Chapter 2: Positioning the subject

ct5308 Breakwaters and Closure Dams

H.J. Verhagen

Faculty of Civil Engineering and Geosciences Section Hydraulic Engineering

February 1, 2012 2

Focus on:

• Technical aspects

• Technical impacts only

February 1, 2012 3

Breakwaters and Closure dams

• Comparable items:

• similar materials

• similar execution methods

• Differences:

• load difference (wave action vs. currents)

• life time

February 1, 2012 4

Characteristic values

Type of structure H/dn

Sandy beachGravel beachRock slopeBerm breakwater(Stable) rubble mound breakwatercaisson

>50020-5006-203-61-4<1

February 1, 2012 5

mound breakwater types

February 1, 2012 6

Monolithic breakwater type

February 1, 2012 7

Sometimes vertical wall is only option

Cardiff

Barrage

14 m tidal

range

(situation at

high water

February 1, 2012 8

Composite breakwater types

February 1, 2012 9

Special breakwater types

February 1, 2012 10

Floating breakwater in Italy (Marina di Verbania, Lago Maggiore)

February 1, 2012 11

Floating breakwater in Italy

February 1, 2012 12

Floating breakwater in Italy

February 1, 2012 13

Vertical screens (Royal Prince Alfred Yacht Club, Sydney, Australia)

February 1, 2012 14

Basic methods of closure

February 1, 2012 15

Closure named after topography

February 1, 2012 16

Closures named after hydrologic conditions

February 1, 2012 17

closures named after materials used

• stacking up willow mattresses (opzinken)

• sand closure

• clay or boulder clay closure

• stone dam closure (rock closure)

• caisson closure

February 1, 2012 18

Pluimpot, Tholen

February 1, 2012 19

sand closure

February 1, 2012 20

Afsluitdijk

February 1, 2012 21

rock closure

February 1, 2012 22

caisson closure

February 1, 2012 23

Rubble mound breakwater at Cittavecchia

February 1, 2012 24

Breakwater at Cherbourg

February 1, 2012 25

Breakwater at Plymouth

February 1, 2012 26

Monolithic breakwater at Dover

February 1, 2012 27

Breakwater at Marseilles

February 1, 2012 28

Typical breakwater along the Mediterranean coast

February 1, 2012 29

Historical closures

• Rhine damming (Wijk bij Duurstede)

• Sloe closure (pakwerk)

• Hindeburgdam

February 1, 2012 30

Walcheren, four gaps on one island

February 1, 2012 31