Bodmin Town Leat Repair Report
ARUP-C-RP-0010
Issue 3 | 26 March 2018
This report takes into account the particular
instructions and requirements of our client.
It is not intended for and should not be relied
upon by any third party and no responsibility
is undertaken to any third party.
Job number 253391
Ove Arup & Partners Ltd
63 St Thomas Street
Bristol BS1 6JZ
United Kingdom
www.arup.com
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Contents Page
1 Introduction 1
1.1 Introduction 1
1.2 The Works 1
1.3 Contact Details 2
1.4 Reference Documents 3
2 Bodmin Town Leat 4
2.1 Flood Risk 4
3 Discussion on Existing Condition 6
3.1 CCTV Survey 6
4 Recommended Remediation Work 7
4.1 Culvert replacement 7
4.2 Hydromorphology and ecology improvements 7
4.3 Reduction of flood risk 7
4.4 Specification 8
4.5 Health and Safety 8
4.6 Cost assessment 8
5 Permitting, Consents and Approvals 9
5.1 South West Water 9
5.2 Environment Agency 9
5.3 Planning 10
Appendices
Appendix A
CCTV Survey Outputs
Appendix B
Recommended Remediation Works
Appendix C
South West Water & Environment Agency Records
Appendix D
Designers Risk Assessment
Appendix E
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Cost Estimate
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Page 1
1 Introduction
1.1 Introduction
The Bodmin Jail Redevelopment aims to refurbish the existing Victorian Grade II
listed jail house buildings into a new hotel and visitor attraction.
Arup has been appointed by Mallino Development Ltd to provide civil
engineering design advice for the refurbishment works.
As part of these works, the client has been asked to schedule repairs to the
culverted Bodmin Town Leat that runs through the lower part of the Berrycombe
Vale site.
1.2 The Works
The following report covers the following aspects of the remedial works to the
culverted watercourse. It comprises:
• Discussion on the existing condition of the asset;
• Results of CCTV surveys;
• Discussions on remedial works;
• Recommended further works.
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Page 2
1.3 Contact Details
Project name Bodmin Jail Redevelopment Project
Project ref Arup Project Reference 253391
Planning Application Reference
PA17/00086
Address Bodmin Jail, Berrycoombe Road, Bodmin, Cornwall, PL31 2NR
Principal Designer (Architect)
Name Twelve Architects
Address 148 Tooley Street, 5th Floor, SE1 2TU
Contact name Hannah Baker/ Lorraine Stout Griffith
Telephone 0207 846 2012 Email h.baker@twelvearchitects.com
Project Manager and Quantity Surveyor
Name Turner & Townsend project management
Address One Castlepark Tower Hill, Bristol, BS2 0JA
Contact name Phil Toghill / Rob Cox
Telephone 0117 922 7300 Email phil.toghill@turntown.co.uk
Engineer
Name Arup
Address 63 St Thomas Street Bristol BS1 6JZ United Kingdom
Contact name Andrew Rolf / Charles Bennett
Telephone 0117 976 5432 Email Charles.bennett@arup.com
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Page 3
1.4 Reference Documents
This document is to be read with the following documents:
• Preliminaries provided by the Project Manager
• Pre-contract H&S plan provided by the Principle Designer
• Sewers for Adoption 7th Edition. ‘Part E – Civil Engineering Specification’ of Sewers for Adoption 7th Edition shall be used as the specification for all construction works.
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Page 4
2 Bodmin Town Leat
Bodmin Town Leat is a tributary of the River Camel that rises in the Castle
Canyke area to the east of Bodmin and flows west through Bodmin town centre,
joining the River Camel approximately 1.5 km west of Bodmin.
Bodmin Town Leat has been heavily modified since medieval times, and runs
below ground in pipes and culverts along much of its length.
The extent of the Leat under consideration is shown below and extends from an
existing manhole (east) to the ‘silt traps’ (west).
Figure 1 – Route of culverted watercourse through the site
Bodmin Town Leat as it runs through the site is a 1200mm diameter precast
concrete culvert. The culvert is known to be in poor condition. A CCTV survey
has been undertaken to assess the condition of the existing culvert and identify
potential remediation works (see Section 3).
2.1 Flood Risk
The Bodmin Town Leat catchment has been identified by the EA as ‘red’ problem
catchment and as a Critical Drainage Area. This is attributable to a combination of
the steep, flashy catchment and the constrained, culverted nature of the
watercourse through Bodmin town centre.
The areas adjacent to the Bodmin Town Leat are at raised probability of flooding,
as shown in the extract of the EA fluvial flood map (Figure 2).
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Page 5
Figure 2
A flood alleviation scheme was constructed in the early 2000s. This included
measures to remove restrictions in the culverted sections of the watercourse and
construction of a flood storage area in the Priory Grounds area to seek to reduce
flood risk in the town centre. However, a high residual risk remains.
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Page 6
3 Discussion on Existing Condition
As part of the contractual conditions for the transfer of land at Berrycombe Vale it
is understood that Bodmin Town Council have requested a schedule of works for
the Bodmin Town Leat that runs from east to west through the Berrycombe site.
3.1 CCTV Survey
Two independent CCTV surveys have been undertaken over the section of the
Leat crossing the site. Both surveys were partial, covering different extents of the
Leat / Culvert.
When combined the two surveys provide a complete picture of the condition of
the culverted watercourse within the Berrycombe Vale site.
3.1.1 Exjet, October 2016
This survey was provided to Mallino Developments and is understood to have
been commissioned by Bodmin Town Council.
CCTV survey of the Bodmin Town Leat culvert was undertaken by Exjet Services
Ltd in October 2016. The results of this survey are included in Appendix A.
The survey was progressed from Manhole 0401 to Manhole 4316. These being
located to the west of the development site. Surveys were progressed down-stream
from Manhole 0401 and up-stream from Manhole 4316.
Manhole 0401 has a depth of circa 2.86m from cover level. Manhole 4316 has a
depth of circa 3.12m from cover level.
The section of culvert between Manholes 0401 and 4316 was found to be in very
poor condition throughout. A section located circa 80m from Manhole 0401 has
fully collapsed preventing full survey.
3.1.2 Solum, March 2018
This survey was commissioned by Mallino Development Ltd in March 2018.
Solum Surveying Ltd undertook a new CCTV survey in March 2018. The results
of this survey are included in Appendix A.
The survey extended upstream from Manhole 4316 towards the collapsed section.
The results concur with the previous 2016 survey, finding the majority of the
culvert in very poor condition.
An additional length of survey was conducted upstream from Manhole 4316, to
the east of the site (adjacent to No. 145 – No. 150 Hillside Park). This section of
culvert was shown to be in good condition.
The findings of the survey are summarised on BJH-ARP-XX-XX-DR-CD-1201
included in Appendix B.
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Page 7
4 Recommended Remediation Work
4.1 Culvert replacement
Based on the survey information received for the section of culvert between
Manhole 0401 and 4316, it is recommended that a c290m length of the culvert is
replaced.
Subject to further consultation with the Environment Agency, it is suggested
this could be with a replaced with a similar culvert section to the existing (i.e. a
new 1200mm diameter culvert). The culverts up and down-stream are both of
similar diameter.
A typical section of the proposed replacement is culvert is included on BJH-ARP-
XX-XX-DR-CD-1201 in Appendix B.
The new culvert would be constructed alongside the existing culvert (i.e. offline)
to avoid the need for significant temporary pumping. Temporary pumping would
be required to make the final connections.
4.2 Hydromorphology and ecology improvements
Bodmin Town Leat is identified in the Environment Agency (EA) records as a
Statutory Main River.
The EA have duties to supervise all matters relating to flood defence on Main
Rivers and to promote conservation of the aquatic environment.
As such, the EA may identify that they seek hydromorphological and ecological
improvements as part of the remediation of the culvert. These may include:
• Daylighting of the culvert (i.e. replacing with an open watercourse). This is
the EA’s preferred approach for culverted watercourses, however given the
depth of the culvert (c.2.8m depth) it may not be a feasible approach for the
Berrycombe Vale site.
• A modified culvert section to include, for example, habitat ledges or low flow
channels, to improve the biodiversity of the culverted section.
The EA requirements and preferences with regard to hydromorphology and
ecology will need to be confirmed through consultation.
4.3 Reduction of flood risk
As discussed in Section 2.1, there is a high probability of flooding in parts of
Bodmin from the Bodmin Town Leat.
As a result, Bodmin Town Council, Cornwall Council (as Lead Local Flood
Authority) and the EA may wish to seek opportunities to reduce flood risk as part
of the culvert replacement works.
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Page 8
Detailed hydrological assessment would be needed to assess whether
opportunities for flood risk reduction exist, however it is believed that the flood
risk is mainly attributable to the limited conveyance capacity at pinch points in
Bodmin town centre. As such, increasing conveyance through the Berrycombe
Vale site would be unlikely to provide significant betterment.
As above, the EA requirements and preferences with regards to flood risk
reduction will need to be confirmed through consultation.
4.4 Specification
All construction work should be undertaken in accordance with Sewers for
Adoption 7th Edition. ‘Part E – Civil Engineering Specification’ of Sewers for
Adoption 7th Edition shall be used as the specification for all construction works.
