CAPCOG 2015 DISASTER DEBRIS WORKSHOP SERIES
Workshop 1: Debris Management 101March 19, 2015
2015 Workshop Series
• Workshop 1: Debris Management 101• March 19, 2015
• Workshop 2: Developing and Exercising a Debris Management Plan• April 7, 2015
• Workshop 3: Documentation and Closeout• April 16, 2015
Capital Area Council of Governments 2
Agenda
• Introductions• Purpose• FEMA Public Assistance• Disaster Debris News• Debris Preparedness and Immediate Response
Operations• Roles and Responsibilities• Long-Term Debris Management and Recovery
Operations• Project Spotlight – Bastrop County, TX
Capital Area Council of Governments 3
Introductions and Purpose
• Part 1: Introductions and Purpose
Welcome
• IntroductionsName Agency Position/role in disaster
debris management
5
Purpose
• Provide a brief update on new federal debris guidance and recent changes in regulations.
• Acclimate new staff to debris operations.• Provide a refresher course to veteran debris managers.• Stimulate interactive discussion and questions.
6
Why does debris matter?
• Removing debris is costly.• FEMA has expended or
obligated over $8 billion in eligible debris removal costs.
• The table represents the federal cost share only.
FEMA Public Assistance (PA)
• Part 2: Disaster Debris News
Understanding the ProcessFEMA Public Assistance
Understanding the ProcessRecovery Funding
Determine LossesDisaster Expenses vs. Normal Expenses
Categorize Losses
Type of WorkTime to Complete
Work*Category of
Work Description
Emergency or Temporary
6 months to 1 year*A Debris Removal
BEmergency Protective
Measures
Permanent 1.5 - 4 Years*
C Road and Bridges
D Water Control Facilities
E Building and Equipment
F Utilities
G Park, Recreational, and Other
* Approximate; Can be extended in certain cases
Determine Eligibility4 Factors of Eligibility
Implement the PlanSimple Keys to Success
Implement the PlanProject Worksheets and Opportunities
• Repair vs. Replacement (50% Rule)• Special Considerations• 406 Mitigation• Codes & Standards• Alternative Procedures for Permanent Work• Alternative Procedures for Debris Removal
Development of the Project Worksheet (PW)
Documents the scope and cost estimate for a project.
Options for PW Development:› Internally› Consultants (Reimbursable)› FEMA staff
PWs for small projects (less than $120,000) due sixty (60) days after the FEMA kick-off meeting.
Understand Audit RequirementsFrequent OIG Findings
• Failure to adequately describe work performed• Claiming indirect costs• Lack of documentation for fringe benefits• Leave time• Inability to reconcile equipment hours• Failure to provide clear audit trail • Failure to segregate ineligible work• Applicant fails to gain permission for Alternate or
Improved projects
Disaster Debris News
• Part 2: Disaster Debris News
Changes and Implementation of Federal Disaster Aid
• Sandy Recovery Improvement Act of 2013 • Robert T. Stafford Act as Amended April 2013• FEMA Public Assistance Program• Federal Highway Administration Emergency Relief
Program
18
Sandy Recovery Improvement Act
• Reduce the cost of federal government assistance• Increase the administrative flexibility of the FEMA
Public Assistance program• Expedite the process of providing and using the
assistance• Create incentives for applicants to complete projects in
a timely and cost-effective manner
19
Stafford Act
• Defines the requirements for new alternative procedures
• Changes that apply to Section 406 – repair, restoration and replacement of damaged facilities
• Addition of Section 428(e)(2) which applies to Sections 403(a)(3)(A), 407, and 502(a)(5) – debris removal assistance
• Reauthorizes similar authorities to those granted by the PA Pilot Program
20
FEMA Public Assistance Program Alternative Procedures
• Accelerated debris removal – Increased Federal cost share (sliding scale)
• Recycling revenues• Straight time force account labor• Debris management plans
21
Changes to Federal Disaster Aid Programs
• FEMA Recovery Policies‐ RP9523.5 Debris Removal from Waterways• http://www.fema.gov/library/viewRecord.do?id=6719 ‐ Recovery Fact Sheet 9580.212 Public Assistance Grant
Contracting• http://www.fema.gov/library/viewRecord.do?id=6654‐ Recovery Fact Sheet 9580.214 Debris Removal on Federal-Aid
Highways• http://www.fema.gov/library/viewRecord.do?id=6640 ‐ Recovery Fact Sheet 9580.215 Debris Removal Force Account
Labor Costs• http://www.fema.gov/library/viewRecord.do?id=6670 ‐ 9500 Series Policy Publications• http://www.fema.gov/9500-series-policy-publications
22
Federal Highway Administration Emergency Relief Program (FHWA-ER)
• Section 1107 of MAP-21 placed limits on the ER eligibility for debris removal.
