Post on 04-Sep-2014
1
BTS3900 V100Quick Installation Guide
Issue: 04Date: 2010-03-19
Copyright © Huawei Technologies Co., Ltd. 2010. All rights reserved.
900 mm
42 mm
450 mm
600 mm420 mm
≥200 mm
≥800 mm
Modules in the Cabinet
Clearance for the Cabinet
Cabinet dimensions (height x width x depth): 900 mm x 600 mm x 450 mm
220 V cabinet-48 V cabinet +24 V cabinet
Fan box
BBUDCDU-01
BBU
+24 V power equipmentDCDU-01
BBU
220 V power equipmentDCDU-01
RFU RFU RFU
Fan box Fan box
2
Installing the BaseInstalling the Base on the Concrete Floor
2. Install the base.
1. Determine the installation position of the base and install expansion bolt assemblies.
Base
Ø1690°
52 mm to 60 mm
M12x60 boltSpring washerFlat washer
Expansion tubeDo not use a hammer drill to drill holes on the concrete pad through the holes on the base.
Insulating spacer(x2)
M12x60 bolt (x4)Spring washer 12
Flat washer 12Insulating washer
3. Adjust the base level and measure the resistance between the base and the bolts.
Adjust M12x30bolts (x4) on site.
Normal display: > 5 MΩ
The resistance between the base and the four expansion bolt assemblies should be respectively measured.
Level
Anchor hole
Concrete floor
Marking template
3
Installing the Base on the ESD Floor
Concrete floor
2. Temporarily fasten the ESD floor and supports.
1. Determine the installation position of the base and drill holes on the ESD floor.
Support for the ESD floor
ESD floorFor details on how to drill holes and install expansion bolt assemblies on the concrete floor as shown in the figures ② and ③, see page 2.
When tightening the height locking bolts, you should tighten the bolts in the middle before tightening the bolts on both sides.
3. Install the base on the ESD floor.
M12x60 bolt
M12x70 bolt
Spring washer 12
Flat washer 12
M12x60 bolt (x4)Spring washer 12Flat washer 12Insulating washer
Insulating spacer (x2)
4. Adjust the base level and measure the resistance between the base and the bolts.
Do not use a hammer drill to drill holes on the concrete pad through the holes on the base.
(For details, see step 3 on page 2.)
For details, see step 1 on page 2.
Anchor hole
ESD floor
Marking template
Height locking bolt (both sides)
Mounting holes for the support
Height locking bolt (middle)
4
Installing the PGND Cables and Equipotential Cables
Installing the Cabinet and PGND Cables
Installing the PGND Cablesa
External ground barExternal ground bar
1. Install the PGND cable for the -48 V or 220 V cabinet.
2. Install the PGND cable for the +24 V cabinet.
If the cabinet is installed with the power subrack before delivery, you should remove the power subrack from the cabinet and also the power cable between the power subrack and the DCDU-01 and PGND cable for the power subrack before tightening bolts. After the cabinet is installed, install the power subrack, related power cable, and related PGND cable.
The cabinet door can be removed before the cabinet is installed for easy operations.
M12x50 bolt (x2)
Power subrack
Installing the Cabinet
5
Installing the Equipotential Cables b
The -48 V cabinet can be stacked.The +24 V cabinet cannot be stacked.Stacking 220 V cabinets are not recommended. If they have to be stacked, the cabinets can bear the highest ambient
temperature that is 5°C lower than normal.
side-by-side mode stack mode
M6
M6
M6
M6
BBU
DCDU-01 DCDU-01
BBU
DCDU-01
DCDU-01
RFU RFU RFU
RFU
Remove the cover plate.
Fan box
Fan boxFan boxFan box
6
Installing the Power Cable for the -48 V Cabineta
Installing the Power Cable for the +24 V Cabinetb
DCDU-01
Free
PSU
+24 V cabinet
-48 V cabinet
When arranging for the power cable on site, do not expose the metal wire.
BBUFREE
BBUDCDU-01
RFU
RFU
Plastic cover plate
RTN(+)
The method for installing the power cable for cabinets installed side-by-side or power cable for stacked cabinets is the same as that for installing the power cable for a single cabinet.
NEG(-)
Installing the Input Power Cable
Installing Cables
In this document, the cable color and equipment appearance is for reference only. The actual cables and equipment may differ from what are shown in the figures.
Attach labels before routing cables.When cutting the BTS3900 input power cable, reserve an extra length of 300 mm. Add an OT terminal to the cable on site.
+-
Fan box
Fan box
7
E1/T1 E1/T1
E1/T1
Installing the Input Power CableInstalling the Power Cable for the 220 V Cabinetc
Installing Transmission Cables
BBU
PSU
BBU
RFU
DCDU-01
PMU
220 V AC single-phase input
110 V AC dual-live-wire input
220 V AC three-phase input
Short-circuiting cable for live wires (brown)
Short-circuiting cable for neutral wires (blue)
Installing the E1 Cablea
E1 cable or FE cable can be configured according to the transmission mode of the base station. Only one transmission mode is supported by the base station working in the GSM standard, and two transmission modes can be supported by the base station working in the UMTS standard. For details about the configurations and cable connections, see the BTS3900 Hardware Description.
For a multi-mode base station, only SRAN5.0 supports the LTE mode.
Ensure that both ends of the E1 cable are disconnected. Then, weld connectors to the bare wires at one end of the E1 cable all at once.E1 transmission in the GSM standard E1 transmission in the UMTS standard
220 V cabinet
Fan box
E1 transmission in the LTE standard
8
FE0
FE0
FE/GE0 SFP1
FE1
Installing Transmission Cables
Installing the RF cableb
Installing RF Cables
ANT_RXB
ANT_TX/RXA
A single cabinet
BBU
DCDU-01
RFU
FE transmission in the GSM standard
FE transmission in the UMTS standard(over the electrical port)
Install the cables in the sequence from top to bottom and from both sides to middle, as shown in figure 1.