4.5 Health and Safety
The assessment, design and construction of any works in relation to the culvert are
to be undertaken in accordance with all relevant health and safety legislation,
including the Construction (Design and Management) Regulations 2015 (CDM
2015).
It is assumed that the works to the culvert will be undertaken as part of the wider
redevelopment works at the site.
A CDM Designers Risk Assessment is included in Appendix D. In this document
we have identified the key hazards relating to the proposed culvert works and
identified measures to, where possible, eliminate these risks and reduce or control
any risks that cannot be eliminated.
4.6 Cost assessment
Turner and Townsend have undertaken an estimate of the cost of replacement of
the culvert. This estimate is based on the following assumptions:
• The culvert is replaced on a like-for-like basis, with a new 1200mm
diameter precast concrete culvert;
The estimated replacement cost is c£500,000. A breakdown of this cost estimate is
included in Appendix E.
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Page 9
5 Permitting, Consents and Approvals
5.1 South West Water
Bodmin Town Leat is currently shown on the South West Water asset records as a
public sewer. This was confirmed by email by Martyn Dunn of South West
Water. These records are included in Appendix C.
If this is correct, then the responsibility for repair, maintenance and assessment of
the culvert lie with South West Water and would be unaffected by change of
ownership of the land above.
However, it is understood that South West Water believe the culvert is incorrectly
designated as a public sewer. As a result they intend to update their records in the
coming months to remove this from their asset records.
If this is the case, then the responsibility for repair and maintenance of the culvert
will lie with the owner of the land above the culvert in accordance with standard
riparian responsibilities.
5.2 Environment Agency
Regardless of the SWW status, as a Main River, a Flood Risk Activity
environmental permit from the EA is required for any works that could have
impact on flood risk. This includes:
• Altering, repairing or maintaining any temporary or permanent structure in,
over or under a Main River, where the work could affect the flow of water in
the river or affect any drainage work;
• Any activity within 8m of the bank of a Main River;
• Any activity within 8m of any flood defence structure or culvert on a Main
River.
The proposed works are not covered under the list of Exempt Activities or the
activities covered by a Standard Rules permit and therefore a Bespoke Permit will
be required.
The requirements for a Bespoke Permit will depend on the EA’s specific
requirements. However, there requirements are likely to include:
• Detailed method statement for the proposed works (including enabling /
temporary works);
• Programme for undertaking the works;
• Construction drawings for the proposed works;
• Environmental risk assessment. This may require the undertaking of
ecological surveys to identify the current baseline condition of the
watercourse;
• Construction Environmental Management Plan.
Mallino Developments Bodmin Jail Redevelopment
Bodmin Town Leat Repair Report
ARUP-C-RP-0010 | Issue 3 | 26 March 2018
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\4.70_DESIGN_NOTES\03 INFRASTRUCTURE\BODMIN TOWN LEAT\ARUP-C-RP-0010 BODMIN JAIL - BODMIN TOWN
LEAT CCTV SURVEY REPORT_ISSUE 2.DOCX
Page 10
The EA may also identify alternative design preferences for the replacement
culvert to improve the ecological potential of the culvert as discussed in Section
4.2.
The starting position for the EA is that where possible, opportunities should be
sought to ‘daylight’ existing culverts. As discussed above, given the depth of the
culverted watercourse (2.5m – 3.0m deep) this would be challenging to achieve on
the Berrycombe Vale site.
5.3 Planning
Advice from a planning consultant should be sought to determine if the proposed
works are covered under the current Bodmin Jail planning application or if a new
planning application or amendment is required for these works.
Appendix A
CCTV Survey Outputs
EX
MH
3
EX
MH
2
EX
MH
1
Unplo
tted
EX
MH
4
Unplo
tted
EX
MH
5
94
93
79
80
Elm
65
60
Grove
Trelane
10
7
TC
B
22
1
WA
TE
RY
LA
NE
79.8
m
1 Hil
lH
ou
se
Wo
rk
s
1
CARDELL ROAD
Post
Flaxmoor
Terr
144
35
112
El Sub
Sta
127
142
145
120
94.6
m
72
66
HILLSIDE P
AR
K
73
88
Sub S
ta
El
46
87
7
102
106
Arw
eth
76
.1m
Tressa
Ell
esm
ere
83.9
m
Hil
lfie
ld
31
30
Clifden
Terrace
18
113
COR
NER
3
27
23
4
7
AR
MC
HAIR
1
14
128
134
135
4
98
101
HILLSI
DE PARK
72
.1m
Cross
Crossw
ays
31a
Ho
use
The Co
ach
The
Governor
s
House
Chapla
incy
11
14
8
12
86.4
m
4
107
Path
65.2
m
150
LB
TA
NW
OO
D
VIE
W
27
15
2
11a
97
59
56
78.7m
72.2m
HILL
119
18
10
20
28
TANWOOD VIEW
18a
52
55
41
46
141
36
28
24
46
35b
Po
nd
35a
14
BERRYCOOMBE
22
Berryco
mbe
House
1111a
SHER
WO
OD
DRIV
E
44
36
24
2
12
BERR
YC
OO
MBE
VALE
42
38
13
59.5
m 1 to 11
30
El S
ub
S
ta
3264.1
m
Path
(u
m)
ED Bdy
11
SC
ARLETTS
WELL R
OA
D
1
35
SC
ARLETTS
WELL P
AR
K
8
22
19
29
27
60
.0m
4
Car P
ark
1
Su
b
El
12
14
Sta
46
5
CA
MEL
84
45
52
20
16
81
COURT
10
22
21
1
64.4
m
38 to 44
22
35
24
26
DYMOND COURT
23
10
16
17
43
Cran
bo
rn
e
NORW AY ROAD
51
3
29
Sitka L
odge
1
289
.1m
Beechcroft
Ho
use
SE
WE
R IN
PO
OR
CO
ND
ITIO
N A
LON
G 2
90M
LE
NG
TH
. RE
PLA
CE
ME
NT
RE
QU
IRE
D
SE
WE
R IN
GO
OD
CO
ND
ITIO
N.
NO
RE
ME
DIA
L W
OR
KS
RE
QU
IRE
D.
CL
~60
.0IL
~57
.1D
epth
= 2
.86
CL
~64
.5IL
~61
.4D
epth
= 3
.12
App
rox.
Col
laps
ed s
ewer
Leng
th o
f sew
er s
ubje
ct to
de
form
atio
n / f
ract
ures
thro
ugho
ut
Leng
th o
f sew
er s
ubje
ct to
de
form
atio
n / f
ract
ures
thro
ugho
ut
Bod
min
Jai
l (25
3391
-00)
AR
P-C
-SK
-100
419
/03/
18 |
Inf
orm
atio
n |
CJB
Bod
min
Tow
n Le
atC
CT
V S
urve
y F
indi
ngs
NO
TES.
