Post on 24-Jan-2019
~4.
-. -~
.A.
-
11.01.07Permit Issue Set
San Francisco City Hall
PROJECT DIRECTORYOWNERdiV AND COUN1VOF SAN FRANCISCO
PROJECT MANAGEMENTDEPARTMENT OF PUBLIC WORICS BUREAU OF ARCHITECTURE
36 Van N.an A4.nu, SUb 41000.4 FanrUano, CA 94102I: 415.557.4700I: 415.557.4701
Board Of Supervisors Chamber_c. ~
*4‘$‘_~9
.4~1 .5.
—. ~. -
~.
~
.,I,
-~-~=~ -
_
I ~ 0~
It, ~
I,
HISTORIC PRESERVA11ON ARCHITECTPAGE B TIJRNBIJLL. INC.
724 PIn. Sb,..lSan Frandano, CA 941DB5 415.342.51545 415.362.5060Joy TOANOD, Pdr~Ubth.CIrao~.EISa bragg,. Projenl UaDBQel
STRUCTURALRIGGS CARDOSA ASSOCWTES. INC.
101 C.JIfoIdo 5110.1,51.9755.11 Franarno, CA 94111I 415.9961911I 415.986.1916SkarICa, H.y.l. P,indp.I-b-Ch.lg.Anthony RId1er96an Projenl Manager
ELECTRICALF.W. ASSOCLHTES NC
66 12th Street. SUb 306San Franorano, CA 94103I 415.961.0296I: 415.861.0191
PAGEN~Hfl~fl~E I~I~CP~VA11~
CITY OF SAN FRANCISCO
4 ~5~y4St
Go1~’~
Alamos—a
DsPOCR M’~
g j4OhSt
15th St~
THE FOLLOWING CODES WILL BE USED FORTHIS PROJECT:
BUILD NC:2001 CAL FORNIA BUILDING CODECIII OF SAN FRANCISCO AMENDMENTS
ELECTRIC:2002 NAT ONAL ELECTRICAL CODE (NFPA 70).
ACCESS BILITY:2001 CALFORNA BUILDING CODE
UQI~THE SAN FRANCISCO CIII HALL IS L STED ON THE NAT ONALREGISTER AND IS A NAT ONAL HISTOR C LANDMARK. IT IS ADES GRATED HISTORICAL BUILDING AND THEREFORE ELIGIBLE TOUSE THE STATE HISTORICAL BUILDING CODE (SHNC).
ALTERNATE ACCESSIBILITY PROVISIONS IN SHBC USED FORDES TN.
BIDDER REQUIREMENTS
1 AT THE TIME TN S CONTRACT IS BID,THECONTRACTOR SHALL POSSESS A CLASS B,GENERAL BUILD NG CONTRACTOR LICENSE.
2. IN ACCORDANCE WITH THE PROVIS ONSOF THE CALIFORNA PUBLC CONTRACTCODE SECTION 3300, A BID TO A PUBLICAGENCY BY A CONTRACTOR WHO IS NOTL CENSED IN ACCORDANCE W TN CHAPTER9 OF THE BUS NESS ADN PROFESSIONALCODE SHALL BE CONSIDEREDNON—RESPONSVE AND SHALL BEREJECTED BY THE PUBLIC AGENCY.
HISTORIC SIGNIFICANCETHE SAN FRANCISCO CITY HALL, DESIGNED BY ARTHURBROWN, JR. AND JOHN BAKEWELL, IS LISTED ON THENATIONAL REGISTER (HR #78000757) AND S ANATIONAL HISTORIC LANDMARK IN THE SAN FRANCISCOCIVIC CENTER HISTOR C DISTRICT. THE SANFRANCISCO CITY HALL IS SUBJECT TO ARTICLE 10,PRESERVAT ON OF HISTOR CAL ARCHITECTURAL ANDAESTHETIC LANDMARKS, APPENDIX J — CIVIC CENTERHISTORIC DISTRICT OF THE SAN FRANICSCO PLANNINGCODE.
