BETTER COORDINATION - · PDF fileCARL VEILLETTE VP RS&DE JIMMY PLANTE CEO @CarlVeillette...

Post on 09-Mar-2018

215 views 2 download

Transcript of BETTER COORDINATION - · PDF fileCARL VEILLETTE VP RS&DE JIMMY PLANTE CEO @CarlVeillette...

BETTER COORDINATION

BETTER BUILDINGS

Welcome to our specialBIMbc presentation!

• Goals of this presentation:• Briefly present BIM Track features

• Explain the purpose of BIM Track

• Give you a chance to ask questions and provide feedback

AGENDA

• BIM Track – The Genesis

• Actual BIM Coordination Process & Problems

• Improved BIM Coordination with BIM Track™

• Live demo

• What is coming next?

• Questions

CARL VEILLETTEVP RS&DE

JIMMY PLANTECEO

@CarlVeillette

@jimmyplante

CHRISTIAN PROULX, P.ENG.

CUSTOMER SUCCESS DIRECTOR

@ChrisP_02

WHO

WE

ARE?

WHAT WE DO?

BIM Consulting

ServicesApps

Free Apps

PersonalizedApplications

REVIT & NAVISWORKS FREE ADD-ONS

Clash sphere

generator

Excel Import / Export

ColorSplasher

NWC batch export

WHERE IT STARTED

MODEL COORDINATION

Model coordination

Construction Efficiency

Typical BIM COORDINATION PROCESS

Read and annotate report

Report

transmittal

• Merge models• Clash detection• Quality control• Identification

information

Fix issues / Modeling

Engineers

Architects

Managers

Others

Modelstransmittal

BIM Managers / BIM Coordinators BIM Modellers

Report

transmittal

COORDINATION PROCESS PROBLEMS

• No link with models

• Only textual description of issues

• Wasted time to retrieve issue in original authoring BIM software

• No-standard information channel and format

• Hard to control file versioning

• Work in silos

• High risks of loosing control of the process

IMPROVED COORDINATION PROCESS

• Clash detection• Merge models• Quality control• Identification

information

Resolving issues / Modeling

BIM Manager / BIM Coordinator BIM Modeller

• Centralize coordination communications

• Track issues through open BIM formats

• 3D viewer to see issues in original context

• Access to your information anywhere, anytime

• Manage team access and rights

• Upload attached files to support discussions

• Visualize metrics for better project management And more…

WE ARE OPEN BIM

OPEN BIM is a universal approach to the collaborative design, realization, and operation of

buildings based on open standards and workflows.

DEMO

WHAT IS COMING NEXT?

Web 3D viewer

• Better navigation tools, section

box, saved viewpoints

• Show/hide model elements

and element properties

• Direct upload from

Revit/Navisworks to BIM Track

• Mobile navigation

Addins

• Clash to issue with clash tracking

• Bi-directional update clash-issue

• Clash pin-point identification

• Access/modify more issue

properties (status, team, etc)

• More…

BIM TRACK IS

In contextproblem solving

(addins)

Managingissues

Assigning issues and delays

Filtering issues Workflow adaptative

3D web-basedviewer

Reporting History tracking Metrics

Architects

• Design Coordination

• Team Coordination Accountability

Engineers

• Design coordination

• Contractorsmodel validation

CM

• Web Visualization

• Trades model supervision

• Construction planning

• Quality control

Contractors

• Web Visualization

• Pre-Construction coordination

Owners

• Reducing risks

• Coordination evolutionfeedback

• Web visualization

WHAT DOES IT MEANS FOR YOU?

BETTER COORDINATION, BETTER BUILDINGS

Collaboration platform to enhance your BIM coordination workflows

Track issues through open BIM formats supported by 3D visualization and projects metrics

@BIMTrackBIM Track WWW.BIMTRACK.CO

blog.bimtrack.co

christian.proulx@bimtrack.co