Big Button Model Based Assembly

Post on 31-Dec-2015

26 views 0 download

Tags:

description

Big Button Model Based Assembly. Jim Lind Boeing IDS. Scott Sandwith New River Kinematics. CMSC 2003 July 21-25 2003. Introduction: Model Based Assembly. Integrate engineering design, Measurement Plan Script with advanced metrology in an easy to use interface - PowerPoint PPT Presentation

Transcript of Big Button Model Based Assembly

Big Button Model Based Assembly

Jim LindJim LindBoeing IDSBoeing IDS

Scott SandwithScott SandwithNew River KinematicsNew River Kinematics

CMSC 2003 July 21-25 2003

Introduction: Model Based Assembly

• Integrate engineering design, Measurement Plan Script with advanced metrology in an easy to use interface

• Improve cost and quality by simplifying aerospace manufacturing

• Simplify assembly and build processes by implementing and quickly delivering integrated production-ready solutions

• Minimal operator learning curve

Motivation: Produce Product

• Move away from large assembly tooling– Less complex / lower cost– Mobility / smaller footprint

• Engineering tolerances remain critical

• Increasing production rates

• Limited skill base• Technology learning

curve

Automation ROI

• Existing Tool Routine– Subset average 34 hours– 110 hour average

• Automating Tool routine– Subset demonstrated in 3

minutes– Overall projected within 1

shift

• Time savings not enough – Multiplier for reduction in

Production Disruption

Embedding Metrology Solutions

• Transparent to mechanic– Process not technology

training– If done well, they may not

realize they are operating precision metrology equipment

• Simple interface– Work instructions displayed

with big action buttons– Results displayed with big

action buttons

• Automatic reporting

Benefits

• Single person operation possible

• Speeds up process• Improved repeatability• Quality check built into

process• Consistent, traceable

results

Benefits• Optimize product performance• Cost savings and flow time reduction

– Maintenance and time– Set/Inspect part features directly from CAD– Reduces measurement tolerance guess

work

• Part specific template and general measurement plan support custom configurations directly on the shop floor without reprogramming

• Relationship between features are optimized directly! Build / Inspect

• Integrate assembly configuration for design/tolerance improvements

• CAMS Reaches High-Tech Milestone In Support of F/A-22 Aft Fuselage

• The Computer Aided Measurement Systems (CAMS) organization recently demonstrated a new process improvement using a scripting program, which measures F/A-22 aft fuselage parts to ensure proper fit. The old process involved hand-guided measuring, which took up to six hours and time-consuming set-up. After months of research and testing, the CAMS organization is now able to program specific coordinates into a database that tells the laser tracker and computer exactly what, where and how to measure. Automating this process reduces the flow time by 87.5 percent from the old process and could yield approximately eight hours of processing time on future builds. “While this represents a very significant savings, we expect savings as great, or greater as we integrate Model Based Assembly – using the CATIA model as the authority to do the aircraft assembly – into our manufacturing processes,” said Ed Baker, Emergent Manufacturing & Tooling senior manager.

CAMS Reaches High-Tech Milestone In Support of F/A-22 Aft Fuselage

“…“…reduces the flow time byreduces the flow time by87.5 percent…”87.5 percent…”

CAMS Reaches High-Tech Milestone In Support of F/A-22 Aft Fuselage

“…“…we expect savings as we expect savings as great, or greater as we great, or greater as we integrate Model Based integrate Model Based Assembly into our Assembly into our manufacturing processes.”manufacturing processes.”

Ed Baker, EM&T senior manager. Ed Baker, EM&T senior manager.

Simulation of Application

Direct Project Benefits (Overall)• OLD

– 142,000 lbs. steel– $14 million fabrication– ~ 3150 sq. ft. footprint– Future – rate tools?

• NEW– < 1 ton– < $ 1 million to fabricate– Assemble 3 or 4 sections

in the same footprint– Flexibility – move assets

to support need

Summary

• Big Button Model Based Assembly improves over traditional processes

• Reduce the amount of tolerance information by working directly with the critical features

• Preparation, Setup, and Flow time are minimized

• Direct use of the CAD Geometry improves part and trend analysis

• Using part tolerances instead of tooling tolerances enables significant cost savings

Acknowledgements

• Ed Baker, John Costello and Barry Cooke of Boeing

• Dr. Robert Salerno, Dr. Joseph Calkins, Bruce Thomas, and Rick Cole of NRK