1. S
KE
TCH
SH
OW
S C
OM
BIN
ED
RE
SU
LTS
FR
OM
:(i)
EX
JET
CC
TV S
UR
VE
Y, O
CTO
BE
R 2
016
(RE
F 33
875/
16)
(ii) S
OLU
M C
CTV
, MA
RC
H 2
018
SOLUM SURVEYING LTD THE OLD STABLES
PINES COURTYARD, STONETel: 01454413592
Fax: Email: SHOLBROOK@SOLUMSURVEYING.COM
Project-informationProject name : Project Number : Contact : Date :
BODMIN JAIL 08 03 18 13/03/2018
BODMIN JAIL 08 03 18 // Page: 1
Client:Contact Name:Department:Road:Town:County:Telephone:Fax:Mobile:E-mail:
ARUPCHARLES BENNETTSENIOR EGINEERST THOMAS STREETBRISTOL
0117 976 5432
0746 4488 837Charles.Bennett@arup.com
Site:Contact Name:Department:Road:Town:County:Telephone:Fax:Mobile:E-mail:
BODMIN JAILCHARLES BENNETTSENIOR ENGINEERSCARLETTS WELL ROADBODMIN
ContractorContact Name:Department:Road:Town:County:Telephone:Fax:Mobile:E-mail:
SOLUM SURVEYING LTDSTEVE HOLBROOKOPERATIONS MANAGERTHE OLD STABLESPINES COURTYARD, STONEBERKELEY GL13 9LE01454413592
07730620143SHOLBROOK@SOLUMSURVEYING.COM
SOLUM SURVEYING LTD THE OLD STABLES
Street : PINES COURTYARD, STONETel: 01454413592
Fax: Email: SHOLBROOK@SOLUMSURVEYING.COM
Inspection reportDate : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
13/03/2018 no rain or snow 1 X
no rain or snow VEHICLE 1 SOLO PRO
BODMINSCARLETTS WELL ROAD
EXMH1 (D/S) EXMH2
EXMH1
EXMH2
Surface water
Routine inspection of condition81.81 m
1200 mmConcrete
1:645 Position Code Observation Grade
BODMIN JAIL 08 03 18 // Page: 2
0.00 MH (Constr) 0Start node type, manhole, reference number :EXMH1
0.01 WL (Serv) 0Water level, 10% of the vertical dimension
3.73 CN (Constr) 0Connection other than junction, at 11 o'clock,diameter 100mm
9.69 CN (Constr) 0Connection other than junction, at 10 o'clock,diameter 100mm
81.81 MHF (Constr) 0Finish node type, manhole reference number:EXMH2
EXMH1
EXMH2
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Features
SOLUM SURVEYING LTD THE OLD STABLES
Street : PINES COURTYARD, STONETel: 01454413592
Fax: Email: SHOLBROOK@SOLUMSURVEYING.COM
Inspection reportDate : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
13/03/2018 no rain or snow 2 X
no rain or snow VEHICLE 1 SOLO PRO
BODMINSCARLETTS WELL ROAD
EXMH2 (D/S) EXMH3
EXMH2
EXMH3
Surface water
Routine inspection of condition177.14 m
1200 mmConcrete
1:720 Position Code Observation Grade
BODMIN JAIL 08 03 18 // Page: 3
0.00 MH (Constr) 0Start node type, manhole, reference number :EXMH2
0.00 FL (Struct) 3Fracture, longitudinal, at 12 o'clock
0.00 WL (Serv) 0Water level, 10% of the vertical dimension
0.00 S01 CUW (Misc) 0Loss of vision, camera under water, Start
16.40 F01 CUW (Misc) 0Loss of vision, camera under water, End
16.40 S02 FM Fracture, multiple, from 8 to 4 o'clock, Start
48.20 S03 D (Struct) 2Deformed sewer/drain, 5%, Start
54.20 F03 D (Struct) 2Deformed sewer/drain, 5%, End
54.20 S04 D (Struct) 4Deformed sewer/drain, 10%, Start
76.10 F02 FM (Struct) 4Fracture, multiple, from 8 to 4 o'clock, End
76.10 F04 D (Struct) 4Deformed sewer/drain, 10%, End
76.10 S05 CL (Struct) 2Crack, longitudinal, at 12 o'clock, Start
85.50 CL (Struct) 2Crack, longitudinal, at 8 o'clock
90.60 F05 CL (Struct) 2Crack, longitudinal, at 12 o'clock, End
90.60 S06 CM Cracks, multiple, from 8 to 4 o'clock, Start
EXMH2
SOLUM SURVEYING LTD THE OLD STABLES
PINES COURTYARD, STONETel: 01454413592
Fax: Email: SHOLBROOK@SOLUMSURVEYING.COM
Inspection ReportDate : Job number : Weather : Operator : Section number : PLR :
Weather Vehicle : Camera : Preset : Cleaned : Grade:13/03/2018 no rain or snow 2 X
no rain or snow VEHICLE 1 SOLO PRO
1:720 Position Code Observation Grade
BODMIN JAIL 08 03 18 // Page: 4
112.20 FL (Struct) 3Fracture, longitudinal, at 12 o'clock
120.20 F06 CM (Struct) 3Cracks, multiple, from 8 to 4 o'clock, End
120.20 S07 FL Fracture, longitudinal, at 12 o'clock, Start
120.20 S08 FL Fracture, longitudinal, at 9 o'clock, Start
136.00 F08 FL (Struct) 3Fracture, longitudinal, at 9 o'clock, End
151.30 CL (Struct) 2Crack, longitudinal, at 4 o'clock
154.40 F07 FL Fracture, longitudinal, at 12 o'clock, End
154.40 S09 FM Fracture, multiple, from 7 to 5 o'clock, Start
158.00 IR (Serv) 0Infiltration, running, at 9 o'clock
168.10 F09 FM (Struct) 4Fracture, multiple, from 7 to 5 o'clock, End
168.10 S10 FL Fracture, longitudinal, at 12 o'clock, Start
168.10 S11 FL Fracture, longitudinal, at 8 o'clock, Start
168.10 S12 FL Fracture, longitudinal, at 4 o'clock, Start
177.10 F10 FL (Struct) 3Fracture, longitudinal, at 12 o'clock, End
177.10 F12 FL (Struct) 3Fracture, longitudinal, at 4 o'clock, End
177.10 F11 FL (Struct) 3Fracture, longitudinal, at 8 o'clock, End
177.10 SA (Misc) 0Survey abandoned OUT OF REEL
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Features
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Project-informationProject name : Project Number : Contact : Date :
33875. BODMIN TOWN LEAT, BERR 33875/16 Anne Banks 21/10/2016
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
Client:
Contact Name:
Department:
Road:
Town:
County:
Telephone:
Fax:
Mobile:
E-mail:
Bodmin Town Council
Anne Banks
Shire House
Mount Folly Square
Bodmin
Cornwall PL31 2DQ
01208 76616
anne.banks@bodmin.gov.uk
Site:
Contact Name:
Department:
Road:
Town:
County:
Telephone:
Fax:
Mobile:
E-mail:
Berrycombe Road
Bodmin
Contractor
Contact Name:
Department:
Road:
Town:
County:
Telephone:
Fax:
Mobile:
E-mail:
Exjet Services
Mr Dave Longley
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Devon, TQ4 7HP
01803 557000
01803 559556
info@exjet.co.uk
Exjet Services
Exjet House, Torbay Business Park
Street : 30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection reportDate : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :
Road : Catchment: U/S Depth :
Location Tape number : D/S MH :
Inspection Pipe Length D/S Depth :
Use: Pipe shape :
Year laid : Pipe size :
Purpose : Pipe material :
Total length : Lining :
Comment :
21/10/2016 33875/16 no rain or snow SW 1 X
no rain or snow WF65XPT camera 2 yes SW
BODMIN.
BERRYCOOMBE ROAD.
Fields
MH.0401. (D/S) MH.4316.
1
MH.0401.
2.86
MH.4316.
Culverted watercourse
Z
Sample survey to determine asset condition
190.43 m
Circular
1200 mm
Concrete
1:792 Position Code Observation MPEG Photo Grade
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
0.00 MH 00:00:00 (Constr) 0Start node type, manhole, reference number : MH.0401.
0.00 WL 00:00:15 (Serv) 0Water level, 5% of the vertical dimension
0.00 S01 FL 00:01:05 1_3A (Struct) 3Fracture, longitudinal, at 12 o'clock, Start
0.00 S02 FL 00:01:05 (Struct) 3Fracture, longitudinal, at 3 o'clock, Start
0.00 S03 FL 00:01:06 (Struct) 3Fracture, longitudinal, at 6 o'clock, Start
0.00 S04 FL 00:01:07 (Struct) 3Fracture, longitudinal, at 9 o'clock, Start
0.01 S05 SAV 00:01:08 (Struct) 1Surface damage, visible aggregate, from 5 to 7 o'clock,Start
0.01 S06 D 00:01:09 (Struct) 2Deformed sewer/drain, 5%, Start
23.22 GP 00:05:10 (Misc) 0General photograph taken at this point Remarks:GENERAL CONDITION
41.25 F06 D 00:05:64 (Struct) 2Deformed sewer/drain, 5%, End
41.25 S07 D 00:06:55 1_11A (Struct) 4Deformed sewer/drain, 10%, Start
43.49 S08 B 00:07:05 1_12A (Struct) 4Broken pipe, from 3 to 9 o'clock, Start
55.76 F07 D 00:08:32 (Struct) 4Deformed sewer/drain, 10%, End
55.76 S09 D 00:08:32 1_14A (Struct) 5Deformed sewer/drain, 15%, Start
58.83 S10 B 00:09:20 1_15A (Struct) 4Broken pipe, from 4 to 9 o'clock, Start
MH.0401.