SCOPE OF WORKTHE SCOPE OF WORK INCLUDES AN ALTERATION TOTHE DAIS IN THE BOARD OF SUPERVISORS’ CHAMBERN THE SAN FRANCISCO CITY HALL IN ORDER TO
PROV DE ACCESSIB LITh’ TO THE DAIS.
DAIS AT PRESIDENT’S DESKTHE FNISH FLOOR AT THE TOP OF THE DAIS IS 30NCHES ABOVE THE MAIN FLOOR OF THE CHAMBER.THE SCOPE OF WORK WILL INCLUDE REMOVING THETHREE BOTTOM MOST RISERS LEADING UP TO THEPRESIDENT’S DESK. THE DAIS AND UPPER TWOR SERS WILL BE LOWERED AND A NEW RAMP WILL BEBUILT ON THE WEST SIDE OF THE DAIS. THE NEWFINISH FLOOR LEVEL WILL BE 12 INCHES ABOVE THEFLOOR OF THE MAIN CHAMBER.
DAIS AT CLERK’S DESKTHE EXISTING FINISH FLOOR S SIX INCHES ABOVETHE MAIN FLOOR OF THE CHAMBER. THE PLATFORMAT THE CLERK’S DESK WILL BE REMOVED AND THEDESK LOWERED TO THE SAME LEVEL AS THE MAINCHAMBER FLOOR.
ALL MATERAL ALTERED OR REMOVED WLL BE DONETO AVOID DAMAGE TO ORIGINAL MATERIALS TO REMAIN.ALL WORK IS INTENDED TO BE REVERSIBLE. REMOVETHE LEAST MATERIAL POSSIBLE TO ACHIEVE DESIREDCONDTION. SALVAGE ALL REMOVED MATERIAL FOROWNER. ALL WORK IS WITH N THE BOARD OFSUPERVISORS’ CHAMBER, NO EXTERIOR WORK ISINCLUDED IN THE SCOPE.
1. CONTRACTOR SHALL OBTAIN & PAY FORALL REQUIRED PERMITS (OTHER THANBUILD NG PERMIT), LICENSES, APPROVALS &INSPECTIONS.
2. VER FY ALL DIMENSIONS & CONDITIONS NTHE FIELD PRIOR TO START OF WORK. NOTIFYTHE C TY OF ANY D SCREPANCIES PRIOR TOPROCEEDING.
3. THE CITY NOR THE ARCHITECT ARERESPONSIBLE FOR DEVIATIONS FROMAPPROVED CONSTRUCTION DOCUMENTS.
4. PROVIDE ADDITONAL STRUCTURALCOMPONENTS, M SCELLANEOUS METAL BRACING,BLOCKING, CLIPS, ANCHORS, FASTENERS, ANDINSTALLATION ACCESSORIES AS REQU RED TOPROPERLY ANCHOR, FASTEN OR ATTACHMATERIALS, SYSTEMS, & ASSEMBLIES TOSTRUCTURE.
5. ALL WORK SHALL MEET OR EXCEED THEREQUIREMENTS OF THE LATEST EDITIONS OFTHE FOLLOWING: CALIFORNIA BUILDING CODE,CAL FORNIA HISTORICAL BUILDING CODE,CAL FORNIA ELECTRICAL CODE, CALIFORNIAMECHANICAL CODE, CALIFORNIA PLUMBINGCODE, CALIFORNIA F RE CODE, AS WELL ASALL REQUIREMENTS OF THE CITY OF SANFRANCISCO.
6. SAFETY MEASURES: AT ALL TIMES, THECONTRACTOR SHALL BE SOLELY &COMPLETELY RESPONSIBLE FOR THECONDITIONS OF THE JOB SITE INCLUDINGSAFETY OF THE PERSONS & PROPERTY ANDFOR ALL NECESSARY INDEPENDENTENGINEERING REVIEWS OF THESE CONDITIONS.THE JOB SITE REVIEWS OF THE CITY ORARCHITECT OR ENGINEER ARE NOT INTENDEDTO INCLUDE REVIEW OF THE ADEQUACY OFTHE CONTRACTOR’S SAFETY MEASURES.PROVIDE SHORING & BRACING WHEREREQUIRED.