• In certain cases, debris removal that was previously eligible for ER funding will only be eligible for FEMA funding.
23
FHWA-ER – Conditions for Eligibility
• Governor declares emergency but does not receive a Presidential declaration.
• The event receives a Presidential emergency declaration, but FEMA has determined that debris removal is not eligible for its assistance.
• A Governor’s emergency declaration includes more counties than the Presidential declaration. FHWA can participate in debris removal costs for the counties not included in the Presidential declaration.
24
FHWA-ER
For additional information on changes as a result of MAP-21:• http://www.fhwa.dot.gov/map21/qandas/qaer.cfm
For additional information on the FHWA ER Program:• http://www.fhwa.dot.gov/reports/erm/
25
Debris Preparedness and Immediate Response Operations
• Part 3: Debris Preparedness and Immediate Response
Gulfport, Mississippi – Hurricane Katrina• Households: 26,943• Land area: 56.9 square
miles• 2,019,320 pounds of
hazardous material (pork bellies and chicken carcasses)
• 387 abandoned vehicles removed
• 10,466 linear feet of pool fencing removed
Case Study
Terrebonne Parish, Louisiana – Hurricane Gustav
• Households: 35,997• Land area: 1,255 square
miles• 13,022 hazardous hangers
removed• 1,286 white goods removed• 1,469 hazardous tree
removals
Case Study
Orange County, Texas – Hurricane Ike• Households: 31,642• Land area: 356 square miles • White goods: 21,348 collected•5,756 of the collected white goods required Freon removal•6,486 of the collected white goods required putrid food removal
• Cost: $2,082,580.00
Case Study
Henrico County, Virginia – Hurricane Irene• Households: 108,121• Land area: 245 square miles•Leaners: 132 removals•Hangers: 13,233 trees serviced•Vegetative debris: 26,951 tons
Case Study
New Jersey Department of Environmental Protection – Superstorm Sandy
• Coastline miles: 1,344 miles
• 333,375 cubic yards of displaced sediment removed from waterways
Case Study
State of Connecticut – Winter Storm Nemo• Contracted equipment: wheel-loaders, dump
trucks, trailers, etc.• Contracted labor: Project manager, foreman,
laborer• 63 T&M tickets generated for contracted
emergency push work• $130,000 of reimbursement for contracted time
and materials work
Case Study
Augusta-Richmond, Georgia – Winter Storm Pax• Population: 197,872• Land area: 306.5 square miles
• Leaners: 792 removals• Hangers: 26,027 trees serviced• Vegetative debris: 645,970 cubic
yards
• Debris Removal and Hazardous Tree Cost: $12.1 million dollars
Case Study
Debris Management Planning
Key Department PersonnelGIS/Information TechnologyFinance and AdministrationPublic Works and Solid WasteGeneral CounselEnvironmental ServicesPublic Information
34
Situation and assumptions Roles and responsibilities Concept of operations Training and exercise Functional annexes
Debris Management Planning
35
Components of the Plan
Identify priority roads. Identify debris management site
locations. Identify collection zones. Develop final disposal plan. Maintain road lists with
maintenance and funding. Provide job aids/checklists. Provide annual training, exercises,
and updates.
