Page 1 of 1/boq(1) rev1
ITEM NO. QUANTITY UNIT
1
Part-A FACILITIES FOR THE ENGINEER
A.1.1 (8) Prov. of Field Office for the Engr (Rental Basis)
per month 8.50 month
A.1.2 (4) Prov. Of 4x2 Pick Up Type Service Vehicle for Engineer
per month 0.50 month
Part-B OTHER GENERAL REQUIREMENTS
B.5 Project Billboard/Signboard
per ea. 3.00 ea
B.7 Occupational Safety and Health Program
per month 8.50 month
B.9 Mobilization / Demobilization
per l.s. 1.00 l.s.
B.17 Temporary Diversion of Waterways
per l.s. 1.00 l.s.
Part IA EARTHWORKS
1700(1) Clearing and Grubbing
per sq.m. 3,092.00 sq.m.
1701(b) Channel Excavation
per cu.m. 42,125.59 cu.m.
1702(1)a Structure Excavation
per cu.m. 1,277.00 cu.m.
1702(5)b Shoring, Cribbing & Related works
per l.s. 1.00 l.s.
1705 Fill and Backfill (gravelfill)
per cu.m. 1,445.30 cu.m.
PART IB BANK & SLOPE PROTECTION WORKS
1710(1)b Riprap Class B
per cu.m. 14,452.11 cu.m.
1710(1)a Riprap Class A
per cu.m. 2,106.00 cu.m.
1712(2) Concrete Slope Protection
per cu.m. 2,459.20 cu.m.
1717(2)a2 Steel Sheet Piles
per l.m. 5,370.00 l.m.
TOTAL AMOUNT IN FIGURES SUB TOTAL - 1
Total Amount in Words
CONTRACTOR:
SIGNATURE:
19FA0099 - CLUSTER 54 REHABILITATION/IMPROVEMENT OF SOA FLOOD CONTROL (UPSTREAM), MALINAO, ALBAY AND
CONSTRUCTION OF BALZA RIVER FLOOD CONTROL STRUCTURE, BRGY. BALZA, MALINAO, ALBAY
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer
Albay 1st District Engineering Office
Airport Site, Legazpi City
REHABILITATION/IMPROVEMENT OF SOA FLOOD CONTROL (UPSTREAM), MALINAO, ALBAY
BILL OF QUANTITIES
DESCRIPTION UNIT COST TOTAL
Page 1 of 1/boq(2) rev1
ITEM NO. QUANTITY UNIT
1 CONSTRUCTION OF BALZA RIVER FLOOD CONTROL STRUCTURE, BRGY. BALZA, MALINAO, ALBAY
Part-A FACILITIES FOR THE ENGINEER
A.1.1 (8) Prov. of Field Office for the Engr (Rental Basis)
per month 2.50 month
Part-B OTHER GENERAL REQUIREMENTS
B.5 Project Billboard/Signboard
per ea. 3.00 ea
B.7 Occupational Safety and Health Program
per month 2.50 month
B.9 Mobilization / Demobilization
per l.s. 1.00 l.s.
B.17 Temporary Diversion of Waterways
per l.s. 1.00 l.s.
Part IA EARTHWORKS
1701(b) Channel Excavation
per cu.m. 6,956.95 cu.m.
1702(1)a Structure Excavation
per cu.m. 120.00 cu.m.
1702(5)b Shoring, Cribbing & Related works
per l.s. 1.00 l.s.
1702(3) Foundation Fill
per cu.m. 28.00 cu.m.
PART IB BANK & SLOPE PROTECTION WORKS
1710(1)b Riprap Class B
per cu.m. 736.16 cu.m.
1710(1)a Riprap Class A
per cu.m. 99.00 cu.m.
1712(2) Concrete Slope Protection
per cu.m. 154.88 cu.m.
1717(2)a2 Steel Sheet Piles
per l.m. 495.00 l.m.
1718(1) Pipe Culverts ( 1070mmØ ) 42"Ø
per l.m. 16.00 l.m.
TOTAL AMOUNT IN FIGURES SUB TOTAL - 2
TOTAL
Total Amount in Words
CONTRACTOR:
SIGNATURE:
19FA0099 - CLUSTER 54 REHABILITATION/IMPROVEMENT OF SOA FLOOD CONTROL (UPSTREAM), MALINAO, ALBAY AND
CONSTRUCTION OF BALZA RIVER FLOOD CONTROL STRUCTURE, BRGY. BALZA, MALINAO, ALBAY
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer
Albay 1st District Engineering Office
Airport Site, Legazpi City
BILL OF QUANTITIES
DESCRIPTION UNIT COST TOTAL