2026 the amount can be increased to 9MGD and ultimately with additional wells etc would peak at 10.7 MGD. The average daily consumption, based on a 12 month average, is about 14MGD for the City.
Transmission main & pump station:
June 2013Treatment Plant:
In preliminary design
Currently under construction
RIVER IMPROVEMENT PROJECTTotal Project Budget - $14.1 million ($ 9.3M currently under contract with Templeton Construction)COSADC – $12.8 million
Description:Bank stabilization; enhancements to existing trails; construction of new trails; replacement of trail light-ing; a new restroom building; a games court area and the renovation/restoration of 5 existing foun-tains along the Concho River banks between the Oakes Street bridge at the downstream end and the low water crossing just upstream of Pecos Street at the upstream end, for a total reach of about 7,500 feet.
Bank stabilization portion of the project includes boulder rip rap stabilization in most area with some stacked stone in selected areas.
Project Start:
October 2011Estimated Completion Date:
April 2013
[community development projects]
UNDER CONSTRUCTION OR
CONSTRUCTION IN 2011
17
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
MUNICIPAL SWIMMING POOL
IMPROVEMENTSTotal Project Budget - $3.2 million ($2.7M currently under contract)COSADC - $3.2 million
Description:Total renovation of the existing building and a complete redesign of the pool area; the proposed pool will fi t within the footprint of the old pool however will be of a “beach entry” design with spray features, 2 slides and an area for swimming laps.
Construction Start:
August 2011Estimated Completion Date:
April 2012
AIRPORT RENOVATIONTotal Project Budget - $5,925,715COSADC - $500,000 (non federal eligible items
only)Notice to proceed issued to Templeton
Construction. Description:Complete terminal reconstruction on the “land” side, exclusive of the new concourse area.
Project Start:
January 25, 2012. Estimated completion date:
August 2013
ay
AToC
o
C
DCe
18
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
50th STREET PROJECTTotal Project Budget - $2.4 millionCOSADC - $2.4 million
Description:Construction of a new city street approximately 4475’ in length and 63’ in width consisting of grad-ing, drainage structures, curb & gutter, illumination, signage, 5’ sidewalks on both sides, and roller com-pacted concrete pavement. Project limits were from Travis Street to Armstrong Street (SH 208 ).
Construction Start:
April 2011Estimated Completion Date:
April 2012
GRAPE CREEK ROAD
RECONSTRUCTIONTotal Project Budget – $1.2 millionCOSADC – $1.2 millionConstruction Start – May 2011Completion Date – November 2011
Description: Reconstruction of a city street approximately 3,835’ in length and 40’ in width consisting of grading, drainage structures, curb & gutter, signage, a 5’ side-walk on the west side & 7’ sidewalk on the east side, and roller compacted concrete pavement.
Construction Start:
May 2011Completion Date:
November 2011
LIVESTOCK BARNTotal Project Budget - $1,000,000COSADC - $1,000,000
Description:Demolition of the existing livestock building south of the Wells Fargo Pavilion; construction of a new 37,000 SF livestock building on the site.
Construction Bid Opening:
February 7, 2012Demolition Bid Opening:
February 21, 2012Estimated Start Date:
April 2, 2012Estimated Completion Date:
December 15, 2012
COMPLETED PROJECTS IN PREVIOUS
YEARS
Meadow Creek ParkCommunity Tennis facilityTexas Bank Sports ComplexLake Nasworthy Dredging1st Community FCU Spur ArenaColiseum improvementsYouth sports fi elds
[community development projects]
UNDER CONSTRUCTION OR
CONSTRUCTION IN 2011
19
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
L-R: Tony Villarreal, Chris Cornell, Randy Brooks, Scott Tankersley, Larry Teague (President), Joe Terrazas, John Bariou.
[board of directors]
[professional staff ]
L-R: Bob Schneeman, Donna Osborne, Nora Regino, Shawn Lewis (Executive Director)
Making a
diff erence
21
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
[local & state partnerships]
workforce development
marketing
business attraction
entrepreneurial development
fi nancial services
22
fworkforce development
kmarketing
bbusiness attraction
entrepreneurial developmenentrepreneurial development
fifi nancial services
CITY OF SAN ANGELO DEVELOPMENT CORPORATION ANNUAL REPORT 2011
Copyright © 2012
FUNDED BY COSADC AND THE HALF CENT SALES TAX