Burj Khalifa, Dubai - eps-gulf.comeps-gulf.com/pdfdocs/jordahl/Jordahl Reference List.pdf · 23...

Post on 06-Feb-2018

217 views 3 download

Transcript of Burj Khalifa, Dubai - eps-gulf.comeps-gulf.com/pdfdocs/jordahl/Jordahl Reference List.pdf · 23...

Burj Khalifa, Dubai Client : Emaar Properties

Main Contractor: Arabtech Construction LLC

Main Contractor 1: BESIX

Main Contractor 2: Arabtech Construction LLC

Main Consultant: Skidmore, Owings and Merrill (SOM)

(Architect Consultant)

Main Consultant: Turner Construction Company (Project

Manager)

Façade contractor: Al Ghurair Aluminum and Glass

23 Marina Residential Tower, Dubai

Client: Hircon International

Consultant: KEO International

Main Contractor: Dubai Civil Engineering

Façade Contractor: Al Hamad

Construction Period: 2006-2012

Masdar City, Abu Dhabi

Client: Masdar

Consultant: RW Armstrong

Main contractor: ACC

Facde contractor: Reem Emirates Aluminium

Saraya Residential Tower, Abu Dhabi

Consultant: Architecture and Planning Group, APG

Main Contractor: Arabian Construction Company, ACC

Facade Contractor: Arabian Industrial

Client: Landmark Asset Holding Limited

Architect: Ian Banham

Consultant: ARCHGROUP

Main contractor: Shapoorji Pallonji

Façade Consultant: Meinhardt

Façade Contractor: ALICO

Landmark Group Head Quarter, Dubai

The Louvre - Abu Dhabi

Client: Tourism Development & Investment Company (TDIC)

Contractors : Arabtech-Sanjose construction-Oger

Architect: Jean Nouvel

Structural Consultant: Buro Happold

Steel and glass works : Metallic Equipment

Shatha Tower

Location: Dubai, Dubai Media City

Architect: National Engineering Bureau

Contractor: Al Shafar General Cont. Co LLC

Façade contractor: Alumco

Ocean Heights , Dubai.

Location: Dubai Marina

Architect: Engineering Consulting Group ( ECG ).

Contractor: Arabtec Construction L.L.C.

Façade contractor: Alumco

The Address Hotel, Dubai

Location: Burj Dubai Development

Architect: W.S.Atkins

Contractor: Besix - Arabtec

Façade Contractor: Alumco

Citadel Tower

Location: Dubai - Business Bay

Architect: Dar Consultant

Contractor: Al Shafar General Contracting

Façade contractor: Alumco

CITY VIEW, Bangalore India

Client: City View Bangalore Properties pvt ltd

Architect : Studio U+A LLC, New York

Facade Consultant: Meinhardt

Façade Contractor: Al Abbar

DUBAI AIRPORTS AVIATION CORPORATION

Client: Dubai Airports Aviation Corporation

Consultant : Dar Al Handasah

Main Contractor : ALEC

Façade contractor: Al Abbar

Elite Residence, Dubai

Client : Tameer Real Estate FZCO

Architect: Eng. Adnan Saffarini (EAS)

Main Contractor : Arabian Construction Co

Façade contractor: Cladtech International

Installation Period : Feb 2010 – Sept 2011

Princess Tower, Dubai

Client : Tameer Real Estate FZCO

Architect: Eng. Adnan Saffarini (EAS)

Main Contractor : Arabian Construction Co

Facade Contractor: Cladtech International

Installation Period : Dec. 2010 – Jul. 2011

Dubai World Central

Main Contractor : Al Kharafi Group

Consultant: Dar Al Handasah

Façade contractor: Al Abbar

Etihad Towers, Abu Dhabi

Client : SSPD Sheikh Suroor Projects

Main Contractor: ACC

Consultant: AECOM

Project Management : Hill International

Facade contractor: Reem Emirates Aluminium

Cleveland Clinic, Abu Dhabi

Main contractor Contractor: Sixco-Samsung Joint Venture (SSJV)

Design Architect: Henningson, Durham and Richardson International (HDR)

Construction Architect: Aedas

Façade Contractor: Yuanda

Abu Dhabi Airport

Client: Abu Dhabi Airports Company (ADAC)

Main Contractor 1: Arabtec

Main Contractor 2: TAV Construction (TAV)

Main Contractor 3: Consolidated Contractors International Co. (CCC)

Dubai Festival City

Main Contractor : Higgs and Hill

Façade Consultant: Meinhardt

Façade contractor: Permasteelisa Gartner

Jordan Gate, Amman Jordan

Architect: Gulf Finance House, KIFC, DTZ

Main Contractor : Al Hamad Contracting

Façade contractor: Al Hamad

The Address Skyview, Dubai

Project Manager: TURNER

Consultant: NORR

Main Contractor : Arabian Construction Company

Façade Consultant: Koltay Facades

Façade Contractor: Al Ghurair Aluminium and Glass

Burj Vista, Dubai

Consultant: BH-NS Consultants

Main Contractor : Consolidated Construction Company

Façade Consultant: Koltay Facades

Façade Contractor: Folcra Beach

Al Fattan Sky Towers, Dubai

Consultant: AE7

Main Contractor : Delta Emirates

Façade Contractor: Engineering Aluminium System

Dubai City Walk Development

Client: Meraas Development

Consultant: Holford Associates

Main contractor: Al Shafar General Contracting

Façade Contractor: Al Abbar

Bay’s Edge, Dubai

Client: Damac

Consultant: Shadid Engineering

Main contractor: Al Sahel Contracting Company

Façade Contractor: Zebian Aluminium