7. THE JOB SITE SHALL BE MAINTAINED N ANEAT AND ORDERLY CONDITION. DISPOSE OFWASTE, TRASH, & DEBRIS IN A SAFE,ACCEPTABLE & LEGAL MANNER, OFF THEOWNER’S PROPERTY.
8. DO NOT SCALE DRAW NGS: REQUESTCLARIFICATION FROM THE CITY FOR SIZES &LOCATIONS WHERE NOT INDICATED ONCONTRACT DOCUMENTS.
9. CONTRACTOR TO NOTIFY THE CITY OF ANYUNCOVERED CONDITION DURING THE COURSEOF WORK THAT HAS QUESTIONABLE MATERIALINTEGRITY, SUCH AS UNSOUND OR MISSINGSTRUCTURAL MATERIAL, BIOLOGICAL ATTACK OFMATERIALS, INADEQUATE STRUCTURAL SUPPORT,AND EXCESSIVE WEATHERING OF MATERIALS.
10. CONTRACTOR TO PROVIDE PROTECTION OFEXISTING MATERIALS, FINISHES AND FLOORINGMATERIALS TO REMAIN THROUGHOUT DURATIONOF THE PROJECT, PROVIDE PROTECTIONAGAINST THE SPREAD OF DUST, DEBRIS ORWATER AT OR BEYOND WORK AREA WITH THEUSE OF SHEET HG AND TARPAULINS WHILEAVOIDING CONDENSATION. DO NOT USEADHESVE TYPE TAPE OR NAILS FORPROTECTIVE COVERINGS.
11. CONTRACTOR TO REVIEW WITH OWNERQUALITY CONTROL AND SECURITY PRECAUTIONSTO BE UNDERTAKEN TO PROTECT OWNER’SPROPERTY DURING THE PROJECT.
12. ALL DIMENSIONS ARE TO FACE OF FINISHUNLESS OTHERWISE INDICATED.
13. SEE SPEC FCATIONS FOR REQUIREDSUBMITIALS.
14. CONTRACTOR TO COORDINATE & REVIEWWORK PLAN & SCHEDULE WITH THE CITY.
BOARD
SUPERVISORS’CHAMBER
SAN FRANCISCOCALIFORNIA
ABBREVIATIONS SYMBOLS DRAWING INDEX PROJECT SUMMARY GENERAL NOTES
EXISI1NG F.O. FACE OF PLEAD PLYWOODNEW FOG. FACE OF CONCRETE PNL PANEL
C AT PU F. FACE OF RN SH PNL’O PANEUNOAD. ANCHOR BOLT F.O.I.C. TERN SHED BY OWNER. PAD. PAINTEDA000S. ACOUSI1CAL NSTALLED BY CONTRACTOR P0W. PAROTONADJ. ADJACENT F.0.I.O. FURNISHED NT OWNCR. ND. ROOF DRAINAOJUST. ADJUSTABLE INSTAU.ED BY OWNER NO. ROUGH OPENINOA.F.F. ABOVE FiNISH FLOOR F.O.S. FACE OF STUD H.W.L RAIN WATER LEADERALT. ALTERNATE POW. FOUNDATION ~ RADIOSALUM. ALUMINUM FAN. FINISH RET. RETAININGNPPROU. APPHOO ANTE FAN. FLOOR REINF. REINFORCEDARCH. ARCHITECTURAL FLRG FLOORING REM. REMUVEID)RD. BOTTOM OF FLUSH. FLUORESCENT REOD. REGOIREDSD. BOARD FR. FIREPLACE NM. ROOMBOOM. BTOM 0000 FTU. F005NG RAHO. REDWOODSANG BUILD NO FOT. FUTJRE SC. STUD CORESLAG. SLOCT