Depth: 2.86
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection ReportDate : Job number : Weather : Operator : Section number : PLR :
Weather Vehicle : Camera : Preset : Cleaned : Grade:
21/10/2016 33875/16 no rain or snow SW 1 X
no rain or snow WF65XPT camera 2 yes
1:792 Position Code Observation MPEG Photo Grade
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
63.02 F10 B 00:10:14 (Struct) 4Broken pipe, from 4 to 9 o'clock, End
63.02 F09 D 00:10:18 (Struct) 5Deformed sewer/drain, 15%, End
63.02 S11 D 00:10:19 1_18A (Struct) 4Deformed sewer/drain, 10%, Start
77.15 F08 B 00:11:44 (Struct) 4Broken pipe, from 3 to 9 o'clock, End
77.15 F11 D 00:11:44 (Struct) 4Deformed sewer/drain, 10%, End
77.15 S12 D 00:11:45 (Struct) 2Deformed sewer/drain, 5%, Start
95.50 S13 B 00:13:06 1_22A (Struct) 4Broken pipe, from 9 to 3 o'clock, Start
99.41 F12 D 00:13:27 (Struct) 2Deformed sewer/drain, 5%, End
99.41 S14 D 00:13:27 (Struct) 4Deformed sewer/drain, 10%, Start
143.03 GP 00:17:30 1_25A (Misc) 0General photograph taken at this point Remarks:GENERAL CONDITION
151.85 FL 00:18:11 (Struct) 3Fracture, longitudinal, at 2 o'clock
156.25 GP 00:18:31 1_27A (Misc) 0General photograph taken at this point Remarks:GENERAL CONDITION
189.54 F14 D 00:21:10 (Struct) 4Deformed sewer/drain, 10%, End
189.54 D 00:21:11 1_29A (Struct) 5Deformed sewer/drain, 20%
190.39 B 00:21:21 (Struct) 4Broken pipe, from 3 to 9 o'clock
190.39 D 00:21:21 (Struct) 5Deformed sewer/drain, 25%
190.42 F01 FL 00:21:56 (Struct) 3Fracture, longitudinal, at 12 o'clock, End
190.42 F02 FL 00:21:56 (Struct) 3Fracture, longitudinal, at 3 o'clock, End
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection ReportDate : Job number : Weather : Operator : Section number : PLR :
Weather Vehicle : Camera : Preset : Cleaned : Grade:
21/10/2016 33875/16 no rain or snow SW 1 X
no rain or snow WF65XPT camera 2 yes
1:792 Position Code Observation MPEG Photo Grade
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
190.42 F03 FL 00:21:56 (Struct) 3Fracture, longitudinal, at 6 o'clock, End
190.42 F04 FL 00:21:56 (Struct) 3Fracture, longitudinal, at 9 o'clock, End
190.43 F05 SAV 00:21:56 (Struct) 1Surface damage, visible aggregate, from 5 to 7 o'clock,End
190.43 F13 B 00:21:56 (Struct) 4Broken pipe, from 9 to 3 o'clock, End
190.43 SA 00:21:56 (Misc) 0Survey abandoned Remarks: DEFECT HALTINGSURVEY
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade
18 570 285.99 54460.5 5 0 0 0 0 1
Structural Defects
Service Defects
Constructional Features
Miscellaneous Features
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection picturesPlace : Road : Date : Section number : PLR Suffix :
BODMIN. BERRYCOOMBE ROAD. 21/10/2016 1 X
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
Photo: 1_1_3_03112016_093222_A.jpg, Media No:: 1, 00:01:05
0m, Fracture, longitudinal, at 12 o'clock, Start
Photo: 1_1_11_03112016_093258_A.jpg, Media No:: 1, 00:06:55
41.25m, Deformed sewer/drain, 10%, Start
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection picturesPlace : Road : Date : Section number : PLR Suffix :
BODMIN. BERRYCOOMBE ROAD. 21/10/2016 1 X
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
Photo: 1_1_12_03112016_093343_A.jpg, Media No:: 1, 00:07:05
43.49m, Broken pipe, from 3 to 9 o'clock, Start
Photo: 1_1_14_03112016_093407_A.jpg, Media No:: 1, 00:08:32
55.76m, Deformed sewer/drain, 15%, Start
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection picturesPlace : Road : Date : Section number : PLR Suffix :
BODMIN. BERRYCOOMBE ROAD. 21/10/2016 1 X
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
Photo: 1_1_15_03112016_093452_A.jpg, Media No:: 1, 00:09:20
58.83m, Broken pipe, from 4 to 9 o'clock, Start
Photo: 1_1_18_03112016_093608_A.jpg, Media No:: 1, 00:10:19
63.02m, Deformed sewer/drain, 10%, Start
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection picturesPlace : Road : Date : Section number : PLR Suffix :
BODMIN. BERRYCOOMBE ROAD. 21/10/2016 1 X
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
Photo: 1_1_22_03112016_093636_A.jpg, Media No:: 1, 00:13:06
95.5m, Broken pipe, from 9 to 3 o'clock, Start
Photo: 1_1_25_03112016_093717_A.jpg, Media No:: 1, 00:17:30
143.03m, General photograph taken at this point
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection picturesPlace : Road : Date : Section number : PLR Suffix :
BODMIN. BERRYCOOMBE ROAD. 21/10/2016 1 X
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
Photo: 1_1_27_03112016_093832_A.jpg, Media No:: 1, 00:18:31
156.25m, General photograph taken at this point
Photo: 1_1_29_03112016_093929_A.jpg, Media No:: 1, 00:21:11
189.54m, Deformed sewer/drain, 20%
Exjet Services
Exjet House, Torbay Business Park
Street : 30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection reportDate : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :
Road : Catchment: U/S Depth :
Location Tape number : D/S MH :
Inspection Pipe Length D/S Depth :
Use: Pipe shape :
Year laid : Pipe size :
Purpose : Pipe material :
Total length : Lining :
Comment :
21/10/2016 33875/16 no rain or snow SW 2 X
no rain or snow WF65XPT camera 2 yes SW
BODMIN.
BERRYCOOMBE ROAD.
Fields
MH.4316. (U/S) MH.0401.
1
MH.0401.
2.86
MH.4316.
3.12
Culverted watercourse
Z
Sample survey to determine asset condition
73.07 m
Circular
1200 mm
Concrete
1:396 Position Code Observation MPEG Photo Grade
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
0.00 MH 00:00:00 (Constr) 0Start node type, manhole, reference number : MH.4316.
0.00 WL 00:00:30 (Serv) 0Water level, 5% of the vertical dimension
0.00 S01 FL 00:00:30 (Struct) 3Fracture, longitudinal, at 12 o'clock, Start
0.00 S02 FL 00:00:36 (Struct) 3Fracture, longitudinal, at 3 o'clock, Start
0.00 S03 FL 00:00:36 (Struct) 3Fracture, longitudinal, at 6 o'clock, Start
0.00 S04 FL 00:00:36 (Struct) 3Fracture, longitudinal, at 9 o'clock, Start
0.00 S05 D 00:00:36 2_7A (Struct) 2Deformed sewer/drain, 5%, Start
0.00 S06 ISJ 00:00:39 (Serv) 0Infiltration, seeping at joint, from 3 to 5 o'clock, Start
0.00 S07 ISJ 00:00:39 (Serv) 0Infiltration, seeping at joint, from 7 to 9 o'clock, Start
16.47 IRJ 00:02:14 (Serv) 0Infiltration, running at joint, at 4 o'clock
19.01 FL 00:02:27 2_11A (Struct) 3Fracture, longitudinal, at 1 o'clock
27.48 DEE 00:03:05 (Serv) 3Attached deposits, encrustation, from 5 to 7 o'clock, 10%cross-sectional area loss
35.97 B 00:03:46 2_13A (Struct) 4Broken pipe, from 9 to 3 o'clock
37.69 MH 00:03:54 2_14A (Constr) 0Start node type, manhole, reference number :UNPLOTTED 1 Remarks: LATERAL WITHIN CHAMBER
48.56 GP 00:05:06 2_15A (Misc) 0General photograph taken at this point Remarks:GENERAL CONDITION
MH.4316.
Depth: 3.12
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection ReportDate : Job number : Weather : Operator : Section number : PLR :
Weather Vehicle : Camera : Preset : Cleaned : Grade:
21/10/2016 33875/16 no rain or snow SW 2 X
no rain or snow WF65XPT camera 2 yes
1:396 Position Code Observation MPEG Photo Grade
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
53.52 MH 00:05:30 (Constr) 0Start node type, manhole, reference number :UNPLOTTED 2 Remarks: LATERAL WITHIN CHAMBER
66.25 F05 D 00:07:58 (Struct) 2Deformed sewer/drain, 5%, End
66.25 S08 D 00:07:58 2_18A (Struct) 4Deformed sewer/drain, 10%, Start
69.39 S09 B 00:08:18 2_19A (Struct) 4Broken pipe, from 3 to 9 o'clock, Start
72.25 B 00:08:38 (Struct) 4Broken pipe, from 3 to 9 o'clock
72.29 F01 FL 00:08:38 (Struct) 3Fracture, longitudinal, at 12 o'clock, End
72.29 F02 FL 00:08:38 (Struct) 3Fracture, longitudinal, at 3 o'clock, End
72.29 F03 FL 00:08:38 (Struct) 3Fracture, longitudinal, at 6 o'clock, End
72.29 F04 FL 00:08:38 (Struct) 3Fracture, longitudinal, at 9 o'clock, End
72.29 F06 ISJ 00:08:38 (Serv) 0Infiltration, seeping at joint, from 3 to 5 o'clock, End
72.30 F07 ISJ 00:08:38 (Serv) 0Infiltration, seeping at joint, from 7 to 9 o'clock, End
72.30 F08 D 00:08:38 (Struct) 4Deformed sewer/drain, 10%, End
72.75 FM 00:08:38 2_28A (Struct) 4Fracture, multiple, from 12 to 12 o'clock
73.07 D 00:08:38 2_29A (Struct) 5Deformed sewer/drain, 25%
73.07 F09 B 00:08:38 (Struct) 4Broken pipe, from 3 to 9 o'clock, End
73.07 SA 00:10:00 (Misc) 0Survey abandoned Remarks: DEFECT HALTINGSURVEY
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade
12 420 192.92 14097 5 1 2 0.03 2 3
Structural Defects
Service Defects
Constructional Features
Miscellaneous Features
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection picturesPlace : Road : Date : Section number : PLR Suffix :
BODMIN. BERRYCOOMBE ROAD. 21/10/2016 2 X
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
Photo: 2_1_7_03112016_102711_A.jpg, Media No:: 1, 00:00:36
0m, Deformed sewer/drain, 5%, Start
Photo: 2_1_11_03112016_102744_A.jpg, Media No:: 1, 00:02:27
19.01m, Fracture, longitudinal, at 1 o'clock
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection picturesPlace : Road : Date : Section number : PLR Suffix :
BODMIN. BERRYCOOMBE ROAD. 21/10/2016 2 X
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
Photo: 2_1_13_03112016_102905_A.jpg, Media No:: 1, 00:03:46
35.97m, Broken pipe, from 9 to 3 o'clock
Photo: 2_1_14_03112016_102930_A.jpg, Media No:: 1, 00:03:54
37.69m, Start node type, manhole, reference number : UNPLOTTED 1
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection picturesPlace : Road : Date : Section number : PLR Suffix :
BODMIN. BERRYCOOMBE ROAD. 21/10/2016 2 X
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
Photo: 2_1_15_03112016_103001_A.jpg, Media No:: 1, 00:05:06
48.56m, General photograph taken at this point
Photo: 2_1_18_03112016_103027_A.jpg, Media No:: 1, 00:07:58
66.25m, Deformed sewer/drain, 10%, Start
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection picturesPlace : Road : Date : Section number : PLR Suffix :
BODMIN. BERRYCOOMBE ROAD. 21/10/2016 2 X
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
Photo: 2_1_19_03112016_103100_A.jpg, Media No:: 1, 00:08:18
69.39m, Broken pipe, from 3 to 9 o'clock, Start
Photo: 2_1_28_03112016_103151_A.jpg, Media No:: 1, 00:08:38
72.75m, Fracture, multiple, from 12 to 12 o'clock
Exjet Services
Exjet House, Torbay Business Park
30 Woodview Road, Paignton
Tel: 01803 557000
Fax: 01803 559556
Email: info@exjet.co.uk
Inspection picturesPlace : Road : Date : Section number : PLR Suffix :
