Post on 06-Oct-2020
1Complete Urban Pty ltd I www.completeurban.com.au
CARPARKS TOTAL 150PROPOSED INTERNALROADWAY ANDCARPARKING
1. OFFICE SPACE - 2 STOREY 2400m2
MASTERPLAN 08CAMDEN DEPOT
2. PLANT PARKING
3. PARKS DEPOT
4. CARPARK
5. RANGERS STORE
6. TRADE SHEDS
7. WORKSHOPS
8. MATERIALS STORE
10. OUTDOOR STORES
11. INDOOR STORES / GOODS IN / OFFICE
12. WASTE
12a. WASTE ADMIN
1500m2
2100m2
CARPARKS ASSHOWN
400m2
900m2
2640m2
980m2
500m2
1600m2
2000m2
3980m2
300m2
ONE WAY INTERNAL ROADWIDTHS TO BEGENERALLY 16.5 METRESWIDE. REDUCED TO MIN.12 METRES FOR NON-CRITICAL TURNING.SECURITY LINE - VISITOR
SECURITY LINE - SITE STAFF
FUTURE SEPARATION
AREAS SHOWN ARE FORTHE ULTIMATE LAYOUT
1a. STAFF OUTDOOR SPACE 390m2
MILLWOODAVE
MIL
LWO
OD
AVE
R.O.W
0701
01a
10
02
03
12
13
12
04
DUEL FUEL
CARPARK
06
04a
4a. VISITORS CARPARK CARPARKS ASSHOWN
FUTURE GROWTHBEYOND ULTIMATE
9. WASH BAYS/WASTE +SLUDGE COLLECTION/RWT
05
STORES & WORKSHOPSAREAS
TYREBAY
OFFICE
SERVICE BAYS
COVERED OUTDOOR STORAGE
PALLETRACKINGSYSTEM
ENTRY
12a
08
13. BIN STORAGE 300m2
CARPARKS VISITORS 15
11
09BOOMGATE
NCOMPLETE Proposed Camden DepotConcept Masterplan 08 - Proposed Layout - Ultimate
Project No. 7612Scale 1:1000 @A3
Date June 2013 Issue 3Page 08 of 11
COMPLETE Urban were commissioned to provide Council with an independent review of their Depot operations. As with many Council depots the existing buildings and layout grew in an ad hoc manner over many years, resulting in an inefficient depot.
Camden City Council is expected to grow significantly in the coming years and it is critical that a masterplan is developed that caters for the planned growth.
Upon commencement COMPLETE undertook a Functional Analysis in collaboration with Council staff input, plotting all required areas, activities and interrelationships.
From this study, COMPLETE developed a number of depot masterplan options incorporating all admin, storage and workshop functions required over the long term. These were presented to key Council Operational, Parks, Waste & Engineering staff.
A subsequent staging plan that identified 3 stages was then developed from the favoured Master Plan as well as a costing plan to allow for on going investment by Council over a number of years. The input by operational staff was invaluable and COMPLETE facilitated a number of interactive sessions with various groups in Council.
Alternative funding options have also been developed for Council.
LOCATION: CAMDEN, NSWPROJECT TYPE: Project Management, Architectural, EngineeringBUDGET: Stage 1 $14.1m, Stage 2 $5.5m, Stage 3 $6.8mSTATUS: Masterplan CompletedORGANISATION: Camden City Council
CAMDEN DEPOT MASTERPLAN
Camden Depot Masterplan