NO GA. GAUGE S.E.D. SEE ELECTRICAL DRHOSSOT. BOTTOM GALV. GALVANIZED S.F. SlOANE FEETCS. CATCH BASIN GD. GRIOHIC DESIGN S.LD. SEE LIOHTNG DRAW 005CI CAST IRON GFRC GLASS FIBER SM. SHEET METALCAR. CABINET REINFORCED CONCRETE SN D. SEE MECHANICAL ORHOS.GEM. CEMENT GL. GLASS OP 0. SEE PLUMBING DRWGS.C.T. CERAMIC TLE GYP. ND GYPSUM 80800 0.0. STAINLESS STEELCL CENTERUNE H.S. HOSE NIBS S.M.D. SEE MECHAN CAL DRAWINGSCLO. CR000 HE. HOLLOW CURE 5.5.0. SEE STRUCTURAL DRHGS.COAPT COMPARTMENT STAIR. HARDWARE SCHED. SCHEDULE.CONG. CONCRETE RORZ. HORIZONTAL SECT. SECI1ONCO’I’D CONDITUN INSUL INSOLATiON SHLVS SHELVESCD’OFIO. COSFIGURNT1OS BIT. INTERIOR OMIT. OHEETCO’ISTR. CONSTHUC000 JT. JOINT SM. SIM LXIIETHOS COWON000S RIO. KITCHEN SPEC. SPECIF1CATONCO’lTT. CONTRACTOR LIV. LAVATORY STD. STANDARDERA. CENTER LOCH LOCATiON OIL STEELCTSR. CUUVTESSONR ME. MEDICINE CANINET 500R. STORAGEDBL DOUBLE MAT. MATERIAL SORUCT. STRUCTURALDEN. OEM005H MAO. MACMUM SOSP SUSPENDEDDEl. SETAIL MECH. MECHANICAL TAO TONGUE—ADO—GROOVEDIM. DIMENSION MEL MELANINE TB TOWEL BARMEMB. MEMBRANE T.C. TOP OF CURSDISP DISPENSER MFR. MANUFACTURER TO. TOP OFON. DOWNOS. DOTS MOB. MANAGER T.O.C. TOP OF CONCRETEOS. DOHNSPUUT MN. MIN MUM T.P.D TO LET PARER DISPENSERDRWH. DRAWER MR. B RROR TELE. TELEPHONE0MG. DRAWING M SC. MISCELLANEOUS TRW TA CAE.J EUPANSION JONT MOO. MOUNTED TOP. TYPICALEN. EACH MIL. METAL 0.0.0. UNLESS OTHERHSE NOTEDE.F. EXHAUST FAN N NORTH N.E. WATER CLOSETELEC ELECTRICAL N.I.C. NUT IN CONTRACT H/— WITHELEV. ELEVATON N.T.S. NOT TO SCALE W/O WITHOUTEMER. EMEROENGY NEC. NECESSARY MD. MOOD
NO or if NUMBER HP. WATERPROOFENCL ENCLOSURE MOM. HUM HAL NT. WDGHTEQ EQUALEOPT. EQUIPMENT UC. UN CENTEREVICT. EXIOTN0 OPNG. OPENINOEOP. EOPANSIOH PANT’N PANTIT1OSEXT. EXTERIOR P. LXXI. PLASTC LAMINATEF.D. FLOOR DRAW PT. PRESSURE TREATEDF.F FACTORY FAMISH PL PLATE
PLRS. PLASTER
OFFICElOT
TA
A
EH
ROOM NAME & SOMBER
IN) WALL
CE) WALL
(C) HALL TO SE REMOVED
IN) ODORCE) 000R
REVISION SUMBER
WINDOW SOMBER
HALL TORE
REVISED AREA
OETAIL REFERENCE VU.
SHEET REFERENCE NO.
OECTDN REFERENCE NO
SHEET REFERENCE NO.