BODMIN. BERRYCOOMBE ROAD. 21/10/2016 2 X
33875. BODMIN TOWN LEAT, BERRYCOOMBE RD, BODMIN.
Photo: 2_1_29_03112016_103211_A.jpg, Media No:: 1, 00:08:38
73.07m, Deformed sewer/drain, 25%
Appendix B
Recommended Remediation
Works
94 93
79
80
Elm65
60
Grove
Trelane
22
1
WA
TE
RY
LA
NE
79.8m
1
Hill House
Works
1
CA
RD
EL
L
RO
AD
Post
Fla
xmoor
Terr
144
112
El
Sub
Sta
127
142
145
120
94.6m
Hill End
72
66
73
88
Sub Sta
El
87
7
102
106
Arweth
76.1m
Tressa
Ellesmere83.9m
Hillfield
31 30
18
113
CORNER
3
27
23
4
7
ARMCHAIR
1
128
134
135
4
98
101
HIL
LSID
E
PA
RK
72.1m
Cross
Crossways
31a
House
The
Coach
The
Governors
House
Chaplaincy
11
14
8
12
86.4m
4
107
Path
65.2m
150
LB TANWOOD VIEW
27
15
2
11a
97
59
56
119
18
10
20
28
TA
NW
OO
D
VIE
W
18a
141
36
Berrycombe
House
24
2
59.5m
1 to 1
1
30
32
64.1
m
Path (um)
ED Bdy
11
SCARLETTS WELL ROAD
1
SCARLETTS WELL PARK
22
4
Car Park
1
Sub
El
12
14
Sta
46
39
5
CA
MEL
84
45
52
20
16
81
CO
UR
T
10
22
21
1
64.4m
38 to 44
22
35
24
26
DY
MO
ND
CO
UR
T
23
10
16
17
43
Cranborne
NO
RW
AY
RO
AD
51
3
29
Sitka Lodge
1
2
89.1m
57.25
57.25
57.10
57.05
56.99
57.0356.94
57.00
57.05
56.99 56.88
56.83
56.82
56.59
56.8
0
56.6
056.7
6
56.85
56.78
56.7
1
56.83
56.71
56.70
56.73
56.62
56.76
56.57
56.6
5
56.5
1
56.48
56.47
56.37
56.25
56.17
56.18
56.2256.25
56.21
56.31
56.38
56.56
56.53
56.4956.55
56.53
56.41
56.48
56.81
56.91
57.2
6
57.3
6
58.4
0
58.3
559.4
0
59.4
459.7
7
59.6
6
56.89
56.9557.35
58.4
8 57.06
57.35
57.39
59.39
57.41
59.23
59.7557.53
59.90
57.63
57.65
59.83
57.91
58.06
59.3858.15
58.54
58.6
5
58.77
57.51
57.41
56.76
56.3256.37 56.43
56.65
56.76
56.75
56.67
56.54
56.53
56.85
56.78
56.96
57.06
57.25
57.19
57.37
57.45
57.64
57.56
57.72
57.83
57.64
57.59
57.65
57.81
57.97
58.08
58.26
58.18
57.87
57.92
57.91
57.95
57.77
57.73
57.72
57.62
57.59
57.63
57.71
57.47
57.27
57.14
56.98
56.90
56.85
56.85
56.81
56.79
56.80
56.81
56.85
56.81
56.78
56.78
56.65
56.60
56.51
56.57
57.00
56.99
57.06
57.11
57.28
57.32
57.51
57.50
57.69
58.01
56.3556.37
Stn A
206126.327 E
67405.343 N
57.367m
Stn B
206309.203 E
67367.651 N
61.841m
58.91
60.1459.28
60.31
59.71
61.49
59.77
60.16
60.14
61.28
60.92
60.49
61.99
62.45
60.74
60.94
62.75
62.14
61.31
61.43
62.43
61.96
62.27
63.84
62.68
62.75
64.94
63.12
63.35
65.16
63.69
64.08
66.86
64.08
64.25
67.00
66.98
64.28
64.11
61.71
62.29
62.74
63.18
63.3963.53
64.16
64.51
68.49
67.89
63.91
64.43
64.60
67.8467.44
67.58
67.04
64.89
64.66
64.2264.44
64.80
65.03
67.31
66.52
66.96
64.64
64.93
65.02
67.04
67.51
64.62
65.08
65.37
67.42 67.45
65.89
65.47
65.02
65.22
65.60
65.82
67.63
67.97
65.35
65.09
64.71
63.73
66.11
66.37
67.89
68.47
68.16
68.51
68.04
67.11
66.84
66.08
65.34
63.8
4
63.77
64.55
64.6
3
65.7
1
65.88
66.4
5
66.7
1
66.67
66.43
62.22
62.3662.60 62.75 62.99
63.19 63.34
63.66
63.79
63.79
63.63
61.86
57.2557.26
56.62
57.02
57.1157.11
57.45
57.45
57.20
57.48
57.64
57.57
57.88
57.75
57.74
57.85
58.02
58.35
59.07
58.63
58.38
58.53
58.84
59.45
60.04
59.20
58.83
59.23
59.58
60.44
61.60
60.29
59.76
59.48
59.82
60.23
60.83
62.4462.92
61.17
60.44
60.10
60.50
60.84
61.74
62.96
61.18
60.8361.05
61.50
61.99
62.03
61.51
61.11
61.45
61.86
62.40
62.46
61.89
61.58
61.90
62.24
62.72
62.83
62.47
62.11
62.41
62.80
63.19
63.33
62.92
62.86
63.46
65.01
64.51
63.24
57.89
57.42
58.33
59.27
58.25
58.09
59.2
5
58.66
59.75
59.67
60.49
59.60
58.65
58.60
58.07
57.81
57.80
58.02
58.18
58.48
58.43
57.70
57.63
57.52
57.61
57.57
57.56
58.42
58.09
57.98
60.28
59.64
59.52
59.3759.39
59.35
58.90
58.55 59.91
60.31
61.4961.25
61.03
60.8260.6060.46
Stn C
206472.032 E
67377.935 N
64.139m
64.58
64.48
63.84
64.71
64.09
63.88
63.68
63.48
63.21
62.99
62.97
63.15
62.88
62.63
62.41
62.2561.97
61.6661.44
64.10
64.11
64.20
64.35
64.40
64.46
64.58
64.48
64.28
64.38
64.6464.83
64.90
64.93
65.02
64.98
64.86
64.75
64.90
64.78
64.80
64.73
64.73
64.52
64.48
64.57
64.48
64.29
64.55
64.37
64.50
64.28
64.29
64.17
63.94
64.08
64.09
64.05
63.90
63.84
63.7263.65
63.65
63.51
63.35
63.47
63.47
63.97
64.11
64.29
60.28
60.26
60.38
60.41 60.57
60.49
60.62
60.63
60.83
60.85
60.7360.97
61.08
61.18
61.31
61.33
61.32 61.44
61.57
61.5861.89
61.84
61.73
62.14
62.19
62.22
62.34
62.4062.50
62.58
62.56
62.43
62.59
62.72
62.74
62.87
62.98
62.96 63.01
63.06
62.94
63.16
63.28
63.22
60.42
60.36
60.25
60.23
59.93
59.78
58.51
58.54
58.60
58.57
58.58
58.59
58.76
58.3
4
58.60
58.60
58.73
58.74
58.77
58.80
58.55
58.75
59.34
59.98
60.26
60.30
60.32
60.28
60.23
60.24
60.20
60.16
60.12
60.07
60.02
59.98
59.92
59.87
59.82
59.76
59.83
60.16
60.06
59.89
60.21
60.17
60.34
60.50
61.36
61.2
2
60.49
58.38
63.08
63.12
63.16
63.42
63.59
63.8563.90
60.44
60.08
60.12
63.68
60.23
64.30
64.2464.15
64.11
64.05
63.96
63.94
63.81
63.63
63.58
63.2463.12
62.99
62.78
62.51
62.41
62.3161.89
61.6061.2961.1261.0060.7960.55
60.31
60.00
59.73
59.46
59.29
59.03
58.61
58.42
64.21
64.12
64.03
63.98
63.90
63.73
63.57
63.53
63.1963.12
62.92
62.73
62.36
62.1761.83
61.5461.2761.01
60.88
60.6960.5060.25
59.37
59.27
58.97
58.56
64.20
64.16
64.45
64.40
64.07
64.21
63.91
59.05
59.16
59.50
59.72
60.10
60.38
60.6360.78
61.01
61.14
61.28
61.5561.80
62.17
62.52
62.38
62.52
62.68
62.88
62.85
62.80
62.98
63.00
63.15
63.16
63.31
63.24
63.44
63.76
63.48
63.87
63.96
64.44
58.03
58.22
60.22
59.58
59.42
59.97
63.98
64.43
61.25
61.2
6
61.2
4
64.51
60.89
57.96
57.68
60.1059.85
62.98
59.67
59.6459.66
59.77
59.7459.80
63.14
63.07
59.91
59.64
62.93
57.81
62.02
61.14
cover and frame.
