Bridge Avenue 2020 Construction – Detour RoutesBridge Avenue 2020 Construction – Detour Routes...

Post on 14-Jul-2020

2 views 0 download

Transcript of Bridge Avenue 2020 Construction – Detour RoutesBridge Avenue 2020 Construction – Detour Routes...

Stage 1(May, June)

Stage 2(June, July, Aug.)

Stage 3(Sept., Oct.)

Bridge Avenue 2020 Construction – Detour Routes

Contact Information

• Sue Miller, Freeborn County Engineer (507)-377-5188 sue.miller@co.freeborn.mn.us

• Steve Jahnke, Albert Lea City Engineer (507)-377-4325 sjahnke@ci.albertlea.mn.us

• Matt Hansen, SRF Project Manager (763)-475-0010 mhansen@srfconsulting.com