STER OR ELEVATION
SOROI ARROW
COVER SHEEP
ARCHITECTURAL
TS.OG TITLE SHEEP
00.00 SITE PLAN & MOD SIGN OFF SHEEP
00.01 PHOTO DOCUMENTATION
00.02 PHOTO DOCUMENTATION
0003 PHOTO DOCUMENTATION
02.00 DEMOLITION PLAN
04.00 ENLARGED DEMOLITON PLAN
ONTO DEMOLITIOFI ELEVATIONS
A4.GG ENLARGED PLAN
AO.OG ELEVATIONS
A7.OG DETAILS
A7.GI DETAILS
A7.G2 DETAILS
STRUCTURAL
S—I PLAN AND NOTES
O 2 DETAILS
ELECTRICAL
EO.U1 SYMBOL LEGEND, ABBREVATIONS & GENERAL NOTES
E1.OI POWER DEMOLTION FLOOR PLAN
El .02 TELE/DATA DEMOLITION FLOOR PLAN
E2.Ol POWER FLOOR PLAN
E2.O2 TELE/DATA FLOOR PLAN
BUREAU OFARCHITECTURE
DEPARTMENT OF PUBLIC WORKSCITY AND COUNTY OF SAN FRANCISCO
30 Van NOUN Avenue Suile 4100SBn FraTciNco, CA (415)557-470094102-6028 Fax 1415)5574701
PYSIBOt
VICINITY MAP - SAN FRANCISCO CITY HALL CODE INFORMATION
CUN 1)1ED
50
02
,4IEASPlava
HOLa~ayetto ~
PaxA
02_
BOSON PTI—
000150 FT
pmSY02 GMT9BYSA
ETs SI
CNRNA 11801
SNWIlmA 5t
02
02
‘5’‘41
41‘3-
S4,s’A5 1%
H~i
~AH~
1515SF ANAL
16)5 SE
PAGE & TUENBULL, INC
APATXA1BSSN,R. IAOASP,U PPASBPEBINSR, U,’Sso DSSAO,N
724 PINE BTREET~1 SAN FRANCISCO
CALIFORNIA 94108415.382—5154
ROUSIBAS
P15). ArON.
P15I. M5r.
OBTO
Phase
____________
BUreaU Msnagep
DrowiNg TATe —
Sheet NB. —
I7ITASE ..~
EZDN
TITLE SHEET
TS~OO00010 AS NOTED
JSN NH.
_______
6590A
SITE PLAN - SAN FRANCISCO CITY HALL
MAYOR’S OFFICE ON DIABILITY SIGN OFF FORM
Mayor’s Office on DisabilityDISABILITY ACCESS COMPLIANCE APPROVAL
GavIn Newean.Maym
S.e.c Mba.nO~reoan
PROJECT: Board of Supervisors’ Chambers Number: FY2006:_Prclect Ad~ess: 1 Dr. Caullon B. GoodieS Place 1400 Van Nessl, Sen Fancisco, CA
BUREAU OFARCH ITECTU RE
DEPARTMENT OF PUBLIC WORKSCITY AND COUNTY OF SAN FRANCISCO
BOARD
SUPERVISORSCHAMBER
SAN FRANCISCICALIFORNIA
0u272007 004* S
~
THE MAYOR’S OFFICE ON DISABILITY HAS REVIEWED AND APPROVEDSd. P~,mit Plan.
— Final Conetnaulon Plans
ACCESSIBILITY COMPLIANCE AT THE SITE HAS BEEN APPROVED IN THE FOLLOWING FORM:Tonpolery CCIANoI. of Onoupaurcy (TCOIAnal Sl9naff
— Cn,Iltlcate of F:nal Completion (CFCI
Br Jim WIsppla
Rev. Marsh 05 461 P.o Ne.. Sole 300 S.n Frnrssso, CA 94102 415.554.0711 415.554.nr5a Fao415 654.6706 TTY MODshilonv.og
DrawS
Prat Arch
Prry Mgr
Dana
PhaseBureau Manager
Drawrng 1310
Shoot No.