Mortar bedding and haunching to
cover and frame.
Mortar bedding and haunching to
230
subsequent movement.
manhole to permit satisfactory joint and
Joint to be as close as possible to face of
Over 750mm diameter = 1.25m length
601-750mm diameter = 1.00m length
150-600mm diameter = 0.60m length
Rocker pipe to be :
Over 750mm diameter = 1.25m length
601-750mm diameter = 1.00m length
150-600mm diameter = 0.60m length
Rocker pipe to be :
cover slab not required
diameter intermediate reducing
On manholes less than 1.5m
diameter shaft with ladder.
approximately 200mm for 1200mm
over 900mm shaft and offset
Note: Opening to be located centrally
Schedule for requirements.
14396. Refer to the Manhole
Ladder complying with BS EN
the ladder to the edge of the channel.
area to be 500 mm from the edge of
Minimum width of benching for landing
75mm GEN 1 concrete blinding.
using channel pieces.
Inverts to be formed
exceeds 600 mm wide.
provided where channel
Self-cleaning toe holes to be
(minimum thickness 20 mm).
to all branch connections
face, neatly shaped and finished
be brought up to a dense, smooth
High-strength concrete topping to
rings to be pointed.
Lifting eyes in concrete
access behind ladder.
900mm minimum clear
first ladder rung from cover level.
675mm maximum distance to
concrete cover frame seating rings.
engineering bricks or precast
Minimum 2 courses of Class B
requirements.
the Manhole Schedule for
Manhole cover and frame. Refer to
cover and frame.
Clear access to be as Manhole
to BS EN 1917 and BS 5911-3.
or elastomeric seal conforming
bedded with mortar, plastomeric
sections and cover slabs to be
Precast concrete manhole
Shaft diameter 1200mm.
into base concrete minimum 75mm.
The bottom precast section to be built
Benching slope to be 1:10 - 1:30.
Construction joint.
minimum 50mm to maximum 300mm.
underside of precast section to be
Distance between top of pipe and
GEN 3 concrete
225mm to underside of channel,
benching to be 225mm.
Minimum width of
inside face of manhole.
located minimum 100mm
Pipe joint with channel to be
Sewers for Adoption Type 1A
Pre-Cast with Concrete Surround
Manhole Depth 3-6m (Cover to Soffit)
subsequent movement.
manhole to permit satisfactory joint and
Joint to be as close as possible to face of
Over 750mm diameter = 1.25m length
601-750mm diameter = 1.00m length
150-600mm diameter = 0.60m length
Rocker pipe to be :
Over 750mm diameter = 1.25m length
601-750mm diameter = 1.00m length
150-600mm diameter = 0.60m length
Rocker pipe to be :
cover slab not required
diameter intermediate reducing
On manholes less than 1.5m
diameter shaft with ladder.
approximately 200mm for 1200mm
over 900mm shaft and offset
Note: Opening to be located centrally
Schedule for requirements.
14396. Refer to the Manhole
Ladder complying with BS EN
the ladder to the edge of the channel.
area to be 500 mm from the edge of
Minimum width of benching for landing
75mm GEN 1 concrete blinding.
using channel pieces.
Inverts to be formed
exceeds 600 mm wide.
provided where channel
Self-cleaning toe holes to be
(minimum thickness 20mm).
to all branch connections
face, neatly shaped and finished
be brought up to a dense, smooth
High-strength concrete topping to
rings to be pointed.
Lifting eyes in concrete
first ladder rung from cover level.
675mm maximum distance to
concrete cover frame seating rings.
engineering bricks or precast
Minimum 2 courses of Class B
requirements.
the Manhole Schedule for
Manhole cover and frame. Refer to
cover and frame.
Clear access to be as Manhole
access behind ladder.
900mm minimum clear
to BS EN 1917 and BS 5911-3.
or elastomeric seal conforming
bedded with mortar, plastomeric
sections and cover slab to be
Precast concrete manhole
Benching slope to be 1:10 to 1:30.
into base concrete minimum 75mm.
The bottom precast section to be built
Construction joint.
minimum 50mm to maximum 300mm.
underside of precast section to be
Distance between top of pipe and
GEN 3 concrete
225mm to underside of channel,
benching to be 225mm.
Minimum width of
inside face of manhole.
located minimum 100mm
Pipe joint with channel to be
Sewers for Adoption Type 2
Pre-Cast with Concrete Surround
Manhole Depth 0-3m (Cover to Soffit)
GL
Pipe dia.Aggregate
Graded Single size
Over 400
4/40
2/14, 4/20 or
10/20 or 20/40
4/10, 6/14,
Scale 1:20
3. Any works within 3m of South West Water public sewer subject to agreement with South West Water.
of ground investigation and highway loading requirements.
2. Design is indicative based on preliminary information. Detailed design to be undertaken to take account
1. Pipe bedding material shall comply with the geometrical requirements as identified in SHW Table 5/3
Notes
Coarse Aggregate for pipe bedding
SHW Table 5/3
Bedding Factor 1.9
Class B - 180° Granular Bedding for 1200mmØ Culvert
Pavement construction / soft landscape
Granular backfill to SHW Series 600 Type 2
1200mmØ DN Precast Concrete Culvert
& Table 6/1
Class 8 material to SHW Clause 503.3(iv)
and Table 5/3
Granular material to SHW Clause 503.3(i)
1440300 300
2040
1200
1440
240
300
2700mm
2700mm
N
EXMH2
S1.1
Drainage Legend
Description Proposed Existing To be Abandoned
SX001Public Surface Water Sewer & Manhole
NO REMEDIAL WORKS REQUIREDSEWER IN GOOD CONDITION
REPLACEMENT REQUIRED
SEWER IN POOR CONDITION ALONG WHOLE LENGTH.
SX001
Depth to invert = 2.86m
IL 54.04mAOD
CL 56.9mAOD
C1.9(x)
Depth to Invert = 3.12m
IL ~61.4mAOD
CL ~64.5mAOD
Depth to invert = 3.12m
IL 59.88mAOD
CL 63.0mAOD
EXMH2
Depth to invert = 3.22m
IL 59.78mAOD
CL 63.0mAOD
C1.1
Depth to invert = 3.42m
IL 59.48mAOD
CL 62.9mAOD
C1.2
Depth to invert = 3.91m
IL 58.59mAOD
CL 62.5mAOD
C1.3Depth to invert = 3.80m
IL 57.70mAOD
CL 61.5mAOD
C1.4Depth to invert = 3.29m
IL 56.81mAOD
CL 60.1mAOD
C1.5Depth to invert = 3.28m
IL 55.92mAOD
CL 59.2mAOD
C1.6Depth to invert = 2.98m
IL 55.02mAOD
CL 58.0mAOD
C1.7
Depth to invert = 2.87m
IL 54.13mAOD
CL 57.0mAOD
C1.8
remedial works identified.
in adequate condition. No
Existing culverted watercourse is
Environmental Information
Safety, Health and
intrusive investigation.
Location to be confirmed through survey and
Voltage power cable from WPD records.
Approximate route of buried 33KV High
intrusive investigation.
Location to be confirmed through survey and
Voltage power cable from WPD records.
Approximate route of buried 33KV High
intrusive investigation.
Location to be confirmed through survey and
Water water main.
Approximate route of buried South West
intrusive investigation.
Location to be confirmed through survey and
Main.