Concept of Operations: Preparedness
36
Plan Development
Confirm debris management site locations and ensure all proper environmental permitting.
Confirm time and materials documentation plan.
Confirm priority road clearance responsibilities.
Confirm emergency procurement policies.
Concept of Operations: Preparedness
37
Emergency Policies
GIS Information Coordinate with Texas Department of
Transportation (TxDOT) to identify Federal Highway Administration (FHWA) Emergency Relief (ER)-eligible road segments in the jurisdiction.
Review geographic information system (GIS) data to confirm functional classifications.
Coordinate with prepositioned contractors for operations and documentation of FHWA ER road segments.
Concept of Operations: Preparedness
38
First 70 HoursEmergency PushContracting - Time and materialsWindshield assessmentsAerial assessmentsEstimated quantity of debrisAcceptable duration of pick-upEstimate volume of trucks
Concept of Operations: Response
39
Assess Debris Reimbursement OptionsCompile data from damage assessmentsDetermine potential debris programsEstimate timeline for completionDetermine most appropriate reimbursement options
Sliding scale Grants based on estimates
Concept of Operations: Response
40
Days 2-5Twice daily meeting with contractorsPublic information noticesDebris hotline numberSubcontractor hiring/referral processDMS preparation DMS planDMS regulationsTruck certification.ROW debris removal operationsDocumentation
Concept of Operations: Response
41
• The applicant is responsible for obtaining certification from TCEQ to operate the DMS.
• The applicant must complete a four page form for each debris management site and submit to TCEQ.
• The Form can be found at the following link on the TCEQ website:
• http://www.tceq.texas.gov/assets/public/response/tornado/tdms-request.pdf
• The applicant must complete the form and submit to the appropriate TCEQ Regional Office with a copy to the TCEQ Central Office.
Concept of Operations: Response
42
TCEQ Requirements
ROW Collection• Debris that is a result of a disaster incident can be placed
along the ROW or curbside for collection.• Vegetative debris: Tree limbs, branches, and other leafy
material• Construction and demolition (C&D) debris: Damaged
components of buildings (excluding reconstruction debris)• Household hazardous waste (HHW): Paints, stains,
solvents, etc.• White goods: Refrigerators, air conditioners, etc.
Concept of Operations: Response
43
Sidewalk
Sidewalk
Urban Areas
Roadway Roadwa
y
Right-of-Way
Right-of-Way
Right-of-Way
Right-of-Way
Rural Areas
Power Poles
Identify the ROW
Concept of Operations: Response
44
Public Information/Emergency Set-out Procedures
• Debris should be staged separately by debris type along the ROW.
• Do not bag debris; only loose debris will be collected.• Do not mix HHW with any of the other staged debris types.• Do not mix household garbage with any of the other staged
debris types.• Do not place debris near water vaults, fire hydrants, or any
other above-ground utility.• Do not place debris on driveways.