SITE PLAN&
MAYOR’S OFFICEON DISABILITY
SIGN OFF FORM
GO.OOScot. AS NOTED
I I
__________
.L[1~I ~tE
____________ _____________
III30 Van Ness AvenueSan Frarrcusco, CA94102-6028
Suile 4100141 ~)~S7-4700
Fax (415)5574701
N
C0550ltanl
PAGE & TURNBULL, INC
Avohil.olruns, chummy Preen’suhon. Urban Dmiga
~ 724 PINE STREETSAN FRANCISCO
CALIFORNIA 94106415.362—5154
No. I Date I RnvircOns
— I —
JohNs. 6590A
BUREAU OFARCHITECTURE
A1d~
~ M~.
D~e
DEPARTMENT OF PUBUC WORKSCITY AND COUNTY OF SAN FRANCISCO
30 Van Noes A~je Sli~ 4100Sari Frer~co. ~ (415)667470094102-6028 Fax (415)6614701
BOARD
SUPERV ISORSCHAMBER
SAN FRANCISC•CALIFORNIA
PAGE & TURNBULL, INC
~ HüI~i~ P m,th~ U~b~ Do~g,.
SAN FRANCISCO~ 724 PINE STREET
CALIFORNIA 94108415.362—5154
~Io~
041120q7 ~Zt
04.27.2CC? CCt1
l.0I~1 p2504 OSE CU
PHOTODOCUMENTATION
9h.etNo
GO.O1Soele AS NOTED
Job~ 6590A
O PRESIDENTS DESK, EAST SIDE- SCALE: ~1TS O PRESIDENTS DESK, LOOKING WEST
SCALE:~S O PRESIDENTS DESK LOOKING EASTSCALE NTh
SUPERV ISORS’CHAMBER
SAN FRANCISCOCALIFORNIA
I 724 PINE P~REET1 SAN FRANCISCO
I CALIFORNIA 94108415.362—5154
QD~ I
04 112047 P~ S
~27.2~7 57* 047
Il.0I~ £404176044 507
I
II
BUREAU OFARCH ITECTU RE
DB’ARTMENT OF PUBUC WORKSCFrY AND COUNTY OF SAN FRANCISCO
30 Van Naea A’o~sxie Sufte 4100San Frerideoo, CA (415)557470094102-6028 Fax (415)6674701
~qe7*
BOARD
PAGE & TURNBULL, INC
A*,o6o,o, Ihotso P,.mootio,~ 0715
® PRESIDENTS DESK, WEST SIDE“ SCALE:II(tS
O DAIS, WEST SIDESCALE: NTS
7.,
-I. 1’~ ~~S I4~~ —~k• ~ ~
cr~)~~js_~~ ,~,
O PRESIDENTS DESK, EAST VIEW FROM BEHINDSCALE~S
KEY PLAN: BOARD OF SUPERVISORS’ CHAMBER N.T.S.
® PRESIDENTS DESK, WEST VIEW FROM BEHIND61 SCALE: NTS
4 ~
~.1~ ~“
5 e
O CHAMBER LOOKING SOUTHSCALE: 7*47*
7*~ M~.
0~
PHOTODOCUMENTATION
66ea9 No
GO.02S~e AS NOTED
659 CIA
—-—I
BUREAU OF
ARCHITECTURE
F
0
DEPARTMENT OF PUBLIC WORKSCITY AND COUNTY OF SAN FRANCISCO
Suilo 410014151557-4700
Fax (415)5574701
O CLERK’S DESK, VIEW FROM BEHINDSCALE: NTS
C.