If the inter-RFU RF signal cables are installed before the cabinet is delivered, only the cables on the ANT_TX/RXA ports need to be installed, as shown in figure 2.
Figure 1 Figure 2
Fan box
FE transmission in the UMTS standard (over the optical port)
FE transmission in the LTE standard (over the optical port)
FE transmission in the LTE standard(over the electrical port)
9
Installing RF Cables
ANT_RXB
ANT_TX/RXA
ANT_RXB
ANT_TX/RXA
Stacked cabinets
BBU
DCDU-01
DCDU-01
RFU
RFU
The methods for routing RF jumpers in a single cabinet and in cabinets installed side-by-side are the same. The cover plate of the upper cabinet must be removed before the RF jumpers are installed in stacked cabinets.
Remove the cover plate.
Diversity antenna: one white ring and one blue ring
Main antenna: one white ring and two blue rings3
Diversity antenna: one white ring and one yellow ring
Main antenna: one white ring and two yellow rings
2
Diversity antenna: one white ring and one red ring
Main antenna: one white ring and two red rings1System 2
Diversity antenna: one blue ring
Main antenna: two blue rings3
Diversity antenna: one yellow ring
Main antenna: two yellow rings2
Diversity antenna: one red ring
Main antenna: two red rings1System 1
Color RingSectorSystem
Attach color rings by referring to the following table.
If main and diversity are not distinguished, the RF signals transmitted from the left RF unit are regarded as the main signals by default, and the RF signals transmitted from the right RF unit are regarded as the diversity signals.
If an antenna system serves six sectors, the colors of the rings for sectors 4, 5, and 6 are purple, orange, and green respectively.
Fan box
Fan box
10
Power-On Check
This chapter describes only the power-on check of the equipment. The base station must be powered on in seven days after installation.
The normal status of the indicators on the PMU:
RUN indicator: BlinkingALM indicator: OFF
The normal status of the indicators on the PSU:
Power indicator: Steady greenProtection indicator: OFFFault indicator: OFF
The normal status of the indicators on the GTMU:
RUN indicator:BlinkingALM indicator:OFFACT indiactor:ON
The normal status of the indicators on the WMPT:
RUN indicator:BlinkingALM indicator:OFFACT indicator:ON
The normal status of the indicators on the WBBP:
RUN indicator:BlinkingALM indicator:OFF
The normal status of the indicators on the FAN:
STATE indicator:Blinking greenThe normal status of the indicators on the UPEU:
RUN indicator:ON
The normal voltage range of the DC output power to the DCDU-01 is from:
-38.4 V DC to -57 V DC
The normal status of the indicators on the RFU:
RUN indicator: BlinkingALM indicator: ON for 1s and
then OFFACT indicator: ONVSWR indicator: OFFCPRI indicator: Steady green
Turn on the external switch of thepower supply to the BTS3900
Start
Rectify the fault
Rectify the fault
Rectify the fault
Rectify the fault
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
End
Power on the DCDU-01
Check whether the outputpower of the DCDU-01 is normal?
(Optional)Check whether the LEDs
on the PSUs and PMU arefunctional?
Set the MCB labeled FAN on theDCDU-01 to ON
Check whether the Fan boxunit is functional?
Set the MCB labeled BBU on theDCDU-01 to ON
Set the MCB labeled RFU on theDCDU-01 to ON
Check whether all theLEDs on the BBU panel are functional?
Check whether all theLEDs on the RFU panel are functional?
The normal status of the LEDson the Fan box is as follows:
RUN indicator:BlinkingALM indicator:OFF
11
AppendixRemoving the CPRI Cables
Product 4 Product 5
Product 3 Product 2 Product 1
Waterproofing Outdoor Cables
1. Wrap three layers of waterproof tapes.
2. Wrap three layers of insulating tapes.
Push Push Push
Push Push
PullPull
Pull
Pull
Cable tie
Waterproof tape
Insulating tape
The waterproof tape should be wrapped for an extra length of 20 mm away from the connectors at both ends.
The tapes should be wrapped around the connector from the lower part to the upper part. When wrapped for another layer, the tapes may not be cut.
When wrapping the waterproof tape, ensure that the upper layer of the tape covers at least 50% of the lower layer.
The insulating tape should be wrapped for an extra length of 20 mm away from the waterproof tapes at both ends.
Extend the tape.
Pull
12
Pin Assignment
TX4
TX3
TX2
TX1
RX4
RX3
RX2
Green
Gray
White
Brown
White
Green
Blue1
Orange23
Red22Twisted
pair Blue21
White20
Twisted pair Red26
Twisted pair Red24
25
White
Orange
White
Wire Color
6
Twisted pair
7
8
Twisted pair
19
Twisted pair
5
4
3
2
X1
Twisted pair
Twisted pair
Wire Type
RX1
Label
TX4
TX3
TX2
TX1
RX4
RX3
RX2
Tip
Tip
Ring
Tip
Ring
Tip
Tip1
Tip23
Ring224
Tip21
Ring20
8Ring26
6Ring24
25
Ring
Tip
Ring
Wire Type
6
77
8
219
55
4
3
2
X1
3
1
Coaxial SN
RX1
Label
1. Pin assignments for the wires of the 75-ohm E1 coaxial cable
2. Pin assignments for the wires of the 120-ohm E1 twisted pair cable
HUAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian Longgang
Shenzhen 518129People’s Republic of China
www.huawei.com
Green/whiteBrown/whiteGray/whiteBlue/redOrange/redGreen/red
Orange/whiteBlue/white