Concept of Operations: Recovery
45
Roles and Responsibilities
• Part 4: Roles and Responsibilities
Federal Agencies Involved in Debris Operations
47
• Federal Emergency Management Agency (FEMA)• United States Coast Guard (USCG)• United States Army Corps of Engineers (USACE)• Natural Resources and Conservation Service (NRCS)• Farm Service Agency (FSA)• Animal Plan and Health Inspection Service (APHIS)• Federal Highway Administration (FHWA)• Environmental Protection Agency (EPA)• National Oceanic and Atmospheric Administration (NOAA)
• Provides technical assistance• Environmental and historical review process• Reimbursement process
• Assigns federal mission assignments as requested• Emergency Support Function #3, Public Works and
Engineering• Emergency Support Function #10, Oil and Hazardous
Material Response• Administers the FEMA Public Assistance Program
• Ensures safety, eligibility, and compliance are maintained
FEMA Roles and Responsibilities Following a Disaster
48
• Primary federal entity for Emergency Support Function (ESF) #3 - Public Works and Engineering
• Responsible for emergency debris clearance and removal
USACE Roles and Responsibilities Following a Disaster
49
• Remove sunken vessels from navigable waterways under emergency conditions
• Provide strong technical assistance and training support to state and local agencies
• Enable state and local operations to the greatest extent possible
50
USACE Roles and Responsibilities Following a Disaster
• Coordinated with TxDOT with emergency clearance on Galveston Island
• Contracted crews for emergency push• Coordinated with USCG, NOAA, Gulf Intracoastal Canal
Association, and shipping industry as part of the Texas Joint Hurricane Response Team to survey and open waterways
• Partnered with EPA to assess damaged water treatment and wastewater treatment facilities
51
USACE Role During Previous Disasters in Texas
• Responsible for maintaining natural streams and creeks (unless in a state or national park)
• Provides funding through the Emergency Watershed Protection (EWP) program
NRCS Roles and Responsibilities Following a Disaster
52
• Funded through congressional appropriations• Must have signed agreement with NRCS before work
can begin• Strictly 75/25 cost share; typically, state does not
provide funding• Submit for reimbursement as project continues• FEMA is NOT a second tier funding source for NRCS
projects• Eligible scope of work is broader than PA
NRCS Emergency Watershed Program
53
• Supports repair and reconstruction of federal aid highways and roads on federal lands
FHWA Roles and Responsibilities Following a Disaster
54
• If applicant receives a FEMA PA declaration, the applicant is ineligible for FHWA ER funds
• State must incur costs of at least $700,000 statewide
• Individual projects (sites) must be $5,000• Debris removal from federal aid roads is eligible for
100 percent reimbursement for the first 180 days. • Program is funded $100 million in annual
authorizations.
Triggering Conditions for FHWA Involvement
55
State Agencies Involved in Debris Operations
56
• Texas General Land Office (GLO)• Texas Department of Transportation (TxDOT)• Texas Parks and Wildlife (TPWD)• Texas Forestry Services
• Debris removal from beaches and submerged lands
GLO Roles and Responsibilities Following a Disaster
57
• Authorized by the governor as the lead agency for debris removal operations
• Provides assistance to communities with special debris programs beyond the their capabilities to manage
• Coordinates with Texas Parks and Wildlife Department to provide support in state and federal parks
• Responsible for debris removal from on-systems roads unless otherwise specified by the Governor
TXDOT Roles and Responsibilities Following a Disaster
58
• Manages debris removal operations in state parks• Provides debris removal from natural streams within state
and federal parks
Texas Parks and Wildlife Department Roles and Responsibilities Following a Disaster
59
• Provides technical assistance for debris removal operations
• Provides arborists to determine tree survival
• Assesses trees killed by saltwater
Texas Forestry Service Roles and Responsibilities Following a Disaster
60
Long-Term Debris Management and Recovery Operations
• Part 5: Long Term Debris Management and Recovery Operations
• Leaners, hangers, stumps• Vehicles, boats, appliances• Private property (right-of-entry
[ROE]) work• Canals and waterways
Special Debris Programs
62
• The tree must be at least 6 inches in diameter when measured 4 and 1/2 feet from the ground and must meet at least one of the following criteria:• More than 50 percent of the crown damaged or
destroyed (as determined by a certified arborist)• Split trunk or broken branches that expose the
heartwood• Fallen or uprooted within public-use area• Leaning at an angle greater than 30 degrees
Hazardous Leaning Limbs (Leaners)
63
• Must meet all of the following criteria:• Must be greater than two inches in diameter• Must be suspended in a tree threatening a public-use
area• Must be located on improved public property
Hazardous Hanging Limbs (Hangers)
64
• Must meet all of the following criteria:• 50 percent or more of the root ball exposed• Greater than 24 inches in diameter when measured 24
inches from the ground• Located on public ROW• Poses an immediate threat to public health and safety
Hazardous Stumps
65
ROE Program Before and After
66
• Service citizens in rural or sparsely populated areas where curbside collection may take longer.