Approximate route of buried W&W MP Gas
2. For further information refer to CDM Risk Register
any works to confirm the location of buried services.
include hand dug trial pits) should be undertaken before undertaking
incomplete or incorrect and thorough buried services survey (to
including HV, MP Gas and MCWS. These records are often
1. Statutory utilities from record drawing have been identified,
work detailed on this drawing, special attention should be given to:
In addition to the hazards/risks normally associated with the types of
and backfilled.
Existing culvert to be broken out
along entire length.
collapsed. Replacement required
in poor condition and partially
Existing culverted watercourse is
13.
12.
11.
10.
09.
08.
07.
06.
05.
04.
03.
02.
01.
General Notes:
periods will apply.
proposed works and the relevant fees and technical approval
Technical approval will be required from South West Water for the
sewer;
the connection of the replacement sewer back into the existing
connection of the existing sewer into the replacement sewer, and for
- A Section 106 connection agreement must be sought for the
adoption of the replacement culvert.
- A Section 104 adoption agreement must be sought for the
planned time of construction the following actions must be taken:
public sewer. Should the culvert still be shown as public sewer at the
The culvert is currently shown on South West Water records as a
approval, assessment, fees and approval periods will apply.
Agency prior to the undertaking of any works, and the relevant
Activity environmental permit will be required from Environment
The culvert is an EA designated Statutory Main River. A Flood Risk
requirements.
advance of works to confirm easement / wayleave and consent
West Water water main. Statutory utility providers to be contacted in
MP Gas Main, Western Power 33kV High Voltage power and South
Statutory utility records show the presence of buried Wales & West
to class 4 (DC4) sulphate resistance.
concrete to BS EN 1916:2002. All precast pipes to be manufactured
Replacement culvert to be 1200mm internal diameter precast
Adoption 7th Edition.
depth) or Type 2 (<3m depth) in accordance with Sewers for
All manholes to be 2700mm diameter precast concrete. Type 1 (>3m
(ii) Solum CCTV Survey, March 2018
(i) Exjet CCTV Survey, October 2016 (Ref 33875/16)
Drawing is based on combined results of:
prior to construction.
Invert levels of existing drainage to be confirmed by investigation
Sewers for Adoption 7th Edition.
All drainage / sewerage to be constructed in accordance with
services.
from Underground Services' when excavating around existing
The Contractor should take note of HS(G)47 'Avoiding Danger
depth of all existing services, mains and cables prior to construction.
It is the Contractors responsibility to determine the location and
of work.
immediately reported to the engineer prior to the commencement
Any discrepancies in the information provided should be
of work.
immediately reported to the Engineer prior to commencement
Any discrepancies in the information provided should be
status.
Drawing Issue Register for full list of drawings and current
Engineers drawings, reports and specifications. Refer to
This drawing is to be read in conjunction with all relevant
Ground).
Digest 1 Concrete in Aggressive
concrete (designed to BRE Special
150mm thick in-situ GEN3 Ground).
Digest 1 Concrete in Aggressive
concrete (designed to BRE Special
150mm thick in-situ GEN3
A0 A B C D E F G H I J K L M N O P Q R S T U
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Do not scale
Arup Job No
Role
Name
Rev
Project Title
Client
© Arup
Rev Date By Chkd Appd
Scale at A0
Suitability
Drawing Title
www.arup.com
Tel +44(0)117 976 5432 Fax +44(0)117 976 5433
Bristol BS1 6JZ
63 St Thomas Street
\Glo
bal\Euro
pe\Bristol\Jobs\2
53xxx\2
53391-0
0\4.3
0_
Drgs\0
_Dra
win
gs\B
JH-A
RP-X
X-X
X-D
R-C
D-1
001.d
gn
Information
Civil Engineering
Mallino Development Ltd
Bodmin Jail Redevelopment
1:500
253391-00
BJH-ARP-XX-XX-DR-CD-1201
01
/ /210318 CB
Information
01
Bodmin Town Leat
Proposed Remediation Works
AR AR
Appendix C
South West Water &
Environment Agency Records
1
Charles Bennett
From: Developer Services Planning <DeveloperServicesPlanning@southwestwater.co.uk>
Sent: 30 September 2016 15:37
To: Salma Hussein
Subject: RE: Bodmin Jail - Culvert WR2753789
Salma the capacity check will only be for the foul – the 10 year greenfield runoff rate suggested by Cornwall Council
for surface water will be acceptable.
Our 1200mm sewer and the Town Leat are in fact one and the same.
Placing actual structures/buildings in relation to a sewer of this size requires a 5m easement either side of it.
Regards
Martyn Dunn
Development Coordinator 01392 443702
South West Water, Peninsula House, Rydon Lane, Exeter, EX2 7HR
From: Salma Hussein [mailto:Salma.Hussein@arup.com]
Sent: 30 September 2016 10:58 To: Developer Services Planning Cc: Charles Bennett; Dave Hunt; Duncan Laird Subject: RE: Bodmin Jail - Culvert WR2753789
Dear Martyn,
Thanks for your reply. I shall be submitting the capacity enquiry form for further information.
Cornwall Council do state that the maximum allowable discharge rate for the surface water is “the 1 in 10
year greenfield runoff rate or a rate agreed with South West Water Ltd, whichever is the lesser”. Can you
please confirm if this information would be provided as part of the capacity application form? In other
words, would the capacity information for both the surface water and foul be supplied using one application
form?
With regards to the culverts, and from your response below, I understand that there are two culverts running
across the playing fields. One is your 1200mm sewer and the other is Bodmin Town Leat (main river).
As previously mentioned, a car park is proposed by the playing fields and hence near the public sewer. Can
you please confirm SWW’s policy on building near/over sewers in addition to what has been mentioned
below.
Thanks very much for your help.
Kind regards
Ms Salma Hussein
2
Civil Engineer | Infrastructure
MEng (Hons)
Arup
63 St Thomas Street Bristol BS1 6JZ United Kingdom
t +44 117 976 5432 d +44 117 988 6776
f +44 117 976 5433
www.arup.com
Follow @ArupUKMEA @ArupGroup
From: Developer Services Planning [mailto:DeveloperServicesPlanning@southwestwater.co.uk]
Sent: 28 September 2016 12:59
To: Salma Hussein
Subject: RE: Bodmin Jail - Culvert WR2753789
Salma I have no concerns in principle over drainage to two parts of the sewer network as suggested provided foul
and surface water is kept separate and discharge to the respective foul and surface water networks.
You will need to consult Cornwall Council with regard to discharge rates for the surface water before we can fully
comment on whether capacity is available as this may be in a critical drainage area and Council policy may apply.
You will need you to submit a capacity enquiry to assess foul drainage capacity – attached giving details of what is
specifically proposed and how the flows would be split between the east and south.
Regarding the culvert shown on the EA plan this is from what I can tell the 1200mm diameter sewer shown currently
on our records to be a public South West Water surface water sewer running through the playing fields which if to
be used as car parking needs to have existing cover retained as at present over the line of the surface water sewer.
Regards
Martyn Dunn
Development Coordinator 01392 443702
South West Water, Peninsula House, Rydon Lane, Exeter, EX2 7HR
From: Salma Hussein [mailto:Salma.Hussein@arup.com]
Sent: 26 September 2016 17:35 To: Developer Services Asset Protection
Cc: zz Searches; Developer Services Planning Subject: Bodmin Jail - Culvert
Dear Sir/Madam,
I am working on the redevelopment project of Bodmin Jail (PL31 2NR) to provide a hotel and enhanced
visitor attraction, with a proposal to provide car parking space by the playing fields near Scarlett’s Well
Road in the south. Please refer to site boundary below.
3
Your asset maps below indicate that there separate foul and surface water systems to the east and south of
the site. Presumably, the foul sewer on the east eventually discharges into the combined system in the south,
whilst the surface continues to flow into the 1200 PCO SW sewer.
At this point in time, I would like to understand if there are any constraints or requirements that we need to
be aware of before developing the drainage strategy. For example, if we were to drain half of the site (foul
and surface) towards the east, and half of it towards the south, would the two systems have enough capacity
for the site to discharge into? If not, what limitations should we anticipate and what would you advise?
4
Lastly, the Environment Agency’s (EA) map below shows a culvert (red dashed line) running across the
fields by Scarlett’s Well Road. I understand that this culvert does not belong to the EA nor Cornwall
Council. Can you please clarify if it is the same surface water sewer shown on your maps above (therefore
your asset)?
5
Thanks for your help. Please do not hesitate to contact me if you require further explanation.
Kind regards
Ms Salma Hussein
Civil Engineer | Infrastructure
MEng (Hons)
Arup
63 St Thomas Street Bristol BS1 6JZ United Kingdom
t +44 117 976 5432 d +44 117 988 6776
f +44 117 976 5433
www.arup.com
Follow @ArupUKMEA @ArupGroup
____________________________________________________________
Electronic mail messages entering and leaving Arup business
systems are scanned for acceptability of content and viruses
________________________________________________________
The information and documents sent in this email from South West Water Ltd are sent in confidence and are intended only for the use of the individual or entity named above. Please note that the contents may contain privileged, personal and/or confidential information and are not to be disclosed to any person other than the addressee. If you are not the intended recipient you are notified that any use, dissemination, distribution or copying of the information and documents contained in this email is strictly prohibited. If you have received this email in error, please return it and any copies immediately, without reading any attachments, and confirm that immediately upon returning the email, you will delete all copies on your system and network.
