Post on 17-Nov-2014
description
1.6 MW
1.04 MW
2.4 MW
Joe McKeeverVice President of Construction
David Rarrick Vice President of Sales
Megan Reshetar Operations Manager
Scott Delany General Manager
Bruce Wenger CEO
X2
• First in industry to develop automated bussing station
• Every industry leader in photovoltaic production uses the X2
AZTEC’s next employee
We are EnergyWe are the Future
We are Aztec Solar Power