• Provide alternative to challenging residential areas where curbside collection is not practical (streets with low hanging trees or power lines, narrow streets, etc.).
• Provide security to avoid illegal disposal.
Citizen Collection Centers
67
• It is critical that plans and contingencies for final disposal of vegetative and mixed debris are established.
• Final disposal sites must be properly permitted.• Debris must be properly disposed/applied at final disposal
site.• Audits are inevitable.
Final Disposal
68
• Invoicing kickoff meeting• Data standards• Electronic hauler invoice• Invoicing process• Retainage
Contractor Invoicing
69
• Approve closure/remediation of DMS• Ensure damage claims are resolved• Transfer original documentation from contractors
to applicant• FEMA/state field validations• Project worksheet close-out• Audits
Project Closeout
70
Project Spotlight – Bastrop County, TX
• Part 6: Project Spotlight – Bastrop County, TX
Project SpotlightBastrop, Texas Wildfire
• Bastrop Conditions Fire started Sept. 4, 2011 Tropical Storm Lee caused 30 mph winds Most destructive single wildfire in Texas history 34,000 acres burned 1,667 Homes destroyed (1,213 survived in the burn area) 38 non-residential structures destroyed 5,000 (+/-) people displaced from destroyed homes 2-fatalities 1.5 million trees killed
72
Project SpotlightBastrop, Texas 2011 Wildfire
73
Project SpotlightBastrop, Texas 2011 Wildfire
74
Project SpotlightBastrop, Texas 2011 Wildfire
75
Project SpotlightBastrop, Texas Wildfire
• FEMA Pricing Sheet for Fire Debris
76
– Hazardous limbs
– Hazardous stumps
– Abandoned vehicles
– Animal carcasses
– White goods
– Freon Removal
– PPDR Vegetative
– PPDR C&D
– Back fill
– Ash
– PPDR concrete slabs
– PPDR hazardous containers
– PPDR HHW
– Vehicle/vessel aggregation
– Haulout
– Mud, silt, sand
Project SpotlightBastrop, Texas Wildfire
• Debris Streams White goods Vehicles Ash Concrete slabs Less construction and demolition (C&D) debris
77
Project SpotlightBastrop, Texas Wildfire
• Private Property Debris Removal (PPDR) 16,000 trees on the right-of-way 30,000 trees removed from private property 400 trees removed from one property
78
Project SpotlightBastrop, Texas Wildfire
• Removal of hazardous dead trees that could potentially fall onto the right of way or damage infrastructure
79
Project SpotlightBastrop, Texas Wildfire
• TREES CUT (Estimate for totals)15,000 ROW35,000 PPDR50,000 SUBTOTAL50,000 Bluebonnet Electric100,000 TOTAL100,000/1,500,000 = 7% of total dead trees
80
Project SpotlightBastrop, Texas Wildfire
DEBRIS STREAMS1,000,000 CY vegetative50,000 CY C&D
COSTS$8,000,000 ROW$8,000,000 PPDR$16,000,000 TOTAL @25% local share, Bastrop County share is $4,000,000
81
Project SpotlightBastrop, Texas Wildfire
• State ParkLogging company removed burned vegetationPayment for services was the timberShort timeframe for useful lumber after being burnedUnique characteristics of the park allowed this project to be
cost-effective and successful
82
Project SpotlightBastrop, Texas Wildfire
• Environmental Concerns: Houston ToadEndangered speciesProject area one of the few remaining habitatsDebris piles may be providing artificial habitatExtensive environmental monitors heavily involved in debris
operations
83
Questions?
84
Next Steps
• Workshop 2: Developing and Exercising a Debris Management Plan
April 7, 2015• Workshop 3: Documentation and Closeout April 16, 2015
85
Thank you
Capital Area Council of Governments 86
Capital Area Council of Governmentswww.capcog.org
John Buri, Director, Post Disaster Programsjohn.buri@tetratech.com 832.251.5197 Anne Cabrera, Deputy Director, Post Disaster Programsanne.cabrera@tetratech.com 954-559-4951