6
South West Water Limited - Registered in England No: 2366665
Registered Office:
Peninsula House
Rydon Lane
Exeter
Devon EX2 7HR
________________________________________________________
Appendix D
Designers Risk Assessment
Hazard Risk Register
Page 1 of 3
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\2.21_PQP\AMS\CDM\BODMIN JAIL - CULVERT CDM RISK REGISTER.DOC ©Arup F18.1 Rev 10, 30 June 2005
Register reference 4.50
Project Bodmin Jail Redevelopment Job number 253391
Package/Topic Whole Site Design stage N/A
Remember: Avoid – Reduce – Control and communicate relevant information to others (CDM Regulation 13)
Date Area/Location of Risk
Exposure
Description of Hazard and
Risk Exposure
Mitigation of Risk
(Potential or Achieved) A R C Further Action by
Status
(+ initials) Active/closed
14/03/17
JH/AR
Whole site Uncovering, damaging or
penetrating unknown buried
services
Obtain latest service records
from statutory undertakers.
Scan areas before any
excavation.
Hand dug trial pit or vacuum
excavation to confirm location
of utilities.
x Contractor to prepare
method statement.
Main
Contractor Active
14/03/17
JH/AR
Whole site Site is located next to a public
road, operational attraction and
adjacent to another site – risk of
unauthorised access
Contractor to provide secure
site boundary and liaise with
public and other site as
necessary
x Main
Contractor Active
14/03/17
JH/AR
Whole site Uncovering ground
contamination during
excavation (Japanese knot-weed
and asbestos in particular)
Levels of contamination
should be reviewed before
starting any excavation and
any necessary measures taken
Avoid unnecessary excavation
x x Should material won from
the site be used as fill
onsite – suitable testing
and remediation measures
should be considered.
Main
Contractor Active
22/03/18
CJB
Demolition of
existing culvert
Risk of injury from utility strike
during excavation for
demolition of existing culvert.
GPR and Intrusive survey
prior to construction to confim
location of existing services.
Contractor to follow H&S
guidance document 47 –
Avoiding Danger from
Underground Services
x Contractor to produce
method statement for
installation
Active
Hazard Risk Register
Page 2 of 3
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\2.21_PQP\AMS\CDM\BODMIN JAIL - CULVERT CDM RISK REGISTER.DOC ©Arup F18.1 Rev 10, 30 June 2005
Register reference 4.50
Project Bodmin Jail Redevelopment Job number 253391
Package/Topic Whole Site Design stage N/A
Remember: Avoid – Reduce – Control and communicate relevant information to others (CDM Regulation 13)
Date Area/Location of Risk
Exposure
Description of Hazard and
Risk Exposure
Mitigation of Risk
(Potential or Achieved) A R C Further Action by
Status
(+ initials) Active/closed
22/03/18
CJB
Demolition of
existing culvert
Working in confined spaces Work in confined spaces to be
minimised as far as possible.
Culvert is to be replaced
between two existing access
chambers.
x Contractor to produce
method statement for
installation
Active
22/03/18
CJB
Demolition of
existing culvert
Working in close proximity to
water – culvert is a live
watercourse and can be
expected to be carrying flowing
water.
Works to be undertaken in
period of low flow if possible.
Contractor to identify suitable
method to overpump and
control flowing water if
required.
x Contractor to produce
method statement for
installation
Active
22/03/18
CJB
Demolition of
existing culvert
Risk of water borne diseases,
such as leptospirosis.
Works to be undertaken in
period of low flow if possible.
Contractor to minimise works
in existing culvert.
x Contractor to identify
appropriate method
statement to control risk.
Appropriate PPE to be
worn. Workers to follow
good hygiene practices
(hand washing).
Active
22/03/18
CJB
Construction of
new culvert
Risk of injury from utility strike
during excavation for
construction of new culvert.
GPR and Intrusive survey
prior to construction to confim
location of existing services.
Contractor to follow H&S
guidance document 47 –
Avoiding Danger from
Underground Services.
x Contractor to produce
method statement for
installation
Active
Hazard Risk Register
Page 3 of 3
\\GLOBAL\EUROPE\BRISTOL\JOBS\253XXX\253391-00\2.21_PQP\AMS\CDM\BODMIN JAIL - CULVERT CDM RISK REGISTER.DOC ©Arup F18.1 Rev 10, 30 June 2005
Register reference 4.50
Project Bodmin Jail Redevelopment Job number 253391
Package/Topic Whole Site Design stage N/A
Remember: Avoid – Reduce – Control and communicate relevant information to others (CDM Regulation 13)
Date Area/Location of Risk
Exposure
Description of Hazard and
Risk Exposure
Mitigation of Risk
(Potential or Achieved) A R C Further Action by
Status
(+ initials) Active/closed
22/03/18
CJB
Maintenance and
inspection of new
culvert
Hazard from inspections,
clearance of blockage.
Regular access manholes
identified to minimise
requirement for man entry.
Non intrusive methods (eg
CCTV) should be used for
inspection rather than man
entry.
x Active
Further common risks
The following risks are highlighted as risks which a competent contractor should be aware of and are applicable to any site activity. These are not site specific
yet should be considered within the enabling works, construction and demolition.
Falls and trips
Hand Arm Vibration
Working at height (i.e. use of scaffolds)
Use of highly alkaline or acidic materials (appropriate PPE)
Risk of asbestos in existing buildings.
Moving Vehicles within construction sites
Appendix E
Cost Estimate
Bodmin Jail Redevelopment
Cost Estimate - Leat drainage replacement 23rd March 2018
Enabling Works
Strip vegetation (turf) from proposed culvert route; to non-car park
areas only; set aside for re-use
612 m2 £5 £3,060
Strip off remaining topsoil; assume 300mm depth 612 m2 £3 £1,836
Disposal of excavated topsoil to onsite spoil heaps; for future re-use 184 m3 £5 £920
New Culvert / Pipe
Excavation of new drainage culvert trench length; approximately 2.04m
wide and 3m depth to trench bottom from bottom of topsoil strip
1,775 m3 £10 £17,750
Extra excavation to manholes 22 m3 £10 £220
Earthwork support and working space to side of trench 1,914 m3 £25 £47,850
Disposal of excavated material to onsite spoil heaps; for future re-use 1,914 m3 £5 £9,570
Granular material bedding; to SHW Clause 503.3(i) and Table 5/3 368 m3 £60 £22,080
1200mm precast concrete culvert 290 m £350 £101,500
Class 8 material surround 428 m3 £60 £25,680
Granular backfill; type 6F2 or Type 1 ; under car park area only 314 m3 £50 £15,700
Backfill with previously excavated material; to non-car park area; from
onsite spoil heap
337 m3 £10 £3,370
Topsoil; to non-car park area; from spoil heap 92 m3 £10 £920
Re-install turf previously set aside; to non-car park areas 306 m2 £5 £1,530
Manholes; precast concrete; 2700mm diameter; approximately 3.5m
average depth to invert; as Arup drainage details sheet 1 of 6
8 nr £4,750 £38,000
Connections into existing manholes 2 nr £2,500 £5,000
Removal of existing culvert/pipe
Excavation to uncover existing culvert 1,412 m3 £10 £14,120
Disposal of excavated materials to onsite spoil heaps; for future re-use 1,412 m3 £5 £7,060
Allowance for temporary works Item £10,000
Breakout existing concrete culvert/pipe 290 m £60 £17,400
Disposal of broken out concrete culvert offsite; assumed 0.4m3 of
broken out material per m of concrete culvert/pipe
116 m3 £30 £3,480
Infill area under car park with generall fill (class 2 from SHW series
0600)
840 m3 £45 £37,800
Total to be carried forward £384,846
Bodmin Jail Redevelopment
Cost Estimate - Leat drainage replacement 23rd March 2018
Total to be brought forward £384,846
Infill area outside car parking with previously excavated material 900 m3 £10 £9,000
Topsoil; to non-car park area; from spoil heap 92 m3 £10 £920
Re-install turf previously set aside; to non-car park areas 306 m2 £5 £1,530
Other costs
Provisional allowance for dewatering during construction Item £20,000
Additional management and working methodology around potential
crossover with existing WPD electrical supply
2 nr £5,000 £10,000
Allowance to re-use any excess excavated materials onsite Item £5,000
Sub-Total £431,296
Main Contractor preliminaries 10% £43,100
Sub-Total £474,396
Main Contractor's overheads and profit 4.75% £22,500
Sub-Total £496,896
Inflation to 2Q2019 Excluded
Total £496,896
Notes:
Drawing used: Arup BJH-ARP-XX-XX-DR-CD-1201 rev 01
Cost estimate based on a construction works only; excludes VAT, professional fees and land purchase costs
Basis of rates - Recent tender returns and Milton Precast supply quote for concrete pipe
The above exercise excludes surface finishes already included in Berrycombe Vale car park construction works.
Existing culvert/pipe is 1200mm diameter and approximately 3m depth to invert