~1 d°~
O CLERK’S DESK, FRONT VIEW CLERK’S DESK, SIDE VIEWSCALE: NTS • SCALE: NTS
,•~
L
~ \ I~
I :•: .~~ ~
~ ~.S::0r-’ .. ,/
,,,t
“‘..‘k,’. ~>—~
~ -i , ~
~
® WEST ORNAMENTAL SCROLL @ PRESIDENVS DESK DETAIL OF ORNAMENTAL SCROLL WEST ORNAMENTAL SCROLL, VIEW FROM BEHINDSCALE: NTS SCALE: NTS SCALE: NTS
BOARD
SUPERVISORS’CHAMBER
SAN FRANCICALIFORN
30 Van Ness AvenueSan Franc,sco CA94102-6028
Consultant’
PAGE & TURNBULL, INC
AreMl,otor,, Hiotor,r osotlo,u Urbss Desgo
SAN FRANCISCO~ 724 PINE STREET
CALIFORNIA 94108415.382—5154
‘‘I
•1
KEY PLAN: BOARD OF SUPERVISORS’ CHAMBER N.T.S.
No. Dot. I Re~re,onS
aIres, ,atW at
l.oI.~o7 prareacar
NOT USED7 SCALE: NTSNOT USEDSCALE: NTS
Bureau Manager
NOTE:THE PURPOSE OF THISPHOTO DOCUMENTATIONIS TO PROVIDE APHOTOGRAPHIC RECORDOF THE PROJECT AREAPRIOR TO THE WORKFOR INFORMATIONPURPOSES.
CONTRACTOR TO PROVIDEHISTORIC ARCHIVALPHOTOGRAPHS, SEESPECIFICATION SECTION#01322.
Dress
Prol Ard~
PmJ Mgr
Oct.
PIrese
Droning nt.
ShootNo r
Job No.
PHOTODOCUMENTATION
GO.03Soot. AS NOTED
6590A
O DEMOLITION PLAN1 SCALE: 3/16~=T’-O’
DEMOLITION SHEET NOTES
A CONTRACTOR SHALL VERITY EXISONO OIMENSIONO IN FIELD
N CONTRACTOR SHALL SUBMIT MEANS HAD METHIOS FOR DEMOLITION PROCESS FORPRESERVATION ARCHITECT’S APPROVAL PRIOR TO DEMOLITION.
C LOCATE ALL MECHANICAL FASTENERS INCLUD NO SUCH CA ASS AS NAILS AND SCREIASAND CAREFULLY SAACUT PRIOR TO RELOCARNS FURNITTJRE. RESISTANCE NOTED SURINORELOCASON OF RJRNITURE SHOALS BE CONS DERED INS CATION THAT A FASTENER(S)REOU RIMS REMOVAL IS STiLL N PLACE.
SEE EAST FOR ENLANOET SEAT PLAN A 05.00 FOR DENT ELEVASONU.
E REFER TO SPECIRCHI1ONS FOR INFORMATiON RELATED TO HAZARDOUS MATERIALS SURVEE,PROCEDURES AND ABATEMENT.
OEMO PLAN KEY NOTES
I REMOVE (E) FURNITURE AND COMPUTER EQUIP. AND STORE FUR C ES’2. STASINS AREA
3. PROVIDE FLOUR PROTECTION OUR NO CONSTRUCTION, TYP.
4. PATH OF ACCESS FOR WORK
5. PROTECTION BARRIER. SEE SPECIFiCATION SECTION 02070.
KEY PLAN: CITY HALL, SECOND FLOOR N.T.S.
BUREAU OF
ARCHITECTURE
DEPARTMENT OF PUBLIC WORKSCITY AND COUNTY OF SAN FRANCISCO
30 Van NOSSAVeBU6 Sub 4100San FrarTCiBOO, CA (41 5)557-470094102-6026 Fax (4T5)55747OT
Project
BOARDa/
SUPERVISORS’CHAMBER
SAN FRANCISCOCALIFORNIA
724 PINE STREET—1 SAN FRANdISCO
I CALIFORNIA 94106415.362—5154
No. Date Ae’,rS~0nS
Drawn
PraI. Arch.
PraI. Mgr.
Data
Phase
Drawing 1100 -
Sheet Na. -
Jab Na. -
aurnau Manager
DEMOLITIONPLAN
D2.OOScale AS NOTED
Consultant
PAGE & TURNBULL, INC
Arrhitnrtsrn, Hisbowo Proscrcutioo, UnArm DrsAga
L . SECOND FLOOR — HALL
6590A