Calibration Report With Wastany Site 1-9-2015

Post on 13-Dec-2015

1 views 0 download

description

kffksd

Transcript of Calibration Report With Wastany Site 1-9-2015

Report of Activities for WASCOHORANY Site Metering Station

A staff meeting has been held in WASCO/ HORANY Site on 1/9/2015 to finalize

The pressure transmitter of branch”2” and FCA keypad issues.

So,The following activities have been done as follows:

1- Change the pressure transmitter by another one and adjust its range to be “1-

101 Bara”.

2- Replace the FCA keypad by another one without any change at the

configuration.

3- Check the value of the new pressure transmitter at the two flow computers.

WASCO GASCO